Phase 2 of 3 of this project. The BRT team did an exceptional job customizing the infeed conveyor with a different style of support legs, as well relocated the baler power unit with custom main hose supports and longer hydraulic hoses. Once complete, we will be adding a 24' above ground conveyor and box dumper which will be feeding from the side. The bales are averaging around 2,200 pounds.....nearly 1,000 pounds more than the previous baler. [email protected] or (855) 278-1979
-