Filing of Application
g. Vicinity map reflecting the various land uses and important verifiable
landmarks within one (1) kilometer radius of the project site
j. Certification from the Department of Agriculture that the area for the
proposed economic zone is not or has ceased to be economically
feasible and sound for agricultural purposes (i.e. the area is marginal
for agricultural use)
1
agricultural on or before said date, a DAR Exemption Certificate or HLURB
Zoning Certification shall be required
PROCEDURE
3. The proponent brings the Order of Payment to the PEZA Cashier and pays
the application / processing fee.
4. The proponent informs EDD of the payment and EDD takes note of the
Official Receipt No., date and amount paid.
6. The Evaluator inspects the proposed area, if necessary, and prepares the
evaluation report.
7. The EDD Division Head reviews evaluation report and submits to EDD
Manager for final review.
8. Manager reviews the evaluation report and endorses the same to the
Group Manager / Deputy Director General for final comments.
Approval Process
11. The Deputy Director General presents the recommendation to the Board
for approval.
13. EDD informs the proponent of the Board decision and correspondingly
advises the applicant to take the appropriate course of action:
2
Stage 2. Presidential Proclamation
Submission of documents
b. Verified Survey Returns and technical description of the area for the
proposed economic zone
PROCEDURE
17. EDD Manager, upon final review, endorses all documents to DDG for
endorsement to the Director General for signing.
18. Director General signs endorsement letter and forward it to the DTI
Secretary for endorsement to the President.
3
19. President signs proclamation.
21. EDD Division Head reviews draft proclamation and submits to EDD
Proclamation.
Stage 3. Registration
PROCEDURE
24. EDD requests the Legal Services Group (LSG) for the preparation of the
Registration Agreement.
25. LSG prepares the draft Registration Agreement and provides EDD with a
draft to be forwarded to the developer / operator for comments.
26. EDD arranges the date of signing of the Registration Agreement with the
Office of the Director General and the proponent.