Worker and Machine Process Chart For Cooking
Worker and Machine Process Chart For Cooking
Worker and Machine Process Chart For Cooking
Summary
Man
Machine 1
Machine 2
Machine 3
Working
Time per
Cycle
Idle Time
Per Cycle
Total
Hours Per
Cycle
55.62 min.
63 min.
.
63 min.
63 min.
Man
Set-up machine #1
Fill the cooking/mixing machine
with water
Time
0.5 min.
3 min.
5 min.
0.05
5 min.
0.083 min.
4 min.
0.083 min.
5.83
10 min.
5.83 min.
61.45 min.
0.5 min
63.50 min.
0.5 min.
0.5 min.
63.50 min.
63.50 min.
Machine 1
Machine 2
Boiling of
water
30 min.
Machine 3
Cooking
15 min.
Mixing
15 min.
Set-up machine #2
Fill the cooking/mixing machine
with water
Weighing of raw materials
To mixing section
Mixing of powdered ingredients
To straining section
Straining
To cooking section
Idle
Pouring of mixture into boiling
water
0.5 min.
3 min.
5 min.
0.05
5 min.
0.083 min.
4 min.
0.083 min.
5.83
10 min.
Boiling of
water
30 min.
Cooking
15 min.
Mixing
15 min.
Set-up machine #3
Fill the cooking/mixing machine
with water
Weighing of raw materials
To mixing section
Mixing of powdered ingredients
To straining section
Straining
To cooking section
Idle
Pouring of mixture into boiling
water
0.5 min.
3 min.
5 min.
0.05
5 min.
0.083 min.
4 min.
0.083 min.
5.83
10 min.
Boiling of
water
30 min.
Cooking
15 min.
Mixing
15 min.
12
1.67 hours
11
Bottling
12
0.02 hours
12
12 hours
2 hours
Sealing
0.17 hours
Ins
0.25 hours
72 hours
01
02
03
Boiling 1
04
Draining
05
Crushing
06
Natural Fermentation
07
Fermentation with
brine solution
1 month
1 hour
08
0.17 hours
09
Boiling 2
Summary:
Filtration
0.033 hours
13
Event
Number
Operations
13
Inspections
Time
785.28 hours
11