RISK ASSESSMENT
TASK/OPERATION:
CONCRETE POURING
ASSESSED BY:
LIAM McCABE
LOCATION:
HAZARDS ASSOSIATED WITH TASK:
L (LOW)
M (MEDIUM)
H (HIGH)
RISK ASSESSMENT
UNCONTROLLED
Excessive noise and vibration particularly with vibrating pokers, power floats
and mechanical screed boards
Manual Handling particularly movement of the material by shovel
Contact with wet concrete to the skin and eyes causing (possibly) severe
chemical burns
CONTROLLED
Y/N DETAIL
Y
Y
Operatives
Others working within the vicinity
Y/N
Y/N
CONTROL MEASURES:
1.
2.
3.
4.
5.
RISK ASSESSMENT
CONTROL MEASURES: Continued /
6.
Manual handling
Make best use of concrete chutes and pumps to place the majority of the west concrete thereby
reducing work with a shovel. Reduce bending, twisting and stooping actions. Provide information on the
hazards associated with manual handling operation.
7.
8.
Lifting operations
Ensure that any lifting equipment is suitable for the job in hand (i.e. strong enough and in good condition).
Arrange for inspection of lifting equipment in accordance with LOLER 98. A competent banksman should
be in control of the lift. Operate a safe system of working during lifting operations. Prevent unauthorised
access.
9.
10.
RISK ASSESSMENT
ADDITIONAL CONTROL MEASURES: (Review at workplace and add any additional specific controls
required)
Eye/Face
Protection
Hearing Protection
Foot Protection
Safety Clothing
R.P.E.
Hi-visibility Clothing
Gloves
SIGNED BY ASSESSOR:
DATE:
Date
Initial
Name
Date
Initial