Ryan joins SPS as an Estimator. He is a graduate of Nichols College where he majored in General Business. He chose to join the #SPSteam for the opportunity to learn what is like to estimate on projects that are such a large scale. When he's not working, Ryan likes hiking, skiing, and camping. Congratulations, Ryan; welcome aboard! #SPSNE
SPS New England, Inc.
Construction
Salisbury, MA 4,052 followers
New England's Award-winning Team of Bridge, Highway, Transit, and Marine Construction Experts
About us
SPS New England, Inc. provides heavy construction, bridge repair and maintenance services, and design-build services to municipal and state clients throughout New England. As a leading contractor, SPS New England brings more than 25 years of experience and a reputation of excellence to the industry. A combination of management expertise, a high quality workforce and workmanship, a philosophy of safety first, and delivery of projects on time and on budget are what sets SPS apart from industry peers. SPS New England's Heavy Highway Division is responsible for some of the most prominent and complex projects in the region, including the rehabilitation of the Fall River Government Center over I-195, the Commerce Way Interchange in Woburn, Massachusetts, the I-495 Interchange in Lawrence, Massachusetts, and the Route 128 Canton, Dedham, Westwood, Massachusetts Interchange. The Company's Design-Build Division embraces the initiative to find better, faster and smarter ways to build projects. SPS recently completed several historic and time-sensitive accelerated bridge projects in Massachusetts with an "every day counts" philosophy:" the Pleasant Street Bridge Project in Grafton and the first-ever heavy lift bridge project on Rt. 2 in Phillipston. SPS New England's core values insist on a relentless pursuit of customer satisfaction, maintaining business integrity, hiring talented people, being committed to our employees, and giving back to the community.
- Website
-
http://www.spsne.com
External link for SPS New England, Inc.
- Industry
- Construction
- Company size
- 201-500 employees
- Headquarters
- Salisbury, MA
- Type
- Privately Held
- Founded
- 1984
- Specialties
- Bridge and Heavy Highway Construction, Design Build Services, and Bridge Repair and Maintenance
Locations
-
98 Elm Street
Salisbury, MA 01952, US
Employees at SPS New England, Inc.
Updates
-
SPS is seeking CDL Drivers, Utility Foremen and Sitework/Utility Superintendents to join our growing team! Apply today at https://lnkd.in/e_g5mW7e #SPSNE #SPSteam #Construction #NowHiring
-
-
William Gervais joins SPS this summer from the University of New Hampshire He decided to intern with us this summer because "After looking at the program I learned I would be spending a lot of time outside on the job site. As a firm believer that hands on learning is the best way to learn, I knew this internship had my best interest to further my career." Congratulations, William; welcome aboard! #SPSNE #SPSteam #SummerIntern #InternSpotlight
-
-
In order to stay safe erecting, working on, and dismantling a scaffold, employees should take precautions which include the following… #scaffolding #ConstructionSafety
-
-
The #SPSteam would like to congratulate Leah Williams for her recent promotion to Manager of Project Analytics and Controls! #Promotion #SPSNE
-
-
National Tape Measure Day, observed on July 14, commemorates the day in 1868 when an American patent was granted on a spring-loaded tape measure. A key tool that we use on our SPS job sites daily. #SPSNE #NationalTapeMeasureDay #TapeMeasureDay #construction
-
-
Benjamin Pollock joins SPS as a Project Cost Analyst. He is a graduate of the University of New Hampshire where he earned his Bachelor's in Mathematics. When he's not working, Ben likes to go fishing and out to eat with family and friends. Congratulations, Ben; welcome aboard! #SPSNE #SPSteam
-
-
SPS recently completed high priority overhead concrete and pile repairs at the Bass River Bridge in Yarmouth. Tight access, tides, growing repairs, and an expedited repair schedule made this project a challenge for everyone involved. The project started in January and was completed a few days prior to the Fourth of July weekend. It took a huge effort from SPS Superintendents, Foreman, Labor, Operations, Marine Division and Project Management . Mark Rousseau (Site Superintendent) was supported by Joe Harvey, Joe Ford, Nick Terenzoni, Ben Terenzoni, Jimmy Zechello, John Desimone, Jason Williams, Jeremiah Connolly, Chris Pickford, and very determined crew. Congratulations to everyone who made this one a success. https://lnkd.in/e3tXAvZg #SPSNE #SPSteam #StructuresMaintenance #BridgeConstruction
-
-
SPS New England, Inc. reposted this
Beautiful day to take delivery of SPS New England, Inc. brand new Komatsu WA-475 loader! What an absolute UNIT! This machine will play an integral part of our pile driving and trestle construction operations at our NH 1A, Hampton River Bridge Replacment Project. With the capability to safely lift and carry over 30,000lbs, the is machine will make light work of moving steel trestle parts anywhere they may be needed project wide. Can’t wait to see this project “get off the ground”!!! #spsnewengland #komatsu #cnwood
-
-
Originally from North Reading, MA, Nicholas Pasquale joins SPS this summer from Providence College where he studies Finance/Economics. Congratulations, Nicholas; welcome aboard! #SPSNE #SPSteam #SummerIntern #InternSpotlight
-