Caledonia Mining (CMCL)’s Post

View organization page for Caledonia Mining (CMCL), graphic

7,703 followers

We are currently in the process of constructing a new tailings storage facility, which will operate for the next 20 years. The TSF footprint area is 65Ha, and the planned solids to be deposited are 14.4m tonnes. Construction is being undertaken in Phases, with Phase 1A, and the first slurry line completed and commissioned in October 2023. Phase 1B and the second slurry line will be completed in 2024, with Phase 2 and final commissioning in 2025. The TSF has been classified as Type 3 waste (SANS 10286), and a barrier system of a 1.5mm HDPE geomembrane placed over a 300mm compacted clay liner has been installed. Check out some of the latest photos 📸👇 #CMCL #Mining #Gold

  • No alternative text description for this image
  • No alternative text description for this image
Quinn He

😎Foreign trade clerk 🤓Manufacturer Manufacturer&Professional Production Of Mining Equipment

3w

Good news, if you need mining processing equipment such as centrifuges, vibrating screens, cyclones, I can provide

GRACIANO ZIVOVORA

Sustainability &ESG PROFESSIONAL /Occupational Hygienist/ Ventilation Engineer/HSE Professional

3w

Great staff. Aligning Tailing Facility designs to GISTM requirements and conformants protocols will also enhance ESG performance.

Davison Kaphaizi

MBA| MSc.SHE| PGD.SHE| BSc.ES| SAMTRAC|LEAD AUDITOR-SAATCA| ISO14001|ISO 45001| ISO 9001| ESG

3w

Most appropriate facility for tailings management. A clear demonstration of leadership commitment in ESG.

Douglas Junior Urayai

Operations Engineer Trainee

3w

Impressive outlook 👍

Like
Reply
Weston Matongo

Branch Manager at West Rand Engineering

3w

Amazing strides

Like
Reply
Ndumiso Dube

Community Development and Livelihoods Specialist

3w

Inspiring!

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics