S.B.�No.�883
AN ACT
relating to the use of the state highway fund to participate in the
costs associated with a toll facility of a public or private entity.
�������BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
�������SECTION�1.��Section 222.001, Transportation Code, is amended
to read as follows:
�������Sec.�222.001.��USE OF STATE HIGHWAY FUND. (a)��Money that is
required to be used for public roadways by the Texas Constitution or
federal law and that is deposited in the state treasury to the
credit of the state highway fund, including money deposited to the
credit of the state highway fund under Title 23, United States Code,
may be used only:
�������������(1)��to improve the state highway system;
�������������(2)��to mitigate adverse environmental effects that
result directly from construction or maintenance of a state highway
by the department; or
�������������(3)��by the Department of Public Safety to police the
state highway system and to administer state laws relating to
traffic and safety on public roads.
�������(b)Notwithstanding Section 222.103, the department may not
pledge or otherwise encumber money deposited in the state highway
fund to:
�������������(1)guarantee a loan obtained by a public or private
entity for costs associated with a toll facility of the public or
private entity; or
�������������(2)insure bonds issued by a public or private entity
for costs associated with a toll facility of the public or private
entity.
�������SECTION�2.��Subsection (b), Section 222.001, Transportation
Code, as added by this Act, applies only to an agreement to pledge
or otherwise encumber money in the state highway fund that is
entered into on or after the effective date of this Act, except that
that section does not apply to an agreement to pledge or otherwise
encumber money in the state highway fund that is associated with the
following projects, regardless of whether the agreement is
finalized on or after the effective date of this Act:
�������������(1)��the State Highway 161 project in Dallas County;
�������������(2)��the Southwest Parkway (State Highway 121) in
Tarrant County from Interstate Highway 30 to Dirks Road/Altamesa
Boulevard and the Chisholm Trail project from Dirks Road/Altamesa
Boulevard to U.S. Highway 67 in the city of Cleburne;
�������������(3)��a project associated with the highway designated
as the Trinity Parkway in the city of Dallas;
�������������(4)��the Grand Parkway project (State Highway 99);
�������������(5)��the Hidalgo Loop project in Hidalgo County from
U.S. Highway 83 near the Pharr-Reynosa International Bridge to the
U.S. Highway 83 Expressway in Penitas to U.S. Highway 281 north of
Edinburg to U.S. Highway 83 west of Farm-to-Market Road 1423 to U.S.
Highway 83 near the Pharr-Reynosa International Bridge;
�������������(6)��the U.S. Highway 290 project from east of U.S.
Highway 183 to east of Farm-to-Market Road 734 in Travis County;
�������������(7)��the State Highway 71 East project from Riverside
Drive east to east of State Highway 130 and including the
interchange at State Highway 71 East/U.S. Highway 183 South in
Travis County;
�������������(8)��the U.S. Highway 183 South project from Springdale
Road south to State Highway 71 East in Travis County;
�������������(9)��the Loop 1 added capacity project, comprised of
the addition of a managed lane on Loop 1 from Parmer Lane to State
Highway 45 South in Travis County;
�������������(10)��any transaction related to the acquisition by a
regional mobility authority, a regional tollway authority, or a
county acting under Chapter 284 of a toll project of the department
all or a portion of which was existing and in operation prior to
September 1, 2009;
�������������(11)��any transaction related to the assumption by a
regional mobility authority, a regional tollway authority, or a
county acting under Chapter 284 of the operations of a toll project
of the department all or a portion of which was existing and in
operation prior to September 1, 2009;
�������������(12)��the Loop 49 project from U.S. Highway 69 north of
Lindale to State Highway 110 in Smith County; or
�������������(13)��the U.S. Highway 281 project in Bexar County from
Loop 1604 to the Comal County line and including five direct
connectors at the Loop 1604/U.S. Highway 281 interchange.
�������SECTION�3.��This Act takes effect immediately if it receives
a vote of two-thirds of all the members elected to each house, as
provided by Section 39, Article III, Texas Constitution.��If this
Act does not receive the vote necessary for immediate effect, this
Act takes effect September 1, 2009.
______________________________ ______________________________
���President of the Senate Speaker of the House�����
�������I hereby certify that S.B.�No.�883 passed the Senate on
May�5,�2009, by the following vote:��Yeas�28, Nays�1.
______________________________
Secretary of the Senate����
�������I hereby certify that S.B.�No.�883 passed the House on
May�27,�2009, by the following vote:��Yeas�148, Nays�0, one
present not voting.
______________________________
Chief Clerk of the House���
Approved:
______________________________�
������������Date
______________________________�
����������Governor