Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

SERVICE REPORT

Report No:
FSO 2000-31

DAILY ACTIVITY LOG


Date
Rig/Location

28/02/06
Kharg Island IRAN

FPR Raised today?

Yes

Customer
Well
No

EPI DOROOD IRAN


D104-WI

FPR No

NPT (hrs)

Time

Activity

7h30

Arrived at Logistics base and picked-up toolbox and spare parts box.

8h00

Went to NITC jetty and travelled to DPFG platform.

11h30

Completed work permit, bled all pressure from tree and started operations on choke (P/N WCC40-80000094 S/N E62520-1-1) of well D104-WI X-mass tree S/N 30000340 N5 60004912. Opened bonnet
and outer cage came also. Found scratches on outer cage and inner cage broken. Found foreign
parts in outer cage void (see picture 1). This appeared to be a piece of control line. Changed all cages
and seals. Rebuilt choke CC40 with new outer cage (P/N 2052877-01 REV B01 S/N 45038488-2-4)
and inner cage (P/N 2052879-01 REV B01 S/N 45039505-001). Installed new bonnet gasket.
Inner
Cage

Outer
Cage

Plug &
Stem

Handwheel &
Cover Flange
& Stem Drive
Bonnet
18h00

Performed body test at 220 bars ok.

18h30

Stand by for started infection wells.

18h45

Went back to Kharg island.

Report & Signed By

Achille GRONDIN & Shahab HOSSEINI

Customer Approved

Franois LANGLOIS

Page _1_ of _1_

SR-06 Rev.0

Page _1_ of _1_

SR-06 Rev.0

You might also like