Segyu Gompa Project
Segyu Gompa Project
T.
R. Engineering Consultancy
Gothatar-3,
ffHl3;iu,
Nepal
Esrimate
GF
Boudha-6, Kathmandu.
item
No. I
for
ar
rinciru?Tt'til';;?:
Description
Quantity
and
Rate
Unit Amount
wall of G. floor
2778.0Q
3
PCC for RCC work with M20 grade concrete for GF pillars, beams,slab etc all complete.
805620.00
4636.00
4
ormwork with plywood and suitable props as per design and specification.
.t
1645780.00
9667.00
5
80
Sq. ft.
773360.00
Sal wood works for doors and windows frame chow including cost
hats with 5"x3" for winclows and 4"x3" for door frames
of to
I\{iS
holdfast complete.
ranelled door shutter as per approved design with 4"x1.5" thick finish size Sal wood frames including all accessories and fitting in position all complete.
rnlcK aluminium glazed shuttering with 4"xl.5l' size
82.5nn nnl
r.)'
130.001
975nn nn
4 including all
framing and
fittings.
8
mm
glass necessary
col4mercial
405.001
650
Sq. ft.
263250.00
9975.00
21
47s
sq.ft.