Saudi Aramco Engineering Procedures (Index of Active Saeps) September 2006
Saudi Aramco Engineering Procedures (Index of Active Saeps) September 2006
Title
Saudi Aramco Engineering Procedures
Project Execution Plan
Project Environmental Impact Assessments
Project Proposal
Preparation of Restricted Vendor Lists for Process Automation Systems
Project Execution Guide for Process Automation Systems
Equipment Inspection Schedule
Royalty/Custody Metering Facilities Execution Guide
Tank Calibration Requirements
Estimate Preparation Guidelines
Corporate Equipment and Spare Parts Data Requirements
Environmental Performance Assessment (EPA) Program
Project Execution Requirements for Third Party Royalty/Custody Metering Systems
Metric Units of Weights and Measures
Saudi Aramco Standard Drawings
Saudi Aramco Materials System Specifications
Saudi Aramco Security Drawings
Operating Instructions for New Facilities
Project Records
Preparation of Saudi Aramco Engineering Standards
Security and Control of Saudi Aramco Engineering Data
Instructions for the Development of "Regulated Vendors List" Engineering Standards
Saudi Aramco Engineering Procedure Preparations
Saudi Aramco Process Automation System (PAS) Obsolescence Program
Saudi Aramco Management of Electric Equipment Obsolescence Program
Project Training Impact Assessment
Saudi Aramco Engineering Reports
Instructions for Establishing and Maintaining Mandatory
Saudi Aramco Engineering Requirements
Instructions for Obtaining a Waiver of a Mandatory
Saudi Aramco Engineering Requirement
Engineering Reviews of Project Proposal and Detail Design Documentation
Saudi Aramco Library Drawings
Evaluating the Remaining Strength of Corroded Pipelines
5/31/2003
8/31/2004
6/29/2005
9/20/2006
6/30/2003
5/31/2003
9/28/2005
5/3/12004
4/4/2006
8/15/2006
9/30/2003
6/30/2003
7/30/2003
4/30/2005
3/31/2004
4/30/2005
3/31/2004
8/31/2002
7/31/2005
5/31/2003
6/30/2004
1/4/2006
4/30/2003
7/30/2003
6/30/2004
5/31/2004
3/31/2004
2/26/2003
5/31/2000
6/30/2003
8/15/2006
4/28/1999
5/29/2002
1/29/2003
4/30/2003
New
New
8/31/1998
2/26/2003
12/1/1996
12/1/1996
6/30/2002
5/31/2003
11/30/1999
1/27/1998
2/29/2004
3/31/2003
12/31/2002
6/29/2005
New
New
New
New
1/31/2001
Next
Planned
Update
3/1/2008
9/1/2009
7/1/2010
8/15/2011
71/2008
6/1/2008
10/1/2010
6/1/2009
4/4/2011
8/15/2011
10/1/2008
3/1/2008
8/1/2008
5/1/2010
4/1/2009
6/1/2008
4/1/2009
9/1/2007
3/1/2009
4/1/2008
1/1/2008
7/1/2010
5/1/2008
8/1/2006
7/1/2009
6/1/2009
4/1/2009
11/13/2005
6/29/2005
5/1/2007
10/12/2005
01/31/05
7/1/2007
7/31/2002
3/31/2004
6/29/2005
12/31/1996
11/30/1999
3/29/2000
8/1/2007
4/1/2009
7/1/2010
Current
Issue
Previous
Issue
page 1 of 5
Title
Plant Inspection Unit Reviews
Inspection of Community and Operations Support Facilities
Pipeline Repair and Maintenance
Installation of Hot Tapped and Stopple Connections
PLIDCO Weld+Ends Couplings
PLIDCO Split Sleeves
Use of PLIDCO Smith Pipeline Repair Clamps
Performance Qualification of Coating Personnel
Testing and Inspection (T&I) of Shell and Tube Heat Exchangers
Pressure Relief Valve Program Authorization for Installation, Deletion and Changes
Pressure Relief Valves Routine Test, Inspection, Quality Assurance and Regulation
Performance Qualification Testing and Certification of Saudi Aramco Welders
Performance Qualification Testing and Certification of Saudi Aramco Brazers
Performance Qualification Testing of Contract Welders and Brazers
Certification Review and Registration of Project Welders and Brazers
Inspection Requirements for Pressurized Equipment
Disposal of Wastewater from Cleaning, Flushing, and Dewatering Pipelines and Vessels
Project Close-Out Report
Cathodic Protection Commissioning
Cathodic Protection Monitoring
Retrieval, Certification and Submittal of Saudi Aramco Engineering & Vendor Drawings
Boiler Condition Assessment
Marine Dredging and Landfilling Approval and Permitting
Air Quality Impact Analysis and Assessment
Equipment Life Cycle Cost Procedure
Engineering Drawings Emergency Delivery Plan
Risk-Based Inspection (RBI) for In-Plant Static Equipment
Supplying Material from Stockists
Chemical Cleaning, Disinfection, Post Treatment
and Storage of Reverse Osmosis Membranes
Advanced Process Control (APC) Systems
Regular Maintenance and Testing for Industrial Stationary Batteries
Bolted Flange Joints Assembly
Welding Procedures Review and Approval
Current
Issue
Previous
Issue
5/31/2004
6/30/2004
11/30/2005
12/28/2005
01/31/05
01/31/05
01/31/05
11/13/2010
7/30/2003
10/31/2004
10/31/2004
6/30/2003
6/30/2003
6/30/2003
6/30/2003
6/30/2004
5/31/2003
11/23/2005
5/31/2005
7/31/2004
1/4/2006
2/28/2005
12/29/2004
12/21/2005
3/15/2006
3/31/2004
12/14/2005
10/31/2004
7/30/2003
4/30/2000
1/29/2003
11/13/2005
1/29/2003
1/29/2003
1/29/2003
7/30/2003
3/29/2000
3/31/2003
10/30/2002
1/31/2000
1/31/2000
1/31/2000
1/31/2000
3/31/2001
8/30/2000
3/31/2001
9/30/2002
11/28/2001
9/29/2004
1/28/2004
12/31/2000
1/30/2002
6/30/2001
1/29/2003
2/28/2005
7/31/2004
Next
Planned
Update
6/1/2009
7/1/2009
4/1/2006
12/1/2010
2/1/2010
2/1/2010
2/1/2010
8/1/2008
8/1/2008
11/1/2009
11/1/2009
7/1/2008
7/1/2008
7/1/2008
7/1/2008
7/1/2009
6/1/2006
12/1/2010
6/1/2010
8/1/2009
1/1/2009
6/1/2009
1/1/2008
1/1/2011
3/15/2009
2/1/2008
1/1/2007
8/1/2006
7/31/2004
New
8/1/2009
11/30/2004
5/31/2004
4/30/2003
5/31/2003
New
New
New
New
12/1/2007
6/1/2009
5/1/2006
6/1/2008
page 2 of 5
Title
High Integrity Protective Systems Design Requirements
Field Metallography and Hardness Testing
Fiber Reinforced Plastic Grating Installation Guide
Management of Technologically Enhanced Naturally Occurring Radioactive Material
(NORM)
Project Planning Guidelines
Storage, Handling and Installation of Weight-Coated Pipe
Hand-Applied Tape Wrapping of Buried Pipe
Pipeline Simulation Model Development and Support
Process Simulation Model Development and Support
Capital Program Planning
Surveying Services Division Project Control
Chemical Cleaning of New Steam Generating Equipment1
Chemical Cleaning of Boilers
Boilers Lay-Up Procedures
Pressure Relief Valve Conventional and Balanced Types
Chemical Cleaning and Flushing of Lube/Seal Oil and Fluid Power Systems
Guideline for Disaster Recovery Plan Development for Decision Support System
Welding Test Supplement S01 SMAW, Carbon and Low Alloy Steel Pipe, Uphill
Welding Test Supplement S02 for SMAW, Carbon and Low Alloy Steel Pipe, Downhill
Welding Test Supplement S03 for SMAW, Stainless Steel, Single Sided
Welding Test Supplement S04 for SMAW, Stainless Steel/Nickel, Backing
Welding Test Supplement S05 for SMAW, Nickel, Single Sided
Welding Test Supplement S06 for GTAW, Aluminum with Backing
Welding Test Supplement S07 for GTAW, Carbon, Low Alloy and Stainless Steel Pipe
Welding Test Supplement S08 for GTAW, Nickel
Welding Test Supplement S09 for GTAW, Aluminum, Single Sided
Welding Test Supplement S10 for SAW, Carbon and Low Alloy Steel Pipe
Welding Test Supplement S11 for SAW, Overlay, Carbon and Low Alloy Steel Pipe
Welding Test Supplement S12 for SMAW, Carbon Steel, Small Diameter
Welding Test Supplement S13 for FCAW, Carbon Steel
Welding Test Supplement S14 for SMAW, Carbon and Low Alloy Steel Plate
Welding Test Supplement S15 for SMAW, Stainless Steel Lap
Welding Test Supplement S16 for SMAW Nickel Lap
10/29/2003
2/29/2003
2/28/2005
3/30/2005
8/31/2003
New
New
New
Next
Planned
Update
9/1/2008
3/1/2009
3/1/2010
5/1/2010
1/31/2006
5/31/2005
5/31/2005
1/25/2006
1/25/2006
6/30/2004
11/23/2005
7/31/2005
2/28/2005
2/28/2005
7/31/2002
1/28/2004
10/26/2005
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
New
New
New
New
New
2/28/2001
12/31/2002
1/28/2004
1/28/2004
1/28/2004
1/31/2001
3/31/2003
7/31/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
4/30/2000
8/31/2002
4/30/2000
4/30/2000
8/31/2002
1/31/2011
6/1/2010
6/1/2010
1/25/2009
1/25/2009
7/1/2009
12/1/2006
8/1/2010
11/1/2009
3/1/2010
8/1/2007
4/1/2008
11/1/2010
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
11/1/2008
Current
Issue
Previous
Issue
page 3 of 5
Title
Welding Test Supplement S17 for SMAW, Wet Welding
Brazing Test Supplement S25 with TB, Copper and Copper Alloy Tubing
Pressure Relief Valve Program Use of Form 3099A-ENG, RV Authorization
Instructions for Using the Relief Valve Test Stand
Form 3750-ENG, Pressure Relieving Device Test Report
Relief Valve Technician Certification
On-Stream Inspection Administration
Qualification of Saudi Aramco NDT Personnel
Radiation Protection for Industrial Radiography
Qualification of Non-Saudi Aramco NDT Personnel
Radiographic Examination
Magnetic Particle Examination
Liquid Penetrant Examination
Manual Ultrasonic Thickness Testing
Inspection Coverage on Projects
Approval Procedure for Ready-Mixed Concrete Mix Design
Guidelines for Contractor's Quality Plan
Process Controls for Capital Projects
Design Basis Scoping Paper (DBSP) Preparation and Revision Procedure
RVL Products Management Procedure
Preparation of Functional Specification Documents
Preparation of Technical Bid Evaluation Plan Document for Process Automation Systems
Preparation of System Design Documents
Configuration and Graphics Guidelines
Preparation of Integration Specifications Document
Preparation of Integration Test Procedure Document
Factory Acceptance Test
Installation and Checkout Plan
Site Acceptance Test Plan
Operating Instructions for Process Automation Systems
Maintenance Manual for Process Automation Systems
Waste Minimization Opportunity Assessments
Cleaning of Heat Exchangers and Unfired Plant Equipment
Equipment and Spare Parts Data Requirements for Contractor Procured Equipment
Current
Issue
Previous
Issue
10/29/2003
10/29/2003
10/31/2004
8/31/2002
11/13/2005
7/31/2004
2/29/2004
2/15/2006
6/29/2005
2/29/2004
5/29/2002
10/12/2005
10/12/2005
8/31/2004
6/30/2004
3/30/2005
3/31/2004
6/7/2006
3/20/2006
4/30/2003
2/28/2005
4/11/2006
2/28/2005
2/28/2005
2/28/2005
2/28/2005
2/28/2005
2/28/2005
4/30/2002
2/28/2005
2/28/2005
1/31/05
1/31/05
9/30/2003
12/31/2000
4/30/2000
6/30/2002
4/30/2000
7/31/2002
4/30/2000
8/31/1999
7/31/2004
12/31/1996
9/30/2000
9/30/1998
9/30/2001
9/30/2001
5/30/2001
5/31/2004
3/31/2002
New
New
11/30/2005
3/31/1999
1/30/2002
2/28/2005
1/30/2002
1/30/2002
1/30/2002
4/30/2002
4/30/2002
1/30/2002
6/28/2000
1/30/2002
1/30/2002
11/30/2002
1/28/2004
8/31/1998
Next
Planned
Update
11/1/2008
11/1/2008
11/1/2009
9/1/2007
12/1/2008
8/1/2007
3/1/2009
2/15/2011
7/1/2010
3/1/2009
6/1/2007
11/1/2010
11/1/2010
9/1/2007
6/1/2007
4/1/2008
4/1/2005
6/7/2011
4/1/2010
5/1/2006
2/1/2007
4/11/2011
2/1/2007
2/1/2007
2/1/2007
2/1/2007
2/1/2007
2/1/2007
5/1/2007
2/1/2007
2/1/2007
2/1/2010
2/1/2010
10/1/2008
page 4 of 5
Title
Equipment and Spare Parts Data Requirements for SAPMT Originated Requisitions
Equipment and Spare Parts Data Requirements
for Proponent/MRO Originated Requisitions
Current
Issue
Previous
Issue
9/30/2003
8/31/1998
Next
Planned
Update
10/1/2008
9/30/2003
8/31/1998
10/1/2008
page 5 of 5