QA/QC Inspection Checklist

design coordinates, inc. CP No. __________________


VECTOR THREE
Northgate, Cyberzone, Filinvest Corporate City,
Alabang, Muntinlupa City

Building Element/System: D20 Plumbing Systems


Category: D2010 Domestic Water Distribution / Water Supply Equipment
Items to be Inspected: Steel Tank
Date Inspected:
Supplier:
Location:

Non - Not Remarks / Due


ITEM / REQUIREMENT Conform.
Conform. Avail.
N/A
Corrective Actions Date
Open Close

A SUBMITTALS:
A.1 Materials:
1. Type :
2. Brand :
3. Origin :
4. Type of Joint :
5. Mill Certificate:
A.2 Shopdrawings

B INSTALLATIONS:
Steel Tank complete with the
B.1
following:
b.1.1 capacity as required
b.1.2 dimension as per
drawing
b.1.3 minimum thickness
b.1.4 shell and roof ladder
b.1.5 roof hatch
b.1.6 vent pipe
b.1.7 overflow
b.1.8 drain pipe
b.1.9 liquid level controls
b.1.10 water level indicator
b.1.11 piping properly
supported
b.1.12 cleaning (flushing)
b.1.13 chlorination

DCI-QIC rev. 01 Page 1 of 2


QA/QC Inspection Checklist
design coordinates, inc. CP No. __________________
VECTOR THREE
Northgate, Cyberzone, Filinvest Corporate City,
Alabang, Muntinlupa City

Remarks /
Non - Not Due
ITEM / REQUIREMENT Conform.
Conform. Avail.
N/A Corrective
Date
Open Close
Actions

C TESTING PROCEDURES:
C.1 Flushing
C.2 Leakage
C.3 Drop in water level inside tank
C.2 Test Certificate

General Notes, Comments and Recommendations:

Inspected by : Noted by : Concurred by :

________________________________ ___________________________________ ________________________________


Construction Project Engineer / Architect Construction Project Manager Supplier

Distribution:

Supplier Customer/ Developer DCI File

Note: A separate Notice to Comply (DCI-NTC) can be issued to the supplier/contractor if the non-conforming item may
take time to rectify and complete.

DCI-QIC rev. 01 Page 2 of 2