Prasanna Chebbi, P,E., (My views are personal, do not represent my firm)
Houston, Texas, United States
5K followers
500+ connections
About
Mr. Chebbi is hands-on Project Manager overseeing TXDOT Consultant Contracts…
Experience
Education
-
McNeese State University
-
Activities and Societies: Masters in Civil Engineering with specialization in StormWater Management, with thesis in Surface Water Hydrology
Thesis was " Flood Frequency analysis for Gaged Louisiana Streams" and its based on endowed scholarship from the State of Louisiana and has been accepted at American Water Works Association (AWWA) conference.
-
-
Activities and Societies: Master of Science in Computer Information System with emphasis on Management and Programming with GPA of 3.80/4.00. The Master's thesis "Internet Addiction" was awarded one of the best submitted Graduate Paper at Journal of Information Science Educators (JISE) at Philadelphia November 2000.
Computer Information Systems (CIS)
-
-
-
-
Activities and Societies: Bachelor Degree in Civil Engineering with first Division, with Final year Project on Environment Engineering curriculam and Computer Programming in Fortran-77 to Gravity Dam and Spillway analysis involving over 1000 lines of code.
B.S. in Civil Engineering
Licenses & Certifications
-
Level 1B - Roadway Properties Specialist
Hot Mix Asphalt Center, Buda, Texas
Issued ExpiresCredential ID 10101 -
SB101 - Properties Specialist
Hot Mix Asphalt Specialist
Issued ExpiresCredential ID # 854 -
SB102 - Base Field Specialist # 3204
Hot Mix Asphalt Center, Texas
Issued ExpiresCredential ID # 3204 -
SB103 - Material Analyst Specialist # 519 - Precertification
Hot Mix Asphalt Center, Texas
Issued ExpiresCredential ID # 519 -
-
-
Publications
-
Storm Water Inlet Capacities
City of Houston Infrastructure Design Manual
I presented the modified and revised the Storm Water Inlet Capacities based on their geometry and allowable depth of flow, utilizing reputed storm water publications to Chapter 9 and 13 revision cycle of City of Houston's Infrastructure Design Manual . The peer reviewed calculations were approved by the committee and the Table has been recommended as part current chapter 9 (Storm Water Guidelines) of City of Houston's Infrastructure Design Manual.
-
Internet Addiction
Southern Univerity New Orleans Masters Thesis and Published at Journal of Information Science for Educators (JISE), Conference at Philadelphia
-
Flood Frequency analysis for Gaged Louisiana Streams
American Water Works Association (AWWA)
Projects
-
City of Houston - Flood Gauge and Flood Warning System
The scope of work included the design and construction of the Storm Water Pump Station and Flood Warning System Improvements at over 13 grade separations. More specifically the work covered by the contract documents includes installation of new advanced safety warning lights, street signs, water level gauges, electrical wiring, traffic control regulation, and pavement rehabilitation as detailed on the Contract Drawings.
The work in general consists of the following:
On-Call…The scope of work included the design and construction of the Storm Water Pump Station and Flood Warning System Improvements at over 13 grade separations. More specifically the work covered by the contract documents includes installation of new advanced safety warning lights, street signs, water level gauges, electrical wiring, traffic control regulation, and pavement rehabilitation as detailed on the Contract Drawings.
The work in general consists of the following:
On-Call contract for the construction of Advance Flood Warning System including signage at intersections which includes High Sierra Model 3480 and HSE Model 3350 Series controller with major components consisting of: Flood Sensor, Master Station, Advance Warning Station, Communications System Solar Power System, load Control, Mounting, Conduit and Cabling; Optional Gauging, and Monitoring and Control and the erection of Advance Warning Signage at intersections.
Other creators -
City of Houston - Flood Gauge and Flood Warning System
The scope of work included the design and construction of the Storm Water Pump Station and Flood Warning System Improvements at over 13 grade separations. More specifically the work covered by the contract documents includes installation of new advanced safety warning lights, street signs, water level gauges, electrical wiring, traffic control regulation, and pavement rehabilitation as detailed on the Contract Drawings.
The work in general consists of the following:
On-Call…The scope of work included the design and construction of the Storm Water Pump Station and Flood Warning System Improvements at over 13 grade separations. More specifically the work covered by the contract documents includes installation of new advanced safety warning lights, street signs, water level gauges, electrical wiring, traffic control regulation, and pavement rehabilitation as detailed on the Contract Drawings.
The work in general consists of the following:
On-Call contract for the construction of Advance Flood Warning System including signage at intersections which includes High Sierra Model 3480 and HSE Model 3350 Series controller with major components consisting of: Flood Sensor, Master Station, Advance Warning Station, Communications System Solar Power System, load Control, Mounting, Conduit and Cabling; Optional Gauging, and Monitoring and Control and the erection of Advance Warning Signage at intersections.
Other creators -
FM 1463 Segment 1 and 2
-
Project Manager for Segment 1 and 2 for preparation of plans, specifications and estimates (PS&E) and related documents for FM 1463, from IH-10 to FM 1093 (7.00 MI) widening from 2-4 lane to 4-6 lanes, including bridge reconstruction, side walks, detention pond , 16 traffic signals, 9 Noise / Sound barriers, 144 Right of way parcels, 64 Utilities, 16 Utility agreements, Co-ordination with numerous MUD districts and other municipal entities ( Fort Bend, County City of Katy and City of…
Project Manager for Segment 1 and 2 for preparation of plans, specifications and estimates (PS&E) and related documents for FM 1463, from IH-10 to FM 1093 (7.00 MI) widening from 2-4 lane to 4-6 lanes, including bridge reconstruction, side walks, detention pond , 16 traffic signals, 9 Noise / Sound barriers, 144 Right of way parcels, 64 Utilities, 16 Utility agreements, Co-ordination with numerous MUD districts and other municipal entities ( Fort Bend, County City of Katy and City of Fulshear)- Estimated Construction Cost $ 110 million
Languages
-
English, Hindi and Kannada.
-
-
English
Full professional proficiency
-
Kannada
Native or bilingual proficiency
-
Hindi
Professional working proficiency