Case Study for Ground Improvement Using PVD with Preloading for Coal & Iron Ore Stackyard
(%)
(g/cc)
(%)
(%)
(%)
(%)
(%)
0.721.95
(m/yr)
0.191.05
1829
0.0950.991
(kg/cm)
(deg)
(kg/cm)
Spacing of PVD:
Consolidation Period:
Hydraulic Stitchers
10.00 m to 18.00 m below
OGL
1.00 m c/c in Triangular Grid
below the stacker reclaimers
1.50 m c/c in Triangular Grid
in other area
For 1.00 m spacing: 65 days
For 1.50 m spacing: 174
days
300 mm
Section 2
CP4
Section 3
CP3
Section 4
CP2
VP4, VP5
PS3, PS4
MS3,
MS4
Section 5
CP5
VP12, VP13,
VP14
PS11,
PS12,
PS13
MS7
IN 4
VWP4(6m)
MS3
IN 10
IN 3
PS12
AREA - B
IN 5
IN 7
IN 1
VWP6(9m)
PS5
CP4(9m)
MS6
VWP9(6m)
PS8
VWP1(9m)
MS1
VWP2(6m)
PS1
MS6
MS5
PS9
VWP10(6m)
VWP3(6m)
VWP11(9m)
PS10
CP1(9m)
PS2
IN 2
VWP7(6m)
PS6
PS11
CP2(9m)
PS3
IN 9
C'
MS4
Preload As Per Design
PS8, PS9,
PS10
PS5, PS6,
PS7
MS1,
MS2
VWP13(6m) VWP12(9m)
CP5 (6m)
VWP14 (9m)
PS13
VWP5(6m)
CP3(6m)
PS7
PS4
GL
6m
MS2
Vwp8(9m)
MS5
CP PS
Soft Clay
PS1, PS2
Section 5
MS7
VP1, VP2,
VP3
VP9,
VP10,VP11
VP6,
VP7,VP8
Magnetic
settlement
recorder
CP1
Plate
settlement
markers
Section 1
Vibrating
wire
piezometer
Section
Combined system of
geotextile pipe formed by
boulders/gravels encased in
geotextile and band drains
laid horizontally connecting
these pipes.
Casagrande
piezometer
Horizontal Drainage
System:
3m MS
6m
9m 9m
VWP
Section 4
IN 6
Section 3
SECTION - C-C'
AREA - A
IN 8
Section 2
Section 1
Case Study for Ground Improvement Using PVD with Preloading for Coal & Iron Ore Stackyard
after
1.30
load
1.20
1.10
2.3.2 Settlements
From settlements, the degree of consolidation can be
assessed by Asaoka Method and Hyperbolic Method. By
these methods the ultimate settlement S100 is evaluated based
on the observed data. Then the degree of consolidation is
determined as,
%U =
1.40
%U =
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0
St
* 100
S100
25
50
No of Days
75
100
125
150
CP 1
175
200
CP 2
225
250
CP 3
275
300
CP 4
St:
Settlement at time t
Ultimate Settlement
S100:
Asaoka Method: This method is based on the Barrons
solution for radial drainage. From the timesettlement
curves the settlements at different time (with equal interval
t) is determined. Then the points (Si, Si-1) are plotted. The
interception of this line and the line drawn with slope = 1
gives the ultimate settlement S100.
1.30
1.20
1.10
1.00
0.90
0.80
0.70
1.40
0.60
0.50
0.40
0
25
50
No of Days
75
100
VP 2
125
150
VP 11
175
VP 10
200
225
VP 9
250
VP 8
275
300
VP 5
508
Case Study for Ground Improvement Using PVD with Preloading for Coal & Iron Ore Stackyard
25
50
75
100
125
150
175
200
225
250
275
300
Hyperbolic Method - PS 1
1.00
0.70
0.90
0.80
0.60
Time / Settlement
200
300
400
0.70
0.50
0.60
0.40
0.50
0.30
0.40
0.30
0.20
0.10
0.00
0
PS1
PS2
PS4
PS6
PS9
PS10
1.20
1.10
1.00
0.90
0.30
0.20
0.10
0.00
0
1.10
1.00
0.70
Settlements (Si)
Settlements (Si)
200
100
0
0
800
500
400
500
400
300
200
100
0
0
0 100 200 300 400 500 600 700 800
Settlements (Si-1)
Settlements (Si)
700
600
300
200
100
0.20
0
0.60
0
1.20
1.10
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0
3. CONCLUSIONS
500
400
300
800
700
600
0.30
0.70
100
0
800
700
600
400
300
200
100
0.50
Time /Settlements
500
400
300
200
800
700
600
500
Settlements (Si)
Time / Settlements
Settlements (Si)
Settlements (Si)
0.60
0.40
0.80
Hyperbolic Method - PS 10
1.20
800
700
600
Time (Days)
1.30
0.80
800
700
600
500
400
300
200
100
0
1.40
Hyperbolic Method - PS 9
1.50
0.90
0.00
0.80
0.70
Time / Settlements
No of Days
Time / Settlements
Settlement
0.10
1.00
0.90
0.60
0.50
0.40
600
0.20
Hyperbolic Method - PS 6
Hyperbolic Method - PS 4
500
Time /Settlements
100
Settlement (mm)
Hyperbolic Method - PS 2
0.80
Hyperbolic
Method
(Slope =
0.824)
Hyperbolic
Method
(Slope =
1.0)
Spacing 1.00
78115
6384
5270
Spacing 1.50
8592
3953
3243
REFERENCES
Al-Shamrani M.A., Settlement Prediction of Sabkha
Formations Using Rectangular Hyperbolic Method.
Holtz R.D., Jamiolkowski M.B., Lancellotta R. and Pedroni
R. (1991). CIRIA Ground Engineering Report: Ground
ImprovementPrefabricated Vertical drains: Design and
Performance.
Bo M.W., Arulrajah A. and Choa V. (1997). Assessment of
degree of consolidation in Soil Improvement Project,
Proc. of International Conference on Ground
Improvement Techniques, 7180.
509
Case Study for Ground Improvement Using PVD with Preloading for Coal & Iron Ore Stackyard
510