Integrated Design Project 2
Integrated Design Project 2
Name/Student ID
: Adesh Ramharack
: Donothan Sookraj
: Kieron Ramlochan
: Imzaman John
/
/
/
/
52748
52682
52696
60690
Date
: 2014/07/18
PROGRAMME
STATUS
YEAR
SEMESTER #
CAMPUS
COURSE CODE
:STRU2011
COURSE LEADER
: Richard Flick
1
Integrated Design Project II
Table of Contents
1.0 Introduction .......................................................................................................................................................... 2
1.1. Project Definition ............................................................................................................................................ 2
1.2. Objectives ........................................................................................................................................................ 2
2.0 Discussion ............................................................................................................................................................ 3
2.1. Design Criteria ................................................................................................................................................ 3
2.1.1 Load Definition ......................................................................................................................................... 3
2.2. Codes, Standards and Literature ..................................................................................................................... 4
2.3 Concept Design ................................................................................................................................................ 5
3.0 Calculations .......................................................................................................................................................... 6
3.1 Floor Slab ......................................................................................................................................................... 6
3.2 Beam............................................................................................................................................................. 100
3.3 Column ......................................................................................................................................................... 133
3.4 Square Pad Footing ...................................................................................................................................... 155
4.0 Drawings ............................................................................................................................................................ 19
4.1 Designed Elements......................................................................................................................................... 20
4.2 Force Elements ............................................................................................................................................. 191
4.3 Floor Slab ..................................................................................................................................................... 192
4.4 Beam and Column Section .......................................................................................................................... 193
4.5 Beam and Column Front Elevation ............................................................................................................. 194
4.6 Beam and Column Side Elevation ............................................................................................................... 195
4.7 First Floor Entrance ..................................................................................................................................... 196
4.8 Pad Footing Entrance ................................................................................................................................... 197
4.9 Foundation Plan Entrance ............................................................................................................................ 198
4.10 First Floor Layout ........................................................................................................................................ 29
4.11 Second Floor Layout .................................................................................................................................... 30
4.12 Front Elevation of Office Building .............................................................................................................. 31
4.13 Rear Elevation of Office Building ............................................................................................................... 32
4.14 Side Elevation of Office Building ............................................................................................................... 33
5.0 Material List ..................................................................................................................................................... 344
6.0 Bills of Quantities ............................................................................................................................................ 366
7.0 Conclusion .......................................................................................................................................................... 39
8.0 References.........................................................................................................................................................39
9.0 Appendix...40
9.1 Appendix A...41
9.2 Appendix B...45
9.3 Appendix C...47
2014/07/18
2
Integrated Design Project II
1.0 Introduction
1.2. Objectives
This project will be based on designing an office building and
the following objectives were undertaken during the course of
the project:
2014/07/18
3
Integrated Design Project II
2.0 Discussion
2014/07/18
4
Integrated Design Project II
ACI Code
9.2.1 (9-3)
Required strength
U=1.2D + 1.6(L or S or R) + (1.0L or 0.8W)
7.7.1
7.6.1
11.3.1.1
2014/07/18
5
Integrated Design Project II
2014/07/18
6
Integrated Design Project II
3.0 Calculations
6m
5m
0.3m
Assumptions
Concrete fc = 4000 PSI
16mm Grade 60 main tension bars
12mm Grade 60 shrinkage bars
Concrete cover = (0.02m)
Concrete Density = 24 KN/m3
Live Load on Slab - 3 KN/m2
Dead Load on Slab - 0.5 KN/m2 (due to tiling finish)
0.25
7
Integrated Design Project II
= 11.81 KNm
0.3m
0.25m
.
. .
= 903.73 KN/m2
As = b d
2014/07/18
8
Integrated Design Project II
= 0.3m X
= 0.4m apart
0.4m
= smaller of
3 X 025m
0.3m
2014/07/18
9
Integrated Design Project II
= 0.3m X
= 0.23m apart
0.23m
= smaller of
3 X 0.25m
0.3m
2014/07/18
10
Integrated Design Project II
12m
3.2 Beam
SLAB
5m
BEAM
5m
5m
Assumptions
Wu
R1
R3
0.4l
0.4l
Mneg = -0.1wl2
Mpos = 0.08wl2
R1= 0.4wl
b=2h
R2= 1.1wl
R3= 0.4wl
2014/07/18
11
Integrated Design Project II
= 0.65m
b = X 0.65m =0.33m
0.35m
act =
.
.
= 0.00962
act = 0.00962 which is > min = 0.0033 and < max = 0.0214
Mu = 0.9Asfyd { 1- [ 0.59(
)] }
)] }
12
Integrated Design Project II
0.35m
Actual Beam Dimensions
0.65m
2014/07/18
13
Integrated Design Project II
3.3 Column
Assumptions
Concrete fc = 4000 PSI
16mm Grade 60 main tension bars
10mm Grade 60 shrinkage bars
Concrete cover = 1.5 (0.04m)
Concrete Density = 24 KN/m3
3% Steel Reinforcement
Pn =
.
.
= 466163.83 lbf
2014/07/18
14
Integrated Design Project II
Rn =
Kn =
=0
= 0.81
2014/07/18
15
Integrated Design Project II
24
12
Concrete cover = 3
qu =120 KN/m2 = 2506.25 psf
20
6m
5m
5m
Roof dead load = 25 KN/m3 X 0.3m = 7.5 KN/m2
Roof live load = 1.5 KN/m2
Total Combined Load = 1.6 L.L. + 1.2 D.L. = 1.6 X 1.5 KN/m2 + 1.2 X 7.5 KN/m2 = 11.4
KN/m2
Force on Interior Column = 11.4 KN/m2 X 6m X 5m = 342 KN
Factored Loads acting on footing = Load from roof + Load from beam + Self weight of
column
= 342 KN + 2(1.1 X 76.2 KN/m X 6m) + (24 KN/m3 X 0.3m X 0.3m X 8m)
= 1365.12 KN = 306891.19 lbf
2014/07/18
16
Integrated Design Project II
Slab +
Beam Loads
"
) = 250 psf
) = 200 psf
"
.
.
= 117.84 ft2
17
Integrated Design Project II
= 2536.3 psf
11ft=132
12
16.5
60 = 5
12 + 16.5 = 28.5= 2.4
43.5 = 3.6
d=
.
.
"
11.12.2.1(c))
d=
.
.
"
.
.
11.12.2.1(b))
d=
.
.
2014/07/18
18
Integrated Design Project II
.
.
"
= 8 < 16.5
"
.
. "
= 129.4 psi
2014/07/18
19
Integrated Design Project II
4.0 Drawings
2014/07/18
R.C Beam
R.C Column
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
Designed Elements
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
Force Elements
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
5m
6m
Plan View
Section C-C
PREPARED FOR:
Section D-D
DRAWING TITLE
DATE:
SCALE:
Floor Slab
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
0.35 m
0.04 m
0.3 m
0.04 m
0.65 m
0.3 m
Column
Beam
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
PREPARED FOR:
DRAWING TITLE
.3m x .3m
.35m x .65m
.3m x .3m
.3m x .3m
.35m x .65m
.3m x .3m
Ring Beam
.3m x .3m
.3m x .3m
Ring Beam
DATE:
SCALE:
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
18th July
2014
NOT
TO
SCALE
.3m x .3m
.3m x .3m
Ring Beam
.3m x .3m
.35m x .65m
.3m x .3m
.35m x .65m
.3m x .3m
.35m x .65m
.3m x .3m
.35m x .65m
Ring Beam
.3m x .3m
.3m x .3m
Ring Beam
.3m x .3m
.35m x .65m
.3m x .3m
.3m x .3m
.35m x .65m
Ring Beam
.3m x .3m
Ring Beam
.3m x .3m
.3m x .3m
Ring Beam
.35m x .65m
.3m x .3m
.35m x .65m
.3m x .3m
.3m x .3m
.35m x .65m
Ring Beam
.3m x .3m
.3m x .3m
Ring Beam
.3m x .3m
Ring Beam
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
DRAWING TITLE
DATE:
SCALE:
18th July
2014
NOT
TO
SCALE
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
PREPARED FOR:
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
.3m x .3m
R.C Column
0.3m x 0.3m x 4m x 33No .
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
0.08 m
3.3 m
3.3 m
0.5 m
0.08 m
0.5 m
0.08 m
Plan View
3.3 m
3.3 m
Section A-A
PREPARED FOR:
Section B-B
DRAWING TITLE
DATE:
SCALE:
Pad Footing
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
R.C Column
0.3m x 0.3m x 4m x 33No
12m
6m C/C
5m C/C
50m
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
Foundation Plan
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Richard Flick
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
50 m
water closet
office space
hallway
12 m
reception
office space
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
Se
c
o
n
d
Fr
o
n
t
El
e
v
a
t
i
o
n
8.0 m
6 m C/C
12 m
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
Rear Elevation
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
1m
4m
8m
1m
3.6 m
50 m
PREPARED FOR:
DRAWING TITLE
DATE:
SCALE:
18th July
2014
NOT
TO
SCALE
Adesh Ramharack
52784
Donothan Sookraj
52682
Kieron Ramlochan
52696
Imzaman John
60690
Richard Flick
Side Elevation of
Building
34
2014/07/18
35
Quantity
9
14
9
781
8000
30
30
100
200
100
140
25
25
12.5
5000
5000
2000
100
100
548.24
200
1
Rate
$7,000.00
$7,000.00
$7,000.00
$1,000.00
$5.60
$300.00
$200.00
$180.00
$60.00
$30.00
$30.00
$18.00
$18.00
$18.00
$0.25
$0.35
$60.00
$300.00
$300.00
$60.00
$180.00
$8,000.00
Amount
$63,000.00
$98,000.00
$63,000.00
$781,000.00
$44,800.00
$9,000.00
$6,000.00
$18,000.00
$12,000.00
$3,000.00
$4,200.00
$450.00
$450.00
$225.00
$1,250.00
$1,750.00
$120,000.00
$30,000.00
$30,000.00
$32,894.40
$36,000.00
$8,000.00
Subtotal TT$
VAT (15%) TT$
TOTAL MATERIAL ONLY TT$
1363,019.40
204,452.91
1567,472.31
36
2014/07/18
37
Ref
A
Item Description
SITE PREPREPARATION
1 To clean and clear area before and after work is
completed
To set out taking lines and levels
Cleaning and clearing Site After Completion
OSHA
Scaffolding
To summary
EXCAVATION
Excavate trench for foundation base
Removal of excavated earth to be reused for backfill
Unit
Qty
Rate
600
TT$200.00
allow
allow
allow
allow
179.685
TT$400.00
allow
To summary
C
Length
Length
Length
Sheet
150
100
200
150
TT$36.00
TT$36.00
TT$75.00
TT$190.00
To summary
D
STEEL WORK
High Tensile Bars Cut .Bend , Place And Tied
12mm HT Rods
16mm HT Rods
25mm HT Rods
16 Gauge Binding Wire
tonne
tonne
tonne
lb
9
14
9
200
TT$16,000.00
TT$16,000.00
TT$16,000.00
TT$10.00
To summary
E
CONCRETE WORK
In- situ Concrete 1:2:4 mix -Mixed and Pour for
Infill Blocks
To Cast Foundation, Column, Floor and Roof using
Ordinary Portland Cement
To summary
BLOCK WORK Cement Mortar 1:3 Mix
Making good all concrete works; fair face to internal
wall face.
152mm x 204mm x 406mm Concrete Block
CEILING
1 To supply and install suspended gypsum ceiling
To Summary
TILING
1 To supply and place floor tiles
To Summary
205,000.00
TT$
TT$
71,874.00
20,000.00
TT$
91,874.00
TT$
TT$
TT$
TT$
5,400.00
3,600.00
15,000.00
28,500.00
TT$
52,500.00
TT$
TT$
TT$
TT$
144,000.00
224,000.00
144,000.00
2,000.00
TT$
514,000.00
TT$
52,806.00
781.755
TT$1,300.00
TT$
TT$
1016,281.50
1069,087.50
m
m
548.24
250
TT$125.00
TT$181.29
TT$
TT$
68,530.00
45,322.50
TT$
113,852.50
TT$
232,800.00
TT$
232,800.00
TT$
324,000.00
TT$
324,000.00
TT$
100,000.00
TT$
100,000.00
TT$160.00
TT$
TT$
87,718.40
87,718.40
allow
TT$
300,000.00
TT$
300,000.00
TT$
TT$
120,400.00
66,000.00
TT$
186,400.00
1200
1200
TT$194.00
TT$270.00
allow
548.24
ELECTRICAL
To supply all material and labour for electrical
FINISHES
To supply and install Glass Cladding
To supply and install windows
TT$
TT$1,300.00
To Summary
L
120,000.00
10,000.00
10,000.00
25,000.00
40,000.00
40.62
To Summary
PLUMBING
1 To supply and install toilets and sinks
To Summary
PAINTING
1 To supply and work concrete paint and primer
To Summary
TT$
TT$
TT$
TT$
TT$
To summary
G
Amount
m
item
14
44
TT$8,600.00
TT$1,500.00
38
BILL OF QUANTITY
SUMMARY
A
B
C
D
E
F
G
H
I
J
K
L
SITE PREPAPARTION
EXCAVATION
CARPENTRY
STEEL WORK
CONCRETE WORK
BLOCK WORK Cement Mortar
CEILING
TILING
PLUMBING
PAINTING
ELECTRICAL
FINISHES
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
205,000.00
91,874.00
52,500.00
514,000.00
1069,087.50
113,852.50
232,800.00
324,000.00
100,000.00
87,718.40
300,000.00
186,400.00
15%
3277,232.40
491,584.86
3768,817.26
Contingencies
10%
TT$
376,881.73
4145,698.99
39
7.0 Conclusion
At the end of the project the following was designed for the office building:
Floor Slab
-
Beam
-
Column
-
12 x 12 column
Footing
-
8.0 References
Building code requirements for structural concrete (ACI 318-05) and commentary (ACI
318R-05). (2005). Farmington Hills, Mich.: American Concrete Institute.
McCormac, J. C. (1986). Design of reinforced concrete (2nd ed.). New York: Harper &
Row.
2014/07/18
40
9.0 Appendix
2014/07/18
41
9.1 Appendix A
Dead Loads and Live Loads
2014/07/18
01 ConPal Dewalt
7/8/05
3:50 PM
Page 29
Weight, psf
Shingles:
Asphalt (14" approx.) ..................................................2.0
Book tile (2")............................................................12.0
Book tile (3")............................................................20.0
Cement asbestos (38" approx.) .................................4.0
Clay tile (for mortar add 10 psf) ................................9.0 to 14.0
Ludowici ..................................................................10.0
Roman .....................................................................12.0
Slate (14") .................................................................10.0
Spanish....................................................................19.0
Wood (1")...................................................................3.0
Weight, psf
Weight, psf
01 ConPal Dewalt
7/8/05
3:50 PM
Page 30
Weight, psf
Load/ft.2
40 lb.
20 lb.
30 lb.
30 lb.
40 lb.
12 lb.
Live load on roof = local requirements for wind and snow. (Usually 30 lbs. per sq. ft.)
Dead load of roof of wood shingle construction = 10 lbs. per sq. ft.
7/8/05
01 ConPal Dewalt
Live load on second floor = local requirements. (Usually 40 lbs. per sq. ft.)
Joist span
Bridging
Live load on first floor = local requir ements. (Usually 40 lbs. per sq. ft.)
Dead load of first floor, ceiling not plastered = 10 lbs. per sq. ft.
Dead load of first floor, ceiling plastered = 20 lbs. per sq. ft.
Post
Plan of floor framing
showing the
Girder load area.
Page 31
Half
joist span
3:50 PM
45
9.2 Appendix B
Interaction Diagram
2014/07/18
47
9.3 Appendix C
Table A.13 from McCormac, J. C. (1986). Design of reinforced concrete
2014/07/18