HMWSSB Presentation PDF
HMWSSB Presentation PDF
HMWSSB Presentation PDF
SEWERAGE BOARD
WATER SUPPLY
Length of Distribution Network
Installed Capacity of
Treatment System
: 6780 Km
No of Connections
: 7.92 Lakhs
Monthly Revenue
: Rs.62 Crores
Population Served
: 90.00 Lakh
: 1078 Nos
: 6098 Nos.
: 6599 Nos.
: 340 MGD
572 Kms.
3500
1.72 Lakh
750 MLD
1250 MLD
80
60
90
Osmansagar
Himayathsagar
Manjeera
Singur
2007
15
90
38
2004
15
37
1993
Year
1920
30
1991
25
1981
20
1965
40
1927
Capacity in MGD
100
Krishna
Source
Year
Commissioned
Normal
drawls
(in MGD)
Present
drawls
(in MGD)
Osmansagar
1920
25
23
Himayathsagar
1927
15
17
45
45
75
75
Krishna Project
90 & 90
180
340
340
Back Ground:
A beginning was made in the year 1931, for development of sewerage
system in Hyd & Secbad, covering an area of 54 Sqkm. for a population of
4,68,000
Later Developments:
Old City:
A & H&L mains laid with laterals, (sewage is carried through a siphon at
Chadarghat and outfall sewer to Amberpet Treatment Plant).
New City & Secbad:
K&S trunk sewer from IDPL to Amberpet, and Kalasiguda Main from
Secbad Station to Hussainsagar surplus nala to join K&S main.
Cap (Mld)
Length (Km)
62
4.93
53
1.95
Cap (Mld)
Length (Km)
362
18.50
30
5.00
Construction of Nalas
Afzal Sagar Nala
Balkapur Channel
Premnagar Drain
Ameerpet Nala
Amberpet Tank & Nagamaiah Kunta Nala
Hussainsagar Nala
Murki Nala
Panja Gutta Nala
Surplus course of Panjagutta Nala
Yousufguda Nala
Hyderabad Water Supply & Sanitation Project (WB Aided):
{Cost Rs.42.00 Cr - Commissioned during-98}
at -
I&D structures
10
13
15
18
19
20
Total
Rs.234.958 Cr
Rs.100.697 Cr
------------------Rs.335.655 Cr
------------------Sep2004
2009
Rs.400.28 Cr.
21
22
STPs LOCATIONS
NALLACHERUVU
STP
AMBERPET
STP
ZIAGUDA
NAGOLE
STP
MUSI RIVER
ATTAPUR
STP
NANDIMUSALAI
GUDA
23
9
8
6
1
5
2
4
MUSI RIVER
3
16
12
10
13
14
11
15
24
9
8
6
1
2 ZIAGUDA
AMBERPET
NALLACHERUVUSTP
RAMANTAPUR
MAIN(8.0Km)
STP
4
DUP NIS MAIN (4.0Km)
MUSI RIVER
NAGOLE STP
16
ATTAPUR STP
NANDIMUSALAIGUDA
13
10
11
12
14
15
25
STP Location
Capacity
Status
Amberpet
339 Mld
Nagole
172 Mld
Nallacheruvu
30 Mld
Attapur
51 Mld
26
Conveying Main
Size
Length
Status
NIS Main
1800 mm
4.00 Km
Completed
SIS Main
2000 mm
13.51 Km
Completed
Ramanthapur Main
1000 mm
8.00 Km
Completed
Bahadurpura Main
1000 mm
5.36 Km
Completed
27
Location of I & D
Capacity
(Mld)
Type
Status
Puranapool Pumping
Stn.
4.00
Pumping
Completed
Puranapool
15.00
Gravity
Completed
Afzal Sagar
20.00
Pumping
Completed
Patel Nagar
8.47
Gravity
Completed
Puranapool South
5.00
Gravity
Completed
Puranapool Part-II
5.00
Gravity
Completed
Muslimjung
5.00
Gravity
Completed
High Court
10.00
Gravity
Completed
28
Location of I&D
Capacity
(Mld)
Type
Status
Saroornagr
30.00
Gravity
Completed
10
Murki Nala
45.00
Gravity
Completed
11
Ramanthapur
10.00
Gravity
Completed
12
Surplus Nala
80.00
Pumping
Completed
13
Bapughat
30.20
Gravity
Completed
14
Mughalkanala
16.70
Pumping
Completed
15
Bahadurpura
37.60
Pumping
Completed
16
Golnaka
6.15
Pumping
Completed
29
The sewage is treated to river disposable standards and being let into
river musi, thereby improvement in the river hydrology and environs
The sewage entering into musi through 16 open nalas have been
intercepted and being conveyed to the STP of respective catchment's
area.
Trunk conveying mains of 1200 mm - 2000 mm dia have been laid for the
above purpose
EXHIBITS OF COMPLETED
COMPONENTS OF THE PROJECT
31
32
FAL - Aerator
33
34
Chlorine Mixing Tank
UASB Reactors
FAL
Polishing Pond
Distribution Boxes
36
Afzalsagar
Puranapool
Patelnagar
37
Puranapool
Muslimjung
Puranapool Part-II
38
CONVEYING MAINS
40
PROPOSED
NRCD PROJECT PHASE-II
(Abatement of Pollution of River Musi)
41
2024 - 2044 -
926 Mld
1324 Mld
43
44
9.7 Mld
At chainage 4.5 Km
96.4Mld
At chainage 12 Km
472.8 Mld
At chainage 15 Km
716.2 Mld
At chainage 28 Km
949.54 Mld
45
46
Proposals of STPs:
The entire Musi river catchment in the limits of GHMC has been
divided into 10 sub-catchments locating the STPs for easy
collection of sewage, treatment and disposal.
The total quantity of sewage proposed to be treated at all
locations is 610 Mld.
The details of proposed location of STPs & capacities.
Location of STP
Amberpet
Nagole
Nallacheruvu
Hydershakote
Attapur
Miralam
Fathenagar
IDPL Township
Nagaram (Kapra)
Kuntlur (Hayathnagar)
Capacity in Mld
142
140
80
30
70
6
30
59
29
24
47
Location
Length
In Km
Size
(in mm)
4.64
1600 2200
From
Saroornagar I&D
To
STP Nagole
4.03
1600
1.40
Triplicate SIS
Budha Bhavan
Fever Hospital
Fever
Hospital
Surplus Nala
Bapughat
Nallacheruvu
23.30
Kukatpally Y
Junction
IDL, Kukatpally
Fatehnagar
8.35
2.5 x 2.5 M
Duct
2.0 x 2.0 M
2.5 x 2.5 M
3.0 x 3.0 M
Duct
600 1100
Balanagar
10.50
800- 1400
Qutubullapur
IDPL Colony
12.76
600 - 1400
Triplicate NIS
4
5
IDPL Mains
Nagaram Main
Kapra Cheruvu
Nagaram STP
8.00
800 1100
Nacharam Main
Nacharam
Nallacheruvu
STP
1.72
1000
48
49
Components
Tentative
DPR Cost
(in Crores)
Land Acquisition
18.00
3.22
3(a)
84.43
3(b)
474.83
263.38
Sub-total
843.86
4
5
24.77
54.34
TOTAL COST
922.97
50