  • Green River Energy Center

    Sundt Renewables was selected as the EPC for this 400MW PV + 200MW BESS in Emery County, Utah.

  • Pleasant Valley Solar

    Sundt Renewables was selected as the EPC for this 200 MWac solar facility, Idaho’s largest solar facility to date.

  • Appaloosa Solar

    Totaling 200 MWac, Appaloosa Solar 1 & 2 brings additional solar resources to Utah, working with rPlus Energies, Greenbacker, Meta Facebook, Rocky Mountain Power, and PacifiCorp.

    See project
  • Arroyo Solar

    -

    Sundt Renewables recently started work as the EPC on a new 300 megawatt (MW) solar array in McKinley County, New Mexico, working with Centaurus Renewable Energy, DESRI, Public Service Company of New Mexico.

    See project
  • Graphite Solar 1

    -

    We are the EPC for the Graphite Solar 1 project, including 104 MWdc PV, 138KV substation, and transmission lines.

    See project
  • Elk Hill 2 Solar

    -

    Sundt Renewables completed this 17.5MWac PV facility, selected as the EPC by Lightsource BP. It is located in Greencastle, Pennsylvania.

    See project
  • Solar Hagerstown 1

    -

    Greenbacker selected our team as the EPC for this 10MWac PV array built at a Lafarge Holcim cement plant.

    See project
  • California Prison Renewable Projects

    -

    We served as the EPC for 2 x 10MW PV sites for California State Prisons in the Imperial Valley.

  • Grants & Bluewater Solar

    -

    Built for Lightsource BP, these community solar facilities are along historic Route 66 west of Albuquerque, New Mexico. Combined output is 9MWac.

    See project
  • Chocolate Bayou - Combined Cycle Turbines

    -

    We installed a new power island featuring two GE LM6000 turbines for INEOS’ Chocolate Bayou plant in Alvin, Texas.

  • Dominion Solar - Portfolio

    -

    We have contracted with Dominion to provide multiple turnkey EPC projects within the state of Virginia. Between 2016 and 2019, we have completed or are under contract on six utility scale projects. This portfolio continues to grow.

    See project
  • Mill Creek - Emissions Modernization

    -

    Wood served as EPC for several energy enhancements at LG&E / KU Mill Creek Station. New systems included four scrubber upgrades, two new baghouses, plant water processing, and gypsum dewatering with storage and barge load out.

    See project
  • Wistaria Solar

    -

    Wood is providing EPC solutions for this 140MW utility solar facility in California's southern desert region.

  • Panoche Valley Solar

    -

    Wood is providing EPC solutions for this 140MW utility solar facility in central California's Panoche Valley.

  • Marine Corps Logistics Base Solar

    -

    The MCLB project is Amec Foster Wheeler's third partnership with Georgia Power and the US Military to provide EPC services on Georgia military bases.

    Other creators
  • Mesquite 2 Solar

    -

    Mesquite Solar 2 is the second phase of the landmark Mesquite Solar complex in Arlington, Arizona, currently one of the largest photovoltaic solar facilities in the country.

    See project
  • Mesquite 3 Solar

    -

    Mesquite Solar 3 is the latest announced phase of the landmark Mesquite Solar complex, currently one of the largest photovoltaic (PV) solar facilities in the U.S. Construction activities on the 150-MW expansion project got underway in August 2015.

    See project
  • Chiller Project at Duke Energy Hines Energy Complex

    Power Systems Startup - Served as consultant and authored Energization Sequence for substation and switchgear commissioning.

  • Ft. Benning Solar, Georgia Power

    -

    One of three 30MW facilities being constructed by Georgia Power within the state of Georgia.

    See project
  • EW Brown Solar

    Amec Foster Wheeler, a multi-national consultancy, engineering and project management company with experience in utility-scale solar projects, won the competitive bid to build the state's largest solar photovoltaic facility at LG&E and KU’s E.W. Brown Generating Station in Mercer County.

    See project
  • Copper Mountain Solar IV, Sempra

    Copper Mountain Solar 4 is the fourth unit of the Copper Mountain Solar complex. Construction on the 94 MW unit, adjacent to the grouping of Units 1 and 2, commenced in 2015.

    See project
  • King's Bay Solar, Georgia Power

    This project is a 30MWac system built in partnership with Georgia Power and the US Navy.

    See project
  • Utility Solar Project - Indy Solar I, II, & III, Dominion Energy

    The Indy Solar Project, 3 - Indy I a 10MW, Indy II a 10MW, and Indy III a 8.5MW. These projects are located in Indianoplis, IN.

    Other creators
    See project
  • Utility Solar Project - Arizona Public Services

    -

    AMEC, the international engineering and project management company, has been awarded an engineering, procurement and construction (EPC) contract by Arizona Public Service to design and construct a 35-megawatt (MW) solar photovoltaic plant being developed in Yuma, Arizona. The APS-owned project will be the first-ever solar facility to be built on Arizona State Trust lands.

    Other creators
    See project
  • Tissue Machine Installation

    -

    We were tasked with the electrical and pipe installation of new packaging systems, converting lines, pulper, and tissue machine. We decommissioned a tissue machine for a global undisclosed client and replaced it with a new proprietary machine, including control and drive systems.

  • Utility Solar Project - Duke Energy

    -

    AMEC was engaged by Recurrent Energy to provide development, engineering, procurement and construction for a 4.5 megawatt photovoltaic solar plant to be built at the project site in Ajo, Arizona. As well, AMEC also provided development, engineering, procurement and construction for a 15 megawatt photovoltaic solar plant that was built in Bagdad, Arizona.

    Other creators
    See project
  • Energy Modernization - Packaging Corporation of America

    -

    The Valdosta project will reduce fuel and electricity purchased at the mill by 75 per cent. The plants efficiency improvements include a new recovery boiler and turbine generator and upgrades to the paper machine dryer.

    Other creators
    See project
  • Baghouse Installation - NV Energy

    -

    The Reid Gardner generating station is a coal-fueled, steam-electric generating plant with four operating units. AMEC was awarded the EPC contract to replace the existing mechanical separators and positive pressure fly ash conveying systems on three coal fired generating units (units one, two and three). Each nominally rated at 120 MW, with three new pulse-jet baghouses and vacuum fly-ash conveying systems.

    Other creators
    See project
  • Utility Solar Project - Colorado State University

    -

    AMEC provided the engineering, procurement and construction services for Colorado State University’s 2MW solar field generating facility. This ground breaking project sets the standard for clean and renewable energy solutions. The project features more than 8,000 Trina Solar panels that cover fifteen acres of the university’s Foothills Campus.

    Other creators
    See project
  • Emissions Control - Southern Company

    -

    AMEC was responsible for the field installation of a new emissions control project. The project scope included installation of a lime processing system, ball mills, flue gas dampers and bypass system with 8 – 1,000 booster fans, over 5,300 tons of process ductwork, two new jet bubbling reactors (JBR) with supporting electrical and control systems.

    See project

Organizations

  • InterNational Electrical Testing Association

    NETA Alliance Member

    - Present

    The NETA Alliance Program is designed for professionals who share NETA's mission, leaders who bring perspectives from all sectors of the electrical power industry, and those who put quality and safety first.

  • National Fire Protection Association

    NFPA Member - Electrical Section

    - Present

    In 1948, the NFPA Board of Directors authorized an Electrical Section of NFPA. The section provides particular opportunity for section members to become informed and to contribute to the development of NFPA electrical and fire alarm standards.

Recommendations received

View Cal’s full profile

  • See who you know in common
  • Get introduced
  • Contact Cal directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Others named Cal W. in United States

Add new skills with these courses