نبذة عني

A professional Senior Projects Engineer with 25 years of experience in the water industry, out of which 15 years in transmission and distribution utility companies in UAE and 10 years working with leading electromechanical contractors in Jordan and UAE, with specialist experience in all aspects of management including projects, business, Assets, Operation and maintenance, Risk, Quality and Excellence.
Lately I have succeeded to implement the first pumping station working at optimized pressure based on real time change in demand for industrial water with no pressure or flow set points.
My ambition is to reach most smart city in Optomized Water Networks based on demand and achieve leadership in sustainability thus:
saving energy between 15 to 25%, reduce leakage losses, reduce operation and maintenance cost & extend networks life.
I am specialized in managing all type of projects from distribution networks to main city pump stations from inception to close out including checking design reports, hydraulic models, surge analysis and commissioning of all kind of control valves, pumps, surge vessels etc.
I have become EFQM Assessor in 2015

Also I am responsible for establishment of Directorate's Balanced Scorecards, KPIs with targets to achieve Company Strategic objectives and very aligned with Abu Dhabi plan.

Committees:
-BCM Coordinator to ensure that the company complies with NCEMA 7000:2015.
-Core team member in ISO55000 to support ADDC for ISO55000 certification to ensure that ADDC Assets management is following best international practices, after successful certification for PAS55.
-Capital efficiency of ADDC’s water & electricity business capital expenditures over the PC4 to PC5 against the Bureau’s efficiency criteria.
- Key member in ADWEA Water Standard specification update Committee.
- ADWEA Water Pre Qualification team.
-ADDC EFQM main submission committee for ADWEA Excellence award and Abu Dhabi Excellence Awards.
-Projects Risk Management coordinator.

مقالات Mahmoud

النشاط

انضم الآن لعرض كل النشاط

الخبرة

  • رسم بياني ADDC

    ADDC

    Abu Dhabi, United Arab Emirates

  • -

    United Arab Emirates

  • -

  • -

    United Arab Emirates

  • -

    United Arab Emirates

  • -

    United Arab Emirates

  • -

    United Arab Emirates

  • -

    Jordan

التعليم

  • رسم بياني

    -

  • http://www.bishop.edu.jo/

التراخيص والشهادات

الدورات التعليمية

  • ASTRO (ADWEA Strategic Transformation)

    -

  • Chartered Financial Analyst Level 1 Course

    -

  • Communication and Interpersonal Skills

    -

  • Essential of contracting Negotiations and Claims

    -

  • Integrated Management System Foundation course Based on ISO 9001:2008, ISO14001

    -

  • Microsoft Project 2002

    -

  • Modeling & Simulation of Electromechanical Systems

    -

  • Obtained the International Computer Driving License

    -

  • Planning and Scheduling with Primavera 3.0

    -

  • Project Management Professional (PMP)

    -

  • Project Management: A to Z Best Practices

    -

  • Project Management: Skills for successes

    -

  • Project, planning, scheduling, and Cost Control Professional (PSP)

    -

  • Variable Speed Drive Systems

    -

المشروعات

  • Additions & Modifications At Unit IV, Shobaisi & Remah Pump Stations Project

    I worked as Assistant Resident Engineer supervising the mechanical installation and commissioning in Additions & Modifications At Unit IV, Shobaisi & Remah Pump Stations Project. The project consists of the following:

    a- UNIT IV

    1.Remove existing pumps and install 5 No. fixed speed vertically mounted pump sets 1500 m³/hr at 15.5 bar each.
    2.Installing DN1000 D.I. Suction & discharge headers for the pumps.
    3.Installing D.I. suction and discharge branches including all…

    I worked as Assistant Resident Engineer supervising the mechanical installation and commissioning in Additions & Modifications At Unit IV, Shobaisi & Remah Pump Stations Project. The project consists of the following:

    a- UNIT IV

    1.Remove existing pumps and install 5 No. fixed speed vertically mounted pump sets 1500 m³/hr at 15.5 bar each.
    2.Installing DN1000 D.I. Suction & discharge headers for the pumps.
    3.Installing D.I. suction and discharge branches including all fittings, valves , flow control valves, etc.
    4.Installing new 1420m, DN1000 cement lined carbon steel pipeline including fittings, valves, flow meters, etc. from pump station and connected to existing to main line to Shobaisi pump station.
    5.UT, MPI and Radiography of welded joints.
    6.Hydrostatic test up to 25 bars for all pipelines.
    7.Installation of anti surge system consisting of 3 No. 70 m³ new surge vessels, 2 air receivers and 2 compressors connected to the main line.
    8.SCADA Control of the system.

    b- Shobaisi & Remah

    1.Replace 5 old pumps with new similar horizontal centrifugal pumps 950m³/hr at 15.0 bar.
    2.Replace old discharge PN25 carbon steel pipes of the pumps with new discharge piping and manifolds.
    3.Installation of anti surge system including 2 no. of 70m³ surge vessels, compressed air piping and DN800 C.S. pipeline connected to main line.
    4.UT, MPI and radiography of welded joints for the C.S. pipeline of the surge vessels.
    5.Hydrostatic test for same line.

  • Construction, Completion & Maintenance of Water Supply Network For Air Force & Air Defense Institute Camp at Sheikh Zayed Military Cantonment project

    I worked in Construction, Completion & Maintenance of Water Supply Network For Air Force & Air Defense Institute Camp at Sheikh Zayed Military Cantonment project as a Project manager responsible for the design, erection, process, commissioning and maintenance of the following:

    1-Construction main water supply network of the Camp including 50mm to 250mm UPVC piping, fittings, gate valves, altitude valves etc.
    2-Laying 200mm GRE piping to existing Tanks.
    3-Construction of Two Pumping…

    I worked in Construction, Completion & Maintenance of Water Supply Network For Air Force & Air Defense Institute Camp at Sheikh Zayed Military Cantonment project as a Project manager responsible for the design, erection, process, commissioning and maintenance of the following:

    1-Construction main water supply network of the Camp including 50mm to 250mm UPVC piping, fittings, gate valves, altitude valves etc.
    2-Laying 200mm GRE piping to existing Tanks.
    3-Construction of Two Pumping Station which accommodated the following:
    -Two variable speed pumps of 144 m³/hr capacity at 40 m head.
    -Two variable speed pumps of 108 m³/hr capacity at 40 m head.
    -Four variable speed pumps of 36 m³/hr capacity at 40 m head.
    4-Supply and installation of PLC controller for the pumps.
    5-Supply and installation of Two Pressure Vessels.
    6-Hydrostatic testing for the network up to 8 bars.
    7-Supply, lay, joint and Terminate 185mm2 to 300mm2 x 4C – 600/1000V cables.
    8-Supply, install, test and complete maintain the step up Feeder Pillars for the system.
    9-Supply and install electrical panel for the pumps.
    10-Provide Earthling system.
    11-Testing and Commissioning of the whole system

  • Buffer Tanks, Storage Tanks & Pumping stations at Ras Al Khaimah, Fujairah and Ajman project

    I worked in Buffer Tanks, Storage Tanks & Pumping stations at Ras Al Khaimah, Fujairah and Ajman project as senior project engineer responsible for the design, erection, process, commissioning and maintenance of the following:


    1- Construction of five pumping stations, which accommodated the following:
    - Three pumps of 570m³/hr capacity at 55 m head.
    - Three pumps of 710m³/hr capacity at 73 m head.
    - Three pumps of 355m³/hr capacity at 30 m head.
    -…

    I worked in Buffer Tanks, Storage Tanks & Pumping stations at Ras Al Khaimah, Fujairah and Ajman project as senior project engineer responsible for the design, erection, process, commissioning and maintenance of the following:


    1- Construction of five pumping stations, which accommodated the following:
    - Three pumps of 570m³/hr capacity at 55 m head.
    - Three pumps of 710m³/hr capacity at 73 m head.
    - Three pumps of 355m³/hr capacity at 30 m head.
    - Four pumps of 850m³/hr capacity at 55 m head.
    - Three pumps of 425m³/hr capacity at 13 m head.
    - Three pumps of 425m³/hr capacity at 64 m head.
    - All the necessary piping, fittings & valves.
    2-Construction of ten surge suppression vessels with the required accessories for the system.
    3-Erection of D.I. pipes & fittings DN200 to DN1500mm connecting to 4 MIG Tanks Supplying to other stations and distribution networks.
    4-Construction of two chlorination plants.
    5-Testing and commissioning of the above.

  • Improvement of water supply system for greater Amman - Jordan subcontract project

    I worked in Improvement of water supply system for greater Amman - Jordan subcontract project as a Site manager responsible for the erection & commissioning of the following at four identical pump stations:

    1-Removal of existing pumps and replace them with 2500m³/hr capacities 314m head, 3500 Kw, 21 Ton weight each.
    2-Chipping the existing pumps foundations and modifying the motors foundation.
    3-Removal of existing auxiliary piping valves and fittings and replace them with new…

    I worked in Improvement of water supply system for greater Amman - Jordan subcontract project as a Site manager responsible for the erection & commissioning of the following at four identical pump stations:

    1-Removal of existing pumps and replace them with 2500m³/hr capacities 314m head, 3500 Kw, 21 Ton weight each.
    2-Chipping the existing pumps foundations and modifying the motors foundation.
    3-Removal of existing auxiliary piping valves and fittings and replace them with new ones.
    4-Removal of existing air compressors and aftercooler and replace them with new ones.
    5-Installation of 10MVA transformer.
    6-Hydrostatic testing for the piping at 30 bars.
    7-Penetration test for the welded joints.
    8-Pumps alignment.
    9-Calibration of control valves.
    10-Testing and commissioning for the system.

  • Abu Zeghan project

    I worked in Abu Zeghan project as a mechanical engineer responsible for the erection & commissioning of the following:

    1-Erection of DN1400mm, 4Km steel pipeline.
    2- Testing the line to 24 Bar.
    3- Construction of DN1400mm suction & discharge headers.
    4- Construction of valve room including motorized butterfly valves & pressure reducing valves.
    5- Calibration of the Pressure reducing valves.
    6- Erection of 6 sluice gates.

  • Al Eshidya Jordan phosphate mine project

    I worked in Al Eshidya Jordan phosphate mine project as a mechanical supervisor engineer, responsible for the erection, testing & commissioning of the following:

    1- Collection of water from 21 bore wells in four collection headers and feeding to aeration tanks.
    2-Construction & assembly of two aeration tanks with their fans connected to the bore wells’ lines to remove the dissolved gases, hydrogen sulfide & carbon dioxide.
    3-Storage of aerated water in well field reservoir of…

    I worked in Al Eshidya Jordan phosphate mine project as a mechanical supervisor engineer, responsible for the erection, testing & commissioning of the following:

    1- Collection of water from 21 bore wells in four collection headers and feeding to aeration tanks.
    2-Construction & assembly of two aeration tanks with their fans connected to the bore wells’ lines to remove the dissolved gases, hydrogen sulfide & carbon dioxide.
    3-Storage of aerated water in well field reservoir of 12500 m³ capacity.
    4- Construction of two pumping stations:
    a- The first pumping water from well field reservoir for a distance of 23.5Km and storage in Mill site reservoir of 12500 m³ capacity.
    b- The other distributing water to various consumers from the Mill site reservoir.
    Where the two pumping stations accommodated the following:
    - Three high voltage pumps of 1375 m³/hr capacity at 94.5 m head.
    - Two pumps of 835 m³/hr capacity at 35 m head.
    - Two pumps of 730 m³/hr capacity at 15 m head.
    - Two pumps of 140 m³/hr capacity at 25 m head.
    - Four pumps of 35 m³/hr capacity at 25 m head.
    - All the necessary piping, fittings & valves.
    5- Construction of surge suppression vessels with the required air compressors & other accessories.
    6- Construction of filtration system with the required blowers & accessories.
    7- Construction of chlorine plant with all the necessary equipment & instruments.
    8- Erection of all the necessary instrumentation.
    9- Calibration and erection of control valves.

  • National Park pumping station Project

    I worked in National Park pumping station Project as a mechanical engineer, responsible of the erection & commissioning of the following:

    1- Construction of Pump House, which accommodated the following equipment:
    - Four pumps of 600 m³/hr capacity at 200 m head, motor power 510kW.
    - Two pumps of 300 m³/hr capacity at 200 m head, motor power 290kW.
    - Carbon Steel piping, fittings & valves.
    - Overhead crane of 10 Ton capacity.
    2-Testing the pipeline…

    I worked in National Park pumping station Project as a mechanical engineer, responsible of the erection & commissioning of the following:

    1- Construction of Pump House, which accommodated the following equipment:
    - Four pumps of 600 m³/hr capacity at 200 m head, motor power 510kW.
    - Two pumps of 300 m³/hr capacity at 200 m head, motor power 290kW.
    - Carbon Steel piping, fittings & valves.
    - Overhead crane of 10 Ton capacity.
    2-Testing the pipeline to 40 Bar.
    3-Construction of Diesel Generators plant which accommodated two Diesel Generators of 1000 KVA capacity each. Also included 15Ton Over Head Crane.
    4-Construction of chlorine building with all chlorine injection equipment like chlorine cylinders, chlorinators, water pumps, ejectors, chlorine residual analyzer and the safety equipment.
    5-Surge suppression vessels with the required air compressors and controls.
    6-Construction of chambers for valves and flow meters of the different piping, which varies between 350 to 1000 mm sizes.
    7- Calibration of control valves.
    8-Planning of the project using Microsoft Project Software.

  • Connections to Fujairah Water Transmission Scheme

    -

    Project manager for the project representing the client ADWEA

    The project is connecting between the High pressure Fujairah Water Transmission Scheme DN1600 C.S. Twin line from Qidfa Pumping Station in Fujairah to Al Ain Reception Pumping Station and the various areas known as taps off including supplying, installation, testing and commissioning of C.S. pipes, D.I. pipes, Control Valves, Butterfly Valves, Flow meters, Control system for the following:

    -1.7Km DN600mm PN40 C.S…

    Project manager for the project representing the client ADWEA

    The project is connecting between the High pressure Fujairah Water Transmission Scheme DN1600 C.S. Twin line from Qidfa Pumping Station in Fujairah to Al Ain Reception Pumping Station and the various areas known as taps off including supplying, installation, testing and commissioning of C.S. pipes, D.I. pipes, Control Valves, Butterfly Valves, Flow meters, Control system for the following:

    -1.7Km DN600mm PN40 C.S. pipeline between tap off No. 15 of the FWTS and the reservoirs of HH Sheikh Sultan Farms.
    -5.5Km DN600mm PN40 C.S. pipeline between tap off No. 7 of the FWTS and Shuwaib North Reservoirs.
    -0.2Km DN600mm PN40 C.S. pipeline between tap off No. 7 of the FWTS and Kashuna Tanks.
    -0.5Km DN800mm PN40 C.S. pipeline between tap off No. 8 of FWTS and Shuwaib South Reservoirs.
    -1x DN 1400 & 1 DN1200 PN40 C.S. to connect between the 2 X DN 1400 GRP pipelines branching of from FWTS and water inlets of existing tanks at Al Ain Reception P.S.
    -5 Km of 1x DN1400 & DN1200 PN25 D.I. pipes to connect between the DN1400 & DN1200 C.S. pipes and water inlets of existing tanks at Al Ain Reception P.S.
    -DN 800 D.I. to connect existing discharge header of Al Hili pump group to the DN 800 pipeline which is already used for supplying well water to the above P.S.
    -2 x DN 1000 D.I. pipelines to connect the existing 2 X DN 1200 pipeline outside the Al Ain P.S. and the existing suction headers of the DN 1200 and the DN 1000 pipes.
    -5 Km DN900 D.I. connecting between the DN900 coming from Al Ain Reception P.S. and the existing DN 1200 connected to existing tanks at Al Hili P.S.
    -2 x DN 1200 D.I. to connect existing 2 x DN 1200 C.S. pipelines coming from the storage tanks belonging to FWTS and the existing 2 x DN 1200 D.I. inlets pipeline to the tanks of Sweihan P.S.

  • Installation of interface and bulk water consumer metering points Stage 2

    -

    Project manager for the project representing the client ADWEA

    The project consists of the following:

    -66 No. interface metering points including Electromagnetic flow meters, with remote readout, remote pressure transmitter and water sampling points in concrete chambers, control valves and associated GRP kiosks at certain locations in Abu Dhabi Emirate.
    -29 Area metering points including Electromagnetic flow meters with remote readout in concrete chambers at the bulk consumer…

    Project manager for the project representing the client ADWEA

    The project consists of the following:

    -66 No. interface metering points including Electromagnetic flow meters, with remote readout, remote pressure transmitter and water sampling points in concrete chambers, control valves and associated GRP kiosks at certain locations in Abu Dhabi Emirate.
    -29 Area metering points including Electromagnetic flow meters with remote readout in concrete chambers at the bulk consumer points with associated GRP kiosks with flow control valves in some of the above locations.
    -110 bulk metering points including Electromagnetic flow meters with associated GRP kiosks.
    -Solar power supply system with back up 24V DC battery or normal 230 VAC power supply system with KWH meter and back up float charged battery 24VDC with all necessary accessories and cable connections.
    -Flow, pressure and alarm signals wired up to the terminals in GRP kiosks for future telemetry connection.

  • Replacement Of buried Butterfly Valves and construction of valve chambers on PRMs and construction of washout chambers in existing water network in Abu Dhabi City

    -

    Project manager for the project representing the client ADDC.

    The Project comprises the following main works:

    1.Replacement of (58) existing buried Gate Valves/ Butterfly Valves (DN 300 to DN 1000) with new valves in watertight concrete chambers.
    2.Replacement of valves and necessary fittings at seventeen (17) locations, including construction of new watertight concrete chambers in place of the existing chambers at identified locations shown on the Tender…

    Project manager for the project representing the client ADDC.

    The Project comprises the following main works:

    1.Replacement of (58) existing buried Gate Valves/ Butterfly Valves (DN 300 to DN 1000) with new valves in watertight concrete chambers.
    2.Replacement of valves and necessary fittings at seventeen (17) locations, including construction of new watertight concrete chambers in place of the existing chambers at identified locations shown on the Tender Drawings.
    3.Removal of twenty (20) Butterfly Valves (DN 500 to DN 1000) from identified locations on the PRMs in Abu Dhabi City.
    4.Construction of (30) Washout chambers including valves and fittings (DN 150 to DN 300) in the existing network at locations shown on the Tender Drawings.
    5.Demolishing and disposal of abandoned concrete chambers.

  • Submarine line to Al Yafeena Island

    -

    Project manager for the project representing the client ADWEA.

    The project consists of the following:

    -Construction of DI pipeline 900mm at Umm Al Nar long with all fittings, valves and chambers.
    -Construction of Submarine HDPE pipeline to Al Yafeena Island, 500 dia. (OD) by open cut method.
    -Connection of the new HDPE pipeline to the existing GRP tank including altitude valves and flowmeter
    -Construction of submarine HDPE branch to Al Barmiya Island, 355 dia. (OD).

    Project manager for the project representing the client ADWEA.

    The project consists of the following:

    -Construction of DI pipeline 900mm at Umm Al Nar long with all fittings, valves and chambers.
    -Construction of Submarine HDPE pipeline to Al Yafeena Island, 500 dia. (OD) by open cut method.
    -Connection of the new HDPE pipeline to the existing GRP tank including altitude valves and flowmeter
    -Construction of submarine HDPE branch to Al Barmiya Island, 355 dia. (OD).

  • Supply & Laying of D.I. Pipes to Different locations at East and West Liwa

    -

    Project manager for the project representing the client ADWEA

    The project consists of the following:

    -Supply and installation of 100km of DN150-400mm ductile iron networks through a scattered area (over 100km).
    -180 house connections.
    -Tanker filling station.
    -13 time-actuated valves (to maintain pressure).
    -Accommodation buildings for ADDC staff who operates existing pumping stations.

  • Water Supply Scheme to Masdar Shams -1 Project at Madinat Zayed

    -

    Project manager for the project representing the client ADDC.

    The Project comprises the following main works:

    1-Supply and construction of OD 315mm HDPE pipeline for approximate length of 1.9 km including associated valves, meters and fittings.
    2-Supply and construction of OD 250mm HDPE pipeline for approximate length of 4.4 km including associated valves, meters and fittings.
    3-Supply and installation of flow measuring points such as sector measuring points including all…

    Project manager for the project representing the client ADDC.

    The Project comprises the following main works:

    1-Supply and construction of OD 315mm HDPE pipeline for approximate length of 1.9 km including associated valves, meters and fittings.
    2-Supply and construction of OD 250mm HDPE pipeline for approximate length of 4.4 km including associated valves, meters and fittings.
    3-Supply and installation of flow measuring points such as sector measuring points including all necessary civil works.

  • Water Supply to Al Wathba Prison Camel Race and Provision for additional Reservoir at Al Khatim and Upgrading of Pumping Facilities at Salimyah and Ghanada

    -

    Project manager for the project representing the client ADWEA.

    The project consists of the following:

    -Al Wathba Prison Camel Race: Construction of a new water distribution network to supply the southern area of Al Wathba from the new 900mm dia. Transmission pipeline coming from the new pumps group at Mussafah Pump Stations and going to Al Wathba Palace.
    -Al Khatim: Upgrading the existing water distribution system, replacement of existing A.C. pipelines and the refurbishment…

    Project manager for the project representing the client ADWEA.

    The project consists of the following:

    -Al Wathba Prison Camel Race: Construction of a new water distribution network to supply the southern area of Al Wathba from the new 900mm dia. Transmission pipeline coming from the new pumps group at Mussafah Pump Stations and going to Al Wathba Palace.
    -Al Khatim: Upgrading the existing water distribution system, replacement of existing A.C. pipelines and the refurbishment of the existing water storage tanks & pump station.
    -Salmiya: Construction of new pipelines to supply H.H. Sheikh Zayed farms and the Emirates Media MW Radio Station at Salmiya from the new 1600 mm dia.
    -Ghanada: Construction of a new water distribution system to supply the V.I.P. palaces and Al Jarf Palace at Ras Ghanada, including new ground tank and pump station and new distribution network.

  • Water supply to GASCO / ADCO Facilities at Buhasa and Habshan.

    -

    Project manager for the project representing the client ADDC.

    The Project comprises the following main works:

    1-A new dedicated pump station of 7.0 MIGD capacity comprises of two pump groups each with 2 duty + 1 standby pumps to be constructed adjacent to the existing TRANSCO IPS2 pumping station at Habshan including anti-surge system, 1000kVA standby Diesel generator, fire fighting system, HVAC system, fire detection and protection system, hypo chlorination facility comprising…

    Project manager for the project representing the client ADDC.

    The Project comprises the following main works:

    1-A new dedicated pump station of 7.0 MIGD capacity comprises of two pump groups each with 2 duty + 1 standby pumps to be constructed adjacent to the existing TRANSCO IPS2 pumping station at Habshan including anti-surge system, 1000kVA standby Diesel generator, fire fighting system, HVAC system, fire detection and protection system, hypo chlorination facility comprising salt storage, salt handling, production, storage and dosing of sodium hypochlorite, all other related electro- mechanical works.
    2-2 x 0.5 MIG (2 x 2273 m3) storage steel tanks at the proposed pump station (BHFPS) each approx. 22m dia and approx. 11m height complete with inlet, outlet and over flow nozzles, C.P. system internal lining, etc.
    3-1 x DN 700 CS PN 40, followed by DN 800 DI K9 PN16 pipeline of approximately 1.0km from the tie-in point at Transco CS line near IPS2 up to inlet of new buffer tanks of BHFPS.
    4-1 x DN 400 DI K9 PN 25 pipeline of approximately 44.5 km from the proposed pumping station up to Buhasa.
    5-1 x DN 500 DI K9 PN 25 pipeline of approximately 15 Km from the proposed pumping station up to Habshan.
    6-Supply and construction of DI K9 PN25 branch pipelines for Diameters from DN150mm to DN300 from the DN 500 & DN400 main pipelines to connect to GASCO and ADCO Facilities.
    7-Supply and install special type pilot operated control valves working as pressure reducing, flow limitation with pressure sustaining facility and provided with motor controller controlled by RTU, being the first to be used in UAE.

  • Water Supply to Ghayathi And Hamra Militery Camp

    -

    Project manager for the project representing the client ADWEA

    The project consists of the following:

    -Water Supply from twin 1600 dia. Transco mains (fed from Shuwaihat desalination plant) through 29km 600 dia. DI PN 25 to Ghayathi and 2.5km 800 dia. DI PN25 to Takreer (refinery)
    -2.5km 300 dia. DI to military reservoir.
    -New pump station at Bidaa Al Mutawa.
    -25km HDPE DN160 from Bidaa Al Mutawa P.S. to Umm Al Ashtan military camp.

المزيد من أنشطة Mahmoud

عرض ملف Mahmoud الشخصي الكامل

  • مشاهدة الأشخاص المشتركين الذين تعرفهم
  • تقديم تعارف
  • تواصل مع Mahmoud مباشرة
انضم لعرض الملف الشخصي الكامل

ملفات شخصية أخرى مشابهة

أعضاء آخرون يحملون اسم ⁦⁩Mahmoud Al Khatib⁦⁩ في ⁦⁩الإمارات العربية المتحدة

اكتسب مهارات جديدة من خلال هذه المواد الدراسية