PRELIMINARY DATA SHEET
SURVEYING 1 (CE120-0F)
FIELD WORK NO. 11
DETERMINATION OF THE AREA OF A FIELD
WHOSE CORNERS ARE SIDESHOT FROM
TRAVERSE STATION
SUBMITTED BY:
GREGORIO, GEO
Vernier. A reading zeros on the horizontal circle, and run the traverse of the
stations clockwise.
4. Shoot the corners of the lot from the nearest stations and measure the
corresponding distance.
5. Check the traverse for angular error of closure (AEC). Re-run the traverse
if the actual AEC is not within the allowable accuracy requirement.
6. Calculate the area of the lot by DMD or DPD method.
7. Plot the lot by coordinates method on a 30 x40 tracing paper.
Sketch:
SET-UP 3
HD: 88.055 m ; AZIMUTH: 3243859
C 33.972 m
HD:
AZIMUTH:
521805
SET-UP 2
HD: 20.566 m
AZIMUTH:
2520847
B
SET-UP 4
HD: 93.754 m ; AZIMUTH: 2415108
HD: 16.593 m
AZIMUTH:
373237
SET-UP 1
HD: 22.305 m
AZIMUTH:
2395527
E
HD: 31.490 m
AZIMUTH:
3372083
HD: 17.839 m
AZIMUTH:
SET-UP 5 1264817
HD: 28.142 m
AZIMUTH:
1182655
HD: 20.015 m
AZIMUTH:
3404617SET-UP 6
According to the procedures, we should get the bearing, azimuth and also
the length of each side of the LPU campus. To determine such things, we
used the total station for convenience in order to complete the data easily
and accurately. We did side shots to determine the length by using Cosine
law. But first, we made sure that our parallel lines are straight to lessen our
error in this field work.
Total station
This command, designed for total stations and manual entry. It is the
principle data collection routine with total stations. Sideshot/Traverse
interacts with numerous settings, including the feature codes that will draw
line work. All settings in Configure Reading will impact Sideshot/Traverse,
including the Number of Distance Readings, Average Direct & Reverse,
Hgt/Desc Prompt on Save, Angle Only in Reverse Face and Function of
Enter Key.
Foresights
The Foresight Screens are entered automatically after exiting the Take
Backsight screen. The Foresight Screen is also entered quickly, after
selecting Sideshot/Traverse from the main menu, if you press Enter or OK in
the Backsight Point screen. When you choose Sideshot/Traverse, you are
always given the option to accept the default backsight orientation and go
straight to your foresights. There are 2 major types of Foresight Screens: (1)
Standard Total Station, (2) Robotic Total Station. The GPS screen is
discussed under the Store Points chapter.
In the field work we have done, we observed that using lines parallel to the
building is really necessary. We managed to create parallel lines in order to
get the total length of each side using side shots and the cosine law. Using
the total station is very convenient to use in gathering all the data we needed,
since it can record the azimuth and length of the given segment of a line. In
this field work, we were able to practice our skills to determine the bearing
and area of a lot. We were also able to exercise our skills to correct the data
by using transit or compass rule.
MAPUA INSTITUTE OF
TECHNOLOGY
School of Civil, Environmental, and
Geological Engineering
PRELIMINARY DATA SHEET
SURVEYING 1 (CE120-0F)
FIELD WORK NO. 11
DETERMINATION OF THE AREA OF A FIELD
WHOSE CORNERS ARE SIDESHOT FROM
TRAVERSE STATION
GROUP NO. 1:
TINIO, JOSEPH
VENTURINA, LUIS
MONROID, MONAGEN
GREGORIO, GEO
SECTION: A4
Time Element
SCORE
SCORE
SCORE
Excellent
Very good
Limited
Poor
Arrives within
30 minutes
than 30 minutes
Arrives on time
20
20
20
1
of 15 minutes
Preparedness
Knows what
Needs further
exactly is to be
procedure
explanation
what is to be
Cooperativeness
done
Performs
Performs only
Limited in
assigned task
assigned task
performing
help at all
well and is
assigned task
willing to help
group mates
Accuracy
Overall
Contribution on
fieldwork
Computes for
Computes the
Fails to compute
required value
required value
required value
the required
accurately and in
with little
with some
value.
assistance
assistance
Performs
Performs the
Performs the
efficiently a very
important task
secondary load
important task
assigned
assigned
Does nothing
assigned
EVALUATORS NAME/SIGNATURE:
DATA AND RESULTS
Gathered Data:
For SET-UP 1:
STATIO
N
AZIMUTH
BEARING
DISTANCE
LATITUDE
DEPARTUR
E
S1 A
2395527
N 595337
E
22.305 m
+ 11.19
+ 19.30
S1 B
373237
N 373237
W
16.593 m
+ 13.16
- 10.11
BA
2004037.7
2
S
204037.72
W
26.026 m
- 24.35
- 9.19
For SET-UP 2:
STATIO
N
AZIMUTH
BEARING
DISTANCE
LATITUDE
DEPARTUR
E
S2 B
2520847
N 720847
E
20.566 m
+ 6.31
+ 19.58
S2 C
521805
N 521805
W
33.972 m
+ 20.77
- 26.88
CB
1950512.1
1
S
150512.11
E
28.047 m
- 27.08
+ 7.30
For SET-UP 3:
STATION
AZIMUTH
BEARING
DISTANCE
C-D
3243859
N
352101
W
88.055 m
AZIMUTH
BEARING
DISTANCE
For SET-UP 4:
STATION
D-E
2415108
N
615108
E
93.754 m
For SET-UP 5:
STATIO
N
AZIMUTH
BEARING
DISTANCE
LATITUDE
DEPARTUR
E
S5 E
3372053
N 223837
W
31.490 m
+ 29.06
- 12.12
S5 F
1264817
N 531143
E
17.839 m
+ 10.69
+ 14.28
FE
1830637.3
4
S
30637.34
W
39.809 m
- 39.75
- 2.16
For SET-UP 6:
STATIO
N
AZIMUTH
BEARING
DISTANCE
LATITUDE
DEPARTUR
E
S6 F
3404617
N 191343
W
20.015 m
+ 18.90
- 6.59
S6 A
1182655
N 613305
E
28.142 m
+ 13.41
+ 24.74
AF
2091929.6
7
S
291929.67
W
37.059 m
- 32.31
- 18.15
Computations:
Area of LPU
STATI
ON
BEARING
DISTAN
CE
LATITU
DE
DEPART
URE
AB
26.026
- 24.35
- 9.19
204037.72
W
BC
S
150512.11
E
28.047
m
- 27.08
+ 7.30
CD
N 352101 W
88.055
m
+ 71.82
- 50.95
DE
N 615108 E
93.754
m
+ 44.23
+ 82.67
EF
S 30637.34
W
39.809
m
- 39.75
- 2.16
FA
S
291929.67
W
37.059
m
- 32.31
- 18.15
Perimeter =
Distances
39.809m + 37.059m
= 312.75 m
Error in Latitude = - 7.44
Error in Departure = 9.52
Corrected Latitude of AB
= - 24.35 + 0.619
= - 23.731
C AB 26.026
=
7.44 312.75
C AB =0.619
= - 26.413
Corrected Latitude of CD
= 71.82 + 2.095
= 73.915
C BC 28.047
=
7.44 312.75
C BC =0.667
Corrected Latitude of BC
= - 27.08 + 0.667
Corrected Latitude of DE
= 44.23 + 2.230
= 46.460
Corrected Latitude of EF
= - 39.75 + 0.947
C CD 88.055
=
7.44 312.75
CCD =2.095
C DE 93.754
=
7.44 312.75
C DE=2.230
C EF 39.809
=
7.44 312.75
C EF =0.947
C FA 37.059
=
7.44 312.75
C FA=0.882
C AB
26.026
=
9.52 312.75
C AB =0.792
Correction
of Departure for line BC
C BC
28.047
=
9.52 312.75
Correction
of Departure for line CD
C BC =0.854
CCD
88.055
=
9.52 312.75
CCD =2.680
Correction
of Departure for line DE
C DE
93.754
=
9.52 312.75
C DE=2.854
Correction
of Departure for line EF
C EF
39.809
=
9.52 312.75
C EF =1.212
Corrected Departure of AB
= - 9.19 + - 0.792
= - 9.982
Corrected Departure of BC
= 7.30 + - 0.854
= 6.446
Corrected Departure of CD
= - 50.95 + -2.680
= - 53.630
Corrected Departure of DE
= 82.67 + - 2.854
= 79.816
Corrected Departure of EF
= - 2.16 + -1.212
C FA
37.059
=
9.52 312.75
C FA=1.128
Corrected Values:
STATION
BEARING
DISTANC
E
LATITUD
E
DEPARTURE
DMD
2A
AB
S
204037.72
W
26.026 m
- 23.731
- 9.982
- 9.982
236.883
BC
S
150512.11
E
28.047 m
- 26.413
+ 6.446
13.518
357.051
CD
N 352101
W
88.055 m
+ 73.915
- 53.630
60.702
- 4486.788
DE
N 615108 E
93.754 m
+ 46.460
+ 79.816
34.516
- 1603.613
EF
S 30637.34
W
39.809 m
- 38.803
- 3.372
+
41.928
- 1626.932
FA
S
291929.67
W
37.059 m
- 31.428
- 19.278
+
19.278
- 605.869
Area of LPU =
Double Area
2
7729.268 m2
2