U.S. flag An official website of the United States government
  1. Home
  2. Drugs
  3. Drug Safety and Availability
  4. Postmarket Drug Safety Information for Patients and Providers
  5. Safety Labeling Change Orders
  1. Postmarket Drug Safety Information for Patients and Providers

Safety Labeling Change Orders

Safety Labeling Changes (SLC) Overview

Section 505(o)(4) of the Federal Food, Drug, and Cosmetic Act (FD&C Act) (21 U.S.C. 355(o)(4)) authorizes FDA to require application holders for certain drugs1 to make labeling changes based on new safety information2 (including information related to reduced effectiveness) that becomes available after approval of the drug.   

SLC Procedures

Once FDA has determined that there is new safety information (NSI)2 that should be included in labeling, FDA sends a Safety Labeling Change (SLC) notification letter to the application holder(s).  After receiving notification of the required SLC, the application holder(s) must either:3

  • Submit a supplement with proposed labeling changes to reflect the NSI; or
  • Notify FDA that it does not believe a labeling change is warranted and submit a statement detailing the reasons why such a change is not warranted (a rebuttal statement).

When the applicant submits a supplement with proposed labeling changes:

  • If the proposed labeling can be approved without discussion with the application holder, FDA will approve the labeling supplement promptly and notify the application holder by sending a supplement approval letter. 
  • If the labeling supplement proposes changes to the language or placement of the proposed labeling changes to what was provided in the SLC notification letter, the FDA may initiate a discussion period with the application holder to review and discuss the proposed revisions.4 The FDA will issue an action letter within 15 calendar days after the end of the discussion period. 

When the applicant submits a rebuttal:

  • If the application holder submits a rebuttal statement and FDA accepts the reasons why labeling changes are not warranted, FDA intends to promptly notify the application holder.
  • If the application holder submits a rebuttal statement and FDA does not accept the reasons why labeling changes are not warranted, FDA will initiate a discussion period with the application holder.4   

Within 15 calendar days of the conclusion of the 30-day discussion period (and any extension period, if applicable), FDA will proceed as follows:

  • If FDA and the application holder reach consensus on the proposed labeling, FDA will notify the application holder by sending a supplement approval letter.
  • If FDA does not agree with the application holder’s proposed labeling changes or rebuttal statement and FDA and the application holder cannot reach consensus, FDA can order the application holder to make the required labeling changes.5

SLC Order Issuance

If, at the conclusion of the 30-day discussion period (or extension, if applicable), FDA determines that the application holder’s proposed labeling changes do not adequately address the NSI or finds unacceptable the application holder’s reasons why the labeling changes are not warranted, FDA can issue an SLC order to change the product labeling.  FDA can also issue an SLC order if a labeling supplement or rebuttal statement is not submitted within 30 calendar days of the date of the SLC notification letter.6 SLC Order letters will be issued within 15 calendar days of the conclusion of the 30-day discussion period (or extension, if applicable).

All SLC Order letters issued by CDER will be posted on this FDA’s website.

For additional information, please refer to the guidance for industry “Safety Labeling Changes—Implementation of Section 505(o)(4) of the FD&C Act” .


1Drug products approved under section 505 of the FD&C Act (21 U.S.C. 355) and biological products licensed under section 351 of the Public Health Service Act (42 U.S.C. 262) that are regulated as drugs.
2New safety information is defined as: “information derived from a clinical trial, an adverse event report, a postapproval study (including a study under section 505(o)(3) [of the FD&C Act]), or peer-reviewed biomedical literature; data derived from the postmarket risk identification and analysis system under section 505(k) [of the FD&C Act]; or other scientific data deemed appropriate by [FDA] about 1) a serious risk or an unexpected serious risk associated with use of the drug that [FDA] has become aware of (that may be based on a new analysis of existing information) since the drug was approved, since the risk evaluation and mitigation strategy (REMS) was required, or since the last assessment of the approved REMS for the drug, or 2) the effectiveness of the approved REMS for the drug obtained since the last assessment of such strategy.” (505-1(b) of the FD&C Act (21 U.S.C. 355-1(b))
3Section 505(o)(4)(B)(i) and (ii) of the FD&C Act
4Section 505(o)(4)(C) of the FD&C Act
5Section 505(o)(4)(E) of the FD&C Act
6Section 505(o)(4)(B) of the FD&C Act


Date of SLC Order Issuance Application Type & Number Drug Name Applicant
(Applicant Addressed in the SLC Order Letter)
Link to SLC Order Letter
4/28/2023 NDA-019758 Clozaril (Clozapine) HERITAGE LIFE SCIENCES BARBADOS INC Archive
9/20/2021 NDA-018936 Prozac (Fluoxetine Hydrochloride) ELI LILLY AND COMPANY  Archive
4/11/2019 NDA-022526 Addyi (Flibanserin) SPROUT PHARMACEUTICALS INC Archive
3/09/2018 NDA-020839 Plavix (Clopidogrel Bisulfate) SANOFI AVENTIS US LLC Archive
2/23/2017 ANDA-071212, ANDA-071173, ANDA-071172, ANDA-071157, ANDA-071156 Haloperidol FRONTIDA BIOPHANN INC Archive
2/23/2017 ANDA-089903, ANDA-089523 Prochlorperazine Edisylate  WEST-WARD PHARMACEUTICALS CORP Archive
12/20/2016 ANDA-075523 Naloxone and Pentazocine  SUN PHARMACEUTICAL INDUSTRIES, INC Archive
12/16/2016 ANDA-081002 Meperidine Hydrochloride WEST-WARD PHARMACEUTICAL CORP Archive
12/16/2016 ANDA-070765, ANDA-070766,
ANDA-070683
Amitriptyline Hydrochloride and Chlordiazepoxide,
Oxazepam
FRONTIDA BIOPHARM INC Archive
12/16/2016 ANDA-070444, ANDA-070445  Flurazepam Hydrochloride  PAR PHARMACEUTICAL INC Archive
12/16/2016 ANDA-075045, ANDA-075046 Butorphanol Tartrate  WEST-WARD PHARMACEUTICALS CORP Archive
12/16/2016 ANDA-205001 Acetaminophen and Hydrocodone Bitartrate  PAR PHARMACEUTICAL, INC Archive
12/16/2016 ANDA-089671, ANDA-089672  Acetaminophen and Codeine Phosphate FRONTIDA BIOPHARM INC Archive
11/08/2016 ANDA-040805 Hydroxyzine Hydrochloride  HETERO USA, INC
U.S. AGENT FOR HETERO LABS LIMITED UNIT- III
Archive
10/21/2016 ANDA-090387 Testosterone Cypionate  WEST-WARD PHARMACEUTICAL CORP Archive
10/21/2016 ANDA-091244 Testosterone Cypionate  WEST-WARD PHARMACEUTICAL CORP Archive
9/07/2016 NDA-022276 Nicardipine Hydrochloride EXELA PHARMA SCIENCES, LLC Archive
5/09/2016 ANDA-070088 Ibuprofen  BASF CORPORATION Archive
5/09/2016 ANDA-074819,
ANDA-079093
Etodolac,
Nabumetone
PROSAM LABS, LLC Archive
12/15/2014 NDA-050824 Omeclamox-Pak (Omeprazole, Amoxicillin, and Clarithromycin) GASTROENTERO-LOGIC, LLC Archive
9/18/2014 ANDA-078969 Granisetron Hydrochloride  INC RESEARCH LLC Archive
9/09/2014 ANDA-086498, ANDA-086499, ANDA-086500, ANDA-086501, ANDA-086502, ANDA-086503, ANDA-083827 Amitriptyline Hydrochloride,
Imipramine Hydrochloride 
ALRA LABORATORIES, INC Archive
7/31/2014 NDA-009470 Xylocaine Viscous (Lidocaine Hydrochloride) FRESENIUS KABI USA LLC Archive
7/22/2014 ANDA-076015 Fluoxetine Hydrochloride PHARMACEUTICAL ASSOCIATES, INC Archive
7/22/2014 ANDA-040751, ANDA-040752, ANDA-040753 Imipramine Hydrochloride  PROSAM LABS, LLC Archive
7/22/2014 ANDA-075525 Fluoxetine Hydrochloride HI-TECH PHARMACAL CO., INC Archive
7/22/2014 ANDA-071196,
ANDA-071258 
Trazodone Hydrochloride  APOTEX INC Archive
7/03/2014 NDA-014694 Hexadrol (Dexamethasone Sodium Phospate) ORGANON USA INC Archive
6/03/2014 ANDA-088184, ANDA-088185  Hydroxyzine Hydrochloride  FRESENIUS KABI USA, LLC Archive
6/03/2014 ANDA-040600, ANDA-040602, ANDA-040604 Hydroxyzine Hydrochloride  MIKAH PHARMA LLC Archive
6/03/2014 ANDA-087014 Orgatrax (Hydroxyzine Hydrochloride) ORGANON USA INC Archive
10/24/2013 ANDA-040261 Acetaminophen, Butalbital, and Caffeine WEST-WARD PHARMACEUTICALS CORP Archive
10/24/2013 ANDA-087811 Phrenilin (Acetaminophen and Butalbital) KELLER AND HECKMAN LLP
U.S. AGENT FOR VALEANT INTERNATIONAL BERMUDA
Archive
10/24/2013 ANDA-040864 Acetaminophen, Butalbital, and Caffeine MIRROR PHARMACEUTICALS LLC Archive
10/24/2013 ANDA-088831 Phrenilin Forte (Acetaminophen and Butalbital) KELLER AND HECKMAN LLP
U.S. AGENT FOR VALEANT INTERNATIONAL BERMUDA
Archive
10/24/2013 ANDA-040336 Acetaminophen, Butalbital, and Caffeine  WEST-WARD PHARMACEUTICALS CORP Archive
10/24/2013 ANDA-040688 Acetaminophen, Caffeine, and Dihydrocodeine Bitartrate WRASER PHARMACEUTICALS Archive
10/24/2013 ANDA-040883 Acetaminophen, Butalbital, and Caffeine  MIRROR PHARMACEUTICALS LLC Archive
8/19/2013 ANDA-077417, ANDA-077809 Ciprofloxacin  WATSON LABORATORIES, INC. - FLORIDA Archive
8/19/2013 ANDA-078712 Ciprofloxacin  SANDOZ, INC Archive
5/10/2013 ANDA-088704 Triacin-C® Cough Syrup (Codeine Phosphate, Pseudoephedrine Hydrochloride, and Triprolidine Hydrochloride) CLINSMART LLC
U.S. AGENT FOR STI PHARMA LLC
Archive
5/10/2013 ANDA-087006 Acetaminophen and Codeine Phosphate WOCKHARDT EU OPERATIONS (SWISS) AG Archive
5/10/2013 ANDA-040223 Acetaminophen and Codeine Phosphate BARR LABORATORIES, INC Archive
5/10/2013 ANDA-040441 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC - FLORIDA Archive
5/10/2013 ANDA-040447, ANDA-040488 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC - FLORIDA Archive
5/10/2013 ANDA-089997, ANDA-089998, ANDA-089999 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC Archive
5/10/2013 ANDA-040688 Acetaminophen, Caffeine, and Dihydrocodeine Bitartrate WRASER PHARMACEUTICALS Archive
5/10/2013 ANDA-040701 Acetaminophen, Caffeine, and Dihydrocodeine Bitartrate BOCA PHARMACAL, INC. Archive
5/10/2013 ANDA-089671, ANDA-089672 Acetaminophen and Codeine Phosphate FRONTIDA BIOPHARM INC Archive
5/10/2013 ANDA-040443 Acetaminophen and Codeine Phosphate WATSON LABORATORIES, INC - FLORIDA Archive
4/11/2013 ANDA-073143, ANDA-074436 Cyclobenzaprine Hydrochloride  WATSON LABORATORIES, INC Archive
4/11/2013 ANDA-072854 Cyclobenzaprine Hydrochloride  SANDOZ, INC Archive
4/11/2013 ANDA-077209, ANDA-077291 Cyclobenzaprine Hydrochloride  PROSAM LABS, LLC Archive
12/20/2010 NDA-021358 MultiHance Multipack (Gadobenate Dimeglumine) BRACCO DIAGNOSTICS, INC Archive
11/02/2010 ANDA-074900, ANDA-074901 Atracurium Besylate  BEDFORD LABORATORIES Archive
11/02/2010 ANDA-074944,
ANDA-074945
Atracurium Besylate  WATSON PHARMACEUTICALS, INC Archive
11/02/2010 ANDA-090243 Vecuronium Bromide  AKORN-STRIDES, LLC Archive
11/02/2010 ANDA-078562 Mivacurium Chloride PISGAH LABS, INC Archive
11/02/2010 ANDA-074334 Vecuronium Bromide WATSON PHARMACEUTICALS, INC Archive
11/02/2010 ANDA-075218 Vecuronium Bromide  BAXTER HEALTHCARE CORPORATION Archive
6/02/2010 NDA-020692,
NDA-021077,
NDA-021254
Serevent Diskus (Salmeterol Xinafoate),
Advair Diskus (Fluticasone Propionate and Salmeterol), Advair HFA (Fluticasone Propionate and Salmeterol)
GLAXOSMITHKLINE  Archive
6/02/2010 NDA-021929 Symbicort (Budesonide and Formoterol Fumarate Dihydrate) ASTRAZENECA LP  Archive
3/09/2010 NDA-019309 Vasotec (Enalapril Maleate) BIOVAIL LABORATORIES INTERNATIONAL SRL Archive
1/21/2010 NDA-006188 Propylthiouracil  DAVA PHARMACEUTICALS, INC Archive
7/19/2009 NDA-020592, NDA-021253; NDA-021086 Zyprexa (Olanzapine), Zyprexa Zydis (Olanzapine) ELI LILLY AND COMPANY Archive
7/19/2009 NDA-021520 Symbyax (Olanzapine and Fluoxetine) ELI LILLY AND COMPANY Archive
7/30/2008 BLA-103234 Epogen/Procrit (Epoetin Alfa) AMGEN, INCORPORATED Archive
7/30/2008 BLA-103951 Aranesp (Darbepoetin Alpha) AMGEN, INCORPORATED Archive
Back to Top