GMD Company Profile - January 2015

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

2015

GMD CONSULTANTS
COMPANY PROFILE
ROADS
AND
HIGHWAYS

BRIDGES
AND
STRUCTURES

TRAFFIC
AND
TRANSPORTATION

QUALITY
ASSURANCE &
QUALITY
CONTROL

2, Park View, Park Avenue, Sector-17, Nerul (E), Navi Mumbai-400706


www.gmdconsultants.in
+91-022-27700991, 233

Company Profile

Page |2

GMD Consultantsprovidesvalue added solutions for Engineering, Design and Project Management
requirements of infrastructure Industry. Company has its head office in Mumbai and regional office for
northern region at Panchkula, Haryana. The company was established in 2010 as GMD Consultants.
Our main area of expertise includes Traffic & Transportation, Roads, Highways, and Bridges,
Township& Industrial Premises (Infrastructure-Roads, Storm Water Drainage), Detail Engineering,
Pre-Tender Studyand Traffic& Transportation Study of infrastructure projects. Latest state of the art
software for design and modeling provide us cutting edge in terms of accuracy, conformity to
requirement, quality of output and efficiency.
We have successfully completed many Detail Engineering projects including National Highways, State
Highways and other dedicated roads, Pre-Bid assignments for DBFOT projects, Infrastructure Detail
Design for Township, Transportation Planning Assignment and Traffic Impact Studies.
We are empanelled with following government agencies / authorities for providing consultancy
services for infrastructure projects

Ministry of Road Transport & Highways, (MoRT&H)-Category-V


Haryana State Roads & Bridges Development Corporation Ltd (HSRDC) Category I
Haryana State Roads & Bridges Development Corporation Ltd (HSRDC) Category II
Haryana State Roads & Bridges Development Corporation Ltd (E-Traffic Census)
Municipal Corporation of Greater Mumbai (MCGM)
City and Industrial Development Corporation of Maharashtra Limited (CIDCO)
Goa Industrial Development Corporation
Mussoorie Dehradun Develoment Authority, Dehradun (MDDA)

WHAT WE DO
Our core area of functionality remains as Design & Project Management for infrastructure projects:

Detail Engineering Design (DPR) of highways, bridges, flyovers and other infrastructure
elements;

Detail Engineering Design of


Infrastructure of Township &
Industrial Premises Roads,
Storm Water Drainage,

Transportation Planning and


Traffic Studies for Highways,
Townships and Parking;

Highways &
Roads

Structures &
Bridges

Traffic &
Transportation

Quality
Assurance &
Control

Pre-Bid services for DFBOT


(NHAI
&
State
Highway
INFRASTRUCTURE DESIGN & PROJECT MANAGEMENT
Projects) and other BOT
infrastructure
projects
like
terminals, logistic parks etc including costing, revenue and financial model;

Project Management Services to Infrastructure Projects;

Traffic & Transportation Studies;

Quality Assurance & /Quality Control (QA / QC)

Traffic Simulation & Modeling(Vehicular & Pedestrian)

Value Engineering

GMD Consultants

Company Profile

Page |3

HOW WE DO
We use latest state of the art technology in terms of
software; best practices and sound engineering to arrive
at optimized design solution. We develop 3-D models for
design evaluations and analysis
GMD is a process based organization which have inbuilt
quality systems for all activities. It has three tier quality
systems with checks and audits at interfaces of
designer, manager and external expert. At GMD we
thrive for value based design solutions.
Designs are checked through 3-D modeling and simulation techniques for visualization and clash
detection. This approach not only enhances optimization and accuracy of design but also helps in
looking at big picture.
INFRASTRUCTURE
Technology is our forte. We possess latest software and tool for design and analysis. We are
equipped with Civil Infrastructure Design Suite (Auto
Desk) which includes CIVIL-3D and Infra Modeler.
STAAD Pro and Midas are used for structure designs.
For traffic analysis and simulation we work with VISSIM,
PARAMICS, VISSUM, Auto TRACK.

CIVIL LABORATORY
We have established a full-fledged Civil Testing Laboratory which is equipped with all moderns testing
equipment for testing. This in-house capability provides us cutting edges in terms of accuracy and
confidence in test results and also time advantage. We
have In-House capabilities for soil, materials, concrete,
asphalt testing and analysis.

GMD Consultants

Company Profile

Page |4

HUMAN RESOURSE
We are close-knit organized team comprising of young, driving, dynamic and talented achievers.
Amongus are highly experienced and skilled professionals in field ofhighways and roadstraffic
structures and transportation, wet infrastructure as Team Leaders. Their experience ranges from 20 to
30+ years. We have a talented and dedicated team of more than 20 Engineers and CAD
professionals to supporting these team leaders.
At a glance profile of Vertical Leaders with GMD is tabled as below:
Sr.
No
1

Name
Rajesh Gajjar

Qualification

Field of Experience

Managing Director

M. Tech

Civil Engineering, Traffic &


Transportation

24

Civil Engineering, Roads,


Highways Expert

22

Civil Engineering,
Infrastructure Construction
and Project Management

38

Civil Engineering,
Structures (Bridges,
Flyovers, ROBs)

33

(IITB)
2

Shailendra

Director

Mohan
3

M. Tech
(IIT,BHU)

Vinay Kapur

Director & Head-

B.E.

Regional Office
North
4

Years of
Experience

Designation

M. N. Sawant

Head -Structures

B. Tech
(IITB)

These key professionals are ably supported by senior engineers, junior engineers and CAD
professionals.
We constantly upgrade skills and knowledge base of our team by conducting regular training of
software and best practices.

GMD Consultants

Company Profile

Page |5

CLIENTS
We have privilege of successfully working with some of the market leaders as our clients. The scope
of work for included Detail Engineering of Highways & Bridges, Detail Design of Infrastructure of
Townships, Pre-Bid Study of NH, SH and other Infrastructure Projects, Traffic & Transportation
Studies and Advisory Consultancy. Our success manifests in form of repeat orders from our clients
and their referrals. Following are some of our major clients.

GMD Consultants

Company Profile

Page |6

PROJECTS
We have successfully completed a large number of projects (more than 100) in infra sector pertaining
to Roads, Traffic & Transportation, Bridges and Buildings. List of key projects is given under followed
by salient features of some flagship projects:

A. Traffic & Transportation Projects

Sr.
No.

Project Name

Client

Traffic
Management
Consultancy for
Lodha Exellencia

Lodha Group

Residential Township of
multi-storey apartments
in Mumbai

Traffic Impact Study

Completed

Parking Study,
Oberoi Oasis,
Mumbai

I Ven realty Ltd

Residential Township of
multi-storey apartments

Parking & Traffic


Demand Study

Completed

Traffic Planning
Study for ISBT at
Wadala

Pratibha
Industries

Interstate Bus Terminus


for 100 buses with
commercial component
on BOT basis

Traffic Planning Study

Completed

Traffic study for


SatnaChitrakoot SH11 for MPRDC
on BOT Basis

Topworth Infra
Pvt Ltd

75 km of state highway

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

Traffic study for


Ujjain-Jaora SH27 for MPRDC
on BOT Basis

Topworth Infra
Pvt Ltd

95 km of state highway

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

Prebid Traffic
Study for
Walahajpet to
Poonamallee on
NH-46 in state
of Tamilnadu

IRB
Infrastructure
Developers LTD

93 km National Highway

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

Prebid Traffic
Study for Jaipur
Ring Road

IRB, Jaipur
Development
Authority

60 km of Green field ring


road

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

GMD Consultants

Description

Scope

Status

Company Profile

Page |7

Pre- Bid Study


of Ahmadabad Vadodara (NH-8
& NE-1)

IRB
Infrastructure
Developers LTD

95 km of NH Expressway

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed
. IRB won
the project

Pre- Bid Study


of Udaipur Kishangarh Ahmadabad
section of NH-8

IRB
Infrastructure
Developers LTD

300 Km of National
Highway

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

10

Prebid Traffic
Study for Devas
- Shivpuri Gwalior section
of NH-3

IRB
Infrastructure
Developers LTD

Four Laning of 455 km of


national highway in MP

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

11

Traffic Study for


Palais Royale,
Worli, Mumbai

Shriram Urban
Infrastructure P
Ltd

High rise premium


apartment residential
scheme of 80 storey in
Mumbai

Traffic Planning Study


for Residential Project

On-going

12

Traffic Study for


Golf Estate,
Gurgaon

M3M

75 acre, Residential
Township of multi-storey
apartments in Gurgaon

Traffic Planning Study


for Residential Project

Completed

13

Traffic Study for


Cosmopolitan,
Gurgaon

M3M

11 acre, retail and


commercial complex in
Gurgaon

Traffic Planning Study


for Commercial cum
Retail Project

Completed

14

Traffic Study for


Urbana,
Gurgaon

M3M

12 acre, Retail,
Commercial and Multistorey SA apartments in
Gurgaon

Traffic Planning Study


for Commercial cum
Retail cum SA Project

Completed

15

Traffic Study for


Merlin, Gurgaon

M3M

14 acre, Residential
Township of multi-storey
apartments in Gurgaon

Traffic Planning Study


for Residential Project

Completed

16

Traffic Study for


Shopping Mall,
Commercial and
Retail Project,
Gurgaon

Tata Reality and


Infrastructure

14 acre, Mix use project


consisting, residential &
commercial component
in Gurgaon

Traffic Planning Study


for Mixed Use Project

Ongoing

17

Traffic Study for


Multi level car
park at Mumbai
Airport

GVK

Multi-level car park of


1200 capacity at Airport
at Mumbai

Traffic Planning Study


for Taxi Staging and
Visitor Car Park Project

Ongoing

GMD Consultants

Company Profile

Page |8

18

Traffic Study for


Mumbai Trans
Harbour Link,
Mumbai

SRUIL

22 Km sea link project


having integration of all
links of major
transportation network

Traffic Study and


Feasibility Report

19

Traffic Study for


Grand Hyatt
Hotel at Noida

Vision Town
Planners and
Developers

7 acre, 5 star Hotel


Complex at NOIDA

Traffic Planning Study


for Hotel, Service
Apartment,
Commercial, Banquet
and Retail Project

Ongoing

20

Prebid Traffic
and toll study
for Dhule to
Amravati
section of NH6
in Maharashtra

IRB
Infrastructure
Developers LTD

480 km of four Laning of


National Highway

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

21

Traffic Study for


Exhibition
Centre at GIFT,
Ahmedabad

ITME

73 acre of International
Exhibition Centre at GIFT
City Ahmedabad, Gujrat

Traffic Study for 1 lac


sqm International
Exhibition Centre
Facility with all
amenities

22

Prebid Traffic
and toll study
for Eastern
Peripheral
Expressway
(EPE) Delhi

IRB
Infrastructure
Developers LTD

135 km of green field


expressway on eastern
side of Delhi, NHAI
project

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

23

Parking study at
Matunga
Premises

Birla
Infrastructure
Pvt ltd

Residential Township of
multi-storey apartments
in Mumbai

Traffic Impact Study

Completed

24

Traffic study
One M3M,
Gurgaon

M3M

6 acre, Commercial
Complex + Multiplex

Traffic Planning Study

On going

25

Mahim Traffic
Study

Sudarshan
Consultant

Residential Township of
multi-storey apartments
in Mumbai

Traffic Impact Study

Completed

26

Pre-bid traffic
study of
Karnataka, Goa
border section
of NH 4A in
state of

IRB
Infrastructure
Developers LTD

70 km of four Laning
NHAI project

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

GMD Consultants

Completed

Ongoing

Company Profile

Page |9

Karnataka / Goa

27

Pre-bid traffic
study of
Vijayawada
Gondugalanu
section of NH-5
in the state of
Andhra Pradesh

IRB
Infrastructure
Developers LTD

104 km of six Laning of


NHAI project

Traffic survey, analysis,


growth, forecast &
Revenue modeling,
sensitivity analysis

Completed

28

Traffic Study
Township
Kharghar, Navi
Mumbai

Adhiraj
developers

50 acre, Residential
Township of multi-storey
apartments in Navi
Mumbai

Traffic Planning Study


and external
circulation design

On going

29

Namaste Traffic
Study, Parel,
Mumbai

Jaguar Buildcon
+ W Hotel
Group

12 acre, 5 Star luxury


Hotel, 363 keys + retail +
commercial Mumbai

Traffic Planning Study


and circulation design

On going

30

Traffic Study
Faridabad

HP Limited

8 acre, mixed use project


in Faridabad

Traffic Impact Study

31

Traffic Study
Bangalore on
Airport Road

Sobha
Developers

30 acre, Commercial and


retail establishment
(Mall, Offices, Multiplex
etc)

Traffic Impact Study


and circulation design

On going

32

Traffic TCS
Indore

TCS / Somaya &


Kalappa
Consultants Pvt
Ltd

100 acre, IT Park (SEZ)


with 15000 employee
capacity at Indore

Traffic Impact Study


and circulation design

On going

33

Diversion Plan
Mumbai MetroIII

MMRDA /
Shrikhande
Consultants

26 km of metro along
Mumbai Transportation
Network

Traffic diversion plan

On going

34

Traffic Study
Rivali Park,
Borivali

CCI Developers

28 acre, Residential
Township of High rise
multi-storey apartments
in Mumbai

Traffic Study of
external & internal
road, Western Express
Highway

On going

35

Traffic StudyAcme Project Andheri

Acme Builders

17 acre, Residential
Township of multi storey
apartments in Andheri,

Traffic Study of
external & internal
road

On going

GMD Consultants

Completed

Company Profile

P a g e | 10

Mumbai

36

Traffic StudyAcme Project Thane

Acme Builders

27 acre, Residential
Township of multi-storey
apartments in Thane,
Mumbai

Traffic Study of
external & internal
road

On going

37

Traffic Study
imperial Tower
4

S D Corps

Premium Residential
High-rise apartments,
Tardeo, Mumbai

Traffic Study of
external & internal
road

On going

38

Traffic Study
World Towers

Lodha Group

Residential High Rise


apartments, Mumbai

Traffic Study of
external & internal
road

Completed

39

Traffic Study
Hotel Four
Seasons Phase-II

Magus Estate &


Hotels Limited

High rise premium


apartment expansion of
five star hotel with 800
new rooms at Worli,
Mumbai

Traffic Study of
external & internal
road. Dr. E Moses Road
and Worli Naka,
Mumbai

On going

40

Traffic Study for


The Address,
Ghatkopar

Wadhwa
Residency
Private Limited

Residential High rise


apartments, Ghatkopar,
Mumbai

Traffic Study of
external & internal
roads

On going

41

Traffic Impact
Study Balkum
Thane

Kalpataru /
Enviro Analyst
and Engineers
Ltd

75 acre, Residential
Township of multi-storey
apartments in Thane,
Mumbai

Traffic Study of
external & internal
roads

On going

42

Traffic Impact
Study Panvel

Saket
Developers

7.5 acre, Residential


Township of multi-storey
apartments in Panvel,
Mumbai

Traffic Study of
external & internal
roads

On going

43

Traffic Impact
Study Mulund
Project

Ariisto
Developer

38 acre, Residential
Township of multi-storey
apartments in Mulund,
Mumbai

Traffic Study of
external & internal
roads

On going

44

Traffic Study JJ
Hospital

GES / JJ Hospital
Trust

Expansion of JJ Hospital
with New 800 bed super
specialist Hospital,
Mumbai

Traffic Study of
external & internal
roads

On going

GMD Consultants

Company Profile

P a g e | 11

45

Traffic Study of
Ariisto Harmony
Project at
Kandivali

Ariisto
Developer

42 floors - High rise


Multi- Storey apartments
at Kandivali, Mumbai

Traffic Study of
external & internal
roads

Completed

46

Traffic Study SA
and Residential
at NOIDA,

BOP / Design
Plus Architects

4.7 Acre mixed use,


Retail + multi storey
residential project with
1030 apartments at
NOIDA

Traffic Study of
external & internal
roads

On going

47

Traffic Study
Raheja
Reflection

Raheja
Universal

9 acre residential
township with more
than 900 apartments at
Kandivali, Mumbai

Traffic Study of
external & internal
roads

Completed

48

Traffic Study
Samara Nagar

Shapoorji
Pallonji

53 acre residential
township at Samtanagar,
Kandivali, Mumbai

Traffic Study of
external & internal
roads

On going

49

Traffic Study for


Kanakia Levels,
Malad

Kanakia Group

1100 apartments 33
storey High Rise
residential project at
Malad, Mumbai

Traffic Study of
external & internal
roads

On going

50

Traffic Study for


Hotel Trident at
Ghansoli, Navi
Mumbai

Reliance /
Trident Group

165 keys 5 star hotel


with banquet hall (1500
pax)

Traffic Study of
external & internal
roads

Completed

51

Traffic study
Aman Shanti
Project at
Goregaon

Indu
Constructions

14 acre, 52 floors High


Rise apartments

Traffic Study of
external & internal
roads

completed

52

Traffic study
Mangal Bhuvan
Project at Parel

Apex
Constructions

12 acre, 61 floors High


Rise apartments

Traffic Study of
external & internal
roads

completed

53

Traffic study
Raheja Mix
Development
Complex, Navi
Mumbai RICC I

Raheja
Universal

68 acre, 8 High Rise


apartments, 8 IT
Commercial towers,
12000 parking spaces

Traffic Study of
external & internal
roads

On going

54

Traffic study
Raheja
commercial
Development

Raheja
Universal

38 acre, Commercial
spaces, 1000 parking
spaces

Traffic Study of
external & internal
roads

On going

GMD Consultants

Company Profile

P a g e | 12

Complex, Navi
Mumbai RICC II
55

Traffic study
Northern
Heights, Dahisar

NRose
Constructions

22 acre, 32 floors 4
towers High Rise
apartments

Traffic Study of
external & internal
roads

On going

56

Traffic study
High Rise
Residential at
Borivali

Mighty Group

9 acre, 24 floors 2
towers High Rise
apartments

Traffic Study of
external & internal
roads

On going

57

Traffic study
Mixed use
development at
Andheri

L & T Realty

13.5 acre, 32 floors 6


towers High Rise
apartments +
Commercial + Retail

Traffic Study of
external & internal
roads

On going

58

5 Star + 3 Star
hotel project

Kamala Group

Star hotel + retail +


commercial at Lower
Parel

Traffic Impact Study

On going

59

Premium High
Rise Residential
Project Sumer
concorde

Sumer Group

Premium Apartments
tower at Prabhadevi

Traffic Impact Study

Completed

60

5 Star Hotel

Vishwagreen
Group

250 keys Star Hotel at


Nerul, MIDC

Traffic Impact Study

On going

61

Traffic Study for


Four Laning of
Panchkula
Yamunanagar
section of NH73

National
Highways
Authority of
India (NHAI)-PIU
Chandigarh

104 km of national
highway

Traffic survey, Analysis


and forecast

Completed

62

Traffic Study for


Six Laning of
ChandigarhLudhiana
section of NH21 and NH-95

National
Highways
Authority of
India (NHAI)-PIU
Chandigarh

87 km of national
highway

Traffic survey, Analysis


and forecast

Completed

63

Traffic Study for


Four Laning of
Ambala- Kaithal
section of NHNH-65

National
Highways
Authority of
India (NHAI)-PIU
Ambala

Traffic Study of 70 km of
national highway

Traffic survey, Analysis


and forecast

On going

GMD Consultants

Company Profile

P a g e | 13

B. Infrastructure Design Project


Sr. No.

Project Name

Client

DPR for SatnaChitrakoot SH-11


for MPRDC on BOT
Basis

Topworth Infra
Limited, MPRDC

Four / Two
Laning of 75 km
of State
Highway on
DBOT

Detail design, planprofile pavement,


bridges, culverts,
junctions, toll plaza,
bus bays, truck lay
byes, drainage etc

Completed

Pre-bid study for


Kolhapur - Sangli
M.S.H.3, Govt of
Maharashtra

Pratibha
Industries Limited

2/4 Lane MDR

Engineering design
and estimation of 51
km of 2-laning Major
Roads in
Maharashtra,
Revenue, Financial
Modeling

Completed

Detail design of
structures
including major
bridges and
flyovers of Panvel Indapur NH-17

Supreme/ CES

Major StructureKharpada Bridge


(813 m),
Vadkhal Flyover
(1092m)

Detail Design of
foundation,
substructure and
superstructure

Completed

DPR for UjjainJaora SH-27 for


MPRDC on BOT
Basis

Topworth Infra
Limited, MPRDC

Four / Two
Laning of 95 km
of State
Highway on
DBOT

Detail design, planprofile pavement,


bridges, culverts,
junctions, toll plaza,
bus bays, truck lay
byes, drainage etc

Completed

Detail Design
Pavement- BMC
Road

MCGM, Mumbai

City roads of
Mumbai

Detail pavement
design of more than
15 lakh SQM of of
BMC roads

On going

Detailed Design
Project
Management of
Roads and Traffic
Study

Kyan Resorts

2 km of arterial
road for hilly
township along
with retaining
structures

Kyan Resort
township 22 acres
at Karjat

Completed

Detail Design of
Culverts for Jammu
- Udhampur
Project

AFCONS, Mumbai

4 Laning of
JammuUdhampur NH

23 Nos culvert (Box,


Slab)

Completed

GMD Consultants

Project
Specification

Service Scope

Remarks

Company Profile

P a g e | 14

Detail Design of
Road from SH-10
to Vedanta
Aluminum Plant,
Jharsuguda, Orissa

AFCONS, Mumbai

Green field four


/ two lane road
with elevated
portion of 2 km
viaduct and
truck terminal

About 5 km of four
lane & two lane road
for industrial traffic

Completed

Detail Design of 6
Km long elevated
viaduct and
stations for Delhi
MRTS

AFCONS, Mumbai

6 km of metro
rail viaduct and
three stations

6 km elevated
corridor

Completed

10

Infrastructure
design of 150 acre
"Empyrean"
Residential
Township, Nagpur

Fire Arcor,
Nagpur

Four lane and


two lane roads
with footpath,
cycle track and
other facilities

Over 7 km of arterial,
sub arterial and
collector roads,
Parking

Completed

11

Infrastructure
design of 200 acre
"Empyrean"
Residential
Township,
Bangalore

Fire Luxur,
Bangalore

Four lane and


two lane roads
with footpath,
cycle track and
other facilities

Over 25 km of
arterial, sub arterial
and collector roads,
Lake front
development,
Parking

Completed

12

Infrastructure
design of 23 acre
"Grande 101" G
Corps Borivali,
Mumbai

CCI, Mumbai

Internal roads of
township

Over 5 km of arterial,
sub arterial and
collector roads,
Pedestrian High
Streets

Completed

13

Al Khor Bypass
(Qatar)

Urban planning
and Development
Authority, Qatar

6/8 lane rural


expressway

Concept design of 16
Km Rural Expressway

Completed

14

Mkeines-UMM Bab
Link Road UPDA
(Qatar)

Urban planning
and Development
Authority, Qatar

6/8 lane rural


expressway

Concept design of38


Km Rural Expressway

Completed

15

Due Diligence &


Technical Audit of
Bangalore to
Mulbagal NH-4

TRIL Roads &


AIIDPL

80 km of 4laning of NHAI
Road

Technical audit,
design review of
geometric, pavement
quality assessment,
estimate,
maintenance

Completed

GMD Consultants

Company Profile

P a g e | 15

16

Due Diligence &


Technical Audit of
Nelmangala to
Devihalli NH-48

TRIL Roads &


AIIDPL

80 km of 4laning of NHAI
Road

Technical audit,
design review of
geometric, pavement
quality assessment,
estimate,
maintenance

Completed

17

Pre-bid study of
Hyderabad Metro

AFCONS, Mumbai

Metro rail
viaduct design
and estimation

7.75 km of elevated
corridor for
Hyderabad Metro
including station
viaduct

Completed

18

Prebid study for


Ropar to Doraha
road on DBFOT

Topworth, PIDB

2 Lane state
highway along
bank of Canal

Engineering design
and estimation of 53
km of 2-laning State
Highway in Punjab

Completed

19

Pre-bid for two


Laning of NH-66
from Tindivanam
to Krishnagiri.

Gammon India
ltd, NHAI

182 km of 2
Lane NHAI road
project

Engineering design
and estimation of
182 km of 2-laning
with paved shoulder
of NH in Tamilnadu

Completed

20

Prebid for Bhopal


By-pass for MPRDC
under BOT Basis

Topworth Infra
Limited

52 km of four
lane green field
project of NHAI

Engineering design
and estimation of 52
km of 4 lane
greenfield Bhopal
bypass by MPRDC

Completed

21

Pre bid for 4 Laning of Panvel Indapur section of


NH-17 from KM 0.0
to 84.0 KM on
DBFOT Basis

TRIL Roads P Ltd


(Tata)

84 km of four
Laning project,
NHAI

Engineering design
and estimation of 84
km of 4 lane
greenfield Bhopal
bypass by MPRDC

Completed

22

Detail Design of
Delhi Gate Flyover
at Surat

Surat
Municipality /
CES

1020 m flyover
with varying
span (42 m Max)

GAD, Detail Design,


BOQ, Construction
drawings

On going

23

Detail Design of
Moorva Creek
Bridge

Pentacle

35 m RCC
integral bridge
on MMRDA
Road

GAD, Detail Design,


BOQ, Construction
drawings

On going

24

Omalur
Namakkal Due
diligence

TRIL Roads P Ltd


(Tata)

68 Km of NHAI
four lane road

Technical audit,
design review of
geometric, pavement
quality assessment,

GMD Consultants

Completed

Company Profile

P a g e | 16

estimate,
maintenance
25

CIDCO Shed design

CIDCO

70000 SQFT of
steel frame shed
at Navi Mumbai

Detail design, BOQ &


Estimates,
construction
drawings

26

Detailed design of
Pen ROB at NH-17
near Mumbai

CES

135m long ROB


on NH-17 at Pen
(Raigarh)

GAD, Detail Design,


BOQ, Construction
drawings

27

MTHL Project

Sriram Urban

22 km sea link
connecting
Sewri to Nava
Sheva in
Mumbai

Pre-bid advisory
Services

Completed

28

Pre-bid study for


Nashik - Sinnar
section of NH-50 in
Maharashtra

Pratibha
Industries Limited

4 Laning of NHAI

Engineering design
and estimation of 25
km of 4-laning NH
road in Maharashtra,
Revenue, Financial
Modeling

Completed

29

Pre-Bid For Metro


Depot

Supreme
Infrastructures

Metro depot for


Navi Mumbai
Metro Rail

Tender designs, BOQ


and estimates

Completed

30

Road Design Kochi


Township

Kochi Info Park


Limited /
Shrikhande
Consultants

5 Km of internal
road of SEZ- info
park at Kochi

Roads design
including pavement,
geometrics, signage,
tender documents
etc

On going

31

Detail Design of
external and
internal roadChembur Project

Wadhwa Group
Developers

4 Km of external
road on tunnel
and internal
roads of 40 acre
township in
Mumbai

Traffic study, detail


design of geometrics,
pavement,
estimates, tender
documents etc

On going

32

Pre- Concept
Design Logistic
Road Bangalore

Agri Gold Projects


Ltd

Concept design
of 210 km of 6/8
lane road for
logistic corridor
at Bangalore

Concept design,
estimates, typical
sections, walk thru

GMD Consultants

Completed

On going

Completed

Company Profile

P a g e | 17

33

Concept Design of
Improvement of
Shivaji Chowk
Junction at
Panjarpole,
Chembur, Mumbai

Mumbai
Metropolitan
Region
Development
Authority

Improvement of
6 legged
complicated
high traffic
junction at
Chembur,
Mumbai

Traffic Survey, Topo


survey, Concept
design of various
options and 3 D
Modeling

Completed

34

Concept Design of
Approach Road
Panvel Project

Wadhwa Group

1500 Acre
redevelopment
township

Concept Design of
access road including
railway crossing /
ROB / RUP

On going

35

Design of city
Roads

Municipal
Corporation of
Greater Mumbai
(MCGM)

Area of South
Mumbai 9
wards (A to G).
Total Km 120 km
approx

Design of flexible and


rigid (CC) roads
including traffic
study, geometry, soil
investigations and
topo survey

On going

36

Third Party Quality


Audit of Rural
Roads in Haryana
about 400 km

State Agriculture
Marketing Board
(HSAMB)

Rural roads of
six districts
approximately
1000 roads

Third party quality


inspection

On going

C. Integrated Township Projects


Sr.
No.

Project Name

UPDA Qatar Road


Packages Drainage

Client

Scope

Remarks

UPDA, Qatar

Design of Roads including Junctions, Flyovers,


Interchanges and Drainage 300 acres

Completed

Detail design of
roads, drainage and
protection works of
Kyan Club & Resorts,
Karjat
Detail design of
roads, drainage and
protection works of
IgatPuri Township

Srinathji
Construction

Detail Design of road network, junctions,


street furniture, utility corridor, drainage and
protection works and conducting traffic study
for township 21 acres

InProgress

Vaibhav Reality

Detail Design of road network, junctions,


street furniture, utility corridor, drainage and
protection works and conducting traffic study
for township 25 acres

InProgress

Detail Infrastructure
Design of Empyrean Phase II, Bangalore.

Fire Luxur
Developers Ltd

200 acre township. Detail Design of road


network, junctions, street furniture, utility
corridor, water supply, drainage, sewerage
network and plants, solid waste management,
electrical systems for township

Completed

GMD Consultants

Company Profile
5

The Empyrean Vista,


Nagpur.

Fire Arcor

"Grande 101
Township, Mumbai

G Corp
Properties

Raipur - Water
Supply and Sewerage
system Design

Naya Raipur
Development
Authority /
Buildcraft

Infrastructure Design
- Township at Khopoli

Neel Siddhi
Developers

Traffic and Road


design for Bharatiya
City, Bangalore

Bharatiya City
Developers

10

Road Design and


Realignment Study

Department of
Transport Abu
Dhabi

CONTACT

P a g e | 18

150 acre township. Detail Design of road


network, junctions, street furniture, utility
corridor, water supply, drainage, sewerage
network and plants, solid waste management,
electrical systems for township.
23 acre high rise township. Design of road
network, circulation, parking, water supply,
drainage, sewerage network and plants, solid
waste management, electrical systems and
other related infrastructure works for 23 acre
plus township at Mumbai, India

Completed

Detail Design of 1600 acres city level Water &


Sewerage Infrastructure including Pumping
main from WTP to Reservoirs, water
distribution network, reservoirs, water
pumping stations, sewerage collection
network, sewage pumping stations, Sewage
Treatment Plants, Treated Sewage Effluent
Network etc
Detail Design of road network, junctions,
street furniture, utility corridor, and
conducting traffic study for township 30
acres
126 acre township with mixed use
development incl 5 star hotel, retail,
convention centre, school, hospital and
residential units. Scope includes traffic study
and road design geometry, specs, BoQ and
estimate
Realignment of Corniche road (5km) to
enhance urban public realm, parking spaces
and social facilities, utility diversion, roads,
urban planning

Completed

DIRECTORS

Head Office:
2, Park View Society,
Sector-17, Nerul (East),
Navi Mumbai - 400706.
Phones - +91 22 27700991/233
Email: [email protected]
Web: www.gmdconsultants.in

Rajesh Gajjar
(+91 9920519933)

Shailendra Mohan
(+91 9967014586)

GMD Consultants

Completed

On-going

On going

On going

CONTACT
Regional Office (North):
Vinay Kapur (Head & Director)
House N0. 1041, Sector-11,
Panchkula -134109 (Haryana)
Phones - +91 172 4010255
Mobile - +91 7837257246
Email: [email protected]
Web: www.gmdconsultants.in

You might also like