The document outlines the procedure for racking in and racking out a 6.9KV breaker. The rack in procedure involves identifying the correct breaker, checking its condition, inserting it into the compartment in test position, closing the door, racking it in, opening the door to check its position, and then switching on the control supply and selecting remote mode. The rack out procedure involves identifying the breaker, confirming it is open, selecting local mode, racking it out with the door closed, switching off the control supply, opening the door to check its test position and disconnection indication, removing the control supply plug, and discharging the spring.
The document outlines the procedure for racking in and racking out a 6.9KV breaker. The rack in procedure involves identifying the correct breaker, checking its condition, inserting it into the compartment in test position, closing the door, racking it in, opening the door to check its position, and then switching on the control supply and selecting remote mode. The rack out procedure involves identifying the breaker, confirming it is open, selecting local mode, racking it out with the door closed, switching off the control supply, opening the door to check its test position and disconnection indication, removing the control supply plug, and discharging the spring.
The document outlines the procedure for racking in and racking out a 6.9KV breaker. The rack in procedure involves identifying the correct breaker, checking its condition, inserting it into the compartment in test position, closing the door, racking it in, opening the door to check its position, and then switching on the control supply and selecting remote mode. The rack out procedure involves identifying the breaker, confirming it is open, selecting local mode, racking it out with the door closed, switching off the control supply, opening the door to check its test position and disconnection indication, removing the control supply plug, and discharging the spring.
1. Identify the correct Breaker 2. Check Breaker visually for cluster condition, left out tools or any other ext ernal materials 3. Check the breaker is open & spring is fully discharged 4. Check the breaker is on local mode 5. Ensure that breaker control supply is switched off 6. Place the breaker in the compartment in test position & insert the breaker co ntrol supply plug 7. Close the breaker compartment door 8. Rack in the breaker 9. Open the breaker compartment door & check that breaker is in "connect" positi on & spring is in discharged condition 10. Close the breaker compartment door 11. Switch on the breaker control supply (MCCB#02) 12. Select the breaker in Remote mode Breaker Rack out procedure 1. Identify the correct breaker 2. Confirm the breaker is open 3. Select the breaker in Local mode 4. Rack-out the breaker with the compartment door closed 5. Switch off the control supply (MCCB#02) 6. Open the breaker compartment door, ensure that the breaker is in test positio n, also check the breaker indication "Dis-connect" at local 7. Remove the control supply plug 8. Discharge the spring 9. Close the breaker compartment door