QA/QC Inspection Checklist: Design Coordinates, Inc. CP No. - Vector Three
QA/QC Inspection Checklist: Design Coordinates, Inc. CP No. - Vector Three
A SUBMITTALS:
A.1 Materials:
1. Type :
2. Brand :
3. Origin :
4. Type of Joint :
5. Mill Certificate:
A.2 Shopdrawings
B INSTALLATIONS:
Steel Tank complete with the
B.1
following:
b.1.1 capacity as required
b.1.2 dimension as per
drawing
b.1.3 minimum thickness
b.1.4 shell and roof ladder
b.1.5 roof hatch
b.1.6 vent pipe
b.1.7 overflow
b.1.8 drain pipe
b.1.9 liquid level controls
b.1.10 water level indicator
b.1.11 piping properly
supported
b.1.12 cleaning (flushing)
b.1.13 chlorination
Remarks /
Non - Not Due
ITEM / REQUIREMENT Conform.
Conform. Avail.
N/A Corrective
Date
Open Close
Actions
C TESTING PROCEDURES:
C.1 Flushing
C.2 Leakage
C.3 Drop in water level inside tank
C.2 Test Certificate
Distribution:
Note: A separate Notice to Comply (DCI-NTC) can be issued to the supplier/contractor if the non-conforming item may
take time to rectify and complete.