Jump to content

Xi'an–Baoji high-speed railway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m Bonadea moved page Xi'an–Baoji hihg-speed railway to Xi'an–Baoji high-speed railway over a redirect without leaving a redirect
Adding local short description: "Railway line in Shaanxi, China", overriding Wikidata description "railway line"
 
(5 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Short description|Railway line in Shaanxi, China}}
{{Infobox rail line
{{Infobox rail line
| box_width =
| box_width =
| name = Xuzhou–Lanzhou<br>high-speed railway
| name = Xuzhou–Lanzhou<br />high-speed railway
----
----
Xi'an–Baoji Section<br>{{nobold|{{lang|zh-hans|徐兰高速铁路西宝段}}}}
Xi'an–Baoji Section<br />{{nobold|{{lang|zh-hans|徐兰高速铁路西宝段}}}}
| color =
| color =
| logo = ChinaRailwayHighspeed.svg
| logo =
| logo_width = 180px
| logo_width = 180px
| logo_alt =
| logo_alt =
Line 43: Line 44:
| elevation =
| elevation =
| website =
| website =
| map =
| map = {{Xi'an–Baoji high-speed railway}}
| map_state = collapsed
| map_state = collapsed
}}
}}
Line 56: Line 57:
The '''Xi'an–Baoji high-speed railway''', or '''Xibao Passenger Dedicated Line''' is a [[high-speed railway]] operated by [[China Railway High-speed]] between [[Xi'an]] and [[Baoji]], in [[Shaanxi]] province. It is a section of the [[Xuzhou–Lanzhou high-speed railway]], and largely parallels the Xi'an–Baoji section of the [[Longhai Railway]].
The '''Xi'an–Baoji high-speed railway''', or '''Xibao Passenger Dedicated Line''' is a [[high-speed railway]] operated by [[China Railway High-speed]] between [[Xi'an]] and [[Baoji]], in [[Shaanxi]] province. It is a section of the [[Xuzhou–Lanzhou high-speed railway]], and largely parallels the Xi'an–Baoji section of the [[Longhai Railway]].


Construction work on the Xi'an–Baoji high-speed railway started on December 11, 2009. The opening date was 28th Dec, 2013. The total investment of the project is estimated to be CN¥17.967 billion.<ref>http://www.xiancn.com/gb/news/2009-12/12/content_1515110.htm</ref>
Construction work on the Xi'an–Baoji high-speed railway started on December 11, 2009. The opening date was 28th Dec, 2013. The total investment of the project is estimated to be CN¥17.967 billion.<ref>http://www.xiancn.com/gb/news/2009-12/12/content_1515110.htm {{Dead link|date=February 2022}}</ref>


== References ==
== References ==
Line 70: Line 71:
[[Category:Standard gauge railways in China]]
[[Category:Standard gauge railways in China]]
[[Category:Stations on the Xuzhou–Lanzhou High-Speed Railway|*3]]
[[Category:Stations on the Xuzhou–Lanzhou High-Speed Railway|*3]]


{{PRChina-rail-transport-stub}}

Latest revision as of 07:21, 8 October 2023

Xuzhou–Lanzhou
high-speed railway
Xi'an–Baoji Section
徐兰高速铁路西宝段
Overview
StatusOperational
LocaleShaanxi
Termini
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
History
OpenedDecember 2013
Technical
Line length138 km (86 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius7,000 meters
Operating speed300 km/h (186 mph)
Route map

km
Xi'an North
Xianyang Qindu
Xi'an North freight loopUpperLeft arrow
Right arrowXianyang West link
Maoling
Yangling South
Qishan
Baoji South
Xi'an–Baoji high-speed railway
Simplified Chinese徐兰高速铁路西宝段
Traditional Chinese徐蘭高速鐵路西寶段
Transcriptions
Standard Mandarin
Hanyu PinyinXú-Lán Gāosù Tiělù Xī-Bǎo Duàn
IPA[ɕǔ.lǎn káʊ.sû tʰjè.lû ɕí.páʊ twân]
Xi'an–Baoji Passenger Dedicated Line
Simplified Chinese西宝客运专线
Traditional Chinese西寶客運專線
Transcriptions
Standard Mandarin
Hanyu PinyinXī-Bǎo Kèyùn Zhuān Xiàn
IPA[ɕí.páʊ kʰɤ̂.ŷn ʈʂwán ɕjɛ̂n]

The Xi'an–Baoji high-speed railway, or Xibao Passenger Dedicated Line is a high-speed railway operated by China Railway High-speed between Xi'an and Baoji, in Shaanxi province. It is a section of the Xuzhou–Lanzhou high-speed railway, and largely parallels the Xi'an–Baoji section of the Longhai Railway.

Construction work on the Xi'an–Baoji high-speed railway started on December 11, 2009. The opening date was 28th Dec, 2013. The total investment of the project is estimated to be CN¥17.967 billion.[1]

References

[edit]