Giuseppe Masanotti’s Post

View profile for Giuseppe Masanotti, graphic

Construction Engineer | H&S management and training

Marvel of engineering: the movable roof of Atlanta stadium A new view from inside an amazing Fifa2026 venue. A timelapse video shows the Mercedes-Benz stadium open in Atlanta. The roof takes about 8 minutes and ten seconds to open completely. Some facts about the moveable structure: 📌 The stadium roof may appear to rotate open but it’s an optical illusion, the roof opens by the movement of eight “petals” that slide open in a straight line. 📌Each of the moving petals cantilever approximately 200 feet inwards towards the center of the stadium and provide a roof covering when the petals are in the closed position. 📌The moveable petal structures are powered by eight mechanized “bogies” which drive the petals along an inner rail and are attached to the outer uplift rail by six roller mechanisms 📌 In the closed position the petals lock together to form a water tight seal. Each petal structure is clad with air-inflated ETFE pillows. 📌 ETFE is a highly durable, lightweight fabric that is translucent, allowing for a light filled stadium, even when moveable petals are in the closed position. Isn’t it impressive? #stadium #engineering #structuralengineering #engineer For more: 📌 Follow #ImpressiveEngineering 📌 Click on the 🔔and select “All”

Fred Loso

Independant Innovation

1d

Very proud to know my 2 son’s helped build the Control Panels that operate this system right here in Minneapolis. https://controlcenterinc.com/

Like
Reply
Cian Brennan

Helping contractors with high-risk contracts | Posts and articles about the process.

3d

Awe-inspiring. The intricate design with its eight sliding petals and ETFE cladding not only facilitates smooth operation but also ensures a light-filled environment even when closed. 

Like
Reply
Dr. Maxim Grishin

CEO @ Eurasian Advanced Work Packaging Community of Practice | Accredited AWP Consultant | Speaker & Author

4d

The movable roof of the Mercedes-Benz Stadium in Atlanta is a true marvel of engineering. This project is a testament to the power of engineering to transform architectural vision into reality!

Alexandra Stefanakis

Fondatrice chez Anastasi'Art- photographe-directrice artistique - realisatrice -plasticienne

4d

Wow

Like
Reply
Inge van Vierssen-Berghorst EFA

Erkend Financieel Adviseur/ Taaltalent/ Humanist/ Creatieveling/ Omdenker/ Gastdocent LEF Stichting Leven en Financiën

4d

Beautiful. Amazing technique. Needs a lot of maintenance I suppose.

Like
Reply
Vinay Kumar

Sr Recruitment Associate-Taggd

4d

Fascinating roof opening sliding mechanism, wonderful

Like
Reply

Kudos to the engineers who designed this

Like
Reply
Ismail Durgun (Assoc. Prof.)

Sustainable R&D designer reaching more than 5,000 people with training and consultancy that adds value to companies and individuals

4d

Thanks for sharing Giuseppe Masanotti

Like
Reply
Charly Dabbaghian

Teaching Professional at University of Balamand

3d

Very informative and astute.

Like
Reply
See more comments

To view or add a comment, sign in

Explore topics