CETP Calculation r02
CETP Calculation r02
Screen
Raw water
Sewage
Sludge
Sludge Tank
Biological
Clarifier
SF AC
Treated
Sludge
Cake
Dewater
2 Design parameter
Item
Unit
Flow
m3/d
Sewage
250
Flow
m3/h
15
250
Inlet time
h/d
17
Operation
pH
h/d
22
7 to 7.5
BOD
mg/
400
COD
kg/d
mg/
SS
kg/d
mg/
O&G
kg/d
mg/
T-KN
kg/d
mg/
A-N
kg/d
mg/
T-P
kg/d
mg/
TDS
kg/d
mg/L
100
1,200
300
1,000
250
50
13
50
13
20
5
12.0
3
< 2000
3 Calculation
1
Treatment system
1 Coase Screen
Average flow
Max flow
Specification
2 Sewage pit tank
Capacity
Specification
Accessory
3 Sewage pit pump
Specification
4 Equalization tank
Capacity
SFAC Backwash
Total
Specification
Accessory
8 Equalization pump
Capacity
Specification
9 Fine Screen
Specification
9 Aeration tank
Flow
BOD load
Type
F/M
MLSS
Aeration tank Volume
Back check
Removal
Screen
Removal
Bio
250
0%
0%
0%
0%
50%
50%
0%
0%
0%
0%
0%
0%
0%
0%
250
250
7 to 7.5
6.5 to 8.5
6.5 to 8.5
400
95%
20
50%
10
100
1,200
300
500
125
50
13
50
13
95%
85%
85%
80%
80%
90%
90%
50%
50%
0%
0%
50%
50%
5
180
45
100
25
5
1
25
6
50%
70%
70%
70%
70%
50%
50%
10%
10%
0%
0%
10%
10%
3
54
14
30
8
3
1
23
6
0
0
5
1
<2000
17
17
10
30 m3/h *
10
m3
Treated
250
12
250 m3/d *
250 m3/d *
30 m3/h*
Removal
250
h/d *
h/d *
mm *
6
2
1.0
2.0
1
Times
Times
Lines
0.25 hour
6.5 to 8.5
25
150
100
5
BOD*5% Cut
50
6.5
BOD*1% Cut
=
=
Manual type
14.7 m3/h
29.4 m3/h
8 m3
LS
30 m3/h *
20
250 m3/d * (
65
Air mixing pipeLS
mH *
17 h - 1/
5.5
kw *
22 h ) *
2 Nos
17 h =
57 m3
7 m3/time
63 m3
m3
250 m3/d
12 m3/h *
12 m3/h*
250 m3/d /
250 m3/d line*
Conventional
0.3
2,000 mg/L
100 kg BOD/d
22
10
h/d
mH *
2.2
kw *
mm *
Lines
1
Line
400 mg/L
=
2 Nos
11.4 m3/h
Manual type
=
1,000 =
250 m3/d
100 kg BOD/d
CPHEEO 1993
CPHEEO 1993
0.35
kg BOD/kg SS d
2,000
g/m3
1,000 =
143 m3
HRT
6
12 m3/h *
160
m3
Air diffuzer, Air flow indicator
Specification
Accessory
10 Clarifier Tank
Overflow rate
Area
8 to 15
Specification
Rake Specification
Accessory
4.4
m*
4.3
m*
Reduce gear, motor
MS bridge
12 m3/h
12 m3/h *
7
m3
250 m3/d *
11 m3/h *
14 Sand Filter
Line
LV
Area
CPHEEO 1993
15 m3/m2/d
24 h/d)
1.2 m *
19.2 m2 Line
4.38 m
1.5
kw *
1 Nos
Air lift
0.5 h
6 m3
22
25
h/d
mH *
5.5
kw *
=
2 Nos
11.4 m3/h
11 m3/h Line
Lines
1.1 m2
1.18 m
( 1.13 m2 )
Lines
1.1 m2
1.18 m
( 1.13 m2)
m3/m2/hr
10 m3/m2/hr
1.2 m *
6 1/H
1.8 m3
1.6 mH
250 m3/d *
25
m3
22 h /d *
2.0 h
35 m3/m2/hr
40 m3/h *
40 m3/h
15
mH *
60 min/h *
5.5
10 min
kw *
22 m3/h *
40
7.5
kw *
Chemicals
23 m3
LS
1 NaCLO
Feed volume
72 m3
1 Line
1 Line
1 Line
10 m3/m2/hr
Specification
40 m3/
mH *
1 Nos
=
7 m3
2 Nos
Tank
Specification
Pump Specification
3
CPHEEO 1993
h
LS
m3/m2/d
12 m3/h (
Sludge Treatment
1 Sludge tank
BOD SS Sludge
SS sludge
Total DS volume
Total Sludge Volume
Volume
3
30
0.1
0.6
0.6
0.1
20
1.2 SG
mg NaClO/L
m3/d *
kg/d
L/d
L/d *
m3
mL/min *
250 m3 /d *
250 m3/d * (
152.5
kgDS/d
8 m3/d *
3.0
12.0
22
5
g/m3
h/d
d*
60 min/h
1 lines
0.2 Mpa *
kw *
400 mg/L *
500 mg/L
2.0 %
3.0
1,000.0
1.2 *
0.3
10 mg/L )
=
1 =
=
=
0.1
0.6
0.5
3
kg NaClO/d
L/d
mL/min
L
2 Nos
1,000 =
1,000 =
=
=
30.0
122.5
152.5
7.6
22.9
kg DS/d
kg DS/d
kgDS/d
m3/d
m3
Specification
Accessory
25
m3
Air mixing pipe, LS
2 Dewater
Type
Centrifugal
Operation
6
h/d
Capacity
Specification
30 kg DS/h *
Solids contents of cake
15.0 % WW
Cake volume
3 Sludge Feed pump
Capacity
Specification
4 Sludge Dry Bed
Total sludge volume
Bed Area / d
Bed Area Total
Specification
25 kgDS/h
2 m3/h *
For summer season
8 m3/d
7.6 m3/d /
19.1 m2/d *
22 m2 *
Untility
1 Mixing Blower
Air ratio
0.5 to 1.0
Sewage collection tank
10
Equalization tank
65
Sludge tank
25
Total
Specification
120
2 Aeration Blower
O2 volume
Air Volume
BC
Specification
100
6,167
160
220
m3/h/m3
m3 *
m3 *
m3 *
m3/h *
1.02 Ton/d
2.0
0.2
%
mH *
0.4
1
7
m=
days =
nos
0.8
3 m3/h *
Dryer, Filter, Regulator
4 Drain pit -2
Specification
Accessory
LS
2.0
5 m3/h *
kw *
=
2 Nos
1.3 m3/h
19.1 m2/d
19.1 m2
3 Compressor
Specification
Accessory
25 kgDS/h
1 Nos
kw *
0.06 =
=
=
2 Nos
0.7
MPa *
0.8
kw *
1 Nos
mH *
0.4
kw *
1 Nos
5.0
32.5
25.0
62.5
m3/h
m3/h
m3/h
m3/h
m3
Submersible