Traffic & Transit

Traffic Alert: Weekend I-684 Lane Reduction In Bedford

Bridge work is expected to take place between 8 a.m. and 2 p.m. on Saturday, affecting the southbound lanes.

The New York State Department of Transportation said that Interstate 684 southbound will be reduced to one lane.
The New York State Department of Transportation said that Interstate 684 southbound will be reduced to one lane. (Kristin Borden/Patch)

BEDFORD, NY — If you're planning to take advantage of a break in the rainy weather to do a little apple picking and check out the fall colors, maybe consider taking the scenic way home.

A lane reduction along I-684 in Bedford is planned on Saturday for bridge repairs.

The New York State Department of Transportation said that Interstate 684 southbound will be reduced to one lane between Exit 6 (State Route 35) and Exit 4 (State Route 172) in Bedford.

Find out what's happening in Bedford-Katonahwith free, real-time updates from Patch.

The bridge repairs are expected to take place between 8 a.m. and 2 p.m., weather permitting.

The NYSDOT is reminding drivers to slow down and drive responsibly in work zones. Remember, fines are doubled for speeding in a work zone. Convictions of two or more speeding violations in a work zone could result in the suspension of your driver's license.

Find out what's happening in Bedford-Katonahwith free, real-time updates from Patch.

For up-to-date travel information, call 511, visit www.511NY.org or download the free 511NY mobile app.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.