SES was on site last week to conduct our MEP commissioning kick-off meeting with the team for the Bullard Havens Technical High School project. This new 215,000 square foot school facility will serve approximately 900 students and provide career and technical education across thirteen trades: Automotive Technology, Carpentry, Criminal Justice & Protective Services, Culinary Arts, Electrical, Graphic Design, Hairdressing & Cosmetology, Health Technology, Information Technology, Masonry, Plumbing & Heating, Precision Machining and Architecture. In a time when the need for skilled trades is at an all-time high, we’re excited to be part of the team that brings this new education facility to reality! #commissioning #buildingcommissioning
Sustainable Engineering Solutions, LLC’s Post
More Relevant Posts
-
I’m happy to share that I’ve finished Architectural and Mechanical Drawing Reading Course from Engineers House | بيت المهندسين! That course is presented totally free from within the students training initiative from Engineers House | بيت المهندسين. This course included: - The criteria of understanding and reading of the architectural drawings. - The criteria of understanding and reading of different mechanical drawings ( HVAC, firefighting, plumbing, medical gases, swimming pools and water fountains). - The concept of shop drawings.
To view or add a comment, sign in
-
-
🔧 Exploring Electrical Panel Installation Techniques 🔧 Diving into the world of electrical panels, it's fascinating to see the diverse methods of installation that cater to different needs. Here are three distinctive approaches to mounting electrical panels on walls: 1️⃣ Surface-Mounted Method: 🛠️ Ideal for flexibility and accessibility, the surface-mounted technique involves attaching the panel directly to the wall's surface. This method is efficient and practical, allowing quick and straightforward access to the panel components. 2️⃣ Flush-Mounted Method: 🏠 For a sleek and seamless appearance, the flush-mounted method embeds the electrical panel within the wall. This technique not only provides a clean aesthetic but also minimizes protrusions, making it an excellent choice for spaces where aesthetics matter. 3️⃣ Semi-Recessed Method: 🔄 Combining the benefits of both surface and flush methods, the semi-recessed approach strikes a balance. The panel is partially embedded in the wall, offering a compromise between accessibility and aesthetics. This method is often chosen for spaces where a blend of functionality and design is crucial. Understanding these installation techniques is crucial for electricians, contractors, and anyone involved in building infrastructure. Each method has its unique advantages, and the choice depends on the specific requirements of the project. 💡 Whether you prioritize accessibility, aesthetics, or a combination of both, selecting the right installation method ensures a safe and efficient electrical system. Have a look at our Bestseller BMS Online Course: Our Free Mini MEP Course (link in the photo) : Our Free Engineering Blog ( Engalaxy ) #ElectricalInstallation #InfrastructureInsights #ElectricianLife #electricalengineering #electricalengineer #mep #technical #construction #HVAC #plumbing #firefighting #bms #control #coordination #urcoursez #engalaxy #mrzidan
To view or add a comment, sign in
-
-
🔵Experienced Civil/Arch BIM Specialist 🔵13 Years Driving Efficiency and Precision in Construction Projects🔵Trained 3000+ Students, Architects & Engineers🔵2000+ Retail Projects🔵 20+ Infrastructure Project🔵
Glazing refers to the installation of glass in windows and doors or the glass itself. Different types of glazing materials and methods are used in construction to achieve various objectives, including energy efficiency, safety, and aesthetics. Here are some common types of glazing used in construction. It's critical to understand a few technical aspects before learning the software. I've included technical and tool-related information in some of my posts. It is crucial to possess equal technical, analytical, and software skills if you want to survive in the industry. Follow for more Insights, share it with others if you find useful..
To view or add a comment, sign in
-
I’m happy to share that I’ve finished Architectural and Mechanical Drawing Reading Course from Engineers House | بيت المهندسين That course is presented totally free from within the students training initiative from Engineers House | بيت المهندسين. This course included: - The criteria of understanding and reading of the architectural drawings. - The criteria of understanding and reading of different mechanical drawings ( HVAC, firefighting, plumbing, medical gases, swimming pools and water fountains). - The concept of shop drawings.
To view or add a comment, sign in
-
Completed the Course "Design and Implementation of Electrical Systems for Facilities" for 100 Training Hours at A Plus Academy . Ranking Second in the Course Final Project 1) Following the Britch BS and the Jordanian Code 2) Working on Design, Shopdrawing and as Build Drawing for the following systems - Ligting - power - Low Current Systems - Fire Fighting 3) Cable Sizing and Voltage Drop Calculations 4) load Calculations and Load Schedule 5) Earth System Design 6) designing all electrical system using - AutoCad - Ecodial - Dialux
To view or add a comment, sign in
-
-
Eduneers Graduation Project 2023 Eduneers for training and engineering solutions My graduation project of edunners course with my global team: Mohamed Azab Ahmed Taha Amira Mohamed Sayed Administration building consists of ground floor, first floor and roof with built up area 2742 m2. The project involves the distribution design for feeding with paller , selected generator 150 KVA , The project consists of 4 phase design and shop drawing of each phase and cost estimation : 1. Conceptual Design - Load Estimation - Zoning - Bulk Equipment Selection (, Cummins for Gen ). - Space Program - Conceptual SLD 2. Schematic Design - Lighting System Design - Small Power System Design - MEP Feeding Loads - Earthing System Design - Lightning Protection System Design - Schematic SLD 3. Detailed Design - Panel Boards Schedules - Cables Sizing (by using edunners Excel sheets) (ELSEWEEDY for CABLES) - Cables Routing - Voltage Drop and Short Circuit Calculations (by using edunners Excel sheets) - Power Factor Correction (by using edunners Excel sheets) - Detailed SLD - riser diagram 4. Light Current Systems - Fire Alarm System - CCTV System -Data and Telephone System -Access Door System Special thanks to Eng.Mohammed Faramawy Eng.Ahmed Maher Eng.Mohamed Mostafa Eng.Hanem Mahrous Eng.Abdulrahman Adel Koutait #distribution #lightcurrent #electricalengineering #design #technicaloffice
To view or add a comment, sign in
-
MEP Manager | Empowering Electrical & Mechanical Engineers to Achieve Career Success & Growth 🚀 | Project Management Expertise | Safety & Compliance Management | Team Building & Leadership Skills
🔧 Exploring Electrical Panel Installation Techniques 🔧 Diving into the world of electrical panels, it's fascinating to see the diverse methods of installation that cater to different needs. Here are three distinctive approaches to mounting electrical panels on walls: 1️⃣ Surface-Mounted Method: 🛠️ Ideal for flexibility and accessibility, the surface-mounted technique involves attaching the panel directly to the wall's surface. This method is efficient and practical, allowing quick and straightforward access to the panel components. 2️⃣ Flush-Mounted Method: 🏠 For a sleek and seamless appearance, the flush-mounted method embeds the electrical panel within the wall. This technique not only provides a clean aesthetic but also minimizes protrusions, making it an excellent choice for spaces where aesthetics matter. 3️⃣ Semi-Recessed Method: 🔄 Combining the benefits of both surface and flush methods, the semi-recessed approach strikes a balance. The panel is partially embedded in the wall, offering a compromise between accessibility and aesthetics. This method is often chosen for spaces where a blend of functionality and design is crucial. Understanding these installation techniques is crucial for electricians, contractors, and anyone involved in building infrastructure. Each method has its unique advantages, and the choice depends on the specific requirements of the project. 💡 Whether you prioritize accessibility, aesthetics, or a combination of both, selecting the right installation method ensures a safe and efficient electrical system. Have a look at our Bestseller BMS Online Course: https://lnkd.in/dkjvq4gd Our Free Mini MEP Course (link in the photo) : https://lnkd.in/dpPgZjCc Our Free Engineering Blog ( Engalaxy ) https://engalaxy.com/blog #ElectricalInstallation #InfrastructureInsights #ElectricianLife #electricalengineering #electricalengineer #mep #technical #construction #HVAC #plumbing #firefighting #bms #control #coordination #urcoursez #engalaxy #mrzidan
To view or add a comment, sign in
-
-
I'm delighted to present this Certificate of Achievement obtained from The Council Training Academy for successfully completing the course titled "Design and Implementation of Mechanical Systems for Facilities." The course, which spanned a total of 100 hours, took place from August 19th, 2023, to November 18, 2023. Course Overview: This course offered both theoretical and hands-on instruction in the realm of designing mechanical systems for HVAC, plumbing, and firefighting within various construction projects. It encompassed the utilization of local and international codes, standards, and software tools. The following systems were covered: 1-HVAC: Topics encompassed load calculations, employment of HAP Software, unit selection, duct design and sizing, pipe design and sizing, air terminal design, HVAC accessory design, AutoCAD-based installation, as well as the development of tables and details. Additionally, the course delved into Chilled Water, VRF and Split unit systems. 2-Water Supply: The course covered the selection and calculation of pipes, pump calculation and selection, domestic water supply systems, hot water supply systems, underground and overhead water tanks, as well as fittings. 3-Plumbing: This segment delved into pipes' selection and calculations, different plumbing systems, considerations for cesspools and local lines, and techniques for rainwater collection, Manhole design and calculations. 4-Swimming Pools: Participants learned about swimming pool classifications, mechanical parameters, schematic diagram creation involving pumps, and heating systems. 5-Firefighting: The course provided insights into firefighting systems, pipes, utilization of sprinklers software (Fire Elite), as well as pump-related aspects, risk classification.
To view or add a comment, sign in
-
-
Absolutely Ghasem! Implementation insight is key . Having experienced the Essential course in Revit, the impression I developed is that the whole Revit is practically informed and practically structured. Indeed the Revit training experience is richer with practical experience . At the implementation level, reality comes face to face with theory : the tyre hits the road and the rest is a resultant effect .
Just finished the course “Revit 2021: Essential Training for MEP” by Eric Wing! Check it out: https://lnkd.in/e2S6vSB8 #revit #mechanicalelectricalandplumbing.
To view or add a comment, sign in
Project Manager at Arcadis
2wWe are happy to have SES as part of the Bullard Havens THS project team!