Yann DIEBOLT

Yann DIEBOLT

Construction Manager chez Orano

Vire, Normandie, France
429 abonnés 359 relations

Activité

S’inscrire pour voir toute l’activité

Expérience

  • Graphique Orano

    Construction Manager

    Orano

    - aujourd’hui 4 ans 4 mois

    La Hague, Normandie, France

    Management of general installation Subcontracted activities

  • Framatome

    Framatome

    8 ans 3 mois

    • Graphique Framatome

      Electrical & Instrumentation Work-Package Responsible

      Framatome

      - 1 an 8 mois

      Flamanville, Normandie, France

      Responsible for planning, cost, compliance and performance of the Electrical and Instrumentation scope

    • Graphique AREVA NP

      Electrical and I&C Construction LEADER

      AREVA NP

      - 4 ans 5 mois

      Flamanville 3 EPR Project - France

      Responsible in charge of ensuring and supervising on-site operations of the Electrical and Instrumentation scope of the Boiler contract.

    • Graphique AREVA NP

      ELECTRICAL COORDINATOR

      AREVA NP

      - 2 ans 2 mois

      Olkiluoto 3 EPR Project - Finland

      Coordination of erection activities and interfaces with site involved entities (HVAC, Piping, etc.)
      Supervision of Black Boxes installation (Electrical and I&C equipments of stand-alone Systems) - Ensure interface with different system leaders, check applicable documentation, assist sub-contractor, and follow-up of physical progress.

  • Graphique AREVA

    Electrical SUPERVISOR

    AREVA

    - 4 ans 3 mois

    Georges BESSE 2 Project - France

    Check that Contractors perform the works according to the contract HSE, technical and schedule stipulations. Ensure they are using the right erection documentation.
    Check that works are progressing according to time schedule until transfer of equipments to commissioning.

  • Graphique AREVA T&D

    GIS Erection SUPERVISOR

    AREVA T&D

    - 6 ans 8 mois

    Worldwide

    Supervision of erection of high voltage GIS substations worldwide. Management of local erection crews for the mechanical and electrical assembly of the switchgears with respect of HSE, quality and time schedule requirements.

  • SCHEDULER

    TAMARIS INDUSTRIES

    - 2 ans 1 mois

    Région de Montpellier, France

    Time scheduling and follow-up of all manufacturing steps until ready for shipping.

  • Graphique Cameron

    TECHNICAL BUYER

    Cameron

    - 1 an 7 mois

    Région de Montpellier, France

    Place / negotiate purchase orders for mechanical components. Monitoring suppliers to ensure quality and delivery adherence.

Formation

Langues

  • Anglais

    Capacité professionnelle générale

Plus d’activités de Yann

Voir le profil complet de Yann

  • Découvrir vos relations en commun
  • Être mis en relation
  • Contacter Yann directement
Devenir membre pour voir le profil complet

Autres profils similaires

Ajoutez de nouvelles compétences en suivant ces cours