EXECUTIVE SUMMARY
IFFCO Phulpur unit is committed to use the energy in the most efficient way. "Energy
Conservation" is a major objective for IFFCO as such, and more so, for Phulpur Unit.
This has enabled to run the 1980 vintage Naphtha based Ammonia Plant of PhulpurI with better performance level even after 35 years of operation. Ammonia plant of
Phulpur-II, a new generation Naphtha based plant of late nineties, has been
continuously improving its performance by implementing several modifications and
by adopting best operating philosophy. IFFCO Phulpur Unit is continually striving to
be the lowest energy consumer in the fertilizer industry. To achieve the goal several
energy saving schemes have been adopted earlier like change-over of naphtha feed
to natural gas in 2006. After 2006, a number of energy conservation schemes have
been identified and planned to implement in stages under the Energy Saving Project
(ESP). The present project of energy saving scheme is one of them.
1.1
PROJECT LOCATION
IFFCO Phulpur is located at Phulpur Tehsil in Allahabad District of Uttar Pradesh. The
site is located at a distance of 30 km North East of Allahabad city on the UP state
highway no. 7, connecting Allahabad to Jaunpur and Gorakhpur. Phulpur, which is a
Tehsil, is about 6 km away from the site and is linked with Broad Gauge Rail link on the
Varanasi-Allahabad route.
The project is limited to installation of energy saing scheme which includes installation of
GT-HRSG Co-generation Plant having capacity of 23 MW and will be located near UreaI. The project will be implemented on an area of 4800 m2 (60mx80m) within Phulpur
Fertilizer Complex, which is spread over an area of about 432.2 Ha of land.
1.2
The scope of Feasibility Study was aimed at to reduce the specific energy consumption
of Urea by about 0.60 Gcal per MT at Phulpur Fertiliser Complex. To achieve the target,
the following energy saving schemes has been considered at each Unit:
1 of 39
1.2.1
2.
3.
4.
5.
Installation of Fuel gas Expander with inter and after pre-heaters and
bypass arrangement
Installation of VAM for Process Air Compressor Suction Chilling
6.
7.
8.
9.
10
1.
11
Urea-I
1.
2.
3.
1.2.2
2.
3.
2 of 39
4.
Installation of Fuel gas Expander with inter and after pre-heaters and
bypass arrangement
Urea-II
1.2.2
1.
2.
3.
Design basis
(ii)
(iii)
Process flow diagram for all section of the plants. The PFD shall be prepared
for design condition
(iv)
(v)
Engineering Process Specifications and data sheet for new and modified
equipments
(vi)
Details of Tie-in points for taking tapping in plant turn-around marled on PIDs
(vii)
(viii)
(ix)
(x)
First edition of P&I diagrams for all new and modified sections of the plants
The P&I diagrams shall show nominal diameters and medium symbols, walls
and instrumentation, i.e., control loops and measuring points, control logic
and analyzers, etc. Details of changes and modifications to the safety interlock trip systems for new and modified parts shall be shown in separate
diagrams.
(xi)
Line list for new and modified piping based on existing pipings class
specifications.
(xii)
(xiii)
3 of 39
(xiv)
Proposed modified plot plan showing the general layout for all new and
modified section of the plant
(xv)
Marked up existing plot plan showing the available area for the new
equipments
(xvi)
(xvii)
Trip interlock logic diagram of new and modified sections showing trip set
points, alarm annunciation and set points & delay time and manual reset.
(xviii)
Data sheet for new and modified control valves and new safety valves
(xix)
(xx)
(xxi)
(xxii)
Operating Manual / guidelines for the new installations and their integration in
existing plants, highlighting normal operations, start-up and shut-down
operations were modified after revamping.
1.2.2
1.
2.
3.
4.
5.
6.
7.
8.
Plant
Estimated
Cost
(Rs. Lakh)
Ammonia
13600
Ammonia
500
Ammonia
3200
Ammonia
950
Ammonia
800
Ammonia
600
Ammonia
1600
Ammonia
800
4 of 39
9.
10.
Ammonia
Urea
2500
1100
11.
Urea
800
12.
Urea
600
13.
SGP
21000
SGP
6000
Ammonia
4500
14.
15
16.
58550
17.
Contingency
1585
18.
Total
60135
Phulpur-II
S.No.
1.
2.
3.
4.
Plant
Estimated
Cost
(Rs. Lakh)
Ammonia
4000
Ammonia
13600
Ammonia
1200
Ammonia
3200
5.
Urea
8000
6.
Urea
950
7.
Urea
1000
8.
Sub Total
9.
Contingency
10.
Total
31950
950
32900
5 of 39
1.3
The ESP will be implemented in two Phases. Energy savings schemes which are having
high energy savings potential and required relatively short lead time will be implemented
in during 2016 turnaround and while the complete project will be completed in 2017
turnaround.
1.5
Sr No
Units
1.
Phulpur-I
Equipment Cost
(including 3%
Contingency)
601.35
BEDP
DEDP
Total
19
627.35
2.
Phulpur-II
329.00
16
349.00
3.
TOTAL
930.35
35
11
976.35
The overall saving in Urea specific energy at each Unit and the financial analysis will be
as under:
Particulars
Urea Plant Capacity
Energy Saving
Estimated Investment
Monetary Savings
Payback
1.6
UNIT
MTPD
Gcal/MT
Rs Crore
Rs Crore
Years
P-I
2115
0.947
627.35
151
4.16
P-II
3030
0.386
349
97
3.60
Total
5145
0.467
976.35
248
3.94
0.109 MMSCMD
Coal
525 MTPD
Water
2,760 m3/day
6 of 39
1.7
It will decrease the dependency of IFFCO, Phulpur unit over UPSEB grid during
shortage of power generation
It will reduce the consumption of natural resources viz. water, coal & NG
which in turn will have positive impact on environment
It will check the import possibility of fertilizers to some extent and yield national
savings
Installation of new Ammonia Storage tank (double wall double integrity) is as a part
of reliability improvement in storage technology as per one of the best available
technology.
The reduction of green house gas emissions from the stack will contribute to
INTENDED
NATIONALLY
DETERMINED
CONTRIBUTION
(INDC)
under
UNEPCCC.
7 of 39
1.8
Conclusion
As energy cost is increasing with passage of time, it is prudent to take the measures to
save the energy at each location of IFFCO Plants. It is always the endeavour of
IFFCOs top management to adopt the latest available and proven technology for
improving the productivity of the Society. With the efforts taken by IFFCO management
in the past, the IFFCO Plants are running at comparable energy consumption with
global benchmarks. The proposed Energy Saving Project (ESP) will further reduce the
energy consumption at all the Nitrogenous fertiliser Units. With implementation of
Energy Saving Project (ESP), the overall urea specific energy will be reduced by about
0.60 Gcal per MT of Urea with payback of 3.94 Years. Thus, there will be reduction in
the emission levels from each Plant with implementation of Energy saving project due
to reduction in consumption of natural gas, coal, and imported power.
The ESP is simply a change-over scheme without any change in production rate. For
this type of project, EIA Notification 2006 is also silent on preparation of EIA report and
issuance of EC. Further, it would not be out of place to mention here that the area
around IFFCO Phulpur has never been identified as CRITICALLY POLLUTED
AREA / ZONE by CPCB. Further, the ESP fulfills the IFFCO policy related to
protection & safe guard of environment and measures for energy conservation. It
fulfills the aims & objective of EIA.
Considering the above facts, it requires a critical review with due diligence regarding
exemption of Public Hearing and preparation of EIA report in generic form for grant of
EC.
8 of 39
2.0
INTRODUCTION
2.1
IFFCO Phulpur unit is committed to use the energy in the most efficient way.
Energy Conservation is a major objective for IFFCO as such, and more so, for
Phulpur Unit. This has enabled to run the 1980 vintage Naphtha based Ammonia
Plant of Phulpur-I with better performance level even after 35 years of operation.
Ammonia plant of Phulpur-II, a new generation Naphtha based plant of late
nineties, has been continuously improving its performance by implementing
several modifications and by adopting best operating philosophy. IFFCO Phulpur
Unit is continually striving to be the lowest energy consumer in the fertilizer
industry. In 2006, naphtha feed has been changed to natural gas to reduce the
carbon load under strategic plan for carbon reduction. Since then, a number of
energy conservation schemes have been identified and planned to implement in
stages under the Energy Saving Project (ESP).
Unit
Phulpur-I
Phulpur-II
Total
MTPD
2115
3030
5145
Ammonia Production
MTPD
1215
1740
2955
9 of 39
Existing 12.5 MW Turbo Generator (TG-1) is in operation in Phulpur-I Power Plant for
more than 34 years and is prone to frequent maintenance due to ageing. Keeping in
view the technological advancements and the fact that Gas Turbine (GT) in cogeneration cycle is more efficient than Turbo Generator (TG), Turbo generator (driven by
steam turbine) will be replaced by Gas Turbine. IFFCO Phulpur Unit also intended to
install GT-HRSG co-generation plant having capacity of 23 MW Power at 11 KV and 60
MT/hr HP Steam at 116 bar g pressure & 520+/-5 0C temperature.
2.2.2
Proposed Schemes
2.2.2.1
5.
Installation of Fuel gas Expander with inter and after pre-heaters and
bypass arrangement
Installation of VAM for Process Air Compressor Suction Chilling
6.
7.
8.
9.
10.
New Parrallel Methanator Effluent cooler (115-c) & BFW Header (145C)
Installation of new Ammonia storage tank (double wall double
integrity), Capacity: 10,000 MT
4.
11.
Urea-I
1.
2.
3.
10 of 39
2.2.2.2
2.
3.
4.
Urea-II
1.
2.
3.
Project Proponent
11 of 39
years, IFFCO has today emerged as a unique cooperative of the farmers, for the
farmers and by the farmers.
IFFCO Phulpur-I (P-I) Unit was commissioned in the year 1981. Phulpur-I Unit consists
of 1215 MTPD Ammonia plant based on M W Kellogg, USA Process Technology and
2115 MTPD Urea Plant based on Snamprogetti, Italy Process Technology.
Subsequently, Phulpur-II (P-II) Unit was commissioned in the year 1997. Phulpur-II
Unit consists of 1740 MTPD Ammonia plant based on Haldor Topsoe, Denmark
Process Technology and 2x1515 MTPD Urea Plant based on Snamprogetti Process
Technology. The Phulpur Complex have all the associated offsite and utilities facilities
The raw water demand is being met by own borewells and gas is available through
HBJ pipeline of GAIL. Final prilled urea product is being transported through rail
network and also by road to the final destination as per Government of India despatch
plan. Therefore, the entire infrastructure is available at the present Phulpur plant site.
Phulpur Unit has always put its best efforts for conserving water. The effluent
generated in the plant is recycled back after purification in Reverse Osmosis Plant.
Even the sewage water generated in the township is reused in the plant after treatment
in sewage treatment plant. The plant is running on zero effluent discharge and total
recycle basis. The present specific water consumption is one of the lowest among the
fertiliser industry in the country. Plant and its township have ISO 14001 certification
which speaks volumes about its environmental commitment. The complex has won
number of awards for its environment improvement efforts.
Energy Conservation Commitment and Policy
As energy contributes more than 80% of cost of production and sharp rise in energy
cost, energy conservation receives top priority at IFFCO Phulpur.
Major projects Implemented during recent past
1.
2.
3.
12 of 39
4.
5.
6.
7.
Due to stringent efforts, IFFCO Phulpur Unit has bagged a number of awards detailed
below:
a)
IFFCO Phulpur Unit bags 15th Annual Greentech Environment Award 2014
b)
IFFCO Phulpur Unit bags Indira Gandhi Paryavaran Puraskar 2011 which was
conferred on 2nd February 2015.
c)
IFFCO Phulpur Unit bags Environment Protection Award for the year 2013-14 by
FAI, New Delhi.
d)
IFFCO Phulpur Unit bags 2015 IFA Grean Leaf Award by International Fertiliser
Industry Association, Paris, France.
e)
f)
g)
h)
IFFCO - Phulpur Unit, has received "National Award for Excellence in Energy
Management -2012" ,by Confederation of Indian Industry (CII).
i)
IFFCO- Phulpur-I Unit has been awarded Runner-up trophy for "Best Production
Performance Award for Nitrogenous Fertiliser Plant - 2010" by Fertiliser
Association of India (FAI).
13 of 39
and the unit has been accredited with ISO 14001:2004 Certification. IFFCO
Phulpur has received ISO 14001: 2004 Certification for:
Factory Premises.
Moti Lal Nehru Farmers Training Institute, Phulpur located nearby the
factory.
2.2
DESCRIPTION OF PROJECT
The project proposal includes installation of Gas Turbine (GT) in place of Steam Turbine
(ST) as well as installation of Heat Recovery Steam Generation (HRSG). The project will
reduce fuel (NG & Coal) consumption thereby resulting in reduction in generation of solid
and liquid waste.
Overall energy savings for above schemes has been envisaged as 0.947 GCal/MT
urea and 0.386 GCal/MT urea for Phulpur-I and Phulpur-II plants respectively.
Raw Material Consumption at Present
Table- 1.2
Status of Raw Material Consumption & Urea Production at IFFCO, Phulpur
Particulars
Unit
Phulpur-I
Phulpur-II
Total
MTPD
2115
3030
5145
Feed NG
SM3/day
819450
1124816
1944266
Fuel NG
SM3/day
350062
655203
1005265
Coal
MT/day
784.6
784.6
Fuel to SG
SM3/day
36000
248650
284650
Ammonia Energy
Gcal/MT
8.692
7.197
7.811
Urea Energy
Gcal/MT
6.305
5.390
5.751
Urea Production
14 of 39
Table- 1.3
Savings of Raw Material Consumption
Particulars
Phulpur Complex
Natural Gas
0.109 MMSCMD
Coal
525 MTPD
Water
2,760 m3/day
The water consumption after completion of the project, will be met by existing sources
i.e. from deep bore well. The present requirement of fresh water is about 32,00035500 m3/day. Fresh water consumption will be reduced by 2,760 m3/day after the
project completion and operating the modified unit.
2.2.1
Sr No
Units
1.
Phulpur-I
Equipment Cost
(including 3%
Contingency)
601.35
BEDP
DEDP
Total
19
627.35
2.
Phulpur-II
329.00
16
349.00
3.
TOTAL
930.35
35
11
976.35
2.3
It will decrease the dependency of IFFCO, Phulpur unit over UPSEB grid during
shortage of power generation
It will reduce the consumption of natural resources viz. water, coal & NG which in
turn will have positive impact on environment
15 of 39
It will check the import possibility of fertilizers to some extent and yield national
savings
Installation of new Ammonia Storage tank (double wall double integrity) is as a part
of reliability improvement in storage technology as per one of the best available
technology.
The reduction of green house gas emissions from the stack will contribute to
INTENDED
NATIONALLY
DETERMINED
CONTRIBUTION
(INDC)
under
UNEPCCC.
2.4
(000 tonnes)
Urea Demand
25360
26275
27135
27945
28755
29733
30744
31789
32870
33987
16 of 39
2.4.1
Additional Capacity
2011-12
28755
2012-13
29733
2014-15
31789
20000
20000
20000
20000
20000
1652
2560
1652
2560
1652
2560
1652
2560
1652
2560
24212
24212
24212
24212
24212
17 of 39
There is almost 3-4 lakh tones of urea demand per annum for manufacturing of
complex fertilizers and for exports to neighbouring countries like Nepal, Myanmar etc.
This will increase the projected deficit level of urea further.
The projected deficit level of about 46 lakh tonnes of urea by 2011-12 is based on
certain assumptions on the demand as well as supply side. On the supply side, a
critical assumption is that the existing installed capacity is not only retained in good
working condition but is also able to maintain the high capacity utilization levels. As
much as 35 lakh tonnes of urea capacity is from plants based on costlier feedstock
such as naphtha/ fuel oil. It would call for change over of feedstock, if the Country were
to continue to have this much capacity available for production. Even the gas based
plants commissioned in 1980s and thereafter would call for timely revamping and
retrofitting to ensure that they are able to maintain present operating rates and low
energy consumption.
2.4.3
Import of Urea
The quantity of urea available for international trade is limited. The analysis of past 15
years data reveal that increase and decrease in the world export supply or import
demand by 10 million tonnes has led to violent fluctuations in the prices from US$ 70 to
US$ 600 per tonne of urea. This variation in prices is basically due to changes in the
output by either low cost exporters or swing producers who account for about 6
million tonnes of world trade. Low cost producers are export oriented facilities based on
low cost gas. Swing producers are primarily domestic suppliers who either (i) enter the
export market when prices are high even ignoring domestic supplies, or (ii) stop even
domestic supplies when prices are low. Manufacturers in free markets like USA fall
under this category.
When the demand is strong, it is the demand-supply balance which would determine
the price level that the market can sustain at that particular point of time. It has no
relation to manufacturing costs.
When market is weak, it is the cost profiles of the producers and more specifically their
cash costs which would determine the price levels. Low cost exporters do not normally
reduce their export volumes and prefer to maximize sales volumes even when prices
are dropping so long as they recover their cash costs. Generally, the swing producers
have higher manufacturing costs and they would start exiting the market as prices
18 of 39
drop, thereby reducing exports to balance the reduction in import demand and
maintain prices.
From the above discussions, it is apparent that urea is a strategic commodity and
capacity of international market is rather limited to meet significant increases in
demand. An additional demand of even 1-2 million tonnes would cause serious
imbalance and prices would shoot up. Higher levels of demand could result in a
situation when urea would not be available in spot markets at any price.
Therefore, it would not be prudent to depend on imports for more than 5-6 lakh tones
of urea. This in other words means that Country shall be required to have in place
additional domestic capacity of urea for indigenous consumption and to make the
Country export hub for urea. To reduce the demand-supply balance during eleventh
and subsequent Plan periods, a number of new and expansion projects are under
consideration.
2.4.4
2.4.5
19 of 39
3.0
PROJECT DESCRIPTION
3.1
TYPE OF PROJECT
The proposed project is a modernization project without any change in production rate
with an aim to reduce the energy consumption per tone of production by adopting the
modern proven, fail-safe technology through replacement of steam turbines to gas
turbines. The project fulfills the aims and objective of environment by reduction in
energy and natural resources like NG & water.
3.1.1
The proposed project is an independent project and not interlinked with any other
project. The project will be implemented in existing units of Phulpur-I and Phulpur-II.
The project will yield energy saving of 0.947 Gcal/MT of urea at Phulpur-I and 0.386
Gcal/MT of urea at Phulpur-II. A total of 0.467 Gcal/MT of Urea has been estimated.
The natural resources savings equivalent to 0.109 MMSCMD of NG, 525 MTPD of
Coal and 2,760 m3/day of water has been estimated after implementation of the project
with a pay-back period of 3.94 years.
3.2
3.2.1
3.3
DETAILS OF SITE
The choice for selection of alternate site is limited as the proposed ESP project
including GT-HRSG scheme shall be located near existing Urea-I of Phulpur fertilizer
complex. The project is located within the battery limit of the fertilizer complex. As
regards consideration of environmental protection, it is envisaged that there would be
20 of 39
a reduction of pollution load due to reduction in energy consumption, NG, Coal and
water consumption.
3.3
3.4
PROJECT DETAILS
The energy saving that involves schemes related to replacement / revamping of the
existing compressors & turbines and modification of CO2 removal section are targeted.
With regard to execution of the project, energy saving scheme, license and basic
engineering package is required. M/s CASALE, SA Switzerland has provided the scope
of work as mentioned below:
3.4.1
Design basis
(ii) Mater balance, cooling tower and steam & condessate balance
(iii) Process flow diagram for all section of the plants. The PFD shall be prepared for
design condition
(iv) Equipment list of new and modified equipments
(v) Engineering Process Specifications and data sheet for new and modified
equipments
(vi) Details of Tie-in points for taking tapping in plant turn-around marled on PIDs
(vii) Engineering specification for piping with reference to existing piping specifications
(viii) Preliminary eaquipment arrangement for new and modified equipments
(ix) Electrical motors specification with emergency power requirement for new and
modified equipments
(x) First edition of P&I diagrams for all new and modified sections of the plants
The P&I diagrams shall show nominal diameters and medium symbols, walls and
instrumentation, i.e., control loops and measuring points, control logic and
analyzers, etc. Details of changes and modifications to the safety inter-lock trip
systems for new and modified parts shall be shown in separate diagrams.
21 of 39
(xi)
Line list for new and modified piping based on existing pipings class
specifications.
(xii)
(xiii)
(xiv)
Proposed modified plot plan showing the general layout for all new and modified
section of the plant
(xv)
Marked up existing plot plan showing the available area for the new equipments
(xvi)
(xvii) Trip interlock logic diagram of new and modified sections showing trip set points,
alarm annunciation and set points & delay time and manual reset.
(xviii) Data sheet for new and modified control valves and new safety valves
(xix)
(xx)
(xxi)
(xxii) Operating Manual / guidelines for the new installations and their integration in
existing plants, highlighting normal operations, start-up and shut-down operations
were modified after revamping.
3.5
RAW MATERIAL
Existing consumption of raw materials for production of 5145 MTPD of urea are briefed
as under:
Particulars
Total NG
Coal
Water
Unit
SM3/day
MT/day
m3/day
Phulpur Complex
Natural Gas
0.109 MMSCMD
Coal
525 MTPD
Water
2,760 m3/day
22 of 39
Natural Gas is being purchased from GAIL as per Gas Sale agreement between GAIL &
IFFCO dated 25.8.2004. Coal is being procured from nearby colliery of CIL. Source of
water is ground water from deep tube wells. Existing tube wells shall be utilized.
However, water consumption shall reduce after implementation of proposed project.
The project does not require any facility for transportation of raw material and finished
products. The production profile of Phulpur Unit shall remain same.
3.5.1
3.5.2
3.5.3
Due to reduction in water consumption, there will be substantial reduction of about 900
m3/day of wastewater.
23 of 39
4.0
SITE ANALYSIS
IFFCO Phulpur has been commissioned in the year 1981 and running successfully since
then. Several modernization schemes have been implemented successfully in the past.
The prime factor with respect to connectivity plays an important role in successful
implementation of the project as per schedule.
IFFCO Phulpur is located at Phulpur Tehsil in Allahabad District of Uttar Pradesh. The
site is located at a distance of 30 km North East of Allahabad city on the UP state
highway no. 7, connecting Allahabad to Jaunpur and Gorakhpur. Phulpur, which is a
Tehsil, is about 6 km away from the site and is linked with Broad Gauge Rail link on the
Varanasi-Allahabad route.
Phulpur fertilizer complex is spread over an area of about 432.2 Ha of land. The
ownership of the land is with Indian Farmers Fertiliser Co-operative Limited (IFFCO), a
national level cooperative society engaged in the manufacture and marketing of various
fertilizers. The proposed project shall be established within plant premises of existing
complex near Urea-I Plant.
Since the project shall be implemented within existing plant premises, there would no
change in existing land use pattern.
4.1
Eco-sensitive Areas
The proposed ESP project includes various schemes including installation of GT &
HRSG without any change in production profile.
Topography
Phulpur Fertilizer Complex is located in Phulpur tehsil of Allahabad district. The project
area falls under the central Ganga alluvial plain. Ganga and Yamuna are the most
important rivers of the district. Other rivers which flow in the district and at the end meet
with Ganga or Yamuna are Tons and Belan, The holy Ganga and Yamuna confluence in
3 the middle of the district at Allahabad town and flow in the shape of 'Y' alphabet which
divide the district in three physiographic tracts namely Trans-Ganga region, Doab region
24 of 39
and Trans-Yamuna region. The northern part of Allahabad district, popularly known as
Gangapar, is endowed with good fertile soil for cultivation of food grains, pulses, oil
seeds and vegetables. The southern part of Allahabad, known as Yamuna par is partly
hilly and agriculturally backward. (Source: District Industrial Profile of Allahabad.).
4.3
Existing Facilities
Indian Farmers Fertiliser Co-operative Limited (IFFCO) is a national level cooperative
society engaged in the manufacture and marketing of various fertilizers. The Society,
registered as an autonomous cooperative under the Multi State Cooperative Societies
Act, 2002, was established through the Indian farming communitys initiative along with
the Government of India on 3rd November, 1967 for making available much-needed
fertilizer at the farmers doorstep from plants owned by them through their own
distribution channels.
IFFCO Phulpur Unit is a well established fertilizer complex spread over an area of 432.2
Ha of land. In addition to industrial activities, there exists residential area for providing
accommodation to its employees. The residential accommodations are well furnished
and well connected with metallic road with water supply and electricity. Water is being
supplied to the residential colony through underground pipelines. Source of power is
own power generation plant. All the other infrastructural facilities like school, play
grounds etc are well maintained. In addition to above facilities, IFFCO has established
Diary, Fishery and Agro Farms to provide training to the farmers and best uses of
fertilizers. The colony has a good sewerage system and the township sewage are
treated in a dedicated Sewage Treatment Plant. The treated sewage is used as
irrigational water.
4.4
Soil Classification
Phulpur area falls in northern part of Allahabad district, popularly known as Ganga par
and is endowed with good fertile soil for cultivation of food grains, pulses, oil seeds and
vegetables. The soil texture is predominantly clayey in nature and of light grey colour.
The pH of soil is slightly alkaline having pH around 8.0 to 8.5. The porosity varies from
46 to 50%. The cation exchange capacity varies from 12.2 to 19.0 meq/100g of soil.
Nitrogen & Phosphorous ratio has been found around 1:10.
25 of 39
4.5
Climate of Phulpur
Phulpur tehsil falls under humid subtropical climate that is common to cities in northcentral India. Phulpur experiences three seasons: hot dry summer, cool dry winter and
warm humid monsoon. The summer season lasts from April to June with the maximum
temperatures ranging from 40 C (104 F) to 48 C (118 F). Monsoon begins in early
July and lasts till September. The winter season lasts from December to February.
The temperature of the area has been found to vary between 0.5 to 480C. The Humidity
has been found to vary 13 to 97%. Annual rainfall of the area is about 1000mm with an
average rainy day of 48 days. The wind speed of the area varies from 1.8 to 13 Kmph.
The dominant wind direction is West & South-west.
4.6
Social Infrastructure
4.6.1
The residential colony of IFFCO Phulpur falls in Sarai Abdulmalik Panchayat of Phulpur
tehsil. Sarai Abdulmalik is a Census Town city in district of Allahabad, Uttar Pradesh.
The Sarai Abdulmalik Census Town has population of 4,815 of which 2,509 are males
while 2,306 are females as per report released by Census India 2011.
Population of Children with age of 0-6 is 496 which is 10.30 % of total population of
Sarai Abdulmalik (CT). In Sarai Abdulmalik Census Town, Female Sex Ratio is of 919
against state average of 912. Moreover Child Sex Ratio in Sarai Abdulmalik is around
765 compared to Uttar Pradesh state average of 902. Literacy rate of Sarai Abdulmalik
city is 80.62 % higher than state average of 67.68 %. In Sarai Abdulmalik, Male literacy
is around 89.72 % while female literacy rate is 70.92 %.
Sarai Abdulmalik Census Town has total administration over 930 houses to which it
supplies basic amenities like water and sewerage. It is also authorize to build roads
within Census Town limits and impose taxes on properties coming under its jurisdiction.
Caste Factor
Schedule Caste (SC) constitutes 7.46 % of total population in Sarai Abdulmalik (CT).
The (CT) Sarai Abdulmalik currently doesnt have any Schedule Tribe (ST) population.
Work Profile
Out of total population, 1,242 were engaged in work or business activity. Of this 1,087
were males while 155 were females. In census survey, worker is defined as person who
26 of 39
does business, job, service, and cultivator and labour activity. Of total 1242 working
population, 77.21 % were engaged in Main Work while 22.79 % of total workers were
engaged in Marginal Work.
4.6.2
The plant area of Phulpur fertilizer complex falls in Tisaura village. Tisaura is small
village located in Phulpur Tehsil of Allahabad district, Uttar Pradesh with total 285
families residing. The Tisaura village has population of 1952 of which 1033 are males
while 919 are females as per Population Census 2011.
In Tisaura village population of children with age 0-6 is 291 which makes up 14.91 % of
total population of village. Average Sex Ratio of Tisaura village is 890 which is lower
than Uttar Pradesh state average of 912. Child Sex Ratio for the Tisaura as per census
is 753, lower than Uttar Pradesh average of 902.
Tisaura village has higher literacy rate compared to Uttar Pradesh. In 2011, literacy rate
of Tisaura village was 75.20 % compared to 67.68 % of Uttar Pradesh. In Tisaura Male
literacy stands at 89.50 % while female literacy rate was 59.57 %.
As per constitution of India and Panchyati Raaj Act, Tisaura village is administrated by
Sarpanch (Head of Village) who is elected representative of village.
Caste Factor
Schedule Caste (SC) constitutes 17.16 % of total population in Tisaura village. The
village Tisaura currently doesnt have any Schedule Tribe (ST) population.
Worke Profile
In Tisaura village, out of total population, 602 were engaged in work activities. 85.38 %
of workers describe their work as Main Worker (Employment or Earning more than 6
Months) while 14.62 % were involved in Marginal activity providing livelihood for less
than 6 months. Of 602 workers engaged in Main Work, 190 were cultivators (owner or
co-owner) while 125 were Agricultural labourers..
27 of 39
5.0
PLANNING BRIEF
5.1
Planning Concept
IFFCO Phulpur Unit is continually striving to be the lowest energy consumer in the
fertilizer industry. To achieve the goal several energy saving schemes have been
adopted earlier like change-over of naphtha feed to natural gas in 2006. After 2006, a
number of energy conservation schemes have been identified and planned to implement
in stages under the Energy Saving Project (ESP). Planning to meet any unforeseen
requirement for the proposed project is under consideration.
The concept of present ESP has been conceived by IFFCO management in search of
best available technology for reduction of energy and natural resources like NG, Coal &
water.
The consultant has been searched on global basis in consultation with Projects &
Development India Ltd (PDIL). Globally renowned consultant related to energy schemes
has been identified. IFFCO will make responsible M/s Casale for preparation of basic
and detailed engineering package for ESP project and identification of necessary
modifications for optimization of ESP project as stated above.
IFFCO has appointed PDIL for preparation of feasibility report, filling & online submission
of Form-I and necessary formalities related to environmental clearance. After EC the job
allotted to M/s Casale will be executed under schedule fixed by Casale and IFFCO.
Necessary equipments shall be procured after review of basic & detailed engineering
package, which will include replace of old machineries & equipment for optimization of
energy consumption. The scheduled completion of project shall be within 36 months
after award of EC.
5.2
Population Projection
There would be minor influx of population during construction. However, it is envisaged
that local workers of adjoining villages shall be engaged during construction to check the
influx of population in the area. The visit of super specialists during construction period
cannot be ruled out. They will be accommodated in IFFCO Guest House /near-by
facilities.
28 of 39
There will be no influx of population and new appointments and hence no population
projection has been envisaged in the proposed project.
5.3
AREA(HA)
Percentageof
TotalLand
130
30.08
Township
74.5
17.24
26.4
6.11
50.2
11.61
Ash Pond
74.8
17.31
76.3
17.65
Total Land
432.2
100.00
Total green belt area within IFFCO Phulpur premises (Plant, Township, Cordet, Ash
Pond): 123 Ha
As the project proposal is limited to installation of Gas Turbine (GT) in place of Steam
Turbine (ST) as well as installation of Heat Recovery Steam Generation (HRSG) as
energy saving only. Hence, additional land use planning is not envisaged.
5.3.1 Green Belt Development :
The land provided for the factory and township was originally USAR land and was lying
unutilized from long time. IFFCO had taken a challenge to reclaim this usar land and it
has been converted into a green land. 50 to 200 m wide green belt has been developed
around the complex. Today, the entire area is full of trees and vegetation.
About 3.0 Lakh trees of wide variety of about 30 species including some of medicinal
species imparts scenic beauty besides providing suitable habitat for birds and other flora
29 of 39
and fauna. The greenery and the scenic beauty of Sanjivani Vatika, Buddha Vihar,
Nandan Udyan, Saras Kunj, etc. are remarkable and imparts healthy environment. The
species of plants planted are Peepal, Neem Shesham, Pakad, Jamun, Guava, Arjun,
Amla, Bel, Kanji, Ashok, Casurina, Gulmohar, Amaltas, Harre, Bahera, Karenj,
Bottlebrush etc.
5.3.2
There is a full fledge Environment & Safety Department which runs under dedicated
experienced specialist of the field.
The Safety Department runs as per OHSAS: 18001 guidelines and maintains the safety
norms and MSDS guidelines precaution of chemicals and materials used & procured. It
provided all the safety items to the workers and provides necessary training related to
safety and prevention of accidents. The instances of accidents and risk are identified
and reported to the higher authorities. Fire Fighting system is under the control of safety
department.
IFFCO has a well established Environment Department which runs under experienced
specialist of the field. The department works as per guidelines of IS 14001, 9001. The
departmental head is responsible for implementation of guidelines related to
environment issued by CPCB, SPCB, MoEF&CC. The department is responsible for
making compliance against the condition and enquiry made by statutory and nonstatutory bodies.
30 of 39
5.4
5.5
Amenities/ Facilities
IFFCO Phulpur is having all the required amenities and facilities. Safety, healthy,
environmental, social, cultural requirements are periodically assessed and updated as
per requirements.
6.0
Proposed Infrastructure
The existing infrastructure of IFFCO Phulpur with respect to residential colony, green
belt, Social infrastructure, road and rail facilities, supply of water, sewerage facilities,
power requirement etc. are readily available and are working efficiently. In view of the
size and magnitude of proposed project, no additional infrastructure is envisaged.
7.0
8.0
8.1
Project Schedule
Energy Saving Project will be implemented in two phases. First phase will be 2016
turnaround and other will be 2017 turnaround. The likely date of start of construction
shall commence after getting Environmental Clearance (EC) from MoEF. The project is
scheduled to be completed within 24 months after issuance of EC.
31 of 39
8.2
Project Schedule
THEESTIMATEDCAPITALCOSTOFPROPOSEDENERGYSAVINGPROJECTISASUNDER(RS./CRORES):
Sr No
Units
1.
Phulpur-I
Equipment Cost
(including 3%
Contingency)
601.35
BEDP
DEDP
Total
19
627.35
2.
Phulpur-II
329
16
349
3.
TOTAL
930.35
35
11
976.35
8.2.1
Financial Analysis
The financial analysis of project will be as under:
The overall saving in Urea specific energy at each Unit and the financial analysis is as under:
ESP
UNIT
Phulpur-I
Phulpur-II
Total
MTPD
2115
3030
5145
Energy Saving
Gcal/MT
0.947
0.386
0.467
Estimated Investment
Rs. Crore
627.35
349
976.35
Rs Crore
151
97
248
Years
4.16
3.60
3.94
Payback
9.0
32 of 39
IFFCO Phulpur, the over-all urea specific energy will be reduced by about 0.467 Gcal
per MT of Urea with payback of 3.94 Years.
The Energy Saving Project of IFFCO Phulpur is limited to modernization without any
change in production profile. However, the production capacity may increase by about
10% due to ESP. The ESP project fulfils the requirement of Corporate Environmental
Policy and it will reduce the subsidy burden of Government of India under Fertilizer
Control Policy. The proposed project will also check the price rise of chemical fertilizer
and the product cost of urea will be compatible with imported fertilizer.
It is concluded that the over-all energy consumption of 5.751 Gcal/MT shall come down
to 5.284 after implementation of proposed ESP with a pay-back of 3.94 years. Thus,
there will be reduction in the emission levels from each plant with implementation of
Energy Saving Project due to reduction in consumption of natural gas (0.109
33 of 39
Plate-1.1
Location of IFFCO, Phulpur Complex on Google Map
34 of 39
Plate-1.2
Location of IFFCO, Phulpur Complex on Geographical Map
35 of 39
PLATE-1.3
TOPOGRAPHICAL MAP OF PHULPUR AREA
36 of 39
PLATE-1.4
SITE LOCATION MAP
37 of 39
PLATE-1.5
38 of 39
PLATE-1.6
PFD of GT-HRSG
39 of 39