Segyu Monastery Plan
Segyu Monastery Plan
'
T.
Estimate
R. Engineering Consultancy
Gothatar-3, Kathmandu, Nepal
Phone: 4991592
for
SGDL Gumba
Upto
item No.
I
at rnchul-i chowk-6,
Quantity
Rate
Date:Sept.20l3
Kathmandu.
DPC
Description
Unit
Amount
Earthwork
in
excavation in
67340.00
1,2.00
Cu. ft.
808080.0c
(l:2:3) on foundation
and
4
3"
10585.00
average
thick
635100.00
for all
P.C.C. bed
ground floor
10585.0C
rooms.
70.00
sq.ft.
740950.00
Brick work with C/S (1:6) in wall for foundation, septic tank etc. all complete.
9398.00 290.00
5
Cu. ft.
filling'in ground floor including proper ramming and watering all complete.
Earth including making neat cement punning on ground floor surface.
2725420.00
(1:6) on floor
70993.00
10
Cu. ft.
709930.00
5872.00
8
60
Sq.ft. 352320.00
grade foundation
etc
all
4777945.00
Formwork with plywood and suitable props as per design and specification.
8009.00
80
sq. ft.
640720.00