3.1.1 Forms To Be Initiated by The Contractor: Form # Title
3.1.1 Forms To Be Initiated by The Contractor: Form # Title
3.1.1
FORM # TITLE
F23
F01
F02
F03
F04
MATERIAL TRANSMITTAL
F05
F6A
SAMPLE SUBMITTAL
F6B
F07
F08
F09
F10A
F10B
F10C
F11
F12
PAYMENT APPLICATION
F13
F14
F15
F16
F17
F18
Not Used
F19
NON-CONFORMANCE NOTICE
F20
F21
SNAGGING LIST
F22
08/27/2015
7A - Content
CONTRACTOR :
DAILY REPORT
BID PACK
: BP# 8B
CONTRACTOR :
TO
REPORT NO.
: 1841-DR-0001
DATE
SHIFT WORKS :
STAFF:
T W Th F
Overcast Rain
Dust
Windy Humid
LABOUR:
POSITION
NO.
TRADE
AREA
NO.
TOTAL
EQUIPMENT (Available at site today):
TYPE
NO.
HOURS
UNIT
QTY.
Sheet 1 of 2
THIS REPORT MUST BE SUBMITTED NO LATER THAN 9:00AM THE NEXT DAY
CONTRACTOR
F1 - Daily Report
DAILY REPORT
BID PACK
: BP#8B .
CONTRACTOR
TO
DATE
ccs
ACT. NO.
REPORT NO.
ACTIVITY DESCRIPTION
ACTUAL *
START
FINISH
QTY
: 1841-DR-0001
:
LABOUR
TRADE
NO.
TOTAL
COMMENTS:
CONTRACTOR
QP's COMMENTS:
08/27/2015
Sheet 2 of 2
F2 - Daily Report
Mechanical
Electrical
BID PACK
: BP#8B ..
CONTRACTOR
TO
Plumbing
No. 1841/BP#8B/TS/Contr/QP/0001
Date:
Document No.
Rev
Document Title
TYPE +
Issued for
Approval
Ref. QP requirem
RESIDENT ENGINEER :
Date :
RECEIVED BY QP :
Date :
+ TYPE:
SD: Shop Drawings
AB: As Built Drawing
OT: Others
08/27/2015
MATERIAL TRANSMITTAL
Bid Pack:
Contractor:
: OHL-Contrack JV
Material Description:
Document No.
YES
NO
YES
NO
YES
NO
Serial
No.
Specification Reference
Section
Action:
Page
Clause
Drg Ref. /
Location
Reviewed
Checked
Date
Specification
Requirement
Contractor's Rep.
Revision
Date
Proposed
Material / Product
Received By KEO
Manufacturer /
Supplier Details
Remarks /
Attachment
Date
Approved
Comments:
A : Approved
B : Approved W/Comments
C : Not Approved
D: Commented&Resubmit
E: See Response
Civil :
Resident Engineer:
MEP :
Date
Architect :
Received By Contractor
Date
No. of copies to KEO 4(2 Original+ 2 Copy+ 1 Soft Copy) and QP 2 Copy
08/27/2015
F4 - Material Transmit
: BP#8B.
Contractor :
To
REV.:
DATED:
SPEC. REFERENCE :
SPECIFICATION REQUIREMENT
CONTRACTOR'S REPRESENTATIVE :
08/27/2015
CONTRACTOR'S PROPOSAL
REMARKS
DATE :
F5 - Comparison Sheet
SAMPLE SUBMITTAL
BID PACK
: BP#8B
CONTRACTOR :
TO
DATE :
DIVISION NO .
DESCRIPTION
DOCUMENT NO.
DATE SUBMITTED
DATE RETURNED
CONTRACTOR'S REPRESENTATIVE
APPROVED
ACTION
08/27/2015
DATE
NOT APPROVED
ARCHITECT
DATE
Project Engineer
DATE
Contractors Logo
Contractors Logo
Contractors Logo
SAMPLE SUBMITTAL
Bid Pack
Contractor
.
Bid Pack
BP#8B
:
Document No :
Date
Item Desc.
Reference.
Contractor
1841-MT-00-00001
Rev.: 0
:
:
Document No :
:
xyz
Item Desc.
Reference.
NOT
APPROVED
08/27/2015
Bid Pack
Contractor
1841-MT-00-00001
Rev.: 0
BP#8B..
:
Document No :
Rev.: 0
xyz
Item Desc.
xyz
Reference.
CONTRACTOR'S REP. :
NOT
APPROVED
APPROVED
Project Engineer
1841-MT-00-00001
Date
CONTRACTOR'S REP. :
APPROVED
Project Engineer
SAMPLE SUBMITTAL
BP#8B..
Date
CONTRACTOR'S REP. :
APPROVED
SAMPLE SUBMITTAL
NOT
APPROVED
Project Engineer
281449503.xlsx
F6B - Sample Tag
Contrac
tor
Logo
Mechanical
Electrical
PROJECT NO.
2777
CONTRACTOR
TO
Louis Berger
Architectural
Others
Plumbing
Date:
SPECIFICATION DIVISION :
Plumbing
ZONE
23
:
24-Mar-2014
SECTION:
Industrial Area
WE CONFIRM THAT THE WORK TO BE INSPECTED HAS BEEN COORDINATED WITH ALL RELATED SUB-CONTRACTORS AND DIRECT
CONTRACTORS:
Specific Trade :
Sign :
Civil/Architect
Electrical
Mechanical
MEP Coordinator
QA/QC Engineer
26-Mar-2014 @ 8:15 AM
ALAIN ZAILAH
RECEIVED BY LB:
REPLY :
19-Mar-14
A : Approved
C : Not Approved
Initials
LB Resident Engineer
RECEIVED BY CONTRACTOR :
Date
08/27/2015