T.
Estimate

R. Engineering Consultancy
Gothatar-3, Kathmandu, Nepal
Phone: 4991592

for

SGDL Gumba

Upto
item No.
I

at rnchul-i chowk-6,
Quantity
Rate

Date:Sept.20l3

Kathmandu.

DPC
Description

Unit
Amount

Earthwork

in

excavation in

Foundation any kind of soil.

foundation bed and all roorns with proper ramming


complete
3

Flat brick soling on

67340.00

1,2.00

Cu. ft.

808080.0c

(l:2:3) on foundation
and
4

3"

10585.00

60.00 Sq. ft.

average

thick

635100.00

for all

P.C.C. bed

ground floor
10585.0C

rooms.

70.00

sq.ft.

740950.00

Brick work with C/S (1:6) in wall for foundation, septic tank etc. all complete.

9398.00 290.00
5

Cu. ft.

filling'in ground floor including proper ramming and watering all complete.
Earth including making neat cement punning on ground floor surface.

2725420.00

(1:6) on floor

ll2 to 1" thick plastering

70993.00

10

Cu. ft.

709930.00

5872.00
8

60

Sq.ft. 352320.00

fCC work with M20

:oncrete for pillars, beams


:omplete.

grade foundation

etc

all

355 Cu. Ft 13459.00


9

4777945.00

Formwork with plywood and suitable props as per design and specification.

8009.00

80

sq. ft.

640720.00