German W. Aparicio Jr.

German W. Aparicio Jr.

Los Angeles, California, United States
2K followers 500+ connections

About

German W Aparicio Jr is 0-60 Accelerator Co-Founder, Program Manager of Early Innovation…

Articles by German W.

See all articles

Activity

Join now to see all activity

Experience

  • Trimble Ventures Graphic

    Trimble Ventures

    Los Angeles, California, United States

  • -

    Greater Los Angeles Area

  • -

    Pomona,CA

  • -

    Greater Los Angeles Area

  • -

    Los Angeles, California, United States

Education

Publications

  • Data-Insight-Driven Project Delivery: Approach to Accelerated Project Delivery Using Data Analytics, Data Mining and Data Visualization

    ACADIA 2017: DISCIPLINES & DISRUPTION [Proceedings of the 37th Annual Conference of the Association for Computer Aided Design in Architecture (ACADIA) ISBN 978-0-692-96506-1] Cambridge, MA 2-4 November, 2017), pp. 102-109

    Today, 98% of megaprojects face cost overruns or delays. The average cost increase is 80% and the average slippage is 20 months behind schedule (McKinsey 2015). It is becoming increasingly challenging to efficiently support the scale, complexity and ambition of these projects. Simultaneously, project data is being captured at growing rates. We continue to capture more data on a project than ever before. Total data captured back in 2009 in the construction industry reached over 51 petabytes, or…

    Today, 98% of megaprojects face cost overruns or delays. The average cost increase is 80% and the average slippage is 20 months behind schedule (McKinsey 2015). It is becoming increasingly challenging to efficiently support the scale, complexity and ambition of these projects. Simultaneously, project data is being captured at growing rates. We continue to capture more data on a project than ever before. Total data captured back in 2009 in the construction industry reached over 51 petabytes, or 51 million gigabytes (Mckinsey 2016). It is becoming increasingly necessary to develop new ways to leverage our project data to better manage the complexity on our projects and allow the many stakeholders to make better more informed decisions. This paper focuses on utilizing advances in data mining, data analytics and data visualization as means to extract project information from massive datasets in a timely fashion to assist in making key informed decisions for project delivery. As part of this paper, we present an innovative new use of these technologies as applied to a large-scale infrastructural megaproject, to deliver a set of over 4,000 construction documents in a six-month period that has the potential to dramatically transform our industry and the way we deliver projects in the future. This paper describes a framework used to measure production performance as part of any project’s set of project controls for accelerated project delivery.

    See publication

Languages

  • Spanish

    Native or bilingual proficiency

  • English

    Native or bilingual proficiency

Organizations

  • ACADIA

    Conference Paper Peer Review

    - Present
  • U.S. Green Building Council

    LEED AP

    - Present

More activity by German W.

View German W.’s full profile

  • See who you know in common
  • Get introduced
  • Contact German W. directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Add new skills with these courses