Adana Metro: Difference between revisions

Content deleted Content added
→‎External links: rm external link to copyright infringing website
 
(66 intermediate revisions by 42 users not shown)
Line 1:
{{Short description|Metro system}}
{{Use dmy dates|date=September 2022}}
{{Infobox Public transit
|name = Adana Metro
|image = Adana Metro train crossing Seyhan Riverlogo.pngsvg
|imagesize = 250px120px
|image2 = Metro train crossing Seyhan River.png
|locale = [[Çukurova, Adana|Çukurova]], [[Seyhan]], [[Yüreğir]]
|imagesize2 = 270px
|transit_type = [[Rapid transit]]
|caption2 =
|began_operation = 14 May 2010
|native_name = ''Adana metrosu''
|system_length = {{convert|14|km}}
|locale = [[Çukurova, Adana|Çukurova]], [[SeyhanAdana Province]], [[YüreğirTurkey]]
|transit_type = [[Rapid transit]]/[[Medium-capacity rail transport system|Light metro]]
|lines = 1
|stations = 13<ref name="metrosu" /> <br />(''7 more under constructionplanned'')
|vehicles =12
|ridership =
|began_operation = {{start date and age|2009|3|18|df=y}} (trial service) <br /> {{start date and age|2010|5|14|df=y}} (revenue service)
|track_gauge = {{RailGauge|sg}}<ref>http://www.lrta.org/world/worldp-t.html</ref>
|operator = [[Adana#Governance|Adana Metropolitan Municipality]]
|vehicles = 12
|train_length =
|headway = 10–15 minutes
|system_length = {{convert|13.5|km|mi|abbr=on}}<ref name="metrosu" /> <br />''{{convert|9.3|km|mi|abbr=on}} (under construction)''<ref name="metrosu" />
|notracks =
|track_gauge = {{Track gauge|sg|allk=on|nowrap=on}}<ref>{{cite web |url=http://www.lrta.org/world/worldp-t.html#TR |title=World Systems List index - World List P-T - Turkey (TR) |publisher=[[Light Rail Transit Association]] |access-date=2014-06-22 |archive-url=https://web.archive.org/web/20130403062951/http://www.lrta.org/world/worldp-t.html#TR |archive-date=2013-04-03 |url-status=dead }}</ref>
|el = 750 V DC [[Overhead line]]
|top_speed = {{convert|80|km/h|mph|abbr=on}}
|average_speed =
|map = [[File:Metro map Adana.png|270px]]
|map_state = collapsed
}}
{{Adana Metro}}
 
'''Adana Metro''' ({{lang-tr|Adana metrosu}}) is a rail [[rapid transit]] system extending 14&nbsp;{{convert|13.5|km|mi|2|sp=us}} along a north-southnorth–south corridor through [[Adana]]. It, haswith 13 stations. andIt can transport 21,600 passengers per hour each-wayper direction. TotalThe journeytotal travel time on the metro, end to end, takes 21 minutes, including all the stops.
 
==History==
The rapid transit system for [[Adana]] was initiated in 1988 after requests from the mayor [[Aytaç Durak]] and the [[Çukurova University]] rector Mithat Özsan to the Ministry of Transportation. A feasibility report was completed on May 30, 1990, by the consortium of PMBI A.Ş. and Brinckerkoff Int.Inc. The report was approved by the State Planning Agency and the construction of the rapid transit system was included in the 1993 investment program. In 1996, the project was contracted to Adtranz-Alarko-ABB Electric Consortium for $US 340 million.<ref name="metrosu">{{cite web | url = http://www.adana.bel.tr/rayli-sistem-projesi-sayfa.html | title =Metro Raylı Taşıma Sistemi – Adana Raylı Taşıma Sistemi (Turkish)|author=– Adana Metrosu |publisher= Adana Büyükşehir Belediyesi [Adana Metropolitan Municipality] |language=tr accessdate|trans-title=Metro Rail Transit System – Adana Rail Transit System – Adana Metro |access-date=2014-06-22 |url-status=dead |archive-url=https://web.archive.org/web/20130329085911/http://www.adana.bel.tr/rayli-sistem-projesi-sayfa.html |archive-date=2013-03-29 }}</ref>
 
To accommodate the new residential developments along the project route and to better integrate northern and southern Adana, the Adana Metropolitan Municipality decided to make an amendment to the project plan by extending the line to southern Adana. The southernmost point of the initial project had been the D-400 state road. Amendments were approved by State Planning Agency in 1999 and the construction of the metro started on January 28, January 1999.
The rapid transit system for [[Adana]] was initiated in 1988 after requests from the mayor [[Aytaç Durak]] and the [[Çukurova University]] rector Mithat Özsan to the Ministry of Transportation. A feasibility report was completed on May 30, 1990 by the consortium of PMBI A.Ş. and Brinckerkoff Int.Inc. The report was approved by the State Planning Agency and the construction of the rapid transit system was included in the 1993 investment program. In 1996, the project was contracted to Adtranz-Alarko-ABB Electric Consortium for $US 340 million.<ref>{{cite web | url = http://www.adana.bel.tr/rayli-sistem-projesi-sayfa.html | title = Adana Raylı Taşıma Sistemi (Turkish)|author=|publisher= Adana Büyükşehir Belediyesi| accessdate=}}</ref>
 
To accommodate the new residential developments along the project route and to better integrate northern and southern Adana, the Adana Metropolitan Municipality decided to make an amendment to the project plan by extending the line to southern Adana. The southernmost point of the initial project had been the D-400 state road. Amendments were approved by State Planning Agency in 1999 and the construction of the metro started on January 28, 1999.
 
Unexpected costs increases during the construction of the Metro led to the need for extra funding for the project. Metropolitan Municipality made a request to State Planning Agency for new funding, but the request was declined. As a result, construction of the Metro stopped in 2002. After 6 years, the Municipality was able to get approval for new funding of $US 194.2 million and construction resumed in 2008.
 
On 18 March 2009, the Metro was partially opened withfor servicesthe running{{Cvt|8|km|2}} long section between Hastane and Vilayet stations, with 36-car fleet purchased from [[Hyundai Rotem]].<ref name="2009railwayjournal">{{Cite journal |date=2021-05-09 |title=Adana light metro opens |journal=International Railway Journal |language=English |volume=49 |pages=13 |issn=2161-7376}}</ref> After 3 months of free service, this section of the Metro was closed to service sofor thatcompleting the connection{{Cvt|5|km|2}} with theunderground section thatbetween wasVilayet underand construction could be completedAkıncılar.<ref The Adana Metro opened to a full service on May 14, 2010.name="2009railwayjournal"/>
 
All sections of the Adana Metro opened for full public service on 14 May 2010.<ref>{{cite news |last1=Yıl |first1=Bünyamin |title=Adana metrosu dualarla açıldı |url=https://www.hurriyet.com.tr/gundem/adana-metrosu-dualarla-acildi-14724788 |access-date=9 May 2021 |work=Hürriyet |agency=DHA |date=14 May 2010 |language=tr}}</ref>
==System==
[[File:Metro train crossing Seyhan River II.png|thumb|left|250px|Metro train crossing the river]]
 
The cut-and-cover tunnels with a diameter of {{Cvt|5|m|ftin}}, a depth between {{Cvt|15-16|m|ftin}} and {{Cvt|1.13|km}} length, were constructed as the part of metro construction. The tunnels constructed a few meters deeper than the underground water level ({{Cvt|12|m|ftin}}).<ref>{{Cite journal |title=ADANA HAFİF RAYLI TAŞIMA SİSTEMİNDEKİ AÇ KAPA TÜNELLERİ|url=https://www.maden.org.tr/resimler/ekler/b89fd138b104dcf_ek.pdf |journal=Madencilik |publication-date=September 2003 |volume=42 |pages=31–39 |access-date=2021-05-09}}</ref>
Adana Metro is a 13.926&nbsp;km long two-track line of which 3.521&nbsp;km is underground, 5.332&nbsp;km is elevated and 5.073&nbsp;km is at surface level. The line starts from the metro-car depot west of the Hospital for Mental Health. Following Turgut Özal Boulevard, the line reaches Anadolu Lycee, then turns south and follows Alparslan Türkeş Boulevard, crosses [[Turkish State Railways|TCDD]] rail tracks near the City Hall and enters Southern Adana passing the D-400 state road. It then heads to the west of the Kocavezir Commercial Center and the Hürriyet Police Station until it reaches the [[Seyhan River]]. Crossing the river just north of the Regülatör Bridge, the line heads north, again crossing the D-400 state road and ends next to Yüreğir Bus Terminal.
 
==Operations==
The Metro fleet consists of 36 cars, with each having the capacity for 311 passengers. Each train runs in 3 car sets with the capacity to carry up to 933 passengers. The system can transport 43,200 passengers per-hour both-ways and 660,000 daily. The vehicles can travel at up to 80&nbsp;km/h in between the stations, and the trip time between Hastane and Akıncılar stations is 21 minutes including all the stops. The metro is fully secure and monitored by SCADA remote controlling system.
[[File:Metro train crossing Seyhan River II.png|thumb|left|250px190px|Metro train crossing the river]]
Adana Metro is a {{convert|13.9|km|mi|adj=on|sp=us}} long [[double track]] rail line, of which {{convert|3.5|km|mi|sp=us}} is underground (in [[cut and cover]] tunnels), {{convert|2.5|km|mi|sp=us}} is in trench, {{convert|5.3|km|mi|sp=us}} is elevated, and {{convert|2.55|km|mi|sp=us}} is [[at-grade intersection|at-grade]].<ref name="metrosu" />
 
===Service===
The Metro runs from 6:00 am to 23:30 pm everyday,<ref>[http://www.adana.bel.tr/metro/entry/2631/ Metro] Adana Büyükşehir (in Turkish)</ref> running every 10 minutes during weekday peak hours and every 15 minutes at other times such as weekends.<ref name="hours">{{cite web|url=http://adana.bel.tr/metro.html |title=Metro Saatleri → HASTANE - AKINCILAR |publisher=Adana Büyükşehir Belediyesi [Adana Metropolitan Municipality] |language=tr |trans-title=Metro Hours -> HASTANE - AKINCILAR |access-date=2014-06-22 |url-status=dead |archive-url=https://web.archive.org/web/20140620092339/http://adana.bel.tr/metro.html |archive-date=2014-06-20 }}</ref> The total travel time on the metro, end to end, takes 21 minutes, including all stops.<ref name="metrosu" /> Its passenger capacity is 21,600 passengers per hour per direction (PPHPD).<ref name="metrosu" /> The metro is part of the Metropolitan Municipality Bus Department (ABBO) network where an adult fare costs 1 [[Turkish lira|TL]] for Kentkart holders which allows a passenger to have up to one hour for a one-way trip. Several bus and [[dolmuş]] lines are connected to the stations.
 
===Route===
{{Unreferenced section|date=November 2023}}
Adana Metro is a 13.926&nbsp;km long two-track line of which 3.521&nbsp;km is underground, 5.332&nbsp;km is elevated and 5.073&nbsp;km is at surface level. The line starts from the metro-car depot west of the Hospital for Mental Health. Following Turgut Özal Boulevard, the line reaches Anadolu Lycee, then turns south and follows Alparslan Türkeş Boulevard, crosses [[Turkish State Railways|TCDD]] rail tracks near the City Hall and enters Southern Adana passing the D-400 state road. It then heads to the west of the Kocavezir Commercial Center and the Hürriyet Police Station until it reaches the [[Seyhan River]]. Crossing the river just north of the Regülatör Bridge, the line heads north, again crossing the D-400 state road and ends next to Yüreğir Bus Terminal.
 
===Stations===
The Metro has total of 13 stations on one line, of which 4 are underground, 5 are elevated, and 4 are on the surface. All the stations are equipped with escalators and disabled elevators for the disabled.
[[File:Adana Metro İstiklal Station.jpg|thumb|leftright|250px|<center>İstiklal Station</center>]]
 
[[File:Adana metro, huzurevi.jpg|200px|thumbnail|right|around Huzurevi Station]]
 
[[Image:Adanametro.png|thumb|right|300px|<center>Metro Map</center>]]
{| class="wikitable"
! valign=center | Station
Line 45 ⟶ 68:
|-
| Hastane
| rowspan="2" | Underground
| Turgut Özal Boulevard
| Bahçeşehir - Carrefour - Adana Koop<ref>{{cite web | url = http://www.adana.bel.tr/ucretsiz-metro-ring-seferleri-hizmete-baslamistir1-sayfa.html | title = ÜCRETSİZ Metro Ring Seferleri(Turkish)|author= Hizmete Başlamıştır |publisher=Adana Büyükşehir Belediyesi [Adana Metropolitan Municipality] |language=tr accessdate|trans-title=FebruaryFREE Metro Campus Shuttle Service has been started |date=25, February 2011 |access-date=2014-06-22 |url-status=dead |archive-url=https://web.archive.org/web/20120629094411/http://www.adana.bel.tr/ucretsiz-metro-ring-seferleri-hizmete-baslamistir1-sayfa.html |archive-date=29 June 2012 }}</ref>
|-
| Anadolu Lisesi
| Underground
| Turgut Özal Boulevard
| Seyhan Hospital - [[Kurttepe]] - Demirel Boulevard
|-
| Huzurevi
| rowspan="4" | Ground
|
|
|-
| Mavi Bulvar
| Ground
| [[List of highways in Turkey#Motorways|O-50 Motorway]]
|
|-
| Yurt
| Ground
|
|Barış Manço Blv., PTT Cad., HayalPark, Mavi Blv., Çetinkaya
|-
| Yeşilyurt
| Ground
|
|
Line 76 ⟶ 95:
| Fatih
| Elevated
|Karaisalı Minibuses
|
|Kıyıboyu Cad., Cemalpaşa, Hastaneler
|-
| [[Adana railway station|Vilayet]]
| rowspan="2" | Underground
| [[Adana Railway Station]]
|Valilik, İstasyon Cad., Tren Garı, Atatürk Cad., Atatürk Park
|-
| İstiklal
| Underground
| [[State road D400 (Turkey)|D-400]] state road
|
|-
| Kocavezir
| rowspan="4" | Elevated
|
|Bakım Yurdu Cad., Kuruköprü, Küçüksaat, Saydam Cad., Obalar Cad.
|-
| Hürriyet
| Seyhan River, Akkapı Minibuses
| Elevated
| Seyhan River
|
|-
| Cumhuriyet
| Karataş Buses, Minibuses, Seyhan River
| Elevated
| Karataş Road
|
|-
| Akıncılar
| Elevated
| [[State road D400 (Turkey)|D-400]] & Yüreğir Bus Terminal
|Kozan Yolu Buses:110, 113, 114, 116, 118 and 126
|}
 
===Rolling stock===
[[File:Adana Metro İstiklal Station.jpg|thumb|left|250px|<center>İstiklal Station</center>]]
TheDespite Metrobeing named a metro, the fleet consists of 36 [[Hyundai Rotem]] light rail-style cars (Also used on [[T4 (Istanbul Tram)|tram line 4 in Istanbul]]), with each having the capacity for 311 passengers. Each train runs in 3 car sets{{citation needed|date=June 2014}} with the capacity to carry up to 933 passengers. The system can transport 43,200 passengers per-hour both-ways and 660,000 daily. The vehicles can travel at up to {{convert|80&nbsp;|km/h|mph|abbr=on}} in between the stations, and the trip time between Hastane and Akıncılar stations is 21 minutes including all the stops.<ref name="metrosu" /> The metro is fully secure and monitored by SCADA remote controlling system. The fleet is almost identical to the [[LRTA 1100 class]] of the [[LRT Line 1 (Metro Manila)|Manila Light Rail Transit Line 1]].
 
===Service=Future service==
Adana Metro will be extended from Akıncılar to the [[Çukurova University]] main campus ("second stage" project). The extension will be {{convert|9.3|km|mi|adj=on|sp=us}} long,<ref name="metrosu" /> and will have 7 stations. The project was contracted out in January 2010 and the construction was expected to start after an agreement was made with the Çukurova University. As the extension will not be a new line, it will be built consistent with the current system and it is expected to cost $US 210 million.<ref name="Haber" /> Once the extension is completed, the Adana Metro will be {{convert|23.3|km|mi|sp=us}} in length and serve 20 stations,<ref name="Haber">{{cite news|url=http://www.adanahaber.biz/adana-buyuksehir-belediyesince-hazirlanan-ikinci-etap-rayli-tasima-sistemi-projesi-210-milyon-dolara-mal-olacak.html |title=İkinci Etap Raylı Taşıma Sistemi Projesi 210 milyon dolara mal olacak |newspaper=Adana Haber |language=tr |trans-title=Second Stage Rail Transport System Project will cost $ 210 million |access-date=2011-04-12 |url-status=dead |archive-url=https://web.archive.org/web/20110903072359/http://www.adanahaber.biz/adana-buyuksehir-belediyesince-hazirlanan-ikinci-etap-rayli-tasima-sistemi-projesi-210-milyon-dolara-mal-olacak.html |archive-date=2011-09-03 }}</ref> and will be able to transport 660,000 daily.<ref name="metrosu" />
The Metro runs from 6:15 am to 9:00 pm everyday, running every 15 minutes.<ref>{{cite web | url = http://adana.bel.tr/metro-saatleri-anadolu-lisesi-istasyonu-sayfa.html | title = Metro saatleri(Turkish)|author=|publisher= Adana Metropolitan Municipality| accessdate=}}</ref> Several bus and [[dolmuş]] lines are connected to the stations. The metro is part of the Metropolitan Municipality Bus Department(ABBO) network where an adult fare costs 1 TL for Kentkart holders which allows a passenger to have up to one hour for a one-way trip.
 
There are also plans to run a suburban rail line on an existing railway with connections to the Metro.
==Future Extensions==
 
Adana Metro will be extended from Akıncılar to the [[Çukurova University]] main campus. The extension will be 9.5&nbsp;km long and will have 7 stations. The project was contracted out in January 2010 and the construction was expected to start after an agreement was made with the Çukurova University.<ref>{{cite web | url = http://adana.bel.tr/metro-saatleri-sayfa.html | title = Adana Metro Schedule. (Turkish)|author=|publisher= Adana Metropolitan Municipality| accessdate=}}</ref>
== Network Map ==
As the extension will not be a new line, it will be built consistent with the current system and it is expected to cost $US 210 million. Adana Metro will then be 23.5&nbsp;km in length and serve 20 stations.<ref>{{cite web | url = http://www.adanahaber.biz/adana-buyuksehir-belediyesince-hazirlanan-ikinci-etap-rayli-tasima-sistemi-projesi-210-milyon-dolara-mal-olacak.html | title = İkinci Etap Raylı Taşıma Sistemi Projesi 210 milyon dolara mal olacak (Turkish)|author=|publisher= Adana Haber| accessdate=April 12, 2011}}</ref> There are also plans to run a suburban rail line on the existing railway with connections to the Metro.
{{Rapid transit OSM map
| system_qid = Q1577356
| frame-lat = 37.03
| frame-long = 35.305
| frame-width = 750
| frame-height = 470
| zoom = 11
| length = yes
}}
 
==References==
Line 123 ⟶ 148:
 
==External links==
*[https://web.archive.org/web/20170412041839/http://www.adana.bel.tr/metro-saatleri-sayfa.html/ Adana Metro schedule]
*[http://www.cityrailtransit.com/maps/adana_map.htm Network map to scale]
*[https://web.archive.org/web/20150924084928/http://www.rayhaber.com/2012/adana-metrosu-haritasi/ Adana Metro Map]
 
{{coord|37|03|11|N|35|15|26|E|region:TR_type:city|display=title}}
 
{{City of Adana}}
{{Local transport in Turkey}}
{{Rapid transit in Europe}}
{{Rapid transit in Asia}}
 
[[Category:Rapid transit in Turkey|Adana]]
Line 134 ⟶ 163:
[[Category:Standard gauge railways in Turkey]]
[[Category:Railway lines opened in 2010]]
[[Category:750 V DC railway electrification]]