Asad Ahmed

Asad Ahmed

الإمارات العربية المتحدة
٣ آلاف متابع أكثر من 500 زميل

نبذة عني

A result oriented, Quantity Surveying profession with more than 10 Years of international experience & more than 9 years of Gulf experience in all facets of Infrastructure-Roads, Bridges, Highways, Railways, Metros, Tramways, Commercial, Residential Buildings and works with thorough competency in site activities, Standard Method of Measurements for Engineering works, administration of engineering Contracts, preparation of bills / invoices for interim and final payments, Variations and planning and scheduling. Verifiable track record for the successful completion of FAST-TRACK projects through coordinating traits, building positive rapport with Project Managers, Consultants, Cost Consultants, Vendors and Clients while maintaining costs
- Ability to handle all commercial site work related to Billing & Quantity Surveying from execution to handover phase. Managed all technical aspects of highly complex engineering projects.
 Possess extraordinary talent producing cost-effective solutions leading to increased productivity, decreased labor costs, and improved quality. Quickly solved problems and made decisions using data, design goals and local industry standards

Specialties: -
- Billing / Quantity Surveying / Estimation / Claims / Contracts & dispute.
- Excellent Communication Skill.
- Efficient Management and Leadership ability.
- Effective in Cost Management and Budgeting of projects.
- Expertise with latest tools, techniques, computer and Microsoft office tools, Internet and
email.
- Efficient planning and coordination of activities.
- Excellent Time Management to finish the work scheduled on time.
- Cash Flow Management.

النشاط

الخبرة

  • رسم بياني Parsons

    Parsons

    Abu Dhabi, UAE

  • -

    Muscat, Oman

  • -

    Muscat, Oman

  • -

    Dubai

  • -

    Saudi Arabia

  • -

    Gurgaon, India

التعليم

  • -

  • الأنشطة والجمعيات:I completed my schooling from Kendriya Vidyalaya School.

الدورات التعليمية

  • Bachelor of Technology in Civil

    -

  • Senior Secondary

    -

المشروعات

  • Construction of Royal Road, Madinat Al Ilam, Muscat, Oman

    Location: Muscat, Oman
    Client: Royal Office, Madinat Al Ilam, Muscat, Oman
    Supervision & Design Consultant: National Engineering Services Pakistan (Pvt.) Limited , NESPAK
    Project Cost: Circa RO 20 million + 3.3 Million Additional work
    Main Project Features: This is a project of 7 Km road having dual Carriage way which will serve to Royal Office of Muscat, Oman. This project has mass earth work of circa 3.4 Million in Rock as Cut & fill, slope protection, benching concrete. It has…

    Location: Muscat, Oman
    Client: Royal Office, Madinat Al Ilam, Muscat, Oman
    Supervision & Design Consultant: National Engineering Services Pakistan (Pvt.) Limited , NESPAK
    Project Cost: Circa RO 20 million + 3.3 Million Additional work
    Main Project Features: This is a project of 7 Km road having dual Carriage way which will serve to Royal Office of Muscat, Oman. This project has mass earth work of circa 3.4 Million in Rock as Cut & fill, slope protection, benching concrete. It has 90 m long bridge having height more than 42m, several utilities (Telecom, sewerage, Security camera ducts, future ducts, landscaping, 2 helipads, single cell to multi cell box culverts, pipe culverts of different dia., concrete line ditch, street lighting.

    مؤلفون آخرون
  • ARORA HOTEL T5, UK/RVI, NEWCASTLE ADULT HOSPITAL, UK

    ⁩ - الحالي

    Construction of Arora T5 Five Star Hotel & New Castle Adult Hospital. Most of the work were precast elements.

    مؤلفون آخرون
  • Wadi Adai Interchange

    -

    This is a IInd & IIIrd Level Interchange bridge over a Ist Level existing bridge. The substructure of bridge will be of concrete (it includes piling, micro piling, pile cap, pier & pier head) & superstructure will be of steel (it includes steel deck). The highest point will rise to 19m above ground level. The length of Bridge1 is 343m & Bridge2 is 272m. The cost of project is RO 18.7 million+4.5 million additional work. This project includes several Storm Water drainage systems having 2 cell to…

    This is a IInd & IIIrd Level Interchange bridge over a Ist Level existing bridge. The substructure of bridge will be of concrete (it includes piling, micro piling, pile cap, pier & pier head) & superstructure will be of steel (it includes steel deck). The highest point will rise to 19m above ground level. The length of Bridge1 is 343m & Bridge2 is 272m. The cost of project is RO 18.7 million+4.5 million additional work. This project includes several Storm Water drainage systems having 2 cell to 8 cell box culvert, concrete open channel line drains, trapezoidal rip rap channels, 300 to 1000 mm diameter, HDPE & RCC pipe. This project also includes Rock cutting & blasting.

    مؤلفون آخرون
  • AL SUFOUH TRANSIT SYSTEM :-TRAM WAY DUBAI UAE

    -

    Worth : AED 2 Billion (Excluding Track & Locomotive).
    Client : Road & Transport Authority (RTA) DUBAI
    Consultant : SYSTRA
    Designed : AEDAS /PARSONS

    مؤلفون آخرون
    عرض المشروع
  • Harman High Speed Rail Project-Package 1

    -

    Project Cost: SAR 6.8 billion ( USD 1.8 Billion)
    Main Project Features:
    The Haramain High Speed Rail Project involves connection of two Holy Cities Mecca & Madinah via King Abdulaziz International Airport, Jeddah, King Abdullah Economic City, Rabigh, The length of the Track will be 450 km. The double track electric line is designed to run at a speed of 360 km/hr.There will be five stations on the line at: Mecca, Jeddah City Center, King Abdulaziz International Airport, King Abdullah…

    Project Cost: SAR 6.8 billion ( USD 1.8 Billion)
    Main Project Features:
    The Haramain High Speed Rail Project involves connection of two Holy Cities Mecca & Madinah via King Abdulaziz International Airport, Jeddah, King Abdullah Economic City, Rabigh, The length of the Track will be 450 km. The double track electric line is designed to run at a speed of 360 km/hr.There will be five stations on the line at: Mecca, Jeddah City Center, King Abdulaziz International Airport, King Abdullah Economic City, Rabigh & Madinah. It has 154 bridges – 64 rail/wadi bridges, 57 road bridges, 12 camel crossings and 21 miscellaneous structures. The superstructure types include precast post-tensioned girders and box girders. The railway is expected to carry three million passengers a year, including many Hajj and Umrah pilgrims, helping to relieve traffic congestion on the roads.

    مؤلفون آخرون
  • Mashaaer Mugaddassah Metro Project (Makkah)

    -

    Location: Makkah
    Client: Saudi Arabian Government
    Consultant: Atkins, Saudi Arabia
    Project Cost: Approx.SAR 8 Billion
    Main Project Features: This is the Metro Train facility provided to pilgrims during Haj period from Mina, Musdalfa to Arafat. There are 3 types of stations & these are 9 in nos. Length of each station is 300m and width depends upon type of station. The length of the metro track is 18.1 Km.

  • The North South Railway (Mineral Railway)-CTW100

    -

    Project Cost: SAR 13 Billion (USD 3.5 Billion)
    Main Project Features:
    The project involves construction of approximately 2,400 km long single track line to link the northern mineral deposits to the Gulf Port of Jubail. The railway will link Al-Jalamid and Al-Zubairah in the north to the industrial city of Jubail in the east. The contract “Civil and Track Works Contract, CTW 100” includes 32 Bridges, 18 Camel Crossings, 359 Box Culverts (One Cell, Two Cells and Three Cells) and 200 Pipe…

    Project Cost: SAR 13 Billion (USD 3.5 Billion)
    Main Project Features:
    The project involves construction of approximately 2,400 km long single track line to link the northern mineral deposits to the Gulf Port of Jubail. The railway will link Al-Jalamid and Al-Zubairah in the north to the industrial city of Jubail in the east. The contract “Civil and Track Works Contract, CTW 100” includes 32 Bridges, 18 Camel Crossings, 359 Box Culverts (One Cell, Two Cells and Three Cells) and 200 Pipe Culverts across the total track length of around 600 Km. The contract “Signalling and Telecommunication Works Contract S&T 100” includes installation of 179 nos. of 40 m high Signalling and Telecommunication Towers across the total track length of around 2400 Km.

    مؤلفون آخرون
  • Madinah Car Park Ext. (Madinah).

    -

    Project Cost: Approx.SAR 7 Billion
    Main Project Features: The project involves the extension of Holy mosque of Masjid-e-Nabvi with buildup area 164,000 m2. The construction involves extension of existing car parking area to provide better car parking facility to pilgrims & visitors. I find out the structural and architectural finishing work for this project such as floor finishing, column cladding etc.

اللغات

  • English

    -

  • Hindi

    -

  • Urdu

    -

التوصيات المستلمة

عرض ملف Asad الشخصي الكامل

  • مشاهدة الأشخاص المشتركين الذين تعرفهم
  • تقديم تعارف
  • تواصل مع Asad مباشرة
انضم لعرض الملف الشخصي الكامل

ملفات شخصية أخرى مشابهة

أعضاء آخرون يحملون اسم ⁦⁩Asad Ahmed⁦⁩ في ⁦⁩الإمارات العربية المتحدة

اكتسب مهارات جديدة من خلال هذه المواد الدراسية