نبذة عني
Astute and highly confident Lead Engineer with demonstrated experience of working with EPCI contractors in upstream and midstream Offshore Oil and gas sectors as Construction Manager,Lead Engineer ,Senior Methods Engineer, Field/Installation Engineer, Structural Engineer and Site Engineer.
Supremely accomplished professional with great technical and practical capabilities with hands on experience in Project Planning, Engineering, Fabrication/Construction, and Installation sectors
Looking for a challenging and demanding position in Oil and Gas sector where I can render my professional skills and add value to organizational growth and objectives along with exploring and expanding my professional skills to the next level.
Core competencies/Functional Areas:
Engineering, Offshore Installation ,Fabrication/Construction, Planning, Procurement ,Subcontracts and Cost Controls
النشاط
-
Saudi Arabia Halts Major Projects, What Does the Minister of Finance Say? This is how the Western media reports it, or perhaps how they wish to…
Saudi Arabia Halts Major Projects, What Does the Minister of Finance Say? This is how the Western media reports it, or perhaps how they wish to…
تم إبداء الإعجاب من قبل Arun A R
-
Our commitment to safety remains our top priority at NMDC Energy! Today, our project team conducted a thorough safety walk-through, reinforcing our…
Our commitment to safety remains our top priority at NMDC Energy! Today, our project team conducted a thorough safety walk-through, reinforcing our…
تم إبداء الإعجاب من قبل Arun A R
-
The dynamics of oil price is a multifaceted interaction involving geopolitics ,supply and demand statistics and market speculation. Sell the news and…
The dynamics of oil price is a multifaceted interaction involving geopolitics ,supply and demand statistics and market speculation. Sell the news and…
تم النشر من قبل Arun A R
الخبرة
التعليم
-
-
الأنشطة والجمعيات:Student Member at Institution of Structural Engineers
Courses Attended
1.Steel Structures
2.Elastic and Plastic Analysis of Structures
3.Conservation of Structures
4.Research Methods
5.Structural Dynamics and Stability
6.Fire Engineering
7.Concrete Structures
8.Earthquake Engineering
Dissertation/ Thesis
Structural Analysis of Externally Bonded FRP reinforced concrete frame structure -
-
الأنشطة والجمعيات:Civil Engineering Students Association Member
Courses Attended
Strength of Materials, Structural Analysis I & II, Concrete Structures I & II, Steel Structures I & II, Construction Planning & Management, Geotechnical Engineering I & II,Environmental Engineering I & II, Transportation Engineering I & II, Computer Aided Design (Civil), Concrete Technology, Building Construction & Materials, Estimation, Costing & Evaluation.
Main Project
Environmental Impact assessment and waste sand management plan for a sand mining…Courses Attended
Strength of Materials, Structural Analysis I & II, Concrete Structures I & II, Steel Structures I & II, Construction Planning & Management, Geotechnical Engineering I & II,Environmental Engineering I & II, Transportation Engineering I & II, Computer Aided Design (Civil), Concrete Technology, Building Construction & Materials, Estimation, Costing & Evaluation.
Main Project
Environmental Impact assessment and waste sand management plan for a sand mining plant
Researches Done
Cathodic Protection of Reinforced Concrete Bridge Elements
المنشورات
-
Finite Element Approach for Fatigue Analysis of Welded Joints in Offshore Structures
Middle East Steel Conference for Oil and Gas 2013
FEA is carried out to find out load effects in the welded joints of Offshore tubular structures. Hot Spot Stress and SCF for a K-joint under various load cases of pure axial loading, in-plane
bending and out-of-plane bending and combined axial and bending are calculated using different parametric equations. The results are validated using API RP 2A method and compared with FEA approach by means of Stress extrapolation method. This gives an accurate input to predict the fatigue life of the…FEA is carried out to find out load effects in the welded joints of Offshore tubular structures. Hot Spot Stress and SCF for a K-joint under various load cases of pure axial loading, in-plane
bending and out-of-plane bending and combined axial and bending are calculated using different parametric equations. The results are validated using API RP 2A method and compared with FEA approach by means of Stress extrapolation method. This gives an accurate input to predict the fatigue life of the welded joints.مؤلفون آخرون
اللغات
-
English
إجادة كاملة
-
Hindi
إجادة تامة على المستوى المهني
-
Malayalam
إجادة اللغة الأم أو إجادة لغتين إجادة تامة
المؤسسات
-
The Institute of Structural Engineers
-
المزيد من أنشطة Arun
-
On the sidelines of the state visit of President Joko Widodo of Indonesia to the #UAE, I was pleased to welcome to #Masdar Ari Rahmat Indra Cahyadi…
On the sidelines of the state visit of President Joko Widodo of Indonesia to the #UAE, I was pleased to welcome to #Masdar Ari Rahmat Indra Cahyadi…
تم إبداء الإعجاب من قبل Arun A R
-
We are hiring for one of our prestigious client - Oil & Gas LNG Operating Company in Qatar. Lead of Project Interface Project : Onshore LNG…
We are hiring for one of our prestigious client - Oil & Gas LNG Operating Company in Qatar. Lead of Project Interface Project : Onshore LNG…
تم إبداء الإعجاب من قبل Arun A R
-
Exciting opportunity for an experienced Marketing Manager with 12-15 years of experience in the Oil & Gas contracting business! Seeking candidates…
Exciting opportunity for an experienced Marketing Manager with 12-15 years of experience in the Oil & Gas contracting business! Seeking candidates…
تم إبداء الإعجاب من قبل Arun A R
-
Strongly Agree with his perspective. Its will be unfair and shortsighted to reject candidates just because of the "Open to Work" status on…
Strongly Agree with his perspective. Its will be unfair and shortsighted to reject candidates just because of the "Open to Work" status on…
تم إبداء الإعجاب من قبل Arun A R
-
I am pleased to present the latest edition of Lamprelltimes, showcasing our Q2 2024 achievements. Read about the successful completion of the Moray…
I am pleased to present the latest edition of Lamprelltimes, showcasing our Q2 2024 achievements. Read about the successful completion of the Moray…
تم إبداء الإعجاب من قبل Arun A R
-
McDermott employees and the 3CRPO project team are stepping up for #sustainability. All electrical power was turned off for 60 minutes and the teams…
McDermott employees and the 3CRPO project team are stepping up for #sustainability. All electrical power was turned off for 60 minutes and the teams…
تم إبداء الإعجاب من قبل Arun A R
ملفات شخصية أخرى مشابهة
أعضاء آخرون يحملون اسم Arun A R في الإمارات العربية المتحدة
7 عضو آخر يحملون اسم Arun A R في الإمارات العربية المتحدة على LinkedIn
استعرض الأعضاء الآخرين الذين يحملون اسم Arun A R