2008 - Demanda Mx. Hidr.

- Falla Monofsica - Betania 115 kV


----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
13.2.338
| Date: 8/26/2008
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Fault Locations with Feeders
|
| Short-Circuit Calculation according to IEC
Single Phase to Ground
/ Max. Short-Circuit Currents |
----------------------------------------------------------------------------------------------------------------------------------| Asynchronous Motors
| Grid Identification
| Short-Circuit Duration
|
|
always considered
|
automatic
|
Breaker Time
0.10 s |
|
|
|
Fault Clearing Time (Ith)
1.00 s |
|
| Conductor Temperature
| c-Voltage Factor
|
|
|
Userdefined
No
|
Userdefined
No
|
|
|
|
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: Sur HuCa
System Stage: Huila-Caqueta_D |
| Annex:
/ 1
|
----------------------------------------------------------------------------------------------------------------------------------|
rtd.V.
Voltage
cSk"
Ik"
ip
Ib
Sb
EFF |
|
[kV]
[kV]
[deg] Factor
[MVA/MVA]
[kA/kA]
[deg]
[kA/kA]
[kA]
[MVA]
[-] |
----------------------------------------------------------------------------------------------------------------------------------|
|
|Betania 115
A
115.00
0.00
0.00 1.10
644.54 MVA
9.71 kA -88.36
26.13 kA
9.71
644.54 0.00 |
|
B
66.00 -104.96
0.00 MVA
0.00 kA
0.00
0.00 kA
0.00
0.00 0.90 |
|
C
65.51
105.47
0.00 MVA
0.00 kA
0.00
0.00 kA
0.00
0.00 0.89 |
|
|
| lne Betania - H
Hobo 115
A
40.93 MVA
0.62 kA 104.33
1.66 kA
|
|
B
13.64 MVA
0.21 kA -76.88
0.55 kA
|
|
C
13.62 MVA
0.21 kA -77.83
0.55 kA
|
|
|
| lne Betania - N
Neiva 115
A
16.76 MVA
0.25 kA
92.07
0.68 kA
|
|
B
2.62 MVA
0.04 kA -114.14
0.11 kA
|
|
C
2.41 MVA
0.04 kA -78.38
0.10 kA
|
|
|
| lne Betania - N
Neiva 115
A
16.65 MVA
0.25 kA
91.47
0.67 kA
|
|
B
2.62 MVA
0.04 kA -109.84
0.11 kA
|
|
C
2.53 MVA
0.04 kA -74.78
0.10 kA
|
|
|
| tr3 Betania 230
Betania 22 Betania T1
A
286.01 MVA
4.31 kA
90.74
11.60 kA
|
|
B
15.54 MVA
0.23 kA
92.54
0.63 kA
|
|
C
15.66 MVA
0.24 kA
97.71
0.63 kA
|
|
|
| tr3 Betania 230
Betania 22 Betania T2
A
285.26 MVA
4.30 kA
90.72
11.57 kA
|
|
B
2.65 MVA
0.04 kA
99.69
0.11 kA
|
|
C
3.24 MVA
0.05 kA 126.43
0.13 kA
|
|
|
-----------------------------------------------------------------------------------------------------------------------------------

2008 - Demanda Mx. Hidr. - Falla Trifsica - Betania 115 kV


----------------------------------------------------------------------------------------------------------------------------------|
|
|
DIgSILENT
| Project:
|
|
|
| PowerFactory |------------------------------|
|
|
13.2.338
| Date: 8/26/2008
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Fault Locations with Feeders
|
| Short-Circuit Calculation according to IEC
3-Phase Short-Circuit
/ Max. Short-Circuit Currents |
----------------------------------------------------------------------------------------------------------------------------------| Asynchronous Motors
| Grid Identification
| Short-Circuit Duration
|
|
always considered
|
automatic
|
Breaker Time
0.10 s |
|
|
|
Fault Clearing Time (Ith)
1.00 s |
| Decaying Aperiodic Component
| Conductor Temperature
| c-Voltage Factor
|
|
Using Method
B
|
Userdefined
No
|
Userdefined
No
|
|
|
|
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: Sur HuCa
System Stage: Huila-Caqueta_D |
| Annex:
/ 1
|
----------------------------------------------------------------------------------------------------------------------------------|
rtd.V.
Voltage
cSk"
Ik"
ip
Ib
Sb
Ik
Ith |
|
[kV]
[kV]
[deg] Factor
[MVA/MVA]
[kA/kA]
[deg]
[kA/kA]
[kA]
[MVA]
[kA]
[kA] |
----------------------------------------------------------------------------------------------------------------------------------|
|
|Betania 115
115.00
0.00
0.00 1.10
1534.44 MVA
7.70 kA -87.94
20.74 kA
7.67 1528.05
7.70
8.01 |
|
lne Betania - H Hobo 115
130.33 MVA
0.65 kA 104.32
1.76 kA
|
|
lne Betania - N Neiva 115
42.37 MVA
0.21 kA
91.37
0.57 kA
|
|
lne Betania - N Neiva 115
42.30 MVA
0.21 kA
91.37
0.57 kA
|
|
tr3 Betania 230 Betania 22 Betania T1
646.79 MVA
3.25 kA
90.91
8.74 kA
|
|
tr3 Betania 230 Betania 22 Betania T2
675.89 MVA
3.39 kA
90.91
9.13 kA
|
----------------------------------------------------------------------------------------------------------------------------------2020 - Demanda Mx. Hidr. - Falla Monofsica - Betania 115 kV
----------------------------------------------------------------------------------------------------------------------------------| Fault Locations with Feeders
|
| Short-Circuit Calculation according to IEC
Single Phase to Ground
/ Max. Short-Circuit Currents |
----------------------------------------------------------------------------------------------------------------------------------| Asynchronous Motors
| Grid Identification
| Short-Circuit Duration
|
|
always considered
|
automatic
|
Breaker Time
0.10 s |
|
|
|
Fault Clearing Time (Ith)
1.00 s |
|
| Conductor Temperature
| c-Voltage Factor
|
|
|
Userdefined
No
|
Userdefined
No
|
|
|
|
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: Sur HuCa
System Stage: DemMax_DH
|
| Annex:
/ 1
|
----------------------------------------------------------------------------------------------------------------------------------|
rtd.V.
Voltage
cSk"
Ik"
ip
Ib
Sb
EFF |
|
[kV]
[kV]
[deg] Factor
[MVA/MVA]
[kA/kA]
[deg]
[kA/kA]
[kA]
[MVA]
[-] |
----------------------------------------------------------------------------------------------------------------------------------|
|
|Betania 115
A
115.00
0.00
0.00 1.10
707.88 MVA
10.66 kA -86.98
27.95 kA
10.66
707.88 0.00 |
|
B
66.84 -106.03
0.00 MVA
0.00 kA
0.00
0.00 kA
0.00
0.00 0.91 |
|
C
65.55
106.72
0.00 MVA
0.00 kA
0.00
0.00 kA
0.00
0.00 0.89 |
|
|

| lne Betania - H
Hobo 115
A
41.30 MVA
0.62 kA 103.70
1.63 kA
|
|
B
12.89 MVA
0.19 kA -78.23
0.51 kA
|
|
C
12.92 MVA
0.19 kA -77.95
0.51 kA
|
|
|
| lne Betania - N
Neiva 115
A
54.87 MVA
0.83 kA 102.00
2.17 kA
|
|
B
15.44 MVA
0.23 kA -79.72
0.61 kA
|
|
C
15.81 MVA
0.24 kA -73.11
0.62 kA
|
|
|
| lne Betania - N
Neiva 115
A
27.28 MVA
0.41 kA 101.66
1.08 kA
|
|
B
7.81 MVA
0.12 kA -78.49
0.31 kA
|
|
C
8.01 MVA
0.12 kA -72.01
0.32 kA
|
|
|
| tr3 Betania 230
Betania 22 Betania T1
A
293.99 MVA
4.43 kA
91.07
11.61 kA
|
|
B
24.82 MVA
0.37 kA
98.55
0.98 kA
|
|
C
25.02 MVA
0.38 kA 101.69
0.99 kA
|
|
|
| tr3 Betania 230
Betania 22 Betania T2
A
292.49 MVA
4.41 kA
91.00
11.55 kA
|
|
B
11.39 MVA
0.17 kA 106.58
0.45 kA
|
|
C
11.85 MVA
0.18 kA 113.33
0.47 kA
|
|
|
----------------------------------------------------------------------------------------------------------------------------------2020 - Demanda Mx. Hidr. - Falla Trifsica - Betania 115 kV
----------------------------------------------------------------------------------------------------------------------------------| Fault Locations with Feeders
|
| Short-Circuit Calculation according to IEC
3-Phase Short-Circuit
/ Max. Short-Circuit Currents |
----------------------------------------------------------------------------------------------------------------------------------| Asynchronous Motors
| Grid Identification
| Short-Circuit Duration
|
|
always considered
|
automatic
|
Breaker Time
0.10 s |
|
|
|
Fault Clearing Time (Ith)
1.00 s |
| Decaying Aperiodic Component
| Conductor Temperature
| c-Voltage Factor
|
|
Using Method
B
|
Userdefined
No
|
Userdefined
No
|
|
|
|
|
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------| Grid: Sur HuCa
System Stage: DemMax_DH
|
| Annex:
/ 1
|
----------------------------------------------------------------------------------------------------------------------------------|
rtd.V.
Voltage
cSk"
Ik"
ip
Ib
Sb
Ik
Ith |
|
[kV]
[kV]
[deg] Factor
[MVA/MVA]
[kA/kA]
[deg]
[kA/kA]
[kA]
[MVA]
[kA]
[kA] |
----------------------------------------------------------------------------------------------------------------------------------|
|
|Betania 115
115.00
0.00
0.00 1.10
1710.80 MVA
8.59 kA -86.32
22.52 kA
8.56 1705.56
8.59
8.81 |
|
lne Betania - H Hobo 115
130.63 MVA
0.66 kA 103.97
1.72 kA
|
|
lne Betania - N Neiva 115
166.58 MVA
0.84 kA 103.24
2.19 kA
|
|
lne Betania - N Neiva 115
83.14 MVA
0.42 kA 103.24
1.09 kA
|
|
tr3 Betania 230 Betania 22 Betania T1
654.08 MVA
3.28 kA
90.91
8.61 kA
|
|
tr3 Betania 230 Betania 22 Betania T2
683.51 MVA
3.43 kA
90.91
9.00 kA
|
-----------------------------------------------------------------------------------------------------------------------------------