Shear Capacities
Shear Capacities
DRAWN BY
OF
L.M.
CAMERON
Womble
19
APPROVED
E.G.
SHEARING
DATE
ENGINEERING
NO.
702 II
PAGE 1 OF 7
91
Bl
DATE
CIiIID.5
CAPABILITIES
AUG
REVISION
19 AUG 91
OF CAMERON
SHEAR
RAMS
TABLE OF CONTENTS
Page
GENERAL INFORMATION
SHEARING CAPABILITIES:
7-l/16
U,
UL, UM BOPs
3
4
13-S/8
u BOPS.
16-3/4
U BOPs
18-314
U BOPs
20-314
U BOPs
21-114
U BOPs
X3-3/4
U II
18-314
T BOPs
X+3/4
TL
BOPs
BOPS
BULLETIN
PR0PERi-f
~L.M.
Womble
E.G.
ENGINEERING BULLETIN
NO.
702 D
PAGE 2 OF 7
~19 AUG,91
Bl
DATE
APPROVED
CAMERON
REVISION
DATE
DRAWN BY
OF
CEIILDS
19
AUG
91
e
GENERAL INFORMATION:
The shear.ing
capabilities
upon the size
and working
configuration
associated
At this,
Shearing
The following
abbreviations
shearing
configurations:
are
used
to
with
Tandem
Standard
Bonnets
BT
Standard'
Bonnets
Sg
Shear
Bonnets
SBT
Shear
Bonnets
LB
Large
Bore
Shear
Bonnets
LBT
=, '~Large
Bore
Shear
Bonnets
SBR =
DS
='
Shearing
'DS'
with
Blind
Tandem
describe
possible
Boosters
Boosters
with'Tandem
Boosters.
Rams
Shear.Rams
The shearing
capability
limited
by the available
shear
ram blade.
for.a.given
shearing
configuration
force
or the
can be
width
of the
The following
shearing
capabilities
are based on actual
test
results
or derived
from test
'results.
A / mark under
a given
shearing
configuration
indicates
that
shearing
configuration
is capable
of shearing
the corresponding
pipe
at some closing
pressure
equal
to or~less
than 2800 psi.
A *'PL" mark sunder a
given
shearing
configuration
indicates~
that
shearing
is not
possible
due to the 2800 psi l~imit
on remaining
operating
pressure
available
to shear.
After
a few stack
functions,
the
average
remaining
operating
system
pressure
is.2800
psi.
Cameron's
maximum recommended
BOP operating
pressure
is 3000
A "GL" mark under
a given
shearing
configuration
psi.
indicates
that
shearing
is not possible
since
the width
of the
sheared
pipe
exceeds
the width
of the shear ,ram blade.
For additional
information
on Cameron shear rams,
refer
E.B. 538 D,"Shearing
Blind
Rams - Operation,
Care,
and
Maintenance"
or E.B. 700 D "Cameron
IDSI Shear Rams Operation,'Care,
and Maintenance".
I
COT-&%-H
to
e
I
_.
PROPERTY
DRAWN
OF
L.M.
CAMERON
BY
DATE
Womble
19 AUG 91
APPROVED
E.G.
DATE
CHILDS
19 AUG 91
SHEARING
CAPABILITIES:
capable
REVISION
PL =
incapable
of shearing
due to operating
pressure
limitation
GL =
incapable
of shearing
Bl
ENGINEERING BULLETIN
NO.' 702 D
PAGE 3 OF 7
PROPEKPTOF
CAMERON
DRAWNBY
L.M. Womble
DATE
APPROVED
E.G.
CHILDS
capable
of shearing
at 2&O
I
na
incapable
of shearing
due to operating
CL
incapable
of shearing
pressure
limitation
geometry
11 1E.M u
11 3-1OM ULIUM
I
PL =
=
ENGINEERING BULLETIN
NO.
702 D
PAGE 4 OF 7~
19 AUG 91
Bl
DATE
11 3-70M
REVISION
19 AUG 91
limitation
PROPERTY
L.M.
CAMERON
Womble
capable of shearing
Bl
DATE
CHILDS
NO.
702
BULLETIN
PAGE 5 OF 7
19 AUG 91
.J
ENGINEERING
19AUG91
APPROED
E.G.
RElSlON
DATE
DRAWN BY
OF
1%518- 3-10M
I
PL =
incapable
of shearing
due ta operating
pressure
GL =
incapable
of shearing
limitation
geometry
limitation
13-S/8
15M
1
PROPERTY
DATE
DRAWN BY
OF
L.M.
CAMERON
Womble
19 AUG 91
Bl
DATE
*PPRoVED
E.G. CHILDS
_.
REVlSl~N
19 AUG 91
=
G
R
*
L-J
?lPE SIZE
E
=
3-l/2
13.3 #/FT
L
t
s
=
I
G
S
=
4-l/2
16.6 am
E
7
4
S
=
6 18.5 XlFr
,-
E
A
.S
=
5 25.6 #lFr
25
s
=
5-I/2
24.7 #,
2
S
=
6-518 25.2
#lFi
t
S
=
3
=
J=
capable
PL =
incapable
of shearing
due TO operating
GL =
incapable
of shearing
of shearing
limitation
geometry
limitation
ENGINEERING BULLETIN
702
D
NO.
PAGE 6 OF 7
PROPERTY
L.M.
19 AUG 91
DATE
Womble
APPROVED
CAMERON
E.G.
18-314
G
R
A
L
3-l/2
NO.
702
10M II
18.314 16M II
1
88R
SBR
18.3/4
l!SMT&TL
18.3,46,lOMTL
SBR
DVS
5
WITH
LINER
8
WITHOUT
LINER
.f
.f
4-112
16.6 HPT
5 16.5 #//FT
5 25.6 #/FT
6-5,8
25.2 #,F,
capable
of shearing
PL =
incapable
of shearing
due ro operaring
GL =
incapable
of shearing
PAGE 7 OF 7
13.3 X/FT
ENGINEERING
Bl.
19 AUG 91
CHILDS
PIPE SIZE
REVISION
DATE
DRAWN BY
OF
pressure limitation
limiration
BULLETIN