Expressways of Beijing: Difference between revisions

Content deleted Content added
No edit summary
m →‎Jingcheng Expressway: clean up and general fixes using AWB
Line 57:
The S11 Jingcjheng Expressway starts at Taiyanggong Bridge on the 3rd Ring Road.
 
The Entire expressway opened late 2009/early 2010, With the total length being about {{convert|210 |km|abbr=on}} in length.
 
This expressway is part of the larger [[Daguang Expressway]].