DOROOD 3 NEW PLANT

NEXT PLANT SHUTDOWN ACTIVITIES


IDENTIFICATION
I
t
e
m

N

EQUIPMENT TAG
S
Y
S
T
E
M
DESCRIPTION REMARKS W.O. N
ENTITY IN
CHARGE
MATERIAL
AVAILABILITY
REMARKS
1 DS 301 300 6 x 2" spools replacement on LTs / LGs
DS301 to be fully drained, flushed and inerted (put at
disposal by Prod = 2 days).
Const Y
2 EC 313 300
ex PSV 3130B (repaired and calibrated by Fitech) to be installed at PSV
3130A location instead of spare PSV 3200.
Crane has to be used.
Spare PSV 3200 to be returned to 2 YSP store.
Mec Y
3 DS 320A 300 SDV3200 to be replaced by new ball valve and actuator. Mec Y
4 DS 301 300
ex SDV3200 from DS320A to be installed at SDV3015 location (spool in
place)
Mec Y
5 EC 310 300 LV 3107 by pass valve passing. Mec/Inst ?
6 DS 401 400 Replacement of damaged seal on the 4 cycloturbines
DS401 to be fully drained, flushed and inerted (put at
disposal by Prod = 1/2 day)
Crane has to be used.
Mec ETA ?
7 IF 710B 700
Preventive maintenance to be done (cleaning, inspection, anodes
replacement}
This task could be done out of shutdown if item 8 is
fixed.
Crane has to be used.
Mec Anodes ?
8 IF 710B 700
16" u/s or d/s butterfly manual valve is passing. Gasket to be
replaced.
Crane has to be used. Mec ?
9 GX720C 700 ROV 7200C: teflon gasket to be replaced. Crane has to be used. Mec ?
10 SP171/SP271 700
Corrosion coupon and corrosion probe are leaking on water injection
header d/s turbo pumps. O rings/gasket to be replaced.
Mec ?