Green Piling are specialists in the design, supply and installation of Steel Tube, Precast Concrete, CFA, as well as Contiguous and Secant Retaining Walls, and restricted access/headroom projects; ensuring that whatever the criteria we can tailor a package to suit our customer’s needs.
Green Piling have worked on a diverse range of projects in Commercial, Industrial, Public Sector, Civil Engineering and Residential sectors. Working on contracts from £5k to £3m, using state of the art equipment and varying from the straight forward to the more unusual; with a current rig fleet of 15 driven and bored piling rigs.
In house design team provides a fully designed piling solution for each individual project, adhering to all relevant British Standards and/or Eurocodes.
Green Piling are centrally located at Junction 30 of the M1 near Sheffield, a convenient location for full UK wide piling operations.
Our state of the art Precast Factory produces our bespoke pre-stressed precast pile, unique to the UK market.
-
Industry
-
Civil Engineering
-
Company size
-
51-200 employees
-
Headquarters
-
Renishaw, England
-
Type
-
Privately Held
-
Founded
-
2000