Integrity Grading & Excavating, Inc.

Integrity Grading & Excavating, Inc.

Construction

Schofield, Wisconsin 534 followers

Core Values: Integrity, Innovative, Reputation, Respect, Committment, Driven

About us

Established 2006, Integrity Grading & Excavating, Inc. is a diversified construction firm. IGE conducts its operations in the Midwest with the bulk of its work performed statewide throughout Wisconsin. Integrity has locations in Madison, WI & Schofield, WI. Integrity provides excavating and utility services in commercial site development, roadways, environmental cleanup, general excavation, sewer and water utilities, along with snow removal.

Website
http://www.integrityge.com
Industry
Construction
Company size
51-200 employees
Headquarters
Schofield, Wisconsin
Type
Privately Held
Founded
2006
Specialties
WISDOT Roadway, Site Development, FRAC Mine Development, Landfill Operations, Snow Removal, Sewer and Water Utilities, Utilities, Specialty Site Work, Power Plant Site Work, GPS TopCon, Design Build Earth Projects, Lake & Pond Construction, Roadways, Environmental Clean Up, and Cranberry Bogs

Locations

Employees at Integrity Grading & Excavating, Inc.

Updates

  • Integrity Grading & Excavating, Inc. reposted this

    Cory Tomczyk was clearly enjoying himself – full of smiles and booming laughter – while walking a WTBA-member worksite in Wausau this week. “I’m a hands-on guy and I don’t mind getting dirty, but I need to do this more often,” Tomczyk said after an hour-long tour of Integrity Grading & Excavating, Inc.'s reconstruction job on Stewart Avenue.  “It’s really always impressive to see the great work.” Still, the State Senator from Mosinee had to shake his head when IGE crews showed him a prime example of the type of issue his Compensable Utility Delay bill (signed into law in December) aims to prevent.  A fiber line, which was supposed to be moved ahead of construction in April, lays right where crews plan to make a subgrade cut and widen the road to 36 feet. “My job is to make Madison help you guys get your job done better,” Tomczyk pledged. IGE says they’re working with the utility to get the line moved before it gets to the point of seeking compensation.  Instead, a very rainy spring and summer has been the bigger challenge, pushing IGE and its subs about two weeks behind schedule. The project replaces the aging asphalt along a 1.25-mile stretch into and out of downtown Wausau, places new water and sewer lines, and adds a multi-use path. “I think the pedestrians will like (the new path) a lot better and it’s a good local project,” IGE Operations Manager Brandon Barden told WTBA.  “It’s bringing some new stuff to homeowners, wider turning radiuses, so traffic should move more freely.” Barden is a member of the WTBA of Tomorrow Council.  Members are working with WTBA’s Director of Government Affairs Elise Nelson to line up lawmaker project tours all across Wisconsin this summer. Tuesday’s visit gave IGE President Dan Weinkauf the chance to thank Tomczyk for his efforts on the utility bill and offer him and State Rep. Patrick Snyder (R-Schofield) some industry insights to ponder. “This particular project is so relevant for central Wisconsin, because you have Integrity here based right around the Wausau area, you’ve got subcontractors that are from central Wisconsin, so it really is a big impact for here, not only getting the road fixed but economically,” Snyder said. #bootsontheground #roadconstruction #wtbaoftomorrow

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +7
  • Integrity Grading & Excavating, Inc. reposted this

    Cory Tomczyk was clearly enjoying himself – full of smiles and booming laughter – while walking a WTBA-member worksite in Wausau this week. “I’m a hands-on guy and I don’t mind getting dirty, but I need to do this more often,” Tomczyk said after an hour-long tour of Integrity Grading & Excavating, Inc.'s reconstruction job on Stewart Avenue.  “It’s really always impressive to see the great work.” Still, the State Senator from Mosinee had to shake his head when IGE crews showed him a prime example of the type of issue his Compensable Utility Delay bill (signed into law in December) aims to prevent.  A fiber line, which was supposed to be moved ahead of construction in April, lays right where crews plan to make a subgrade cut and widen the road to 36 feet. “My job is to make Madison help you guys get your job done better,” Tomczyk pledged. IGE says they’re working with the utility to get the line moved before it gets to the point of seeking compensation.  Instead, a very rainy spring and summer has been the bigger challenge, pushing IGE and its subs about two weeks behind schedule. The project replaces the aging asphalt along a 1.25-mile stretch into and out of downtown Wausau, places new water and sewer lines, and adds a multi-use path. “I think the pedestrians will like (the new path) a lot better and it’s a good local project,” IGE Operations Manager Brandon Barden told WTBA.  “It’s bringing some new stuff to homeowners, wider turning radiuses, so traffic should move more freely.” Barden is a member of the WTBA of Tomorrow Council.  Members are working with WTBA’s Director of Government Affairs Elise Nelson to line up lawmaker project tours all across Wisconsin this summer. Tuesday’s visit gave IGE President Dan Weinkauf the chance to thank Tomczyk for his efforts on the utility bill and offer him and State Rep. Patrick Snyder (R-Schofield) some industry insights to ponder. “This particular project is so relevant for central Wisconsin, because you have Integrity here based right around the Wausau area, you’ve got subcontractors that are from central Wisconsin, so it really is a big impact for here, not only getting the road fixed but economically,” Snyder said. #bootsontheground #roadconstruction #wtbaoftomorrow

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +7
  • Absolutely fantastic to see State Senator Cory Tomczyk engaging directly with our work on Stewart Avenue in Wausau! His hands-on approach and commitment to supporting our industry are truly commendable. Special thanks to our dedicated IGE crews for showcasing the challenges and triumphs of this reconstruction project. Your hard work and resilience, especially through the weather setbacks, are the backbone of our success. Together, we're not just building roads; we're building a stronger community. #IntegrityGradingExcavating #CommunityBuilding #Infrastructure #Wausau #Wisconsin

    Cory Tomczyk was clearly enjoying himself – full of smiles and booming laughter – while walking a WTBA-member worksite in Wausau this week. “I’m a hands-on guy and I don’t mind getting dirty, but I need to do this more often,” Tomczyk said after an hour-long tour of Integrity Grading & Excavating, Inc.'s reconstruction job on Stewart Avenue.  “It’s really always impressive to see the great work.” Still, the State Senator from Mosinee had to shake his head when IGE crews showed him a prime example of the type of issue his Compensable Utility Delay bill (signed into law in December) aims to prevent.  A fiber line, which was supposed to be moved ahead of construction in April, lays right where crews plan to make a subgrade cut and widen the road to 36 feet. “My job is to make Madison help you guys get your job done better,” Tomczyk pledged. IGE says they’re working with the utility to get the line moved before it gets to the point of seeking compensation.  Instead, a very rainy spring and summer has been the bigger challenge, pushing IGE and its subs about two weeks behind schedule. The project replaces the aging asphalt along a 1.25-mile stretch into and out of downtown Wausau, places new water and sewer lines, and adds a multi-use path. “I think the pedestrians will like (the new path) a lot better and it’s a good local project,” IGE Operations Manager Brandon Barden told WTBA.  “It’s bringing some new stuff to homeowners, wider turning radiuses, so traffic should move more freely.” Barden is a member of the WTBA of Tomorrow Council.  Members are working with WTBA’s Director of Government Affairs Elise Nelson to line up lawmaker project tours all across Wisconsin this summer. Tuesday’s visit gave IGE President Dan Weinkauf the chance to thank Tomczyk for his efforts on the utility bill and offer him and State Rep. Patrick Snyder (R-Schofield) some industry insights to ponder. “This particular project is so relevant for central Wisconsin, because you have Integrity here based right around the Wausau area, you’ve got subcontractors that are from central Wisconsin, so it really is a big impact for here, not only getting the road fixed but economically,” Snyder said. #bootsontheground #roadconstruction #wtbaoftomorrow

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image
      +7
  • Integrity Grading & Excavating, Inc. reposted this

    🌟 PLATINUM SPONSOR HIGHLIGHT | Integrity Grading & Excavating, Inc. 🌟 Integrity Grading & Excavating, Inc. is an excavating and utility services company that operates in the Midwest. The bulk of their work is performed throughout Wisconsin with locations in Madison and Schofield. They believe in building long-lasting relationships with clients and team members through respect, commitment and innovation. Each project is a new challenge that requires innovation and drive to take through to completion. Throughout the years, IGE has cemented themselves in the Madison area with a reputation as a value-driven, grading and excavating 🏆 leader. To learn more about their business, what they do, and how they've become a well known name in Wisconsin, visit their website integrityge.com 🌐 #platinumsponsor #madisonexcavationservices #madisonutilityservices #cbgmadisonsponsor #sponsorships #commercialbrokersgroup

    • No alternative text description for this image
    • No alternative text description for this image
    • No alternative text description for this image

Similar pages

Browse jobs