Jump to content

Dầu Tiếng Lake: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Thachdvt (talk | contribs)
Citation bot (talk | contribs)
Altered title. Removed parameters. | Use this bot. Report bugs. | Suggested by GrapesRock | #UCB_toolbar
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Short description|Artificial lake in the Southeast region, Vietnam}}
[[File:Dau Tieng Lake - 50767513742.png|thumb|A corner of Dầu Tiếng Lake]]
[[File:Dau Tieng Lake - 50767513742.png|thumb|A corner of Dầu Tiếng Lake]]
'''Dầu Tiếng Lake''' is an artificial lake located in the three provinces of [[Tây Ninh]], [[Bình Dương]], and [[Bình Phước]] in the [[Southeast (Vietnam)|Southeast region]], [[Vietnam]]. The lake was formed by damming the upper reaches of the [[Saigon River]], making it the largest irrigation reservoir in Vietnam and [[Southeast Asia]]. Construction of the lake began in 1981 after surveys were conducted starting in 1976. The project was completed with over 100 million USD in funding, which the [[Vietnamese government]] borrowed from the [[World Bank]], making it the first project in Vietnam to be built using US dollars since the [[Reunification of Vietnam]] on April 30, 1975.
'''Dầu Tiếng Lake''' is an artificial lake located in the three provinces of [[Tây Ninh]], [[Bình Dương]], and [[Bình Phước]] in the [[Southeast (Vietnam)|Southeast region]], [[Vietnam]]. The lake was formed by damming the upper reaches of the [[Saigon River]], making it the largest irrigation reservoir in Vietnam and [[Southeast Asia]]. Construction of the lake began in 1981 after surveys were conducted starting in 1976. The project was completed with over 100 million USD in funding, which the [[Vietnamese government]] borrowed from the [[World Bank]], making it the first project in Vietnam to be built using US dollars since the [[Reunification of Vietnam]] on April 30, 1975.
Line 4: Line 5:
Before construction, the lake's development sparked considerable debate among the leaders of Tây Ninh province regarding the choice of the lake's name and the project's feasibility. Nevertheless, the construction proceeded. Since 2017, Dầu Tiếng Lake has been classified as a project of [[national security]] importance due to concerns that a dam breach would affect the [[Ho Chi Minh City]] area. As of 2022, Dầu Tiếng Lake is managed by the Southern Irrigation Exploitation One Member Limited Liability Company{{efn|Formerly known as Dầu Tiếng – Phước Hòa Irrigation Exploitation One Member Limited Liability Company, headquartered at Hamlet B2, Phước Minh Commune, Dầu Tiếng District, Tây Ninh Province. However, after the name change, the company's headquarters moved to 178 Nguyễn Văn Thương, Ward 25, Bình Thạnh, Ho Chi Minh City.<ref>{{Cite web|url=https://nongnghiep.vn/ra-mat-cong-ty-tnhh-mtv-khai-thac-thuy-loi-mien-nam-d332427.html|title=Launch of Southern Irrigation Exploitation One Member Limited Liability Company|author=Thanh Sơn|date=2022-09-15|website=Nông nghiệp Newspaper|language=vi|access-date=2024-04-27|archive-date=2024-04-27|archive-url=https://web.archive.org/web/20240427144704/https://nongnghiep.vn/ra-mat-cong-ty-tnhh-mtv-khai-thac-thuy-loi-mien-nam-d332427.html|url-status=live}}</ref>}} under the management of the [[Ministry of Agriculture and Rural Development (Vietnam)|Ministry of Agriculture and Rural Development]].
Before construction, the lake's development sparked considerable debate among the leaders of Tây Ninh province regarding the choice of the lake's name and the project's feasibility. Nevertheless, the construction proceeded. Since 2017, Dầu Tiếng Lake has been classified as a project of [[national security]] importance due to concerns that a dam breach would affect the [[Ho Chi Minh City]] area. As of 2022, Dầu Tiếng Lake is managed by the Southern Irrigation Exploitation One Member Limited Liability Company{{efn|Formerly known as Dầu Tiếng – Phước Hòa Irrigation Exploitation One Member Limited Liability Company, headquartered at Hamlet B2, Phước Minh Commune, Dầu Tiếng District, Tây Ninh Province. However, after the name change, the company's headquarters moved to 178 Nguyễn Văn Thương, Ward 25, Bình Thạnh, Ho Chi Minh City.<ref>{{Cite web|url=https://nongnghiep.vn/ra-mat-cong-ty-tnhh-mtv-khai-thac-thuy-loi-mien-nam-d332427.html|title=Launch of Southern Irrigation Exploitation One Member Limited Liability Company|author=Thanh Sơn|date=2022-09-15|website=Nông nghiệp Newspaper|language=vi|access-date=2024-04-27|archive-date=2024-04-27|archive-url=https://web.archive.org/web/20240427144704/https://nongnghiep.vn/ra-mat-cong-ty-tnhh-mtv-khai-thac-thuy-loi-mien-nam-d332427.html|url-status=live}}</ref>}} under the management of the [[Ministry of Agriculture and Rural Development (Vietnam)|Ministry of Agriculture and Rural Development]].


In 2005, along with [[Black Virgin Mountain]], Dầu Tiếng Lake was selected to appear in the central part of the [[logo]] of Tây Ninh province.<ref>{{Cite web|url=https://sovhttdl.tayninh.gov.vn/vi/news/tin-tuc-su-kien/-ngh-a-logo-t-nh-t-y-ninh-1020.html|title=The meaning of Tây Ninh province's logo|last=|first=|date=2015-05-07|website=Tây Ninh Department of Culture, Sports and Tourism|language=vi|url-status=live|access-date=2024-05-24}}</ref>
In 2005, along with [[Black Virgin Mountain]], Dầu Tiếng Lake was selected to appear in the central part of the [[logo]] of Tây Ninh province.<ref>{{Cite web|url=https://sovhttdl.tayninh.gov.vn/vi/news/tin-tuc-su-kien/-ngh-a-logo-t-nh-t-y-ninh-1020.html|title=The meaning of Tây Ninh province's logo|last=|first=|date=2015-05-07|website=Tây Ninh Department of Culture, Sports and Tourism|language=vi|access-date=2024-05-24}}</ref>


==Sơ lược==
==Overview==
Hồ Dầu Tiếng nằm trải rộng trên địa bàn 4 huyện: [[Dầu Tiếng]] (tỉnh Bình Dương), [[Dương Minh Châu (huyện)|Dương Minh Châu]], [[Tân Châu (huyện)|Tân Châu]] (tỉnh Tây Ninh) [[Hớn Quản]] (tỉnh Bình Phước)<ref>{{Chú thích web|url=http://gis.chinhphu.vn/?r=lkTV4UjppUJ7PTbFCXOQ|tựa đề=Địa giới hành chính huyện Dương Minh Châu, tỉnh Tây Ninh|ngày=|website=Cổng thông tin điện tử Chính phủ Việt Nam|url-status=live|ngày truy cập=2021-12-02|archive-date=2021-12-02|archive-url=https://web.archive.org/web/20211202171221/http://gis.chinhphu.vn/?r=lkTV4UjppUJ7PTbFCXOQ}}</ref> với diện tích mặt hồ lên đến 270 km<sup>2</sup>, tổng dung tích là 1,58 tỷ m<sup>3</sup> nước.<ref name=":5">{{Chú thích web|url=https://baophapluat.vn/post-376068.html|tựa đề=Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công|tác giả=Gia Nguyễn|ngày=2020-12-25|website=[[Pháp luật (báo)|Báo Pháp luật]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131039/https://baophapluat.vn/xay-dung-ho-dau-tieng-lon-nhat-dong-nam-a-tung-huy-dong-36-nghin-nguoi-va-15-trieu-ngay-cong-post376068.html}}</ref> Hồ nằm cách thành phố Tây Ninh 20 km về hướng Đông Bắc thành phố Hồ Chí Minh 70 km về hướng Bắc.{{Snf|Trần Mạnh Thường||5=2005|p=839}} Do được hình thành từ việc ngăn chặn thượng nguồn sông Sài Gòn,<ref name=":10">{{Chú thích web|url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-1-nhat-cuoc-dau-tien-20200905205123812.htm|tựa đề=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 1: Nhát cuốc đầu tiên|tác giả=Đông Hà; Đức Trong|ngày=2020-09-06|website=[[Báo Tuổi Trẻ]]|archive-url=https://web.archive.org/web/20211201151236/https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-1-nhat-cuoc-dau-tien-20200905205123812.htm|archive-date=2021-12-01|url-status=live|ngày truy cập=2021-12-01}}</ref><ref name=":0">{{Chú thích web|url=https://thanhnien.vn/post-1464080.html|tựa đề=Một ngày ở Tây Ninh: Ngất ngây trước vẻ đẹp 'nàng thơ' của hồ Dầu Tiếng|tác giả=Giang Phương|ngày=2022-06-04|website=[[Báo Thanh Niên]]|ngôn ngữ=vi|archive-url=https://web.archive.org/web/20240424131040/https://thanhnien.vn/api/gettoken.htm|archive-date=2024-04-24|url-status=live|ngày truy cập=2022-12-23}}</ref> nên ngoài điều tiết nước xuống [[sông Sài Gòn]], nhiệm vụ chính của hồ Dầu Tiếng tưới trực tiếp cho trên 100.000 ha đất sản xuất nông nghiệp trên địa bàn [[Tây Ninh|tỉnh Tây Ninh]] và các tỉnh thành lân cận như [[Bình Dương]], [[Thành phố Hồ Chí Minh]] [[Long An]]. Hệ thống thủy lợi Dầu Tiếng 3 kênh chính là [[kênh Đông]], [[kênh Tây]] [[kênh Tân Hưng]] nhiệm vụ đưa nước về điều phối cho trên 1.550 km các tuyến kênh nhánh tại các địa phương.<ref name=":2">{{Chú thích web|url=https://www.vietnamplus.vn/400-ty-dong-nang-cap-kenh-tay-thuoc-he-thong-thuy-loi-dau-tieng/459066.vnp|tựa đề=400 tỷ đồng nâng cấp kênh Tây thuộc hệ thống thủy lợi Dầu Tiếng|tác giả=Lê Đức Hoảnh|ngày=2017-08-02|website=[[VietnamPlus]]|url-status=live|ngày truy cập=2021-12-01|archive-date=2021-12-01|archive-url=https://web.archive.org/web/20211201151236/https://www.vietnamplus.vn/400-ty-dong-nang-cap-kenh-tay-thuoc-he-thong-thuy-loi-dau-tieng/459066.vnp}}</ref> Ngoài ra, lòng hồ còn nơi được người dân tận dụng để nuôi trồng thủy sản.<ref name=":1">{{Chú thích web|url=https://baotayninh.vn/40-nam-thang-tram-cung-he-thong-thuy-loi-dau-tieng-a107262.html|tựa đề=40 năm “thăng trầm” cùng hệ thống thủy lợi Dầu Tiếng|website=Báo Tây Ninh|url-status=live|ngày truy cập=2021-12-01|archive-date=2021-12-01|archive-url=https://web.archive.org/web/20211201151238/https://baotayninh.vn/40-nam-thang-tram-cung-he-thong-thuy-loi-dau-tieng-a107262.html}}</ref><ref>{{Chú thích web|url=https://thuysanvietnam.com.vn/tay-ninh-khai-thac-the-manh-thuy-san-tai-ho-dau-tieng/|tựa đề=Tây Ninh: Khai thác thế mạnh thủy sản tại hồ Dầu|tác giả=Mai Anh|ngày=2020-07-06|website=Tạp chí Thủy sản Việt Nam|url-status=live|ngày truy cập=2021-12-01|archive-date=2021-12-01|archive-url=https://web.archive.org/web/20211201151442/https://thuysanvietnam.com.vn/tay-ninh-khai-thac-the-manh-thuy-san-tai-ho-dau-tieng/}}</ref>
Dầu Tiếng Lake spans across four districts: [[Dầu Tiếng]] ([[Bình Dương Province]]), [[Dương Minh Châu District|Dương Minh Châu]], [[Tân Châu District|Tân Châu]] ([[Tây Ninh Province]]), and [[Hớn Quản]] ([[Bình Phước Province]]) with a surface area of up to 270 km² and a total capacity of 1.58 billion m³ of water.<ref>{{Cite web |date= |title=Địa giới hành chính huyện Dương Minh Châu, tỉnh Tây Ninh |url=http://gis.chinhphu.vn/?r=lkTV4UjppUJ7PTbFCXOQ |url-status=live |archive-url=https://web.archive.org/web/20211202171221/http://gis.chinhphu.vn/?r=lkTV4UjppUJ7PTbFCXOQ |archive-date=2021-12-02 |access-date=2021-12-02 |website=Vietnam Government Portal}}</ref><ref>{{Cite web |date=2020-12-25 |title=Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công |url=https://baophapluat.vn/post-376068.html |access-date=2024-07-02 |website=Báo Pháp luật Việt Nam điện tử |language=vi}}</ref> The lake is located 20 km northeast of Tây Ninh city and 70 km north of Ho Chi Minh City.{{Snf|Trần Mạnh Thường||5=2005|p=839}} Formed by damming the upper reaches of the Saigon River,<ref name=":2">{{Cite web |last= |first= |date=2020-09-06 |title=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 1: Nhát cuốc đầu tiên |url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-1-nhat-cuoc-dau-tien-20200905205123812.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref><ref>{{Cite web |last= |date=2022-06-04 |title=Một ngày ở Tây Ninh: Ngất ngây trước vẻ đẹp 'nàng thơ' của hồ Dầu Tiếng |url=https://thanhnien.vn/mot-ngay-o-tay-ninh-ngat-ngay-truoc-ve-dep-nang-tho-cua-ho-dau-tieng-1851464080.htm |access-date=2024-07-02 |website=thanhnien.vn |language=vi}}</ref> its main purpose is to regulate water flow into the Saigon River and provide irrigation for over 100,000 hectares of agricultural land in [[Tây Ninh Province|Tây Ninh]] and neighboring provinces such as [[Bình Dương]], [[Ho Chi Minh City]], and [[Long An]]. The Dầu Tiếng irrigation system consists of three main canals: [[East Canal]], [[West Canal]], and [[Tân Hưng Canal]], which distribute water through over 1,550 km of branch canals in various localities.<ref>{{Cite web |last=Vietnam+ (VietnamPlus) |date=2017-08-02 |title=400 tỷ đồng nâng cấp kênh Tây thuộc hệ thống thủy lợi Dầu Tiếng |url=https://www.vietnamplus.vn/post-459066.vnp |access-date=2024-07-02 |website=Vietnam+ (VietnamPlus) |language=vi}}</ref> Additionally, the lake is utilized by local residents for aquaculture.<ref name=":1">{{Cite web |title=40 năm "thăng trầm" cùng hệ thống thuỷ lợi Dầu Tiếng |url=https://baotayninh.vn/40-nam-thang-tram-cung-he-thong-thuy-loi-dau-tieng-a107262.html |access-date=2021-12-01 |website=Báo Tây Ninh}}</ref>


Công trình đang điều tiết nước để phục vụ cho 93.000 ha đất Tây Ninh bao gồm: huyện [[Tân Biên]], [[Châu Thành, Tây Ninh|Châu Thành]], [[Bến Cầu]], [[Dương Minh Châu (huyện)|Dương Minh Châu]], [[Gò Dầu]], thị [[Hòa Thành]], [[Trảng Bàng]] thành phố [[Tây Ninh (thành phố)|Tây Ninh]]; ở huyện [[Củ Chi]], [[thành phố Hồ Chí Minh]] huyện [[Đức Hòa]], tỉnh [[Long An]].<ref>{{Chú thích web|url=https://cra.tlu.edu.vn/cong-trinh-tieu-bieu-ca-nuoc/ho-dau-tieng-12042|tựa đề=Hồ Dầu Tiếng|website=Trường Đại học Thủy lợi|archive-url=https://web.archive.org/web/20240427150331/https://cra.tlu.edu.vn/cong-trinh-tieu-bieu-ca-nuoc/ho-dau-tieng-12042|archive-date=2024-04-27|url-status=live|ngày truy cập=2024-04-27}}</ref>
The project is regulating water to serve 93,000 hectares of land in Tây Ninh, including the districts of [[Tân Biên district|Tân Biên]], [[Châu Thành, Tây Ninh|Châu Thành]], [[Bến Cầu]], [[Dương Minh Châu District|Dương Minh Châu]], [[Gò Dầu]], the town of [[Hòa Thành]], [[Trảng Bàng]], and the city of [[Tây Ninh (city)|Tây Ninh]]; in [[Củ Chi]] district, [[Ho Chi Minh City]]; and in [[Đức Hòa]] district, [[Long An]] province.<ref>{{Cite web|url=https://cra.tlu.edu.vn/cong-trinh-tieu-bieu-ca-nuoc/ho-dau-tieng-12042|title=Dầu Tiếng Lake|website=Thuy Loi University|archive-url=https://web.archive.org/web/20240427150331/https://cra.tlu.edu.vn/cong-trinh-tieu-bieu-ca-nuoc/ho-dau-tieng-12042|archive-date=2024-04-27|url-status=live|access-date=2024-04-27}}</ref>


==Lịch sử==
==History==


=== Khảo sát ===
===Survey===
Sau khi [[Sự kiện 30 tháng 4 năm 1975|Việt Nam thống nhất]], năm 1975, chính phủ [[Việt Nam|Cộng hòa xã hội chủ nghĩa Việt Nam]] đã ra quyết định thành lập Đoàn khảo sát thiết kế thủy lợi Nam Bộ. Những bản đồ khai về vùng đất để quy hoạch được tận dụng từ những tấm bản đồ 1:100.000 của chính phủ [[Việt Nam Cộng hòa]]. Năm 1976, ông [[Phạm Hùng]] Phó Chủ tịch Hội đồng Bộ trưởng Việt Nam đã phát động phong trào "Toàn dân, toàn quân ra quân làm thủy lợi" với tưởng "Thủy lợi biện pháp hàng đầu để phục hưng đất nước".<ref name=":9">{{Chú thích web|url=https://nongnghiep.vn/ho-dau-tieng-35-nam-chuyen-bay-gio-moi-ke-d52127.html|tựa đề=Hồ Dầu Tiếng: 35 năm chuyện bây giờ mới kể|tác giả=Quang Ngọc|họ=|ngày=2010-04-30|website=Báo Nông nghiệp|ngôn ngữ=vi|archive-url=https://web.archive.org/web/20200815133944/https://nongnghiep.vn/ho-dau-tieng-35-nam-chuyen-bay-gio-moi-ke-d52127.html|archive-date=2020-08-15|url-status=live|ngày truy cập=2024-04-24}}</ref> Cũng trong thời gian này, nhiều cán bộ từ miền Bắc cũng đã được trung ương cử vào miền Nam để khảo sát và xây dựng hồ bao gồm ông Nguyễn Xuân Hùng Phòng khảo sát địa hình, địa chất thuộc Viện Khảo sát thiết kế (Bộ Thủy lợi) làm Chủ nhiệm thiết kế công trình.<ref name=":12">{{Chú thích web|url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-4-an-bo-bo-va-doi-mat-voi-bom-min-20200909095910947.htm|tựa đề=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 4: Ăn bo bo và đối mặt với bom mìn|tác giả=Đông Hà|họ=|tên=|tác giả 2=Đức Trong|ngày=2020-09-09|website=Báo Tuổi Trẻ|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2022-09-27|archive-url=https://web.archive.org/web/20220927175728/https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-4-an-bo-bo-va-doi-mat-voi-bom-min-20200909095910947.htm}}</ref> Trong lúc đi khảo sát, 7 cán bộ đã tử vong do dẫm phải mìn khu vực bên trong lòng hồ ngày nay. Trước khi xây dựng, tại khu vực cũng đã một vài điền chủ cao su ý định xây dựng một cái hồ nhưng chỉ để làm nơi giải trí.<ref name=":9" />
After the [[Reunification of Vietnam|unification of Vietnam]] in 1975, the government of the [[Socialist Republic of Vietnam]] decided to establish the Southern Irrigation Design Survey Team. Initial maps of the land for planning were adapted from the 1:100,000 maps of the [[Republic of Vietnam]] government. In 1976, [[Phạm Hùng]], the Deputy Prime Minister of Vietnam, launched the movement "The entire population and army to undertake irrigation works" with the philosophy that "Irrigation is the foremost measure to rejuvenate the country."<ref name=":3">{{Cite web |last= |date=2010-04-30 |title=Hồ Dầu Tiếng: 35 năm chuyện bây giờ mới kể |url=https://nongnghiep.vn/ho-dau-tieng-35-nam-chuyen-bay-gio-moi-ke-d52127.html |access-date=2024-07-02 |website=nongnghiep.vn |language=vi}}</ref> During this period, many officials from the North were sent to the South to survey and construct the lake, including Nguyễn Xuân Hùng from the Survey Design Institute (Ministry of Water Resources), who was the chief designer of the project.<ref>{{Cite web |last= |first= |date=2020-09-09 |title=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 4: Ăn bo bo và đối mặt với bom mìn |url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-4-an-bo-bo-va-doi-mat-voi-bom-min-20200909095910947.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref> During the survey, seven officials died after stepping on mines in what is now the lake area. Before the official construction, some rubber plantation owners had intended to build a lake in the area for recreational purposes.<ref name=":3" />


Before the official construction, many auxiliary dams were built by the [[Vietnamese military]] starting in 1977.<ref name=":3" />
Trước khi công trình được xây dựng chính thức, nhiều tuyến đập phụ cũng đã được bộ đội Việt Nam xây dựng từ những năm 1977.<ref name=":9" />


=== Xây dựng ===
=== Construction ===
Công trình thủy lợi Dầu Tiếng được Thủ tướng Chính phủ phê duyệt vào năm [[1979]], khởi công xây dựng vào ngày [[29 tháng 4]] năm [[1981]] với tổng số vốn 110 triệu USD<ref name=":3">{{Chú thích web|url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-2-nhung-rao-can-o-dau-tieng-20200907102936641.htm|tựa đề=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 2: Những 'rào cản' ở Dầu Tiếng|tác giả=Đông Hà; Đức Trong|ngày=2020-09-07|website=[[Báo Tuổi Trẻ]]|url-status=live|ngày truy cập=2021-12-01|archive-date=2021-12-01|archive-url=https://web.archive.org/web/20211201154816/https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-2-nhung-rao-can-o-dau-tieng-20200907102936641.htm}}</ref> tại ấp Thuận Bình [[Truông Mít]], huyện [[Dương Minh Châu (huyện)|Dương Minh Châu]], tỉnh Tây Ninh dưới sự hiện diện của Phó Thủ tướng [[Huỳnh Tấn Phát]].<ref name=":5" /> Lúc bấy giờ, hồ đã bị lãnh đạo tỉnh Tây Ninh phản đối tốn đất 2/3 diện tích hồ Tây Ninh nhưng lại đặt tên hồ là [[Dầu Tiếng]], một địa danh của Bình Dương.<ref name=":3" /> Không chỉ phản đối, thư tỉnh Tây Ninh lúc bấy giờ ông Nguyễn Văn Tốt yêu cầu tất cả quan trong tỉnh không tiếp đón [[Bộ Nông nghiệp Phát triển nông thôn (Việt Nam)|Bộ Thủy lợi Việt Nam]] không được bàn bạc về hồ Dầu Tiếng bao gồm cả Chủ tịch Ủy ban nhân dân tỉnh. Theo báo ''[[Nông nghiệp Việt Nam (báo)|Nông nghiệp]]'', Bộ trưởng Bộ Thủy lợi Nguyễn Thanh Bình cũng bị ông Tốt tố lên [[Ban thư Trung ương Đảng Cộng sản Việt Nam|Ban Bí thư]] do lo ngại [[ quan Tình báo Trung ương (Hoa Kỳ)|Cơ quan Tình báo Trung ương Hoa Kỳ]] cài vào phá hoại Việt Nam. Nhằm xoa dịu Tây Ninh, Thủ tướng Phạm Hùng đã đặt tên hồ là hồ Dầu Tiếng – Tây Ninh.<ref name=":9" /> Tuy nhiên, Phó thư Tỉnh ủy, Chủ tịch Ủy ban nhân dân tỉnh Tây Ninh [[Đặng Văn Thượng]] lại ủng hộ xây dựng công trình. Lúc cao nhất, công trình đã huy động được lên tới 36.300 người thấp nhất 7.200 người xây dựng.<ref name=":9" /> Mặc tỉnh phản đối công trình nhưng hồ lại sự đóng góp "to lớn của thanh niên, nhân dân tỉnh Tây Ninh" sau khi được ông Thượng các các bộ của ông tham gia vận động quần chúng nhân dân đào kênh, xây hồ.<ref name=":12" />
The Dầu Tiếng irrigation project was approved by the Prime Minister in [[1979]] and commenced construction on [[April 29]], [[1981]], with a total investment of 110 million USD<ref name=":4">{{Cite web |last= |first= |date=2020-09-07 |title=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 2: Những 'rào cản' ở Dầu Tiếng |url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-2-nhung-rao-can-o-dau-tieng-20200907102936641.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref> at Thuận Bình hamlet, Truông Mít commune, [[Dương Minh Châu District|Dương Minh Châu]] district, Tây Ninh province, in the presence of Deputy Prime Minister [[Huỳnh Tấn Phát]].<ref>{{Cite web |date=2020-12-25 |title=Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công |url=https://baophapluat.vn/post-376068.html |access-date=2024-07-02 |website=Báo Pháp luật Việt Nam điện tử |language=vi}}</ref> At that time, the project faced opposition from Tây Ninh province leaders due to land concerns, as two-thirds of the lake's area was in Tây Ninh, but it was named after Dầu Tiếng, a location in Bình Dương.<ref name=":5">{{Cite web |last= |first= |date=2020-09-07 |title=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 2: Những 'rào cản' Dầu Tiếng |url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-2-nhung-rao-can-o-dau-tieng-20200907102936641.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref> The opposition was so strong that Nguyễn Văn Tốt, the then-Secretary of [[Tây Ninh province]], instructed all provincial agencies not to receive the Ministry of Water Resources or discuss the Dầu Tiếng project, including the Chairman of the Provincial People's Committee. According to ''Nông nghiệp'' newspaper, Minister of Water Resources Nguyễn Thanh Bình was even accused by Tốt to the [[Central Secretariat of the Communist Party of Vietnam|Central Secretariat]] of fearing sabotage by the [[Central Intelligence Agency (United States)|CIA]]. To placate Tây Ninh, Prime Minister Phạm Hùng named the lake Dầu Tiếng – Tây Ninh.<ref name=":3" /> However, Đặng Văn Thượng, the Deputy Secretary of the Provincial Party Committee and Chairman of the Provincial People's Committee of Tây Ninh, supported the project. At its peak, the construction involved up to 36,300 workers, with a minimum of 7,200 workers. Despite the initial opposition from the province, the project saw "significant contributions from the youth and people of Tây Ninh" after Thượng and his officials mobilized the public to dig canals and build the lake.<ref>{{Cite web |last= |first= |date=2020-09-09 |title=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 4: Ăn bo bo và đối mặt với bom mìn |url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-4-an-bo-bo-va-doi-mat-voi-bom-min-20200909095910947.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref>


The capital for constructing the reservoir is said to have come from a preferential loan of over $100 million USD from the [[World Bank]], which was chaired at the time by [[Robert McNamara|Robert Strange McNamara]]. McNamara was a former [[United States Secretary of Defense]] and considered the "chief architect" of the [[Vietnam War]].<ref name=":7">{{Cite web |date=2020-12-25 |title=Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công |url=https://baophapluat.vn/post-376068.html |access-date=2024-07-02 |website=Báo Pháp luật Việt Nam điện tử |language=vi}}</ref> This was also the first loan successfully secured by the State of the Socialist Republic of Vietnam, making this project the first to be constructed with [[US dollars]] after 1975.<ref name=":7" /><ref>{{Cite web |last= |date=2022-10-26 |title=Công trình thủy lợi đầu tiên 'xài' đô la Mỹ |url=https://nongnghiep.vn/cong-trinh-thuy-loi-dau-tien-xai-do-la-my-d335484.html |access-date=2024-07-02 |website=nongnghiep.vn |language=vi}}</ref> The construction workforce at that time consisted of young people, with the number reaching tens of thousands at its peak. According to statistics from the Tay Ninh provincial youth union, by the time the project was put into operation, Tay Ninh and neighboring provinces and cities had mobilized over 450,000 youth members, completed nearly 15 million workdays, excavated more than 11.6 million cubic meters of earth, and constructed nearly 54,000 cubic meters of concrete and masonry, building thousands of kilometers of canals and thousands of structures along the canals.<ref name=":1" /> The reservoir was also built in the context of Vietnam being [[Khmer Rouge]] attacked on its border by Cambodia.<ref name=":4" />
Nguồn vốn xây dựng hồ được cho là từ khoản vay ưu đãi hơn 100 triệu USD của [[Ngân hàng Thế giới]], lúc bấy giờ do [[Robert McNamara|Robert Strange McNamara]] làm Chủ tịch, ông từng là [[Bộ trưởng Bộ Quốc phòng Hoa Kỳ]] và được xem như "kiến trúc sư trưởng" của [[chiến tranh Việt Nam]].<ref>{{Chú thích web|url=https://baophapluat.vn/post-376068.html|tựa đề=Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công|tác giả=Gia Nguyễn|ngày=2020-12-25|website=[[Pháp luật Việt Nam (báo)|Báo Pháp luật Việt Nam]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-26|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131039/https://baophapluat.vn/xay-dung-ho-dau-tieng-lon-nhat-dong-nam-a-tung-huy-dong-36-nghin-nguoi-va-15-trieu-ngay-cong-post376068.html}}</ref> Đây cũng là số tiền đầu tiên mà [[Nhà nước Cộng hòa xã hội chủ nghĩa Việt Nam|Nhà nước Cộng hòa Xã hội Chủ nghĩa Việt Nam]] vay thành công, chính vì vậy mà công trình này được xem là công trình đầu tiên sau năm 1975 được xây dựng bằng [[đô la Mỹ]].<ref name=":5" /><ref>{{Chú thích web|url=https://nongnghiep.vn/cong-trinh-thuy-loi-dau-tien-xai-do-la-my-d335484.html|tựa đề=Công trình thủy lợi đầu tiên 'xài' đô la Mỹ|tác giả=Hồng Thuỷ; Minh Sáng|ngày=2022-10-26|website=[[Báo Nông nghiệp]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2022-12-23|archive-url=https://web.archive.org/web/20221223184156/https://nongnghiep.vn/cong-trinh-thuy-loi-dau-tien-xai-do-la-my-d335484.html}}</ref> Nhân công xây dựng hồ lúc bấy giờ là các thanh niên, có thời điểm lên đến hàng chục ngàn người. Số liệu thống kê của tỉnh đoàn Tây Ninh cho biết, đến ngày công trình đưa vào vận hành, Tây Ninh và các tỉnh, thành lân cận đã huy động được hơn 450 ngàn lượt đoàn viên - thanh niên tham gia; thực hiện gần 15 triệu ngày công lao động; đào đắp được hơn 11,6 triệu m<sup>3</sup> đất, xây lắp gần 54 ngàn m<sup>3</sup> bê tông và đá xây... để xây dựng nên hàng ngàn km kênh và hàng ngàn công trình trên kênh.<ref name=":1" /> Hồ cũng được xây dựng trong bối cảnh Việt Nam bị [[Khmer Đỏ]] [[Chiến tranh biên giới Việt Nam – Campuchia|tấn công biên giới]].<ref name=":11">{{Chú thích web|url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-2-nhung-rao-can-o-dau-tieng-20200907102936641.htm|tựa đề=Hành trình mở nguồn nước Dầu Tiếng - Kỳ 2: Những 'rào cản' ở Dầu Tiếng|tác giả=Đông Hà|họ=|tên=|tác giả 2=Đức Trong|ngày=2020-09-07|website=Báo Tuổi Trẻ|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2022-12-03|archive-url=https://web.archive.org/web/20221203140255/https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-2-nhung-rao-can-o-dau-tieng-20200907102936641.htm}}</ref>


Để sở hữu diện tích khổng lồ vào năm 1982, hàng nghìn hộ dân ở xã [[Lộc Ninh, Dương Minh Châu|Lộc Ninh]], huyện [[Dương Minh Châu]] đã nhường nương rẫy của mình di dời sinh sống nơi ở mới tại xã [[Truông Mít]] [[Bến Củi]].<ref name=":10" /> Ngày [[2 tháng 7]] năm [[1984]], hồ bắt đầu tích nước đến ngày [[10 tháng 1]] năm [[1985]], hệ thống thủy lợi Dầu Tiếng với hai tuyến kênh chính Đông Tây chính thức đưa vào khai thác.<ref name=":2" /><ref name=":3" /> Năm 1985, ngay tại công trường, Thân Công Khởi - nguyên công nhân lái máy cạp tự hành, tham gia thi công đập chính sau đó thi công kênh Tây, một trong 2 tuyến kênh huyết mạch của hồ Dầu Tiếng đã được [[Chủ tịch nước Cộng hòa hội chủ nghĩa Việt Nam|Chủ tịch Hội đồng Nhà nước]] [[Trường Chinh]] phong tặng danh hiệu [[Anh hùng Lao động (Việt Nam)|Anh hùng lao động]], ông là người duy nhất trong nửa triệu người thi công được danh hiệu này.<ref>{{Chú thích web|url=https://nongnghiep.vn/nguoi-anh-hung-o-cong-trinh-the-ky-d335588.html|tựa đề=Người anh hùng ở công trình thế kỷ|tác giả=Hồng Thuỷ; Minh Sáng|ngày=2022-10-27|website=[[Báo Nông nghiệp]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2022-12-23|archive-url=https://web.archive.org/web/20221223190504/https://nongnghiep.vn/nguoi-anh-hung-o-cong-trinh-the-ky-d335588.html}}</ref> Trong giai đoạn 1985–1986, hồ đã được hoàn thành bản để dẫn nước về tới huyện Củ Chi với lưu lượng nước khoảng 135 triệu mỗi năm.{{Snf|Ban Chấp hành Trung ương Đảng|1985|p=32}} Từ năm [[1996]] đến năm [[1999]], kênh Tân Hưng được xây dựng để dẫn nước từ hồ Dầu Tiếng tưới cho các phía nam của hai huyện Tân Châu Tân Biên.<ref>{{Chú thích web|url=https://baotayninh.vn/hieu-them-ve-tan-hung-a100315.html|tựa đề=Hiểu thêm về Tân Hưng|tác giả=Trần Vũ|ngày=2018-07-11|website=Báo Tây Ninh|url-status=live|ngày truy cập=2021-12-01|archive-date=2021-12-01|archive-url=https://web.archive.org/web/20211201161425/https://baotayninh.vn/hieu-them-ve-tan-hung-a100315.html}}</ref> Năm [[2012]], hồ thủy lợi Phước Hòa kênh dẫn nước đi vào hoạt động để chuyển nước từ [[sông ]] sang [[sông Sài Gòn]], từ đây bổ sung nước cho hồ Dầu Tiếng. Chính vì vậy, đây còn công trình thủy lợi có chức năng chuyển nước từ sông này qua sông khác, hồ tiếp nước cho hồ.<ref>{{Chú thích web|url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-cuoi-huong-den-ho-da-muc-tieu-2020091211024199.htm|tựa đề=Hành trình mở nguồn nước Dầu Tiếng - Kỳ cuối: Hướng đến hồ 'đa mục tiêu'|tác giả=Đông Hà; Đức Trong|ngày=2020-09-12|website=[[Báo Tuổi Trẻ]]|url-status=live|ngày truy cập=2021-12-01|archive-date=2021-12-01|archive-url=https://web.archive.org/web/20211201155809/https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-cuoi-huong-den-ho-da-muc-tieu-2020091211024199.htm}}</ref>
To obtain the vast area in 1982, thousands of households in Lộc Ninh commune, [[Dương Minh Châu]] district, gave up their land and moved to new residences in the Truông Mít and [[Bến Củi]] communes.<ref name=":2" /> On [[July 2]], [[1984]], the reservoir began storing water, and on [[January 10]], [[1985]], the Dầu Tiếng irrigation system with its two main canals, East and West, officially started operation.<ref>{{Cite web |last=Vietnam+ (VietnamPlus) |date=2017-08-02 |title=400 tỷ đồng nâng cấp kênh Tây thuộc hệ thống thủy lợi Dầu Tiếng |url=https://www.vietnamplus.vn/post-459066.vnp |access-date=2024-07-02 |website=Vietnam+ (VietnamPlus) |language=vi}}</ref><ref name=":5" /> In 1985, right at the construction site, Thân Công Khởi, a former operator of a self-propelled scraper who participated in building the main dam and later the West canal (one of the two main arteries of the Dầu Tiếng reservoir), was awarded the title of [[Hero of Labor (Vietnam)|Hero of Labor]] by the Chairman of the State Council [[Trường Chinh]]. He was the only person among the half a million workers to receive this title.<ref>{{Cite web |last= |date=2022-10-27 |title=Người anh hùng ở công trình thế kỷ |url=https://nongnghiep.vn/nguoi-anh-hung-o-cong-trinh-the-ky-d335588.html |access-date=2024-07-02 |website=nongnghiep.vn |language=vi}}</ref> During the 1985-1986 period, the reservoir was substantially completed to deliver water to [[Củ Chi district]], with an annual flow of about 135 million cubic meters of water.{{Snf|Ban Chấp hành Trung ương Đảng|1985|p=32}} From [[1996]] to [[1999]], the Tân Hưng canal was constructed to direct water from the Dầu Tiếng reservoir to irrigate the southern communes of the two districts Tân Châu and Tân Biên.<ref>{{Cite web |title=Hiểu thêm về Tân Hưng - Báo Tây Ninh Online |url=https://baotayninh.vn/hieu-them-ve-tan-hung-a100315.html |access-date=2024-07-02 |website=baotayninh.vn |language=vi}}</ref> In [[2012]], the Phước Hòa irrigation reservoir and canal system became operational, transferring water from the [[ River]] to the [[Sài Gòn River]], thereby supplementing the water for the Dầu Tiếng reservoir. Thus, this is an irrigation project that transfers water from one river to another, with one reservoir replenishing another.<ref>{{Cite web |last= |first= |date=2020-09-12 |title=Hành trình mở nguồn nước Dầu Tiếng - Kỳ cuối: Hướng đến hồ 'đa mục tiêu' |url=https://tuoitre.vn/hanh-trinh-mo-nguon-nuoc-dau-tieng-ky-cuoi-huong-den-ho-da-muc-tieu-2020091211024199.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref>


=== Hoạt động ===
=== Activities ===
Từ ngày 6 tháng 6 năm 2017, [[Thủ tướng Chính phủ nước Cộng hòa xã hội chủ nghĩa Việt Nam|Thủ tướng Chính phủ]] [[Bộ Công an (Việt Nam)|Bộ Công an]] đã cử cán bộ vào Tây Ninh quyết định đưa công trình hồ chứa nước Dầu Tiếng vào danh mục công trình quan trọng liên quan đến [[an ninh quốc gia]].<ref name=":8">{{Chú thích web|url=https://baotayninh.vn/ho-dau-tieng-la-cong-trinh-quan-trong-lien-quan-den-an-ninh-quoc-gia-a87146.html|tựa đề=Hồ Dầu Tiếng là công trình quan trọng liên quan đến an ninh quốc gia|tác giả=Hoàng Thi|website=Báo Tây Ninh|url-status=live|ngày truy cập=2022-12-24|archive-date=2022-12-24|archive-url=https://web.archive.org/web/20221224090431/https://baotayninh.vn/ho-dau-tieng-la-cong-trinh-quan-trong-lien-quan-den-an-ninh-quoc-gia-a87146.html}}</ref><ref>{{Chú thích web|url=https://nongnghiep.vn/ho-dau-tieng-la-cong-trinh-an-ninh-quoc-gia-d195579.html|tựa đề=Hồ dầu tiếng là công trình an ninh quốc gia|tác giả=Phúc Lập|ngày=2017-06-06|website=Báo Nông nghiệp|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-24|archive-date=2022-12-24|archive-url=https://web.archive.org/web/20221224090537/https://nongnghiep.vn/ho-dau-tieng-la-cong-trinh-an-ninh-quoc-gia-d195579.html}}</ref> Đến tháng 6 năm 2019, nhà máy điện mặt trời đầu tiên đã được hình thành trên khu vực bán ngập trong lòng hồ Dầu Tiếng. Sau khi hành thành, nhà máy đã trở thành dự án lớn nhất Đông Nam Á về năng lượng sạch.<ref name=":15" /> Đến năm 2021, [[Bộ Nông nghiệp Phát triển nông thôn (Việt Nam)|Bộ Nông nghiệp Phát triển Nông thôn]] đã giao cho công ty chủ quản hồ thực hiện dự án đầu tư, sửa chữa nâng cao an toàn đập, hồ chứa nước với kinh phí 157 tỉ đồng và hoàn thành trong năm 2022 khi phát hiện những vết nứt. Công ty này còn đề xuất đầu tư 1.500 tỉ đồng để sửa chữa nâng cấp hồ từ 2021–2025.<ref>{{Chú thích web|url=https://nld.com.vn/news-20210503202142002.htm|tựa đề=Hồ Dầu Tiếng vẫn bảo đảm an toàn|tác giả=Thành Đông|họ=|ngày=2021-05-04|website=[[Báo Người lao động]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-24|archive-date=2022-12-24|archive-url=https://web.archive.org/web/20221224065157/https://nld.com.vn/news-20210503202142002.htm}}</ref> Trong giai đoạn 2 sửa chữa, Công ty Thủy lợi miền Nam đã cắt nước 90 ngày đối với tuyến kênh chính Tây sau khi được sự cho phép của Ủy ban nhân dân tỉnh Tây Ninh kéo dài từ ngày 5 tháng 4 năm 2023 mở nước trở lại vào ngày 10 tháng 1 năm 2024 nhằm phục vụ vụ mùa mới.<ref>{{Chú thích web|url=https://moitruong.net.vn/cat-nuoc-kenh-tay-de-phuc-vu-du-an-sua-chua-nang-cap-he-thong-thuy-loi-dau-tieng-giai-doan-2-67212.html|tựa đề=Cắt nước kênh Tây để phục vụ dự án sửa chữa, nâng cấp hệ thống thuỷ lợi Dầu Tiếng giai đoạn 2|tác giả=Hoàng Linh|họ=|ngày=2023-10-06|website=Tạp chí điện tử Môi trường & Cuộc sống|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-27|archive-date=2024-04-27|archive-url=https://web.archive.org/web/20240427150837/https://moitruong.net.vn/cat-nuoc-kenh-tay-de-phuc-vu-du-an-sua-chua-nang-cap-he-thong-thuy-loi-dau-tieng-giai-doan-2-67212.html}}</ref>
Since June 6, 2017, the [[Prime Minister of Vietnam|Prime Minister]] and the [[Ministry of Public Security (Vietnam)|Ministry of Public Security]] have deployed officials to Tay Ninh to decide to include the Dau Tieng water reservoir project in the list of important projects related to national security.<ref>{{Cite web |title=Hồ Dầu Tiếng là công trình quan trọng liên quan đến an ninh quốc gia - Báo Tây Ninh Online |url=https://baotayninh.vn/ho-dau-tieng-la-cong-trinh-quan-trong-lien-quan-den-an-ninh-quoc-gia-a87146.html |access-date=2024-07-02 |website=baotayninh.vn |language=vi}}</ref><ref>{{Cite web |last= |date=2017-06-06 |title=Hồ dầu tiếng là công trình an ninh quốc gia |url=https://nongnghiep.vn/ho-dau-tieng-la-cong-trinh-an-ninh-quoc-gia-d195579.html |access-date=2024-07-02 |website=nongnghiep.vn |language=vi}}</ref> By June 2019, the first solar power plant was established on the submerged area within the Dau Tieng reservoir. Upon completion, the plant became the largest clean energy project in [[Southeast Asia]].<ref>{{Cite web |last= |first= |date=2019-09-07 |title=Khánh thành cụm năng lượng mặt trời Dầu Tiếng, lớn nhất Đông Nam Á |url=https://tuoitre.vn/khanh-thanh-cum-nang-luong-mat-troi-dau-tieng-lon-nhat-dong-nam-a-20190907153217999.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref> In 2021, the [[Ministry of Agriculture and Rural Development (Vietnam)|Ministry of Agriculture and Rural Development]] assigned the reservoir's management company to implement a project to invest in, repair, and enhance the safety of the dam and water reservoir, with a budget of 157 billion dong, completed in 2022 after detecting cracks. The company also proposed an investment of 1,500 billion dong for repair and upgrade from 2021 to 2025.<ref>{{Cite web |last= |title=Hồ Dầu Tiếng vẫn bảo đảm an toàn |url=https://nld.com.vn/thoi-su/ho-dau-tieng-van-bao-dam-an-toan-20210503202142002.htm |access-date=2024-07-02 |website=Báo Người Lao Động Online |language=vi}}</ref> During the second phase of repairs, the Southern Water Irrigation Company cut off water for 90 days to the West main canal with the approval of the Tay Ninh People's Committee, extending from April 5, 2023, and resumed water flow on January 10, 2024, to serve the new agricultural season.<ref>{{Cite web |last= |date=2023-10-06 |title=Cắt nước kênh Tây để phục vụ dự án sửa chữa, nâng cấp hệ thống thuỷ lợi Dầu Tiếng giai đoạn 2 |url=https://moitruong.net.vn/cat-nuoc-kenh-tay-de-phuc-vu-du-an-sua-chua-nang-cap-he-thong-thuy-loi-dau-tieng-giai-doan-2-67212.html |access-date=2024-07-02 |website=tin tức moitruong.net.vn |language=vi}}</ref>


Năm 2024, Tây Ninh cũng đã được Thủ tướng Chính phủ [[Phạm Minh Chính]] giao việc phát huy chức năng hồ Dầu Tiếng mang lại.<ref>{{Chú thích web|url=https://vietnam.vnanet.vn/vietnamese/tin-van/phat-trien-tay-ninh-theo-huong-ben-vung-ket-noi-ban-sac-huu-nghi-366387.html|tựa đề=Phát triển Tây Ninh theo hướng bền vững, kết nối, bản sắc, hữu nghị|tác giả=TTXVN|họ=|ngày=2024-05-05|website=Báo ảnh Việt Nam|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-05-24}}</ref> Trước đó, tỉnh này cũng được giao xây dựng "Đề án phát triển tổng thể đa mục tiêu hồ Dầu Tiếng giai đoạn 2022–2030, tầm nhìn 2050", nhưng sau đó đã bị hủy bỏ do liên quan đến nhiều Luật, lĩnh vực, quy hoạch... vượt thẩm quyền của tỉnh.<ref>{{Chú thích web|url=https://baotayninh.vn/phat-trien-ho-dau-tieng-da-muc-tieu-an-toan-va-hieu-qua-a169383.html|tựa đề=Thứ trưởng Bộ Nông nghiệp và phát triển nông thôn Hoàng Trung: Phát triển hồ Dầu Tiếng đa mục tiêu, an toàn và hiệu quả|tác giả=Thế Nhân|ngày=2024-02-23|website=Báo Tây Ninh|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-05-24}}</ref>
In 2024, Prime Minister Phạm Minh Chính assigned Tây Ninh to leverage the functions provided by the Dau Tieng reservoir.<ref>{{Cite web |author=TTXVN |date=May 5, 2024 |title=Phát triển Tây Ninh theo hướng bền vững, kết nối, bản sắc, hữu nghị |url=https://vietnam.vnanet.vn/vietnamese/tin-van/phat-trien-tay-ninh-theo-huong-ben-vung-ket-noi-ban-sac-huu-nghi-366387.html |access-date=2024-05-24 |website=Vietnam News Agency |language=vi}}</ref> Previously, the province was tasked with developing the comprehensive multi-objective project "Dau Tieng Development Master Plan Phase 2022–2030, Vision 2050," which was later cancelled due to exceeding the province's authority in various laws, sectors, and planning aspects.<ref>{{Cite web |title=Thứ trưởng Bộ Nông nghiệp và phát triển nông thôn Hoàng Trung: Phát triển hồ Dầu Tiếng đa mục tiêu, an toàn và hiệu quả - Báo Tây Ninh Online |url=https://baotayninh.vn/phat-trien-ho-dau-tieng-da-muc-tieu-an-toan-va-hieu-qua-a169383.html |access-date=2024-07-02 |website=baotayninh.vn |language=vi}}</ref>


== Khai thác ==
==Exploitation==
=== Du lịch ===
===Tourism===
[[Tập tin:Dau Tieng Lake - 50766650163.png|thế=Khung cảnh hồ Dầu Tiếng về chiều.|nhỏ|Hồ Dầu Tiếng về chiều với [[núi Bà Đen]] hậu cảnh.]]
[[File:Dau Tieng Lake - 50766650163.png|alt=Scenery of Dầu Tiếng Lake in the evening.|thumb|Dầu Tiếng Lake in the evening with [[Bà Đen Mountain]] in the background.]]
[[Tập tin:Dau Tieng Lake - 50766648278.png|thế=Bờ hồ Dầu Tiếng.|nhỏ|Bờ hồ Dầu Tiếng.]]
[[File:Dau Tieng Lake - 50766648278.png|alt=The shore of Dầu Tiếng Lake.|thumb|The shore of Dầu Tiếng Lake.]]
In [[2008]], the Tây Ninh Provincial People's Committee called for investment in tourism areas within the lake, including Nhim Island, Sin Islet, Tan Thiet Islet, Tan Hoa Islet, Ba Chiem Islet, Ta Do Islet, Dong Ken Islet, and along the southern shore of the lake.<ref>{{Cite web |title=Phát triển hồ Dầu Tiếng an toàn và hiệu quả - Báo Tây Ninh Online |url=https://baotayninh.vn/phat-trien-ho-dau-tieng-an-toan-va-hieu-qua-a142158.html |access-date=2024-07-02 |website=baotayninh.vn |language=vi}}</ref> In [[2022]], the Bình Dương Provincial People's Committee held a meeting to hear the consulting unit's report on the Ecotourism, Resort, and Recreation Project for the Nui Cau – Dầu Tiếng Protective Forest for the period 2021 – 2030, envisioning it as a "miniature [[Đà Lạt]]."<ref>{{Cite web |last= |first= |title=Bình Dương muốn làm khu du lịch sinh thái như 'Đà Lạt thu nhỏ' |url=https://vietnamnet.vn/binh-duong-muon-lam-khu-du-lich-sinh-thai-nhu-da-lat-thu-nho-2044120.html |access-date=2024-07-02 |website=VietNamNet News |language=vietnamese}}</ref>
Năm [[2008]], UBND tỉnh Tây Ninh đã kêu gọi đầu tư các khu vực du lịch hình thành bên trong hồ gồm: đảo Nhím, cù lao Sỉn, cù lao Tân Thiết, Tân Hoà, Bà Chiêm, Tà Dơ, Đồng Kèn và dọc bờ phía Nam của hồ.<ref name=":6">{{Chú thích web|url=https://baotayninh.vn/phat-trien-ho-dau-tieng-an-toan-va-hieu-qua-a142158.html|tựa đề=Phát triển hồ Dầu Tiếng an toàn và hiệu quả|tác giả=Nhi Trần|website=Báo Tây Ninh|url-status=live|ngày truy cập=2022-12-23|archive-date=2022-12-23|archive-url=https://web.archive.org/web/20221223185041/https://baotayninh.vn/phat-trien-ho-dau-tieng-an-toan-va-hieu-qua-a142158.html}}</ref> Vào năm [[2022]], UBND tỉnh Bình Dương đã tổ chức cuộc họp nghe đơn vị tư vấn báo cáo Đề án du lịch sinh thái, nghỉ dưỡng, giải trí rừng phòng hộ Núi Cậu – Dầu Tiếng giai đoạn 2021 – 2030 như "Đà Lạt thu nhỏ".<ref>{{Chú thích web|url=https://vietnamnet.vn/binh-duong-muon-lam-khu-du-lich-sinh-thai-nhu-da-lat-thu-nho-2044120.html|tựa đề=Bình Dương muốn làm khu du lịch sinh thái như ‘Đà Lạt thu nhỏ’|tác giả=Xuân An|họ=|tên=|website=[[VietNamNet]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2022-12-23|archive-url=https://web.archive.org/web/20221223190507/https://vietnamnet.vn/binh-duong-muon-lam-khu-du-lich-sinh-thai-nhu-da-lat-thu-nho-2044120.html}}</ref> Vào năm [[2016]], nhiều người dân đã phát hiện ra một bãi tắm tự phát khu vực hồ Dầu Tiếng. Ngay sau đó, chính quyền địa phương đã yêu cầu người dân tháo dỡ, di dời khỏi khu vực lòng hồ vì không ai quản lý có thể gây mất an ninh trật tự và đuối nước.<ref>{{Chú thích web|url=https://nld.com.vn/news-20160428093427026.htm|tựa đề=Đóng cửa bãi tắm biển Tây Ninh|tác giả=Thiên Tâm|họ=|ngày=2016-04-28|website=[[Báo Người lao động]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2022-12-23|archive-url=https://web.archive.org/web/20221223190856/https://nld.com.vn/news-20160428093427026.htm}}</ref><ref>{{Chú thích web|url=https://www.sggp.org.vn/share21381.html|tựa đề=Tắm “biển” ở... Tây Ninh|tác giả=Đại Dương|ngày=2016-05-07|website=[[Báo Sài Gòn Giải Phóng]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2022-12-23|archive-url=https://web.archive.org/web/20221223191024/https://www.sggp.org.vn/share21381.html}}</ref> Đến cuối tháng 5 cùng năm, khu vực này đã được UBND tỉnh Tây Ninh giao cho các đơn vị liên quan đầu tư cơ sở hạ tầng xuất phát, cải tạo thành bãi tắm tự nhiên mang tên "Biển Tây Ninh".<ref>{{Chú thích web|url=https://thanhnien.vn/post-565023.html|tựa đề='Biển Tây Ninh' hồ Dầu Tiếng sẽ thành điểm du lịch cho người dân|tác giả=Giang Phương|ngày=2016-05-28|website=[[Báo Thanh Niên]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131117/https://thanhnien.vn/api/gettoken.htm}}</ref>


In [[2016]], many residents discovered an impromptu beach area in the Dầu Tiếng Lake area. Shortly thereafter, local authorities requested that residents dismantle and move out of the lake area as it was unregulated, posing potential security and drowning risks.<ref>{{cite web |archive-date=2022-12-23 |archive-url=https://web.archive.org/web/20221223190856/https://nld.com.vn/news-20160428093427026.htm |date=2016-04-28 |access-date=2022-12-23 |language=vi |author=Thiên Tâm |title=Closing the beach in Tây Ninh |url=https://nld.com.vn/news-20160428093427026.htm |url-status=live |website=[[Người Lao Động Newspaper]]}}</ref><ref>{{cite web |archive-date=2022-12-23 |archive-url=https://web.archive.org/web/20221223191024/https://www.sggp.org.vn/share21381.html |date=2016-05-07 |access-date=2022-12-23 |language=vi |author=Đại Dương |title=Swimming at 'the beach' in... Tây Ninh |url=https://www.sggp.org.vn/share21381.html |url-status=live |website=[[Sài Gòn Giải Phóng Newspaper]]}}</ref> By the end of May of the same year, the Tây Ninh Provincial People's Committee assigned relevant units to invest in infrastructure and transform the area into a natural beach named "Tây Ninh Sea.".<ref>{{cite web |archive-date=2024-04-24 |archive-url=https://web.archive.org/web/20240424131117/https://thanhnien.vn/api/gettoken.htm |date=2016-05-28 |access-date=2022-12-23 |language=vi |author=Giang Phương |title='Tây Ninh Sea' at Dầu Tiếng Lake will become a tourist destination for locals |url=https://thanhnien.vn/post-565023.html |url-status=live |website=[[Thanh Niên Newspaper]]}}</ref>
Vào năm 2022, dưới sự quản lý của Sở Văn hóa, Thể thao và Du lịch tỉnh Tây Ninh, Liên đoàn dù lượn, diều bay thể thao đã được thành lập với lễ ra mắt và biểu diễn dù lượn được tổ chức tại khu vực hồ Dầu tiếng, huyện [[Dương Minh Châu (huyện)|Dương Minh Châu]], tỉnh [[Tây Ninh]]<ref>{{Chú thích web|url=https://thanhnien.vn/post-1489831.html|tựa đề=Tây Ninh thu hút du khách với dù lượn, diều bay thể thao|tác giả=Giang Phương|ngày=2022-08-19|website=[[Báo Thanh Niên]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-24|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131109/https://thanhnien.vn/tay-ninh-thu-hut-du-khach-voi-du-luon-dieu-bay-the-thao-1851489831.htm}}</ref> trong vòng 2 ngày là ngày [[30 tháng 4]] và [[1 tháng 5]].<ref>{{Chú thích web|url=https://thanhnien.vn/post-1489831.html|tựa đề=Tây Ninh thu hút du khách với dù lượn, diều bay thể thao|tác giả=Giang Phương|ngày=2022-08-19|website=[[Báo Thanh Niên]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-24|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131109/https://thanhnien.vn/tay-ninh-thu-hut-du-khach-voi-du-luon-dieu-bay-the-thao-1851489831.htm}}</ref> Trong quy hoạch phát triển đô thị của tỉnh Tây Ninh, Dương Minh Châu đã được phê duyệt trở thành khu vực phát triển dịch vụ du lịch xung quanh núi Bà Đen và hồ Dầu Tiếng.<ref>{{Chú thích web|url=https://vneconomy.vn/tay-ninh-cong-bo-quy-hoach-tinh-se-co-16-do-thi-vao-nam-2030.htm|tựa đề=Tây Ninh: Công bố quy hoạch tỉnh sẽ có 16 đô thị vào năm 2030|tác giả=Ban Mai|họ=|tên=|ngày=2024-04-20|website=VnEconomy|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-27|archive-date=2024-04-27|archive-url=https://web.archive.org/web/20240427151734/https://vneconomy.vn/tay-ninh-cong-bo-quy-hoach-tinh-se-co-16-do-thi-vao-nam-2030.htm}}</ref>


In 2022, under the management of the Tây Ninh Provincial Department of Culture, Sports, and Tourism, the Paragliding and Kite Flying Sports Federation was established. The launch event and paragliding performance were held at the Dầu Tiếng Lake area in [[Dương Minh Châu District]], [[Tây Ninh]] province,<ref>{{cite web |archive-date=2024-04-24 |archive-url=https://web.archive.org/web/20240424131109/https://thanhnien.vn/tay-ninh-thu-hut-du-khach-voi-du-luon-dieu-bay-the-thao-1851489831.htm |date=2022-08-19 |access-date=2022-12-24 |language=vi |author=Giang Phương |title=Tây Ninh attracts tourists with paragliding and kite flying sports |url=https://thanhnien.vn/post-1489831.html |url-status=live |website=[[Thanh Niên Newspaper]]}}</ref> over two days, April 30 and May 1.<ref>{{cite web |archive-date=2024-04-24 |archive-url=https://web.archive.org/web/20240424131109/https://thanhnien.vn/tay-ninh-thu-hut-du-khach-voi-du-luon-dieu-bay-the-thao-1851489831.htm |date=2022-08-19 |access-date=2022-12-24 |language=vi |author=Giang Phương |title=Tây Ninh attracts tourists with paragliding and kite flying sports |url=https://thanhnien.vn/post-1489831.html |url-status=live |website=[[Thanh Niên Newspaper]]}}</ref> As part of Tây Ninh province's urban development plan, Dương Minh Châu has been approved to become a tourism service development area surrounding Ba Den Mountain and Dầu Tiếng Lake.<ref>{{cite web |archive-date=2024-04-27 |archive-url=https://web.archive.org/web/20240427151734/https://vneconomy.vn/tay-ninh-cong-bo-quy-hoach-tinh-se-co-16-do-thi-vao-nam-2030.htm |date=2024-04-20 |access-date=2024-04-27 |language=vi |author=Ban Mai |title=Tây Ninh: Announcing the provincial plan to have 16 urban areas by 2030 |url=https://vneconomy.vn/tay-ninh-cong-bo-quy-hoach-tinh-se-co-16-do-thi-vao-nam-2030.htm |url-status=live |website=VnEconomy}}</ref>
=== Thủy sản ===
Theo một khảo sát của Chi cục Chăn nuôi và thú y trực thuộc Sở Nông nghiệp và Phát triển Nông thôn Tây Ninh, hồ Dầu Tiếng có hơn 50 loài cá, trong đó có 10 loại có giá trị kinh tế như [[cá thát lát]], [[cá lăng]], [[cá lóc]], [[cá cơm]]…<ref name=":0" /> Tuy nhiên, theo thống kê từ Viện Nghiên cứu Nuôi trồng Thủy sản II trực thuộc Bộ Nông nghiệp và Phát triển Nông thôn lại cho rằng, hồ có khoảng 60 loài cá cùng nhiều loại thủy sản khác với 15 loài mang lại giá trị kinh tế như [[cá chép]], [[Họ Cá nheo|cá nheo]], [[Mystus|cá chốt]], cá lóc... Các loài thuộc [[Họ Cá chép|họ cá chép]] được cho chiếm khoảng 33,33 %, [[Bộ Cá da trơn|bộ cá da trơn]] chiếm 30 %, [[Bộ Cá vược|bộ cá vược]] chiếm 23,33 % và các loại cá khác. Kể từ khi hồ được xây dựng, số lượng loài xuất hiện trong hồ so với thượng nguồn sông Sài Gòn đã tăng lên 14 loài, với việc xuất hiện 33 loài mới và 19 loài biến mất. Các loài thủy sản biến mất được liệt kê như [[Macrognathus taeniagaster|cá chạch rằn]], [[cá chạch lửa]], [[cá chiên]], [[cá lưỡi trâu]], [[cá hường]], [[cá bống cát]]... và đặc biệt là [[tôm càng xanh]]. Việc nhiều loại cá khác xuất hiện cũng được cho là từ việc người dân nuôi lồng, bè... các loại cá mang lại giá trị kinh tế cao. Từ năm 2005–2013, 7,8 triệu con cá đã được chính quyền địa phương thả xuống hồ nhằm tái tạo nguồn thủy sản.<ref name=":16">{{Chú thích web|url=https://sonongnghiep.tayninh.gov.vn/chan-nuoi-thu-y/t-nh-a-d-ng-sinh-h-c-v-lo-i-c-a-th-y-s-n-trong-h-d-u-ti-ng-1863.html|tựa đề=Tính đa dạng sinh học về loài của thủy sản trong hồ Dầu Tiếng|tác giả=Lê Vũ Việt Phương|họ=|tên=|ngày=2013-12-10|website=Sở Nông nghiệp và Phát triển Nông thôn tỉnh Tây Ninh|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-05-23}}</ref>


=== Fisheries ===
Theo báo ''Tây Ninh'', mỗi năm, tỉnh này đã trích ngân sách từ 500–700 triệu [[Đồng (đơn vị tiền tệ)|đồng]] để thả hàng chục triệu con cá giống các loại vào hồ nhằm tái tạo nguồn lợi thủy sản.<ref name=":6" /> Tuy nhiên, theo chính quyền địa phương, nhiều trường hợp đánh bắt cá trong hồ dầu tiếng đã sử dụng nhiều ngư cụ cấm như lồng xếp, dớn, đăng, te, xiệp, xung điện... hay ngư cụ kết hợp ánh sáng gây ảnh hưởng nặng nề cho hệ sinh thái hồ.<ref>{{Cite web |last= |title=Tận diệt thủy sản ở hồ Dầu Tiếng |url=https://nld.com.vn/tan-diet-thuy-san-o-ho-dau-tieng-196240422215942321.htm |access-date=2024-07-02 |website=Báo Người Lao Động Online |language=vi}}</ref><ref>{{Cite web |last=Nguyễn Sỹ Hùng |date=2024-04-23 |title=Game bài đổi thưởng |url=https://curcillolaw.com/ |access-date=2024-07-02 |website=Báo Người Lao Động Online |language=vi}}</ref><ref>{{Cite web |last= |first= |date=2013-12-10 |title=TÍNH ĐA DẠNG SINH HỌC VỀ LOÀI CỦA THỦY SẢN TRONG HỒ DẦU TIẾNG |url=https://sonongnghiep.tayninh.gov.vn/chan-nuoi-thu-y/t-nh-a-d-ng-sinh-h-c-v-lo-i-c-a-th-y-s-n-trong-h-d-u-ti-ng-1863.html |access-date=2024-07-02 |website=SỞ NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN TỈNH TÂY NINH |language=vi}}</ref> Ngày 25 tháng 3 năm 2024, Công ty trách nhiễm hữu hạn một thành viên Khai thác thủy lợi miền Nam đã lập "Kế hoạch phối hợp kiểm tra các hoạt động trong phạm vi bảo vệ công trình thuỷ lợi Dầu Tiếng", trong đó bao gồm việc kiểm tra ngư cụ và nuôi cá lồng bè xung quanh hồ nhằm bảo vệ hệ sinh thái cũng như nguồn thủy sản tại đây.<ref>{{Chú thích web|url=https://baotayninh.vn/xuat-hien-nhieu-vo-ca-tren-song-sai-gon-a171418.html|tựa đề=Xuất hiện nhiều vó cá trên sông Sài Gòn|tác giả=Minh Quốc|ngày=2024-04-13|website=Báo Tây Ninh|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-27|archive-date=2024-04-27|archive-url=https://web.archive.org/web/20240427151947/https://baotayninh.vn/xuat-hien-nhieu-vo-ca-tren-song-sai-gon-a171418.html}}</ref>
According to a survey conducted by the Livestock and Veterinary Bureau under the Tây Ninh Department of Agriculture and Rural Development, Dầu Tiếng Lake is home to more than 50 fish species, including 10 economically valuable species such as [[Notopterus|featherback fish]], [[Hemibagrus|catfish]], [[Channa|snakehead fish]], and [[Engraulidae|anchovy]].<ref name=":0">{{Cite web |author=Giang Phương |date=2022-06-04 |title=Một ngày ở Tây Ninh: Ngất ngây trước vẻ đẹp 'nàng thơ' của hồ Dầu Tiếng |url=https://thanhnien.vn/post-1464080.html |access-date=2022-12-23 |website=Thanh Niên Newspaper |language=vi}}</ref> However, according to statistics from the Institute of Fisheries II under the Ministry of Agriculture and Rural Development, the lake hosts around 60 fish species and numerous other aquatic species, with 15 species providing economic value such as [[Cyprinus|carp]], [[Anabas|climbing perch]], [[Mystus|mystus fish]], and catfish. Species belonging to the [[Cyprinidae|carp family]] are reported to account for about 33.33%, [[Siluriformes|catfish family]] 30%, [[Gobiidae|goby family]] 23.33%, and various other fish species.<ref name=":16">{{Cite web |last= |first= |date=2013-12-10 |title=TÍNH ĐA DẠNG SINH HỌC VỀ LOÀI CỦA THỦY SẢN TRONG HỒ DẦU TIẾNG |url=https://sonongnghiep.tayninh.gov.vn/chan-nuoi-thu-y/t-nh-a-d-ng-sinh-h-c-v-lo-i-c-a-th-y-s-n-trong-h-d-u-ti-ng-1863.html |access-date=2024-07-02 |website=SỞ NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN TỈNH TÂY NINH |language=vi}}</ref> Since its construction, the number of fish species in the lake has increased by 14 compared to the upstream Saigon River, with 33 new species appearing and 19 species disappearing. The vanished aquatic species include climbing perch, fire snakehead, [[Gourami|gourami]], [[Hemibagrus wyckioides|barred mystus]], [[Clupeidae|herring]], [[Mystus|giant gourami]], and notably, [[Macrobrachium rosenbergii|giant freshwater prawn]]. The appearance of many other fish species is attributed to local residents farming various economically valuable fish in cages and pens. From 2005 to 2013, 7.8 million fish were released into the lake by local authorities to replenish the aquatic resources.<ref name=":16" />


According to the Tay Ninh newspaper, the province annually allocates a budget of 500-700 million VND to release tens of millions of fish fry into Dau Tieng Lake to replenish aquatic resources.<ref name=":6">{{cite web |author=Nhi Trần |title=Developing Dầu Tiếng Lake safely and effectively |url=https://baotayninh.vn/phat-trien-ho-dau-tieng-an-toan-va-hieu-qua-a142158.html |access-date=2022-12-23 |website=Báo Tây Ninh}}</ref> However, local authorities report that many fishermen in the lake have been using prohibited fishing gear such as stacked cages, [[gillnets]] , [[electrofishing]], and light-attracting devices, causing severe damage to the lake's ecosystem.<ref>{{Cite web |last= |title=Tận diệt thủy sản ở hồ Dầu Tiếng |url=https://nld.com.vn/tan-diet-thuy-san-o-ho-dau-tieng-196240422215942321.htm |access-date=2024-07-02 |website=Báo Người Lao Động Online |language=vi}}</ref><ref>{{Cite web |last=Nguyễn Sỹ Hùng |date=2024-04-23 |title=Game bài đổi thưởng |url=https://curcillolaw.com/ |access-date=2024-07-02 |website=Báo Người Lao Động Online |language=vi}}</ref><ref name=":16" /> On March 25, 2024, the Southern Irrigation Exploitation One Member Limited Liability Company established a "Plan for coordinated inspection of activities within the protection scope of Dau Tieng irrigation works", which includes inspecting fishing gear and cage fish farming around the lake to protect the ecosystem and aquatic resources.<ref>{{Cite web |title=Xuất hiện nhiều vó cá trên sông Sài Gòn - Báo Tây Ninh Online |url=https://baotayninh.vn/xuat-hien-nhieu-vo-ca-tren-song-sai-gon-a171418.html |access-date=2024-07-02 |website=baotayninh.vn |language=vi}}</ref>
=== Thủy lợi ===
Hệ thống công trình thuỷ lợi Dầu Tiếng - Phước Hoà, dưới sự quản lý vận hành của Công ty Trách nhiệm hữu hạn Một thành viên Khai thác thủy lợi Miền Nam phục vụ cấp nước, chống lũ, đẩy mặn và cải tạo môi trường cho vùng hạ du lưu vực [[sông Sài Gòn]] và [[Vàm Cỏ Đông]].<ref name=":6" /> Hồ đang là nguồn cung cấp trực tiếp nước cho sản xuất với 116.953 ha thuộc địa bàn các tỉnh, thành phố: [[Tây Ninh]] (92.953 ha), [[Thành phố Hồ Chí Minh]] (12.000 ha) và [[Long An]] (12.000 ha); đồng thời tưới tạo nguồn cho ven sông Sài Gòn và [[sông Vàm Cỏ Đông]] 93.954 ha.<ref>{{Chú thích web|url=http://www.thiduakhenthuongvn.org.vn/chuyen-de/cong-ty-tnhh-mtv-khai-thac-thuy-loi-dau-tieng-phuoc-hoa-quan-ly-va-khai-thac-hieu-qua-he|tựa đề=Công ty TNHH MTV Khai thác thủy lợi Dầu Tiếng - Phước Hòa: Quản lý và khai thác hiệu quả hệ thống thủy lợi Dầu Tiếng|ngày=10/22/2021|website=Tạp chí Thi Đua Khen Thưởng|url-status=live|ngày truy cập=2022-12-29|archive-date=2022-12-29|archive-url=https://web.archive.org/web/20221229093757/http://www.thiduakhenthuongvn.org.vn/chuyen-de/cong-ty-tnhh-mtv-khai-thac-thuy-loi-dau-tieng-phuoc-hoa-quan-ly-va-khai-thac-hieu-qua-he}}</ref> Năm 2017, [[Đinh La Thăng]] đề nghị khởi động lại dự án đường ống nước nối từ hồ Dầu Tiếng về nhà máy nước ở [[Thành phố Hồ Chí Minh]] bằng cách kêu gọi xã hội hóa đầu tư.<ref>{{Chú thích web|url=https://vietnamnet.vn/bi-thu-thang-khoi-dong-lai-du-an-duong-ong-nuoc-tay-ninh-tphcm-356055.html|tựa đề=Bí thư Thăng: 'Khởi động lại dự án đường ống nước Tây Ninh-TPHCM'|tác giả=Việt Đông|họ=|tên=|website=[[VietnamNet]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-23|archive-date=2022-12-23|archive-url=https://web.archive.org/web/20221223190510/https://vietnamnet.vn/bi-thu-thang-khoi-dong-lai-du-an-duong-ong-nuoc-tay-ninh-tphcm-356055.html}}</ref> Năm 2018, chính quyền Tây Ninh đã khởi công xây dựng dự án đưa nước từ hồ Dầu Tiếng sang phía Tây của sông Vàm Cỏ Đông nhằm cung cấp nước cho các xã thuộc huyện [[Châu Thành, Tây Ninh|Châu Thành]], [[Bến Cầu]] thuộc tỉnh Tây Ninh với tổng kinh phí 1.246 tỷ đồng. Công trình bao gồm một ống thép vượt sông với khẩu độ 30 m, chiều cao tĩnh không khoảng 6 m.<ref>{{Chú thích web|url=https://tuoitre.vn/sieu-du-an-thuy-loi-o-tay-ninh-duong-ong-khong-lo-dua-nuoc-vuot-song-20221108125652695.htm|tựa đề=Siêu dự án thủy lợi ở Tây Ninh, đường ống khổng lồ đưa nước vượt sông|tác giả=Châu Tuấn|họ=|tên=|ngày=2022-11-08|website=Báo Tuổi Trẻ|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-05-23}}</ref>


=== Irrigation ===
Trong [[đợt nắng nóng tại Việt Nam năm 2024]], [[Long An]] đã đề xuất Công ty Trách nhiệm hữu hạn Một thành viên khai thác thủy lợi Miền Nam xả nước từ hồ Dầu Tiếng dẫn vào sông [[Sông Vàm Cỏ Đông|Vàm Cỏ Đông]] để đẩy mặn sau khi tỉnh ban bố tình trạng thiên tai hạn mặn cấp độ 4 vào ngày 17 tháng 4. Phía doanh nghiệp cũng đã chấp thuận và cam kết xả 7 triệu mét khối nước dẫn qua hướng sông Vàm Cỏ Đông nhằm hỗ trợ Long An.<ref>{{Chú thích web|url=https://thanhnien.vn/song-vam-co-dong-nhan-7-trieu-met-khoi-nuoc-tu-ho-dau-tieng-de-chong-han-man-185240424144157753.htm|tựa đề=Sông Vàm Cỏ Đông nhận 7 triệu mét khối nước từ hồ Dầu Tiếng để chống hạn mặn|tác giả=Bắc Bình|họ=|ngày=2024-04-24|website=Báo Thanh Niên|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131036/https://thanhnien.vn/song-vam-co-dong-nhan-7-trieu-met-khoi-nuoc-tu-ho-dau-tieng-de-chong-han-man-185240424144157753.htm}}</ref> Tuy nhiên sau đó, Sở Nông nghiệp và Phát triển nông thôn tỉnh Long An đã đề nghị hồ tăng cường mức xả để hỗ trợ tỉnh này.<ref>{{Chú thích web|url=https://tuoitre.vn/de-nghi-xa-them-nuoc-ho-dau-tieng-ve-long-an-de-han-che-han-man-20240422220509506.htm|tựa đề=Đề nghị xả thêm nước hồ Dầu Tiếng về Long An để hạn chế hạn mặn|tác giả=Sơn Lâm|họ=|tên=|ngày=2024-04-22|website=Báo Tuổi Trẻ|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2024-04-22|archive-url=https://web.archive.org/web/20240422172632/https://tuoitre.vn/de-nghi-xa-them-nuoc-ho-dau-tieng-ve-long-an-de-han-che-han-man-20240422220509506.htm}}</ref> Trước đó, hồ cũng đã phải xả nước để ngăn chặn tình trạng xâm nhập mặn ở sông Sài Gòn và hệ thống [[sông Đồng Nai]].<ref>{{Chú thích web|url=https://baotintuc.vn/kinh-te/xa-nuoc-qua-tran-ho-dau-tieng-day-mantren-song-sai-gon-20240411193131137.htm|tựa đề=Xả nước qua tràn hồ Dầu Tiếng đẩy mặn trên sông Sài Gòn|tác giả=Dương Chí Tưởng|họ=|ngày=2024-04-11|website=Báo Tin tức|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2024-04-11|archive-url=https://web.archive.org/web/20240411135629/https://baotintuc.vn/kinh-te/xa-nuoc-qua-tran-ho-dau-tieng-day-mantren-song-sai-gon-20240411193131137.htm}}</ref>
The Dau Tieng - Phuoc Hoa irrigation system, under the management of the Southern Irrigation Exploitation One Member Limited Liability Company, serves to provide water, control floods, repel salinity, and improve the environment for the downstream areas of the Saigon and Vam Co Dong river basins.<ref>{{Cite web |title=Phát triển hồ Dầu Tiếng an toàn và hiệu quả - Báo Tây Ninh Online |url=https://baotayninh.vn/phat-trien-ho-dau-tieng-an-toan-va-hieu-qua-a142158.html |access-date=2024-07-02 |website=baotayninh.vn |language=vi}}</ref> The reservoir is currently the direct source of water for production for 116,953 hectares in the provinces and cities of Tay Ninh (92,953 ha), [[Ho Chi Minh City]] (12,000 ha), and [[Long An]] (12,000 ha); it also provides irrigation for 93,954 hectares along the Saigon and Vam Co Dong rivers.<ref>{{Cite web |title=Công ty TNHH MTV Khai thác thủy lợi Dầu Tiếng - Phước Hòa: Quản lý và khai thác hiệu quả hệ thống thủy lợi Dầu Tiếng |url=http://www.thiduakhenthuongvn.org.vn/chuyen-de/cong-ty-tnhh-mtv-khai-thac-thuy-loi-dau-tieng-phuoc-hoa-quan-ly-va-khai-thac-hieu-qua-he |access-date=2024-07-02 |website=www.thiduakhenthuongvn.org.vn}}</ref> In 2017, [[Dinh La Thang]] proposed restarting the pipeline project connecting Dau Tieng Lake to the water plant in [[Ho Chi Minh City]] by calling for socialized investment.<ref>{{Cite web |last= |first= |title=Bí thư Thăng: 'Khởi động lại dự án đường ống nước Tây Ninh-TPHCM' |url=https://vietnamnet.vn/bi-thu-thang-khoi-dong-lai-du-an-duong-ong-nuoc-tay-ninh-tphcm-356055.html |access-date=2024-07-02 |website=VietNamNet News |language=vietnamese}}</ref> In 2018, the Tay Ninh government commenced construction of a project to bring water from Dau Tieng Lake to the west of the [[Vàm Cỏ Đông River|Vam Co Dong River]] to supply water to communes in [[Chau Thanh, Tay Ninh|Chau Thanh]] and [[Bến Cầu|Ben Cau]] districts of Tay Ninh province with a total investment of 1,246 billion VND. The project includes a steel pipe crossing the river with a span of 30 meters and a static clearance height of about 6 meters.<ref>{{Cite web |last= |first= |date=2022-11-08 |title=Siêu dự án thủy lợi ở Tây Ninh, đường ống khổng lồ đưa nước vượt sông |url=https://tuoitre.vn/sieu-du-an-thuy-loi-o-tay-ninh-duong-ong-khong-lo-dua-nuoc-vuot-song-20221108125652695.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref>


During the [[2024 Southeast Asia heat wave|2024 heatwave in Vietnam]], [[Long An province]] requested the Southern Irrigation Exploitation One Member Limited Liability Company to release water from Dau Tieng Lake into the [[Vam Co Dong River]] to push back saltwater intrusion after the province declared a level 4 drought and salinity disaster on April 17th. The company agreed and committed to releasing 7 million cubic meters of water through the [[Vam Co Dong River]] to support [[Long An]].<ref>{{Cite web |last= |date=2024-04-24 |title=Sông Vàm Cỏ Đông nhận 7 triệu mét khối nước từ hồ Dầu Tiếng để chống hạn mặn |url=https://thanhnien.vn/song-vam-co-dong-nhan-7-trieu-met-khoi-nuoc-tu-ho-dau-tieng-de-chong-han-man-185240424144157753.htm |access-date=2024-07-02 |website=thanhnien.vn |language=vi}}</ref> However, the Department of Agriculture and Rural Development of [[Long An province]] later requested the reservoir to increase the discharge rate to further assist the province.<ref>{{Cite web |last= |first= |date=2024-04-22 |title=Đề nghị xả thêm nước hồ Dầu Tiếng về Long An để hạn chế hạn mặn |url=https://tuoitre.vn/de-nghi-xa-them-nuoc-ho-dau-tieng-ve-long-an-de-han-che-han-man-20240422220509506.htm |access-date=2024-07-02 |website=TUOI TRE ONLINE |language=vi}}</ref> Previously, the reservoir had also released water to prevent saltwater intrusion in the Saigon River and the [[Dong Nai river]] system.<ref>{{Cite web |last= |date=2024-04-11 |title=Xả nước qua tràn hồ Dầu Tiếng đẩy mặn trên sông Sài Gòn |url=https://baotintuc.vn/kinh-te/xa-nuoc-qua-tran-ho-dau-tieng-day-mantren-song-sai-gon-20240411193131137.htm |access-date=2024-07-02 |website=baotintuc.vn |language=vi}}</ref>
=== Khoáng sản ===
Vào năm 2010, Ủy ban nhân dân tỉnh Tây Ninh đã thống nhất cùng tỉnh [[Bình Phước]] trong công văn số 1968 về việc bàn giao cho Ủy ban nhân dân tỉnh này cấp giấy phép khai thác khoáng sản 16 km thượng nguồn của sông Sài Gòn mà hai tỉnh cùng quản lý. Khi giao lại cho Bình Phước, Tây Ninh cho biết sẽ chỉ phối hợp quản lý khi cần thiết. Sau khi công văn có hiệu lực 2 tháng, Bình Phước đã cấp phép duy nhất cho Doanh nghiệp tư nhân Thái Thịnh khai thác cát với thời gian 10 năm. Tuy nhiên đến năm 2017, giấy phép này được chuyển giao cho Công ty trách nhiễm hữu hạn một thành viên Sản xuất Thương mại Phú Thọ. Tuy nhiên sau đó, người dân tại [[Tân Hòa, huyện Tân Châu|Tân Hòa]], [[Tân Châu (huyện)|Tân Châu]] đã báo cáo lên tỉnh Tây Ninh về hoạt động sạt ở nghiêm trọng bên phía Tây Ninh. Khi giám sát, Công ty Thái Thịnh đã gây sạt lở 150 m vào địa phận Tân Hòa khi không thả phao cũng như biển báo khai thác.<ref>{{Chú thích web|url=https://baotayninh.vn/pham-vi-bi-sat-lo-thuoc-dat-ban-ngap-ho-dau-tieng-a171171.html|tựa đề=Vụ tàu khai thác cát trái phép gần rừng phòng hộ Dầu Tiếng: Phạm vi bị sạt lở thuộc đất bán ngập hồ Dầu Tiếng|tác giả=Trường Lộ|ngày=2024-04-07|website=Báo Tây Ninh|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-27|archive-date=2024-04-27|archive-url=https://web.archive.org/web/20240427152943/https://baotayninh.vn/pham-vi-bi-sat-lo-thuoc-dat-ban-ngap-ho-dau-tieng-a171171.html}}</ref> Theo chính quyền tỉnh Tây Ninh, do diện tích hồ rộng lớn, nhiều khu vực hồ không có người dân sinh sống nên quá trình phát hiện khai thác khoáng sản trái phép trong lòng hồ là vô cùng khó khăn.<ref>{{Chú thích web|url=https://baotintuc.vn/dia-phuong/tang-cuong-kiem-soat-khai-thac-cat-tren-ho-dau-tieng-20240308084815738.htm|tựa đề=Tăng cường kiểm soát khai thác cát trên hồ Dầu Tiếng|tác giả=Thanh Tân|họ=|ngày=2024-03-08|website=Báo Tin tức|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-05-24}}</ref>


=== Nhà máy điện Mặt trời ===
=== Minerals ===
In 2010, the People's Committee of Tay Ninh province agreed with Binh Phuoc province in Official Letter No. 1968 to hand over the licensing of mineral exploitation in the 16 km upstream area of the Saigon River, which is co-managed by the two provinces, to the People's Committee of Binh Phuoc province. Upon handing it over to [[Binh Phuoc]], [[Tay Ninh]] stated that it would only coordinate management when necessary. Two months after the official letter took effect, Binh Phuoc granted the sole license to Thai Thinh Private Enterprise for sand exploitation for a period of 10 years. However, in 2017, this license was transferred to Phu Tho Production and Trading One Member Limited Liability Company. Subsequently, residents of Tan Hoa, Tan Chau reported to [[Tay Ninh province]] about serious erosion on the Tay Ninh side. Upon inspection, Thai Thinh Company had caused 150 meters of erosion into Tan Hoa territory without deploying buoys or mining signs.<ref>{{Cite web |title=Vụ tàu khai thác cát trái phép gần rừng phòng hộ Dầu Tiếng: Phạm vi bị sạt lở thuộc đất bán ngập hồ Dầu Tiếng |url=https://baotayninh.vn/pham-vi-bi-sat-lo-thuoc-dat-ban-ngap-ho-dau-tieng-a171171.html |access-date=2024-07-02 |website=baotayninh.vn |language=vi}}</ref> According to Tay Ninh provincial authorities, due to the vast area of the lake and the absence of residents in many areas, detecting illegal mineral exploitation within the lake is extremely difficult.<ref>{{Cite web |last= |date=2024-03-08 |title=Tăng cường kiểm soát khai thác cát trên hồ Dầu Tiếng |url=https://baotintuc.vn/dia-phuong/tang-cuong-kiem-soat-khai-thac-cat-tren-ho-dau-tieng-20240308084815738.htm |access-date=2024-07-02 |website=baotintuc.vn |language=vi}}</ref>
{{Bài chi tiết|Điện mặt trời Dầu Tiếng}}
[[Tập_tin:DAU_TIENG_1-2-3.png|thế=Công trình điện Mặt Trời tại hồ Dầu Tiếng.|nhỏ|258x258px|Một phần của Nhà máy điện Mặt Trời Dầu Tiếng.]]
Điện mặt trời Dầu Tiếng là nhóm nhà máy [[điện mặt trời]] xây dựng trên vùng đất bán ngập và ven hồ Dầu Tiếng ở các huyện [[Tân Châu (huyện)|Tân Châu]] và [[Dương Minh Châu (huyện)|Dương Minh Châu]] tỉnh [[Tây Ninh]], Việt Nam.<ref>{{Chú thích web|url=https://toquoc.vn/xay-dung-nha-may-dien-mat-troi-lon-nhat-chau-a-tai-tay-ninh-99238276.htm|tựa đề=Xây dựng nhà máy điện mặt trời lớn nhất châu Á tại Tây Ninh|tác giả=Phùng Nguyên|họ=|ngày=06/21/2018|website=[[Báo Tổ quốc]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-29|archive-date=2022-12-29|archive-url=https://web.archive.org/web/20221229185620/https://toquoc.vn/xay-dung-nha-may-dien-mat-troi-lon-nhat-chau-a-tai-tay-ninh-99238276.htm}}</ref> Chỉ với 10 tháng thi công xây dựng, vào tháng 6 năm 2019, nhà máy điên mặt trời Dầu Tiếng đã hòa vào lưới điện quốc gia và trở thành dự án lớn nhất Đông Nam Á về năng lượng sạch.<ref name=":15">{{Chú thích web|url=https://tuoitre.vn/khanh-thanh-cum-nang-luong-mat-troi-dau-tieng-lon-nhat-dong-nam-a-20190907153217999.htm|tựa đề=Khánh thành cụm năng lượng mặt trời Dầu Tiếng, lớn nhất Đông Nam Á|tác giả=Phước Tuần|họ=|tên=|tác giả 2=Lê Phan|ngày=2019-09-07|website=Báo Tuổi Trẻ|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2022-12-25|archive-url=https://web.archive.org/web/20221225135247/https://tuoitre.vn/khanh-thanh-cum-nang-luong-mat-troi-dau-tieng-lon-nhat-dong-nam-a-20190907153217999.htm}}</ref> Chỉ vừa khánh thành, sản lượng điện đã bằng mức tiêu thụ điện hàng năm của khoảng 320.000 hộ gia đình Việt Nam.<ref>{{Chú thích web|url=https://nangluongvietnam.vn/khanh-thanh-cum-nha-may-dien-mat-troi-dau-tieng-23116.html|tựa đề=Khánh thành cụm Nhà máy điện mặt trời Dầu Tiếng|họ=|tên=|ngày=2019-09-10|website=Tạp chí Năng lượng Việt Nam|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2023-11-28|archive-url=https://web.archive.org/web/20231128121015/https://nangluongvietnam.vn/khanh-thanh-cum-nha-may-dien-mat-troi-dau-tieng-23116.html}}</ref> Sau khi xây dựng, công trình đã góp phần đưa Tây Ninh trở thành "thủ phủ điện mặt trời" của cả nước.<ref>{{Chú thích web|url=https://www.evn.com.vn/d6/news/Tay-Ninh-Khanh-thanh-cum-Nha-may-Dien-mat-troi-Dau-Tieng-DT1-va-DT2-100-609-52444.aspx|tựa đề=Tây Ninh: Khánh thành cụm Nhà máy Điện mặt trời Dầu Tiếng DT1 và DT2|tác giả=Mai Nhiệm|họ=|ngày=2019-09-09|website=Tập đoàn Điện lực Việt Nam|url-status=live|ngày truy cập=2024-04-24|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131641/https://www.evn.com.vn/d6/news/Tay-Ninh-Khanh-thanh-cum-Nha-may-Dien-mat-troi-Dau-Tieng-DT1-va-DT2-100-609-52444.aspx}}</ref>

Công trình được bắt đầu khởi công vào cuối tháng 6 năm 2018 với tổng kinh phí lên tới 9,1 nghìn tỷ đồng trên diện tích khoảng 504 ha, công suất lắp đạt vào khoảng 420 MW. Dự án được xây dựng bởi Công ty Trách nhiệm hữu hạn Xuân Cầu của Việt Nam và Công ty Trách nhiệm hữu hạn B. Grimm Power Public của Thái Lan. Hai trong số ba nhà máy đầu tiên của cụm Nhà máy điện Mặt trời đã được khánh thành vào năm 2019.<ref>{{Chú thích web|url=https://www.tayninh.gov.vn/vi/news/tin-noi-bat/t-y-ninh-kh-nh-th-nh-nh-m-y-i-n-m-t-tr-i-l-n-nh-t--ng-nam--3540.html|tựa đề=Tây Ninh: Khánh thành nhà máy điện mặt trời lớn nhất Đông Nam Á|tác giả=XV|họ=|tên=|ngày=2019-09-07|website=Cổng thông tin điện tử tỉnh Tây Ninh|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131644/https://www.tayninh.gov.vn/vi/news/tin-noi-bat/t-y-ninh-kh-nh-th-nh-nh-m-y-i-n-m-t-tr-i-l-n-nh-t--ng-nam--3540.html}}</ref>

== Liên quan ==

=== Chính quyền Tây Ninh phản đối xây dựng ===
Trước khi hồ Dầu Tiếng được xây dựng nhiều người dân và lãnh đạo tỉnh Tây Ninh đã phản đối do quan ngại việc chặn dòng sông Sài Gòn để tích nước làm hồ. Thậm chí có người dân còn tuyên bố, "Có bao nhiêu nước về đây, tôi uống hết!". Nhiều lãnh đạo tỉnh Tây Ninh lại phản đối và thắc mắc vì sao hồ chiếm đến 2/3 diện tích ở Tây Ninh nhưng lại đặt tên Dầu Tiếng theo tỉnh Bình Dương.<ref name=":11" /> Bí thư tỉnh ủy Tây Ninh lúc này là ông Nguyễn Văn Tốt đã yêu cầu các cơ quan trong tỉnh không tiếp đón Bộ Thủy lợi và không bàn bạc về hồ Dầu Tiếng. Thậm chí ông Tốt còn tố cáo Bộ trưởng Bộ Thủy lợi Nguyễn Thanh Bình lên Ban Bí thư do quan ngại ông là người của Cơ quan Tình báo Trung ương Hoa Kỳ cài vào nhằm phá hoại Việt Nam.<ref name=":9" /> [[Đặng Văn Thượng]] – Chủ tịch Ủy ban nhân dân tỉnh Tây Ninh lúc bấy giờ chia sẻ ông đã được gọi riêng để nói, "Hồ Dầu Tiếng hao tốn đất đai, công sức, không đem lại lợi ích cho dân Tây Ninh" và yêu cầu ông "không được bàn bạc, tiếp xúc, họp hành" với Bộ Thủy lợi do ông là người ủng hộ công trình này.<ref name=":11" /> Thậm chí sau đó, Bộ Thủy lợi cũng đã phải tổ chức một hội nghị lớn do ông [[Phạm Hùng]] chủ trì để trình bày cơ sở khoa học của hồ.<ref name=":11" /> Sau đó nhằm xoa dịu Tây Ninh, chính phủ đã cho phép quyết định đổi tên thành hồ Dầu Tiếng – Tây Ninh.<ref name=":9" /> Ngoài ông Đặng Văn Thượng, còn có ông Võ Anh Tú và Võ Đức Thiện –giữ chức Phó Chủ tịch Ủy ban nhân dân tỉnh Tây Ninh ủng hộ công trình. Cả ba đã cùng nhau đi vận động người dân để đi đào kênh thủy lợi, tạo dựng hồ Dầu Tiếng.<ref name=":12" />

=== Khu vực sinh sống của những người không quốc tịch ===
Đến năm 2016, theo ghi nhận của chính quyền địa phương, tổng cộng đã có 352 hộ với hơn 1.000 người dân không có quốc tịch đang sinh sống ven lòng hồ thuộc xã [[Tân Thành, Tân Châu (Tây Ninh)|Tân Thành]], huyện [[Tân Châu (huyện)|Tân Châu]], tỉnh Tây Ninh. Theo Bí thư Đảng ủy xã Dương Thị Vất, ban đầu chỉ có 3–4 hộ dân đến sinh sống nhưng sau đó số lượng này đã gia tăng nhanh chóng và dựng nhà tạm ngay trong đêm. Những người dân ở đây chia sẻ họ không thể sinh sống được ở [[Campuchia]] nên quyết định đi ngược thuyền về Việt Nam để sinh sống và số lượng này ngày càng gia tăng. Hầu hết người dân tại đây đều có nguồn gốc từ khu vực [[Tonlé Sap|Biển hồ Campuchia]]. Cũng trong năm, Tây Ninh đã xây dựng hơn 100 ngôi nhà trên đất công cho những người dân không sinh sống. Đồng thời phối hợp với Sở Tư pháp tỉnh làm giấy tờ cho những người này. Tuy nhiên, tỉnh cũng quan ngại việc khi được tin hỗ trợ số lượng người dân từ Campuchia về sẽ gia tăng và gây "áp lực" cho địa phương. Sở Tư pháp Tây Ninh cũng khẳng định, trẻ em được sinh ra tại đây mặc nhiên sẽ được làm giấy khai sinh Việt Nam.<ref name=":13">{{Chú thích web|url=https://vnexpress.net/hon-nghin-viet-kieu-khong-quoc-tich-song-ven-ho-dau-tieng-3446797.html|tựa đề=Hơn nghìn Việt kiều không quốc tịch sống ven hồ Dầu Tiếng|tác giả=Duy Trần|họ=|ngày=2016-08-08|website=VnExpress|ngôn ngữ=vi|archive-url=https://web.archive.org/web/20240424131557/https://vnexpress.net/hon-nghin-viet-kieu-khong-quoc-tich-song-ven-ho-dau-tieng-3446797.html|archive-date=2024-04-24|url-status=live|ngày truy cập=2024-04-24}}</ref> Vào giữa tháng 7, Thủ tướng [[Nguyễn Xuân Phúc]] cũng có công văn yêu cầu các địa phương hỗ trợ người dân hòa nhập cộng đồng.<ref name=":13" />

=== Nguy cơ vỡ đập ===
[[Tập tin:Saigon Ho Chi Minh City (15420160812).jpg|thế=Khu vực hạ lưu sông Sài Gòn|nhỏ|Khu vực hạ lưu [[sông Sài Gòn]], một trong những nguồn thoát nước chính của hồ Dầu Tiếng.]]
Nguy cơ về việc vỡ đập hồ Dầu Tiếng đã được đưa ra vào ngày 31 tháng 7 năm 2013 bởi các chuyên gia thủy lợi trong một cuộc họp của Ủy ban nhân dân Thành phố Hồ Chí Minh.<ref name=":14">{{Chú thích web|url=https://thanhtra.com.vn/dieu-tra/dieu-tra-theo-don-thu/loi-canh-bao-khong-the-lang-quen-169224.html|tựa đề=Lời cảnh báo không thể lãng quên!|tác giả=Nhật Tường|ngày=2020-08-05|website=Báo Thanh tra|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2022-06-29|archive-url=https://web.archive.org/web/20220629220825/https://thanhtra.com.vn/dieu-tra/dieu-tra-theo-don-thu/loi-canh-bao-khong-the-lang-quen-169224.html}}</ref> Theo ước tính của các chuyên gia, chỉ trong vòng 2 giờ 8 phút đợt lũ từ việc vỡ đập sẽ gây ngập tại Củ Chi vào 11,97 m và sau 23 giờ 18 phút sẽ khiến Thành phố Hồ Chí Minh ngập 2,38 m.<ref name=":14" /><ref name=":4">{{Chú thích web|url=https://vtv.vn/news-20220703202346537.htm|tựa đề=TP Hồ Chí Minh sẽ bị ngập sâu hơn 2m sau chỉ 1 ngày nếu đập Hồ Dầu Tiếng vỡ|tác giả=Đức Đệ; Văn Dương|họ=|tên=|ngày=2022-07-03|website=[[Báo điện tử VTV]]|ngôn ngữ=vi|archive-url=https://web.archive.org/web/20221223181857/https://vtv.vn/news-20220703202346537.htm|archive-date=2022-12-23|url-status=live|ngày truy cập=2022-12-23}}</ref> Theo thiết kế, lưu lượng xả tràn của hồ Dầu Tiếng có thể lên đến 2.800 m3/giây với mực nước lũ 26,92 m. Trong khi đó, sức tải lũ của [[sông Sài Gòn]] còn rất thấp.<ref name=":7">{{Chú thích web|url=https://nhandan.vn/post-707743.html|tựa đề=Bảo đảm an toàn cho hồ Dầu Tiếng|tác giả=Hoa Lê|ngày=2022-07-29|website=[[Báo Nhân Dân]]|ngôn ngữ=vi|url-status=live|ngày truy cập=2022-12-24|archive-date=2024-04-24|archive-url=https://web.archive.org/web/20240424131552/https://nhandan.vn/bao-dam-an-toan-cho-ho-dau-tieng-post707743.html}}</ref> Vào ngày 7 tháng 2 năm 2017, Thủ tướng Chính phủ đã ra Quyết định số 166/QĐ-TTg đưa công trình thủy lợi hồ Dầu Tiếng vào công trình quan trọng liên quan đến an ninh quốc gia.<ref name=":14" /> Trước đó, hồ Dầu Tiếng chỉ xả lũ bất thường do sự cố cửa van vào năm 1986 và năm 2008 nhưng đã gây ngập lụt cho nội thành của Thành phố Hồ Chí Minh.<ref>{{Chú thích web|url=https://thesaigontimes.vn/len-phuong-an-ung-pho-vo-dap-ho-dau-tieng/|tựa đề=Lên phương án ứng phó vỡ đập hồ Dầu Tiếng|họ=|tên=|ngày=2011-10-15|website=Tạp chí Kinh tế Sài Gòn|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2021-10-25|archive-url=https://web.archive.org/web/20211025053906/https://thesaigontimes.vn/len-phuong-an-ung-pho-vo-dap-ho-dau-tieng/}}</ref> Vào năm 2016, [[Bộ Nông nghiệp và Phát triển nông thôn (Việt Nam)|Bộ Nông nghiệp và Phát triển nông thôn]] cùng Ban Chỉ huy phòng chống thiên tai và tìm kiếm cứu hộ cứu nạn tỉnh Tây Ninh, Công ty Trách nhiệm hữu hạn Một thành viên Khai thác thủy lợi Dầu Tiếng – Phước Hòa đã tập giả định phá 200 m thân đập để xả lũ về sông Vàm Cỏ Đông trong tình huống hồ Dầu Tiếng quá tải và tránh ngập cho hạ du sông Sài Gòn. Việc phá hủy đập phụ sẽ gây ảnh hưởng 28 hộ dân ở xã Suối Đá, huyện Dương Minh Châu cùng các vùng lân cận khác.<ref>{{Chú thích web|url=https://tuoitre.vn/tap-ung-pho-su-co-nuoc-tran-dap-ho-dau-tieng-1229929.htm|tựa đề=Tập ứng phó sự cố nước tràn đập hồ Dầu Tiếng|tác giả=Đức Trong|họ=|tên=|tác giả 2=Tân Phạm|ngày=2016-12-03|website=Báo Tuổi Trẻ|ngôn ngữ=vi|url-status=live|ngày truy cập=2024-04-24|archive-date=2022-06-26|archive-url=https://web.archive.org/web/20220626090222/https://tuoitre.vn/tap-ung-pho-su-co-nuoc-tran-dap-ho-dau-tieng-1229929.htm}}</ref>

Năm 2022, Trần Quang Hoài, Phó Trưởng ban Chỉ đạo quốc gia về phòng, chống thiên tai nhấn mạnh "Nếu khi có tình huống xấu xảy ra, nguy cơ sẽ rất lớn, thiệt hại gây ra sẽ không nhỏ và có thể trở thành thảm họa đối với [[Thành phố Hồ Chí Minh]]".<ref name=":7" />


==Notes==
==Notes==

Revision as of 21:13, 9 July 2024

A corner of Dầu Tiếng Lake

Dầu Tiếng Lake is an artificial lake located in the three provinces of Tây Ninh, Bình Dương, and Bình Phước in the Southeast region, Vietnam. The lake was formed by damming the upper reaches of the Saigon River, making it the largest irrigation reservoir in Vietnam and Southeast Asia. Construction of the lake began in 1981 after surveys were conducted starting in 1976. The project was completed with over 100 million USD in funding, which the Vietnamese government borrowed from the World Bank, making it the first project in Vietnam to be built using US dollars since the Reunification of Vietnam on April 30, 1975.

Before construction, the lake's development sparked considerable debate among the leaders of Tây Ninh province regarding the choice of the lake's name and the project's feasibility. Nevertheless, the construction proceeded. Since 2017, Dầu Tiếng Lake has been classified as a project of national security importance due to concerns that a dam breach would affect the Ho Chi Minh City area. As of 2022, Dầu Tiếng Lake is managed by the Southern Irrigation Exploitation One Member Limited Liability Company[a] under the management of the Ministry of Agriculture and Rural Development.

In 2005, along with Black Virgin Mountain, Dầu Tiếng Lake was selected to appear in the central part of the logo of Tây Ninh province.[2]

Overview

Dầu Tiếng Lake spans across four districts: Dầu Tiếng (Bình Dương Province), Dương Minh Châu, Tân Châu (Tây Ninh Province), and Hớn Quản (Bình Phước Province) with a surface area of up to 270 km² and a total capacity of 1.58 billion m³ of water.[3][4] The lake is located 20 km northeast of Tây Ninh city and 70 km north of Ho Chi Minh City.[5] Formed by damming the upper reaches of the Saigon River,[6][7] its main purpose is to regulate water flow into the Saigon River and provide irrigation for over 100,000 hectares of agricultural land in Tây Ninh and neighboring provinces such as Bình Dương, Ho Chi Minh City, and Long An. The Dầu Tiếng irrigation system consists of three main canals: East Canal, West Canal, and Tân Hưng Canal, which distribute water through over 1,550 km of branch canals in various localities.[8] Additionally, the lake is utilized by local residents for aquaculture.[9]

The project is regulating water to serve 93,000 hectares of land in Tây Ninh, including the districts of Tân Biên, Châu Thành, Bến Cầu, Dương Minh Châu, Gò Dầu, the town of Hòa Thành, Trảng Bàng, and the city of Tây Ninh; in Củ Chi district, Ho Chi Minh City; and in Đức Hòa district, Long An province.[10]

History

Survey

After the unification of Vietnam in 1975, the government of the Socialist Republic of Vietnam decided to establish the Southern Irrigation Design Survey Team. Initial maps of the land for planning were adapted from the 1:100,000 maps of the Republic of Vietnam government. In 1976, Phạm Hùng, the Deputy Prime Minister of Vietnam, launched the movement "The entire population and army to undertake irrigation works" with the philosophy that "Irrigation is the foremost measure to rejuvenate the country."[11] During this period, many officials from the North were sent to the South to survey and construct the lake, including Nguyễn Xuân Hùng from the Survey Design Institute (Ministry of Water Resources), who was the chief designer of the project.[12] During the survey, seven officials died after stepping on mines in what is now the lake area. Before the official construction, some rubber plantation owners had intended to build a lake in the area for recreational purposes.[11]

Before the official construction, many auxiliary dams were built by the Vietnamese military starting in 1977.[11]

Construction

The Dầu Tiếng irrigation project was approved by the Prime Minister in 1979 and commenced construction on April 29, 1981, with a total investment of 110 million USD[13] at Thuận Bình hamlet, Truông Mít commune, Dương Minh Châu district, Tây Ninh province, in the presence of Deputy Prime Minister Huỳnh Tấn Phát.[14] At that time, the project faced opposition from Tây Ninh province leaders due to land concerns, as two-thirds of the lake's area was in Tây Ninh, but it was named after Dầu Tiếng, a location in Bình Dương.[15] The opposition was so strong that Nguyễn Văn Tốt, the then-Secretary of Tây Ninh province, instructed all provincial agencies not to receive the Ministry of Water Resources or discuss the Dầu Tiếng project, including the Chairman of the Provincial People's Committee. According to Nông nghiệp newspaper, Minister of Water Resources Nguyễn Thanh Bình was even accused by Tốt to the Central Secretariat of fearing sabotage by the CIA. To placate Tây Ninh, Prime Minister Phạm Hùng named the lake Dầu Tiếng – Tây Ninh.[11] However, Đặng Văn Thượng, the Deputy Secretary of the Provincial Party Committee and Chairman of the Provincial People's Committee of Tây Ninh, supported the project. At its peak, the construction involved up to 36,300 workers, with a minimum of 7,200 workers. Despite the initial opposition from the province, the project saw "significant contributions from the youth and people of Tây Ninh" after Thượng and his officials mobilized the public to dig canals and build the lake.[16]

The capital for constructing the reservoir is said to have come from a preferential loan of over $100 million USD from the World Bank, which was chaired at the time by Robert Strange McNamara. McNamara was a former United States Secretary of Defense and considered the "chief architect" of the Vietnam War.[17] This was also the first loan successfully secured by the State of the Socialist Republic of Vietnam, making this project the first to be constructed with US dollars after 1975.[17][18] The construction workforce at that time consisted of young people, with the number reaching tens of thousands at its peak. According to statistics from the Tay Ninh provincial youth union, by the time the project was put into operation, Tay Ninh and neighboring provinces and cities had mobilized over 450,000 youth members, completed nearly 15 million workdays, excavated more than 11.6 million cubic meters of earth, and constructed nearly 54,000 cubic meters of concrete and masonry, building thousands of kilometers of canals and thousands of structures along the canals.[9] The reservoir was also built in the context of Vietnam being Khmer Rouge attacked on its border by Cambodia.[13]

To obtain the vast area in 1982, thousands of households in Lộc Ninh commune, Dương Minh Châu district, gave up their land and moved to new residences in the Truông Mít and Bến Củi communes.[6] On July 2, 1984, the reservoir began storing water, and on January 10, 1985, the Dầu Tiếng irrigation system with its two main canals, East and West, officially started operation.[19][15] In 1985, right at the construction site, Thân Công Khởi, a former operator of a self-propelled scraper who participated in building the main dam and later the West canal (one of the two main arteries of the Dầu Tiếng reservoir), was awarded the title of Hero of Labor by the Chairman of the State Council Trường Chinh. He was the only person among the half a million workers to receive this title.[20] During the 1985-1986 period, the reservoir was substantially completed to deliver water to Củ Chi district, with an annual flow of about 135 million cubic meters of water.[21] From 1996 to 1999, the Tân Hưng canal was constructed to direct water from the Dầu Tiếng reservoir to irrigate the southern communes of the two districts Tân Châu and Tân Biên.[22] In 2012, the Phước Hòa irrigation reservoir and canal system became operational, transferring water from the Bé River to the Sài Gòn River, thereby supplementing the water for the Dầu Tiếng reservoir. Thus, this is an irrigation project that transfers water from one river to another, with one reservoir replenishing another.[23]

Activities

Since June 6, 2017, the Prime Minister and the Ministry of Public Security have deployed officials to Tay Ninh to decide to include the Dau Tieng water reservoir project in the list of important projects related to national security.[24][25] By June 2019, the first solar power plant was established on the submerged area within the Dau Tieng reservoir. Upon completion, the plant became the largest clean energy project in Southeast Asia.[26] In 2021, the Ministry of Agriculture and Rural Development assigned the reservoir's management company to implement a project to invest in, repair, and enhance the safety of the dam and water reservoir, with a budget of 157 billion dong, completed in 2022 after detecting cracks. The company also proposed an investment of 1,500 billion dong for repair and upgrade from 2021 to 2025.[27] During the second phase of repairs, the Southern Water Irrigation Company cut off water for 90 days to the West main canal with the approval of the Tay Ninh People's Committee, extending from April 5, 2023, and resumed water flow on January 10, 2024, to serve the new agricultural season.[28]

In 2024, Prime Minister Phạm Minh Chính assigned Tây Ninh to leverage the functions provided by the Dau Tieng reservoir.[29] Previously, the province was tasked with developing the comprehensive multi-objective project "Dau Tieng Development Master Plan Phase 2022–2030, Vision 2050," which was later cancelled due to exceeding the province's authority in various laws, sectors, and planning aspects.[30]

Exploitation

Tourism

Scenery of Dầu Tiếng Lake in the evening.
Dầu Tiếng Lake in the evening with Bà Đen Mountain in the background.
The shore of Dầu Tiếng Lake.
The shore of Dầu Tiếng Lake.

In 2008, the Tây Ninh Provincial People's Committee called for investment in tourism areas within the lake, including Nhim Island, Sin Islet, Tan Thiet Islet, Tan Hoa Islet, Ba Chiem Islet, Ta Do Islet, Dong Ken Islet, and along the southern shore of the lake.[31] In 2022, the Bình Dương Provincial People's Committee held a meeting to hear the consulting unit's report on the Ecotourism, Resort, and Recreation Project for the Nui Cau – Dầu Tiếng Protective Forest for the period 2021 – 2030, envisioning it as a "miniature Đà Lạt."[32]

In 2016, many residents discovered an impromptu beach area in the Dầu Tiếng Lake area. Shortly thereafter, local authorities requested that residents dismantle and move out of the lake area as it was unregulated, posing potential security and drowning risks.[33][34] By the end of May of the same year, the Tây Ninh Provincial People's Committee assigned relevant units to invest in infrastructure and transform the area into a natural beach named "Tây Ninh Sea.".[35]

In 2022, under the management of the Tây Ninh Provincial Department of Culture, Sports, and Tourism, the Paragliding and Kite Flying Sports Federation was established. The launch event and paragliding performance were held at the Dầu Tiếng Lake area in Dương Minh Châu District, Tây Ninh province,[36] over two days, April 30 and May 1.[37] As part of Tây Ninh province's urban development plan, Dương Minh Châu has been approved to become a tourism service development area surrounding Ba Den Mountain and Dầu Tiếng Lake.[38]

Fisheries

According to a survey conducted by the Livestock and Veterinary Bureau under the Tây Ninh Department of Agriculture and Rural Development, Dầu Tiếng Lake is home to more than 50 fish species, including 10 economically valuable species such as featherback fish, catfish, snakehead fish, and anchovy.[39] However, according to statistics from the Institute of Fisheries II under the Ministry of Agriculture and Rural Development, the lake hosts around 60 fish species and numerous other aquatic species, with 15 species providing economic value such as carp, climbing perch, mystus fish, and catfish. Species belonging to the carp family are reported to account for about 33.33%, catfish family 30%, goby family 23.33%, and various other fish species.[40] Since its construction, the number of fish species in the lake has increased by 14 compared to the upstream Saigon River, with 33 new species appearing and 19 species disappearing. The vanished aquatic species include climbing perch, fire snakehead, gourami, barred mystus, herring, giant gourami, and notably, giant freshwater prawn. The appearance of many other fish species is attributed to local residents farming various economically valuable fish in cages and pens. From 2005 to 2013, 7.8 million fish were released into the lake by local authorities to replenish the aquatic resources.[40]

According to the Tay Ninh newspaper, the province annually allocates a budget of 500-700 million VND to release tens of millions of fish fry into Dau Tieng Lake to replenish aquatic resources.[41] However, local authorities report that many fishermen in the lake have been using prohibited fishing gear such as stacked cages, gillnets , electrofishing, and light-attracting devices, causing severe damage to the lake's ecosystem.[42][43][40] On March 25, 2024, the Southern Irrigation Exploitation One Member Limited Liability Company established a "Plan for coordinated inspection of activities within the protection scope of Dau Tieng irrigation works", which includes inspecting fishing gear and cage fish farming around the lake to protect the ecosystem and aquatic resources.[44]

Irrigation

The Dau Tieng - Phuoc Hoa irrigation system, under the management of the Southern Irrigation Exploitation One Member Limited Liability Company, serves to provide water, control floods, repel salinity, and improve the environment for the downstream areas of the Saigon and Vam Co Dong river basins.[45] The reservoir is currently the direct source of water for production for 116,953 hectares in the provinces and cities of Tay Ninh (92,953 ha), Ho Chi Minh City (12,000 ha), and Long An (12,000 ha); it also provides irrigation for 93,954 hectares along the Saigon and Vam Co Dong rivers.[46] In 2017, Dinh La Thang proposed restarting the pipeline project connecting Dau Tieng Lake to the water plant in Ho Chi Minh City by calling for socialized investment.[47] In 2018, the Tay Ninh government commenced construction of a project to bring water from Dau Tieng Lake to the west of the Vam Co Dong River to supply water to communes in Chau Thanh and Ben Cau districts of Tay Ninh province with a total investment of 1,246 billion VND. The project includes a steel pipe crossing the river with a span of 30 meters and a static clearance height of about 6 meters.[48]

During the 2024 heatwave in Vietnam, Long An province requested the Southern Irrigation Exploitation One Member Limited Liability Company to release water from Dau Tieng Lake into the Vam Co Dong River to push back saltwater intrusion after the province declared a level 4 drought and salinity disaster on April 17th. The company agreed and committed to releasing 7 million cubic meters of water through the Vam Co Dong River to support Long An.[49] However, the Department of Agriculture and Rural Development of Long An province later requested the reservoir to increase the discharge rate to further assist the province.[50] Previously, the reservoir had also released water to prevent saltwater intrusion in the Saigon River and the Dong Nai river system.[51]

Minerals

In 2010, the People's Committee of Tay Ninh province agreed with Binh Phuoc province in Official Letter No. 1968 to hand over the licensing of mineral exploitation in the 16 km upstream area of the Saigon River, which is co-managed by the two provinces, to the People's Committee of Binh Phuoc province. Upon handing it over to Binh Phuoc, Tay Ninh stated that it would only coordinate management when necessary. Two months after the official letter took effect, Binh Phuoc granted the sole license to Thai Thinh Private Enterprise for sand exploitation for a period of 10 years. However, in 2017, this license was transferred to Phu Tho Production and Trading One Member Limited Liability Company. Subsequently, residents of Tan Hoa, Tan Chau reported to Tay Ninh province about serious erosion on the Tay Ninh side. Upon inspection, Thai Thinh Company had caused 150 meters of erosion into Tan Hoa territory without deploying buoys or mining signs.[52] According to Tay Ninh provincial authorities, due to the vast area of the lake and the absence of residents in many areas, detecting illegal mineral exploitation within the lake is extremely difficult.[53]

Notes

  1. ^ Formerly known as Dầu Tiếng – Phước Hòa Irrigation Exploitation One Member Limited Liability Company, headquartered at Hamlet B2, Phước Minh Commune, Dầu Tiếng District, Tây Ninh Province. However, after the name change, the company's headquarters moved to 178 Nguyễn Văn Thương, Ward 25, Bình Thạnh, Ho Chi Minh City.[1]

References

  1. ^ Thanh Sơn (2022-09-15). "Launch of Southern Irrigation Exploitation One Member Limited Liability Company". Nông nghiệp Newspaper (in Vietnamese). Archived from the original on 2024-04-27. Retrieved 2024-04-27.
  2. ^ "The meaning of Tây Ninh province's logo". Tây Ninh Department of Culture, Sports and Tourism (in Vietnamese). 2015-05-07. Retrieved 2024-05-24.
  3. ^ "Địa giới hành chính huyện Dương Minh Châu, tỉnh Tây Ninh". Vietnam Government Portal. Archived from the original on 2021-12-02. Retrieved 2021-12-02.
  4. ^ "Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công". Báo Pháp luật Việt Nam điện tử (in Vietnamese). 2020-12-25. Retrieved 2024-07-02.
  5. ^ Trần Mạnh Thường et al. 2005, p. 839.
  6. ^ a b "Hành trình mở nguồn nước Dầu Tiếng - Kỳ 1: Nhát cuốc đầu tiên". TUOI TRE ONLINE (in Vietnamese). 2020-09-06. Retrieved 2024-07-02.
  7. ^ "Một ngày ở Tây Ninh: Ngất ngây trước vẻ đẹp 'nàng thơ' của hồ Dầu Tiếng". thanhnien.vn (in Vietnamese). 2022-06-04. Retrieved 2024-07-02.
  8. ^ Vietnam+ (VietnamPlus) (2017-08-02). "400 tỷ đồng nâng cấp kênh Tây thuộc hệ thống thủy lợi Dầu Tiếng". Vietnam+ (VietnamPlus) (in Vietnamese). Retrieved 2024-07-02.
  9. ^ a b "40 năm "thăng trầm" cùng hệ thống thuỷ lợi Dầu Tiếng". Báo Tây Ninh. Retrieved 2021-12-01.
  10. ^ "Dầu Tiếng Lake". Thuy Loi University. Archived from the original on 2024-04-27. Retrieved 2024-04-27.
  11. ^ a b c d "Hồ Dầu Tiếng: 35 năm chuyện bây giờ mới kể". nongnghiep.vn (in Vietnamese). 2010-04-30. Retrieved 2024-07-02.
  12. ^ "Hành trình mở nguồn nước Dầu Tiếng - Kỳ 4: Ăn bo bo và đối mặt với bom mìn". TUOI TRE ONLINE (in Vietnamese). 2020-09-09. Retrieved 2024-07-02.
  13. ^ a b "Hành trình mở nguồn nước Dầu Tiếng - Kỳ 2: Những 'rào cản' ở Dầu Tiếng". TUOI TRE ONLINE (in Vietnamese). 2020-09-07. Retrieved 2024-07-02.
  14. ^ "Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công". Báo Pháp luật Việt Nam điện tử (in Vietnamese). 2020-12-25. Retrieved 2024-07-02.
  15. ^ a b "Hành trình mở nguồn nước Dầu Tiếng - Kỳ 2: Những 'rào cản' ở Dầu Tiếng". TUOI TRE ONLINE (in Vietnamese). 2020-09-07. Retrieved 2024-07-02.
  16. ^ "Hành trình mở nguồn nước Dầu Tiếng - Kỳ 4: Ăn bo bo và đối mặt với bom mìn". TUOI TRE ONLINE (in Vietnamese). 2020-09-09. Retrieved 2024-07-02.
  17. ^ a b "Xây dựng hồ Dầu Tiếng - lớn nhất Đông Nam Á: Từng huy động 36 nghìn người và 15 triệu ngày công". Báo Pháp luật Việt Nam điện tử (in Vietnamese). 2020-12-25. Retrieved 2024-07-02.
  18. ^ "Công trình thủy lợi đầu tiên 'xài' đô la Mỹ". nongnghiep.vn (in Vietnamese). 2022-10-26. Retrieved 2024-07-02.
  19. ^ Vietnam+ (VietnamPlus) (2017-08-02). "400 tỷ đồng nâng cấp kênh Tây thuộc hệ thống thủy lợi Dầu Tiếng". Vietnam+ (VietnamPlus) (in Vietnamese). Retrieved 2024-07-02.
  20. ^ "Người anh hùng ở công trình thế kỷ". nongnghiep.vn (in Vietnamese). 2022-10-27. Retrieved 2024-07-02.
  21. ^ Ban Chấp hành Trung ương Đảng 1985, p. 32.
  22. ^ "Hiểu thêm về Tân Hưng - Báo Tây Ninh Online". baotayninh.vn (in Vietnamese). Retrieved 2024-07-02.
  23. ^ "Hành trình mở nguồn nước Dầu Tiếng - Kỳ cuối: Hướng đến hồ 'đa mục tiêu'". TUOI TRE ONLINE (in Vietnamese). 2020-09-12. Retrieved 2024-07-02.
  24. ^ "Hồ Dầu Tiếng là công trình quan trọng liên quan đến an ninh quốc gia - Báo Tây Ninh Online". baotayninh.vn (in Vietnamese). Retrieved 2024-07-02.
  25. ^ "Hồ dầu tiếng là công trình an ninh quốc gia". nongnghiep.vn (in Vietnamese). 2017-06-06. Retrieved 2024-07-02.
  26. ^ "Khánh thành cụm năng lượng mặt trời Dầu Tiếng, lớn nhất Đông Nam Á". TUOI TRE ONLINE (in Vietnamese). 2019-09-07. Retrieved 2024-07-02.
  27. ^ "Hồ Dầu Tiếng vẫn bảo đảm an toàn". Báo Người Lao Động Online (in Vietnamese). Retrieved 2024-07-02.
  28. ^ "Cắt nước kênh Tây để phục vụ dự án sửa chữa, nâng cấp hệ thống thuỷ lợi Dầu Tiếng giai đoạn 2". tin tức moitruong.net.vn (in Vietnamese). 2023-10-06. Retrieved 2024-07-02.
  29. ^ TTXVN (May 5, 2024). "Phát triển Tây Ninh theo hướng bền vững, kết nối, bản sắc, hữu nghị". Vietnam News Agency (in Vietnamese). Retrieved 2024-05-24.
  30. ^ "Thứ trưởng Bộ Nông nghiệp và phát triển nông thôn Hoàng Trung: Phát triển hồ Dầu Tiếng đa mục tiêu, an toàn và hiệu quả - Báo Tây Ninh Online". baotayninh.vn (in Vietnamese). Retrieved 2024-07-02.
  31. ^ "Phát triển hồ Dầu Tiếng an toàn và hiệu quả - Báo Tây Ninh Online". baotayninh.vn (in Vietnamese). Retrieved 2024-07-02.
  32. ^ "Bình Dương muốn làm khu du lịch sinh thái như 'Đà Lạt thu nhỏ'". VietNamNet News (in Vietnamese). Retrieved 2024-07-02.
  33. ^ Thiên Tâm (2016-04-28). "Closing the beach in Tây Ninh". Người Lao Động Newspaper (in Vietnamese). Archived from the original on 2022-12-23. Retrieved 2022-12-23.
  34. ^ Đại Dương (2016-05-07). "Swimming at 'the beach' in... Tây Ninh". Sài Gòn Giải Phóng Newspaper (in Vietnamese). Archived from the original on 2022-12-23. Retrieved 2022-12-23.
  35. ^ Giang Phương (2016-05-28). "'Tây Ninh Sea' at Dầu Tiếng Lake will become a tourist destination for locals". Thanh Niên Newspaper (in Vietnamese). Archived from the original on 2024-04-24. Retrieved 2022-12-23.
  36. ^ Giang Phương (2022-08-19). "Tây Ninh attracts tourists with paragliding and kite flying sports". Thanh Niên Newspaper (in Vietnamese). Archived from the original on 2024-04-24. Retrieved 2022-12-24.
  37. ^ Giang Phương (2022-08-19). "Tây Ninh attracts tourists with paragliding and kite flying sports". Thanh Niên Newspaper (in Vietnamese). Archived from the original on 2024-04-24. Retrieved 2022-12-24.
  38. ^ Ban Mai (2024-04-20). "Tây Ninh: Announcing the provincial plan to have 16 urban areas by 2030". VnEconomy (in Vietnamese). Archived from the original on 2024-04-27. Retrieved 2024-04-27.
  39. ^ Giang Phương (2022-06-04). "Một ngày ở Tây Ninh: Ngất ngây trước vẻ đẹp 'nàng thơ' của hồ Dầu Tiếng". Thanh Niên Newspaper (in Vietnamese). Retrieved 2022-12-23.
  40. ^ a b c "TÍNH ĐA DẠNG SINH HỌC VỀ LOÀI CỦA THỦY SẢN TRONG HỒ DẦU TIẾNG". SỞ NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN TỈNH TÂY NINH (in Vietnamese). 2013-12-10. Retrieved 2024-07-02.
  41. ^ Nhi Trần. "Developing Dầu Tiếng Lake safely and effectively". Báo Tây Ninh. Retrieved 2022-12-23.
  42. ^ "Tận diệt thủy sản ở hồ Dầu Tiếng". Báo Người Lao Động Online (in Vietnamese). Retrieved 2024-07-02.
  43. ^ Nguyễn Sỹ Hùng (2024-04-23). "Game bài đổi thưởng". Báo Người Lao Động Online (in Vietnamese). Retrieved 2024-07-02.
  44. ^ "Xuất hiện nhiều vó cá trên sông Sài Gòn - Báo Tây Ninh Online". baotayninh.vn (in Vietnamese). Retrieved 2024-07-02.
  45. ^ "Phát triển hồ Dầu Tiếng an toàn và hiệu quả - Báo Tây Ninh Online". baotayninh.vn (in Vietnamese). Retrieved 2024-07-02.
  46. ^ "Công ty TNHH MTV Khai thác thủy lợi Dầu Tiếng - Phước Hòa: Quản lý và khai thác hiệu quả hệ thống thủy lợi Dầu Tiếng". www.thiduakhenthuongvn.org.vn. Retrieved 2024-07-02.
  47. ^ "Bí thư Thăng: 'Khởi động lại dự án đường ống nước Tây Ninh-TPHCM'". VietNamNet News (in Vietnamese). Retrieved 2024-07-02.
  48. ^ "Siêu dự án thủy lợi ở Tây Ninh, đường ống khổng lồ đưa nước vượt sông". TUOI TRE ONLINE (in Vietnamese). 2022-11-08. Retrieved 2024-07-02.
  49. ^ "Sông Vàm Cỏ Đông nhận 7 triệu mét khối nước từ hồ Dầu Tiếng để chống hạn mặn". thanhnien.vn (in Vietnamese). 2024-04-24. Retrieved 2024-07-02.
  50. ^ "Đề nghị xả thêm nước hồ Dầu Tiếng về Long An để hạn chế hạn mặn". TUOI TRE ONLINE (in Vietnamese). 2024-04-22. Retrieved 2024-07-02.
  51. ^ "Xả nước qua tràn hồ Dầu Tiếng đẩy mặn trên sông Sài Gòn". baotintuc.vn (in Vietnamese). 2024-04-11. Retrieved 2024-07-02.
  52. ^ "Vụ tàu khai thác cát trái phép gần rừng phòng hộ Dầu Tiếng: Phạm vi bị sạt lở thuộc đất bán ngập hồ Dầu Tiếng". baotayninh.vn (in Vietnamese). Retrieved 2024-07-02.
  53. ^ "Tăng cường kiểm soát khai thác cát trên hồ Dầu Tiếng". baotintuc.vn (in Vietnamese). 2024-03-08. Retrieved 2024-07-02.