6.

9KV Rack in Procedure


1. Identify the correct Breaker
2. Check Breaker visually for cluster condition, left out tools or any other ext
ernal materials
3. Check the breaker is open & spring is fully discharged
4. Check the breaker is on local mode
5. Ensure that breaker control supply is switched off
6. Place the breaker in the compartment in test position & insert the breaker co
ntrol supply plug
7. Close the breaker compartment door
8. Rack in the breaker
9. Open the breaker compartment door & check that breaker is in "connect" positi
on & spring is in discharged condition
10. Close the breaker compartment door
11. Switch on the breaker control supply (MCCB#02)
12. Select the breaker in Remote mode
Breaker Rack out procedure
1. Identify the correct breaker
2. Confirm the breaker is open
3. Select the breaker in Local mode
4. Rack-out the breaker with the compartment door closed
5. Switch off the control supply (MCCB#02)
6. Open the breaker compartment door, ensure that the breaker is in test positio
n, also check the breaker indication "Dis-connect" at local
7. Remove the control supply plug
8. Discharge the spring
9. Close the breaker compartment door