Download as pdf or txt
Download as pdf or txt
You are on page 1of 40

Revamps for Ageing

Ammonia Plants
By;
Gerard B. Hawkins
Managing Director

Introduction
This presentation highlights some of
the retrofits that can be applied to

Safety

Environment

Reliability

Throughput

Improve efficiency
Increase production
Efficiency

Introduction

Why consider a retrofit?


Limitations
Options for retrofits
Problems and Pitfalls
GBHE Catalysts and Retrofits
Conclusions

Why Consider a Retrofit?

Plant is
Inefficient
Has poor economics
Production can be increased by
elimination of bottlenecks

Retrofits generally are more cost


effective than new plant builds

Plant Limitations

Six main areas that can limit plant


performance

Primary

Plant Limitations

Six main areas that can limit plant


performance
Convection Section

Primary

Plant Limitations

Six main areas that can limit plant


performance
Convection Section

Primary

Air Compressor
and Secondary

Plant Limitations

Six main areas that can limit plant


performance
Convection Section

Primary
Cooling, Shifts
and CO2 Removal
Air Compressor
and Secondary

Plant Limitations

Six main areas that can limit plant


performance
Convection Section
Compression

Primary
Cooling, Shifts
and CO2 Removal
Air Compressor
and Secondary

Plant Limitations
Six main areas that can limit plant performance
Convection Section
Compression

Primary
Cooling, Shifts
and CO2 Removal
Air Compressor
and Secondary

Ammonia
Synthesis

Pre-Reformers

Installation of pre-reformer helps to


de bottleneck
The primary reformer - reduced box
duty
The convection section - heat removal
Eliminates heavies/ poisons

Can increase plant rate by up to


11%
Will affect steam balance

Change Catalyst Shape and


Size

By optimizing catalyst size can


Reduce pressure drop by up to 33%
Reduce carbon formation potential

By changing to VULCAN VSG-Z101 can

Reduce ATE/CH4 slip


Reduce Tube Wall Temperatures
Reduce carbon formation potential
Optimize catalyst loading even further

Primary Reformer Re-Tube

By re-tubing reformer can generate


large benefits
Reduce pressure drop by 20%
Improve radiant efficiency
Reduce tube wall temperature
Increased plant rate by 3.5%
Further optimize catalyst loading to
generate even more benefits

Combustion Air Pre-heat

Installed on many modern plants


Has been retrofitted to many plants
Must have high stack temperature
Allows for large improvements in radiant
efficiency
Use less fuel

Can allow for plant increases


Will increase NOx levels

May require NOx reduction system

Options for Secondary Reformers

Install High Intensity


Burner Gun
Install improved
catalyst
Reduce installed
volume - up to 45%
Increase mixing volume

Add excess process air


Requires H2 recovery in
loop

VULCAN SG Delta Retrofit for Shift


Vessels

By installing a specialized support


system we can reduce pressure drop
significantly
GBHE can offer the VULCAN SG Delta
which can reduce pressure drop by 50%
Allows plant rate increases of up to
0.5%

CO2 Removal Retrofits

Can uprate CO2 removal by


Changing packing
Use more efficient solution

Either will help to reduce reboiler duties


In turn allows reduction in steam to carbon
ratio

GBH Enterprises range of catalysts are


designed to operate under these lower
steam to carbon conditions

Water Removal from Synthesis


Gas

Use either molecular sieves or ammonia


washing
Can feed synthesis gas to converter inlet
Reduces ammonia content of gas inlet
converter therefore increases production
Reduced refrigeration load
No loss of reactants in purge gas

Converter Retrofits

Convert to axial-radial or radial flow


Utilize smaller catalyst
Since reaction is diffusion limited
increases reaction rate and therefore
increased production
Can improve efficiency by 0.5-1.0 GJ/t
Must look at rest of plant

Converter exit piping and exchangers

Converter Retrofits

Often link with modifications to circulator


Reduce circulation rate and hence power
requirement
If converter already modified then can
Modify converter again

Use heat exchange rather than quench

Install high activity catalyst

VULCAN Series VSG-A101 low pressure


synthesis
Can be utilized up to 150 bara

Converter Retrofits

Further Options
Add a booster converter

Utilize when main converter has reached limit


Can achieve up to 30% capacity increases
Will need modifications to rest of the plant

Add a synthesis gas converter - for example as


done in the Uhde DPUP

Utilize when main converter has reached limit


Can achieve up to 30% capacity increases
Will need modifications to rest of the plant

Hydrogen Recovery

Can increase plant capacity by up to 5%


with no other modifications
Either
Cryogenic
Membrane

If adding excess air to the secondary then


must install hydrogen recovery
Even greater capacity increases are achievable
since methane slip has been reduced

Other Retrofits

Addition of Saturator
Fuel gas preheat
Synthesis gas machine suction
chilling
Modification of synthesis gas
machine internals
Install AGHR in parallel to existing
Waste Heat Boiler
Upgrade utilities

Other Options

There are other options


There are a number of operational
modifications that will improve plant
performance for no cost
Reduction in steam to carbon
Raising primary exit temperature
Reduce excess air/oxygen in reformer

Energy Audits will help to identify these


areas and the benefits of changing
process parameters

Plant Revamp Selector


Ammonia Capacity Increases
What capacity
increase is required ?
<5%

Front End
Catalyst change
Re-tube
New burner gun
VULCAN SG Delta
Compression/Loop
Syn gas drying
High activity catalyst
H2 recovery
Chill Syn Gas

>15%
5-15%
Front End
SC Reduction
Pre-reformer

Front End
Parallel AGHR
Re-tube
Loop
Booster converter
MUG converter

Plant Revamp Selector


Ammonia Efficiency Improvements
What efficiency improvement
is required ?
<0.1 GJ/t

>1 GJ/t
0.1-1 GJ/t

None

Front End
SC Reduction
Fuel preheat
CO2 solution change
Saturator
Chill syngas

Front End
Combustion air
preheat

Problems and Pitfalls


Contractor and Contract

Must carefully select partners


Must have domain knowledge

Design and operations

Must have correct tools


Must be able to supply correct level of detail
for study

Must select appropriate contract type


LSTK or Reimbursable
Both have advantages and disadvantages

Problems and Pitfalls


Modelling Capability

Must use correct tools


Model the whole plant using a
flowsheeting package

Must include all unit operations


Must develop a robust base case
Must validate against plant data
Must understand deviations
Then develop the retrofit case

Problems and Pitfalls


Retrofit Details

The customer and engineering contractor


must determine

Precise scope for retrofit


Responsibilities
Key deliverables
A detailed and consistent design basis
Time scale and milestones
Review schedules

Summarize as Good Project Management

Problems and Pitfalls


Design Basis

Engineering contractor must conduct on


site visit

Must work with client


Collect representative plant data
Model and understand plant data
Discuss discrepancies and eliminate
Identify bottlenecks
Identify opportunities for improvement

These form the core of the design basis

Problems and Pitfalls


HAZOPs and Commissioning

Must use systematic review method to highlight


potential problems with retrofit
HAZOPs are a well proven system
Requires time and buy in from all parties
Results as good as quality of people !
Retrofit will change plant parameters
Must update PFDs and P&IDs
Must update operating instructions
Must take additional care during start up

What Can GBHE Catalysts Offer?

GBHE Catalysts Process Technology has


developed a detailed flowsheeting package
GBHE Modelling for AMMONIA includes

Detailed primary reformer model


Models for secondary reformers, shifts, methanation and
ammonia synthesis
Can model in detail the synthesis gas machine

Unified, consistent and intelligent process


model

What Can GBHE Catalyst Process


Technology Offer?

Detail catalyst unit operation models such as the


Industry leading VULCAN REFSIM program
Also models for other catalyst unit operations
Detail non-catalyst unit operation models such as
Heat exchange programs
Finite Element Analysis
CFD modelling
One stop shop

What Can GBHE Catalysts


Offer?
Domain

Domain Knowledge

Operations
Many staff have operations
background
Troubleshooting clients plants
Design
Many staff have detailed
engineering background
Engineers work on design daily
Work with leading contractors
on front end and detailed
design issues

Knowledge

Catalysts

Consulting
Services

What Can GBHE Catalysts


Offer?

Can supply any level of detail for


retrofit
Scoping studies
Front End
What are the best options

Front End Engineering

Flowsheets and design of key components

Detailed Engineering

Design of all components of retrofit

A one stop shop for all your revamp


requirements

One Stop Shop Case Study


Re-tube Present Model
Plant
Operator

Concept
Engineer

Tube
Supplier

Detailed
Engineer

Catalyst
Vendor

No Communication

Tube
Installer

Catalyst
Handler

One Stop Shop Case Study


Re-tube One Stop Shop Model
Plant
Operator

GBHE
Concept Engineer

Detailed
Engineer

Tube
Supplier

Tube
Installer

Seamless
Minimum Cost
Maximum Benefit

Catalyst
Handler

Case Study - How GBHE Works

Strong position due to credibility from previous


work
Uprate projects
Feasibility Process Uprate study on Naphtha
115%, 130% or 150% cases
FEEP (Front End Engineering Package, what
would be needed?)
115% FEEP adopted
Option evaluations and natural gas feed
conversion
Followed by full Engineering Detail Design
Also additional design work on Desulfurization
Design Study

Conclusions

Many options for retrofitting an ammonia


plant
Must select correct options based on
Require capacity increase
Present bottlenecks

Must select the right contractor


GBHE has all the right expertise and
knowledge to develop and design retrofits