QATAR FOUNDATION EDUCATION CITY

3.1.1

FORMS TO BE INITIATED BY THE CONTRACTOR:

FORM # TITLE
F23

BID PACK NUMBER, NAME AND CONTRACTOR

F01

DAILY REPORT (SHEET 1)

F02

DAILY REPORT (SHEET 2)

F03

PROJECT TRANSMITTAL NOTE

F04

MATERIAL TRANSMITTAL

F05

SPECIFICATION COMPARISON SHEET

F6A

SAMPLE SUBMITTAL

F6B

SAMPLE SUBMITTAL TAG

F07

REPORT ON CONCRETE CASTING AT SITE

F08

REQUEST FOR INSPECTION / TESTING

F09

REQUEST FOR INFORMATION

F10A

CONTRACTOR'S WEEKLY DRAWING SUBMITTAL LOG (SHEET 1)

F10B

CONTRACTOR'S WEEKLY DOCUMENT SUBMITTAL LOG (SHEET 2)

F10C

CONTRACTOR'S WEEKLY MATERIAL SUBMITTAL LOG (SHEET 3)

F11

CONTRACTOR'S WEEKLY MATERIAL PROCUREMENT LOG

F12

PAYMENT APPLICATION

F13

MATERIAL DELIVERED TO SITE

F14

REPORT OF PUBLIC LIABILITY ACCIDENT

F15

CONTRACTOR'S REQUEST TO WORK OUTSIDE NORMAL WORKING HOURS

F16

REQUEST FOR HOLD POINT APPROVAL

F17

SAFETY VIOLATION REPORT

F18

Not Used

F19

NON-CONFORMANCE NOTICE

F20

REQUEST FOR SNAGING

F21

SNAGGING LIST

F22

SPARE PARTS LIST

08/27/2015

7A - Content

BID PACK NUMBER :


BID PACK NAME :

CONTRACTOR :

QATAR FOUNDATION EDUCATION CITY

DAILY REPORT
BID PACK

: BP# 8B

CONTRACTOR :
TO

REPORT NO.

: 1841-DR-0001

DATE

: M/s Qatar Petroleum


DAY S S
WEATHER Sunny Clear
TEMP. C:

SHIFT WORKS :
STAFF:

T W Th F

Overcast Rain

Dust

Windy Humid

LABOUR:
POSITION

NO.

TRADE

AREA

NO.

TOTAL
EQUIPMENT (Available at site today):
TYPE
NO.

HOURS

MATERIAL (Delivered to site today):


TYPE

UNIT

QTY.

Sheet 1 of 2
THIS REPORT MUST BE SUBMITTED NO LATER THAN 9:00AM THE NEXT DAY

QP VERIFICATION & SIGNATURE


KEO International Consultants
08/27/2015

CONTRACTOR
F1 - Daily Report

QATAR FOUNDATION EDUCATION CITY

DAILY REPORT
BID PACK

: BP#8B .

CONTRACTOR

TO

: M/s Qatar Petroleum

DATE

ccs
ACT. NO.

REPORT NO.

ACTIVITY DESCRIPTION

ACTUAL *
START
FINISH

QTY

: 1841-DR-0001
:

LABOUR
TRADE
NO.

TOTAL
COMMENTS:

* The Actual Dates that the Activity started & Finished.


To be used when updating the Construction Schedule.
THIS REPORT MUST BE SUBMITTED NO LATER THAN 9:00AM THE NEXT DAY

CONTRACTOR
QP's COMMENTS:

QP VERIFICATION & SIGNATURE

08/27/2015

Sheet 2 of 2

F2 - Daily Report

QATAR FOUNDATION EDUCATION CITY

PROJECT TRANSMITTAL NOTE


Civil

Mechanical

Electrical

BID PACK

: BP#8B ..

CONTRACTOR

TO

: M/s Qatar Petroleum (2org+2copy)

Plumbing
No. 1841/BP#8B/TS/Contr/QP/0001
Date:

WE ARE SENDING HEREWITH THE DRAWINGS LISTED BELOW.


S. No.

Document No.

Rev

Document Title

TYPE +

Issued for

Approval

Ref. QP requirem

RESIDENT ENGINEER :

Date :

RECEIVED BY QP :

Date :

+ TYPE:
SD: Shop Drawings
AB: As Built Drawing
OT: Others

08/27/2015

MT: Material Transmittal


DT: Document Transmittal

F3 - Project Transmittal Note

QATAR FOUNDATION EDUCATION CITY

MATERIAL TRANSMITTAL
Bid Pack:

: BP#9 Design and Construction of Sidra.

Contractor:

: OHL-Contrack JV

Material Description:

Document No.

1- Supplier / Manufacturer from Preferred Vendors list :

YES

NO

2- Submittal Complies with Project Specification:

YES

NO

3- Submittal Endorsed and Approved by Consultant:

YES

NO

Serial
No.

Specification Reference
Section

The above referred materials


/products are submitted for
Review.

Action:

Page

Clause

Drg Ref. /
Location

Reviewed

Checked

Date

IF"NO" Submit prequalification endorsed by Consultant for Client Approval

IF"YES" attach endorsement by Consultant

Specification
Requirement

Contractor's Rep.

Revision

Date

Proposed
Material / Product

Received By KEO

Manufacturer /
Supplier Details

Remarks /
Attachment

Date

Approved

Comments:

A : Approved
B : Approved W/Comments

C : Not Approved
D: Commented&Resubmit
E: See Response
Civil :

Resident Engineer:

MEP :
Date

Architect :
Received By Contractor

Date

No. of copies to KEO 4(2 Original+ 2 Copy+ 1 Soft Copy) and QP 2 Copy
08/27/2015

F4 - Material Transmit

QATAR FOUNDATION EDUCATION CITY

SPECIFICATION COMPARISON SHEET


Bid Pack

: BP#8B.

Contractor :
To

REV.:

DATED:

SPEC. REFERENCE :

: M/s Qatar Petroleum

SPECIFICATION REQUIREMENT

CONTRACTOR'S REPRESENTATIVE :

08/27/2015

TRANSMITTAL NO. : 1841-SCS-0001

CONTRACTOR'S PROPOSAL

REMARKS

DATE :

F5 - Comparison Sheet

QATAR FOUNDATION EDUCATION CITY

SAMPLE SUBMITTAL
BID PACK

: BP#8B

NO. : (Document No.)

CONTRACTOR :
TO

DATE :

: M/s Qatar Petroleum

DIVISION NO .

DESCRIPTION

DOCUMENT NO.

DATE SUBMITTED

DATE RETURNED

CONTRACTOR'S REPRESENTATIVE

APPROVED

ACTION

08/27/2015

DATE

NOT APPROVED

ARCHITECT

DATE

Project Engineer

DATE

F6A - Sample Submittal

Contractors Logo

Contractors Logo

Contractors Logo

THE EDUCATION CITY PROJECT

THE EDUCATION CITY PROJECT

THE EDUCATION CITY PROJECT

SAMPLE SUBMITTAL

Bid Pack
Contractor

.
Bid Pack

BP#8B
:

Document No :
Date

Item Desc.

Reference.

Contractor
1841-MT-00-00001

Rev.: 0

:
:

Document No :
:

xyz

Item Desc.

Specs. Xxxxx or BOQ etc

Reference.

NOT

APPROVED

08/27/2015

Bid Pack
Contractor

1841-MT-00-00001

Rev.: 0

BP#8B..
:

Document No :

Rev.: 0

xyz

Item Desc.

xyz

Specs. Xxxxx or BOQ etc

Reference.

Specs. Xxxxx or BOQ etc

CONTRACTOR'S REP. :

NOT

APPROVED

APPROVED
Project Engineer

1841-MT-00-00001

Date

CONTRACTOR'S REP. :

APPROVED
Project Engineer

SAMPLE SUBMITTAL

BP#8B..

Date

CONTRACTOR'S REP. :

APPROVED

SAMPLE SUBMITTAL

NOT
APPROVED

Project Engineer

281449503.xlsx
F6B - Sample Tag

QATAR FOUNDATION EDUCATION CITY

Contrac
tor
Logo

REQUEST FOR INSPECTION / TESTING


Civil/Structural

Mechanical

Electrical

PROJECT NO.

2777

CONTRACTOR

M/s. Construction Development Company

TO

Louis Berger

Architectural

Others

No. 2777-RFIT-08-00008 REV. 1

CCS ACTIVITY No. :


TYPE

Plumbing

Date:

SPECIFICATION DIVISION :
Plumbing

ZONE

23
:

24-Mar-2014

SECTION:

Industrial Area

AREA / LOCATION / SUBJECT:


Sample Consumable Material Approval for Fire Fighting System - 1) Bolts, Nuts (thread long hex nuts & ordinary nuts), & Flat Washers
Manufacturer: Haiyan Dayu, China

WE CONFIRM THAT THE WORK TO BE INSPECTED HAS BEEN COORDINATED WITH ALL RELATED SUB-CONTRACTORS AND DIRECT
CONTRACTORS:
Specific Trade :
Sign :

Civil/Architect

Electrical

Mechanical

MEP Coordinator

QA/QC Engineer

ESTIMATED QUANTITY OF WORK:


DATE&TIME INSPECTION REQUIRED :
CONTRACTOR :

26-Mar-2014 @ 8:15 AM

ALAIN ZAILAH

RECEIVED BY LB:

REPLY :

DATE & TIME:

19-Mar-14

DATE & TIME:

A : Approved

C : Not Approved

Initials

LB Resident Engineer

DATE & TIME:

RECEIVED BY CONTRACTOR :

DATE & TIME:

Date

*Submit at least 24 hours before its commencement*

08/27/2015

Revised RFIT Form