John Jurewicz

John Jurewicz

Southfield, Michigan, United States
500+ connections

About

At Gresham Smith, my focus lies in empowering our industrial market presence through…

Articles by John

Contributions

Activity

Join now to see all activity

Experience

  • Gresham Smith Graphic

    Gresham Smith

    Southfield, Michigan, United States

  • -

    Detroit, Michigan, United States

  • -

    Greater Detroit Area

  • -

    Detroit

  • -

    Chicago, IL

  • -

    Woodstock, Illinois, United States

  • -

    Chicago, IL

  • -

  • -

    Empire, Michigan, United States

  • -

    O'Hare Airport

  • -

    Chicago, Illinois, United States

  • -

    Hoffman Estates, Illinois, United States

  • -

Education

  • University of Minnesota Graphic

    University of Minnesota-Twin Cities

    -

    Activities and Societies: Built anti-synclastic structure in modular steel in the Architecture school courtyard after winning a design competition.

    I worked on an Intergraph Workstation beginning my modeling career in 1984.

  • -

  • -

    Activities and Societies: Track- Pole Vaulting

    Architecture and Computer modeling

  • -

    Core curriculum offered by LCI with an emphasis on Continuous Improvement

  • -

    Activities and Societies: B.F. Technical Services taught by Warren Olson

    An Intensive 6 Hour Course on Fire Resistive Design Details and requirements.

  • -

    Activities and Societies: https://www.must-safety.com/

    MUST is an organization of building trade unions and contractor associations working together to promote trade safety in Michigan. The 18 module program centers on trade specific safety training such as Aerial Lifts, cranes, fall protection, caught between, scaffolding and equipment blind spots. It takes OSHA certification to a higher level

Licenses & Certifications

Volunteer Experience

  • Lend Lease Graphic

    Junior Achievement

    Lend Lease

    - 3 years 1 month

    Children

    Lend Lease was a strong advocate for community Volunteer Projects

  • Capuchin Soup Kitchen Graphic

    Associate

    Capuchin Soup Kitchen

    - Present 8 years 10 months

    Social Services

    Helped feed those that are economically challenged

Publications

Patents

  • Apparatus and method for mobile computer-aided design

    Issued US US 7272464 B1

    A mobile computer aided design apparatus is disclosed comprising a vehicle that includes an engine and a cab. Inside the cab is a computer aided design workstation. The workstation is coupled to a router wherein the router includes a first wireless communication transceiver, a second communication transceiver, a third communication transceiver. The router is coupled to an antenna system. An uninterrupted power supply is coupled to the computer aided design work station, the router, and to the…

    A mobile computer aided design apparatus is disclosed comprising a vehicle that includes an engine and a cab. Inside the cab is a computer aided design workstation. The workstation is coupled to a router wherein the router includes a first wireless communication transceiver, a second communication transceiver, a third communication transceiver. The router is coupled to an antenna system. An uninterrupted power supply is coupled to the computer aided design work station, the router, and to the engine. A plotter is coupled to the workstation and carried in the vehicle.

    See patent

Courses

  • 2017 ICC Building Code Changes

    ICC 2015

  • Navisworks 2015 with I construct

    -

  • Synchro Pro Advanced

    -

  • Taught various technology courses over the past 12 years at the Univ. of Michigan and Northwestern University

    CIVIL ENGINEERING CE 455

Projects

  • Renovation of the GM Warren Tech Center Campus Design Build

    -

    A multi-year / multi-phased design-build transformation of the General Motors Global Technical Center focused on updating the overall engineering campus, which originally opened in 1956. The work to date has included extensive higher end office renovations with mechanical, electrical and architectural upgrades. To date over the last six years I have been the lead superintendent on 8 transformation projects totaling over $350 million dollars mainly at the Cole / Vehicle Engineering Center.

    Other creators
  • Detroit Factory Zero

    -

    A 268,000 SF expansion and renovation of the existing 1 million SF body shop, a 25,000 SF addition and renovation of the 1.5 million SF. Design Build with Ghafari. The 3.5 million SF facility will produce 270,000 vehicles annually. The project included a 268,000 SF expansion and renovation of the existing 1 million SF body shop, a 25,000 SF addition and renovation of the 1.5 million SF general assembly shop, and a new 54,000 SF battery storage shop. A critical step in GM’s commitment to using…

    A 268,000 SF expansion and renovation of the existing 1 million SF body shop, a 25,000 SF addition and renovation of the 1.5 million SF. Design Build with Ghafari. The 3.5 million SF facility will produce 270,000 vehicles annually. The project included a 268,000 SF expansion and renovation of the existing 1 million SF body shop, a 25,000 SF addition and renovation of the 1.5 million SF general assembly shop, and a new 54,000 SF battery storage shop. A critical step in GM’s commitment to using 100% renewable energy, the completed factory utilizes solar carports and a 516-kilowatt ground-mounted solar panel array.

    Other creators
  • Ford Infrastructure Renovation of the Research and Engineering Center in Dearborn, MI

    -

    The 8 Square-mile campus renovation e R&E site’s northwest corner—involved the renovation and documentation of all the tunnels systems and utilities that fed 143 buildings. New parking facilities, , lab space, exhibition space and maintenance buildings were provided. This doubled the number of employees at R&E from roughly 11,000 to 22,000 upon full realization of the master plan, supporting greater knowledge exchange, collaboration, and informal social interaction through heightened proximity…

    The 8 Square-mile campus renovation e R&E site’s northwest corner—involved the renovation and documentation of all the tunnels systems and utilities that fed 143 buildings. New parking facilities, , lab space, exhibition space and maintenance buildings were provided. This doubled the number of employees at R&E from roughly 11,000 to 22,000 upon full realization of the master plan, supporting greater knowledge exchange, collaboration, and informal social interaction through heightened proximity and connectivity.

    Other creators
  • Davenport Works 2016-2017

    -

    World's Largest Stretcher "Jaws" in partnership with Fluor and SMS Group

    Other creators
  • GM Flint Paint Shop

    -

    $115 million lump sum Design Build project in which we redeveloped an old brownfield engine plant site. Complete construction of a 1.3 million sq. ft. multi story building and site development with early implementation of RFID markers to document underground utilities. My team won an award for Implementation of Synchro Pro to simulate steel erection.

    Other creators
  • Texas A&M Nanotech Lab and Research Park

    -

    50,000 SF 2 story laboratory featuring synchro 4D cost loaded schedules and delivery installation simulations

    Other creators
    See project
  • 111 West Wacker

    -

    58 story apartment tower with a tricky transfer slab at level 30. Coordination with existing structure from level 28 down. Smart points pushed back to model for verifying existing structure and post tension cable systems were modeled for coordination.

    Other creators
    See project
  • Northwestern University Campus infrastructure

    -

    multi-million dollar site campus utility redevelopment involving chilled water, steam, electrical, roadway relocations, scanning and modeling of existing utilities all simulated and linked to a construction schedule

    Other creators
    See project
  • Micro pile drilling project

    -

    It can be challenging to get caisson equipment under existing roadways

    Other creators
    • Shawn Philips
    See project
  • Ford's Blue Oval City, Stanton, TN

    -

    11 MSF, on 4400 acres, 29 miles of underground piping for utilities, custom electrical systems, access roads, a railroad spur and shipping area. Approximately 30,000 tons of structural steel and 600,000 cu yd of concrete were required for the steel-framed facilities, both of which are founded on thousands of 6-ft-dia to 8-ft-dia caissons drilled an average of 70 ft deep to meet the area’s Category D seismic requirements.

Honors & Awards

  • Running with the Bulls Award

    General Motors

    As a leader for the transformation Program, I was awarded the biggest risk taker for tackling many of the move management challenged we faced at Warren Technical Center.

  • Leadership in the Science and Engineering of Process Plant Creation

    Hexagon CAU Intergraph

    Recognition by Hexagon's CAU Houston Chapter for my work leading teams with Design Build of Process Plants.

  • Twenty Five year member of the AIA Chicacago

    AIA Chicago

    25 Yr Award for members in Good standing who have contributed to the Industry.

  • Safety Award Great Lakes Region Innovation and Business Process - Individual

    Lend Lease

    This was the first year the company issued this award, out of all the entries in nationwide, I was selected as the most innovative, as rated by my peers.

Test Scores

  • USGBC LEED AP Exam

    Score: 99

    LEED EXAM

Languages

  • English

    Native or bilingual proficiency

Recommendations received

More activity by John

View John’s full profile

  • See who you know in common
  • Get introduced
  • Contact John directly
Join to view full profile

Other similar profiles

Explore collaborative articles

We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.

Explore More

Others named John Jurewicz in United States

Add new skills with these courses