V Sem SPA Design Brief.
V Sem SPA Design Brief.
Mahaveer Marg, Masab Tank, Hyderabad 500 028 B.Arch V Semester, Section-B Date : 07/09/2012
Studio Faculty: Dr.S.Kumar, Prof. M. Vinod Ganesh, Ar. Syed Ateeq Mirza, Ar.Madhusudhan (VF)
The Institution shall offer the following full time courses. 1. B.Arch (5yrs) 40 intake per batch 2. B.Planning (4yrs) 40 Intake per batch 3. M.Arch (2yrs) - 20 intake per batch 4. M.Planning (2yrs) - 20 intake per batch The Institution shall be designed keeping in view the Norms prepared by AICTE/COA and the G.O.86 of A.P.
REQUIREMENTS Administration 1. 2. 3. 4. 5. Entrance Foyer Reception and Waiting Administrative Office with 6 capacity Principals room with attached toilet Secretary room (Peshi) with attached toilet 100 sq.m 30 sq.m 50 sq.m 35 sq.m 25 sq.m
Academic Department of Architecture 1. 7 Studios 40 Capacity (5 B.Arch & 2 M.Arch) 2. 4 Class rooms - 40 Capacity 3. 2 Seminar Halls 60 Capacity 4. 1 Exhibition cum Conference room 5. Material Museum 200 sq.m each
60 sq.m each
80 sq.m each
200 Sq.M
80 sq.m
6. Construction Yard 7. 2 Work Shops 8. Labs i) Surveying ii) Material Testing and Structures iii) Climatology iv) Computer for 60 capacity 9. Faculty Rooms 19 in No. i) Professor 3 rooms ii) Asst. Professor 6 rooms iii) Lecturer 10 rooms 10. Common room for boys 11. Common room for girls Department of Planning. 1. 6 Studios 40 Capacity (4 B.Plan & 2 M.Plan) 2. 3 Class rooms - 40 Capacity 3. 2 Seminar Halls 60 Capacity 4. 1 Exhibition cum Conference room 5. 6. 7. 8. Material Museum Construction Yard 2 Work Shops Labs i) Surveying ii) Material Testing and Structures iii) Climatology iv) Computer for 60 capacity 9. Faculty Rooms 19 in No. i) Professor 3 rooms ii) Asst. Professor 4 rooms iii) Lecturer 8 rooms 10. Common room for boys 11. Common room for girls Common facility for both departments 1. Central Library 2. Auditorium Student Amenities 1. Outdoor Sports (Volleyball, Basketball, Badminton) 2. Indoor games (TT, Billiards, etc.) 3. Gymnasium
100 sq.m 60 sq.m each 40 sq.m 40 sq.m 40 sq.m sq.m 12 sq.m each 10 sq.m each 8 sq.m each 50 sq.m 50 sq.m
40 sq.m 40 sq.m 40 sq.m sq.m 12 sq.m each 10 sq.m each 8 sq.m each 50 sq.m 50 sq.m
Parking - to include: Car parking, Bus Parking, Scooter Parking, Visitors parking as required. Total parking -20% of Built-Up Area. SUBMISSION SCHEDULE 1. 2. 3. 4. 5. 6. 7. Desktop Study Literature and Data Collection Case Study Preliminary Design - I Preliminary Design II Developed Design Final Submission 04/09/2012 21/09/2012 23/09/2012 09/10/2012 23/10/2012 30/10/2012 06/11/2012
DRAWINGS 1. 2. 3. 4. 5. 6. 7. Site Plan Floor Plans (Layout plans) Elevations Sections Detailed plans Elevations Sections 8. Views and Sketches to Support 1:500 1:200 1:200 1:200 1:50 1:50 1:50