A PRELIMINARIES
ITEM DESCRIPTION UNIT QTY TOTAL COST
37
ITEM DESCRIPTION UNIT QTY RATE TOTAL COST
1 Technogreen pipe
32mm x 50mm m 144 208.00 29,952.00
25mm x 42mm m 120 182.00 21,840.00
20mm x 32mm m 100 156.00 15,600.00
2 Technogreen pipe
32m x32mm x 32mm no 75 78.50 6,337.50
25mm x 25mm x 25mm no 60 78.00 4,680.00
25mm x 20mm x 25mm no 50 65.00 3,250.00
20mm x20mm x20mm no 50 65.00 3,250.00
3 Elbow
1/2' x 20mm no 45 52.00 2,340.00
20mm no 45 52.00 2,340.00
25mm no 45 52.00 2,340.00
32mm no 150 78.00 11,700.00
38
ITEM DESCRIPTION UNIT QTY RATE TOTAL COST
SUB-TOTAL (B/F) 103,629.50
4 Technogreen pipe
25mm x20mm no 35 75.00 2,275.00
32mm x 25mm no 35 75.00 2,275.00
2 Technogreen
Threaded male elbow
3/4 x 25mm no 45 325.00 14,625.00
3/4 x 20mm no 35 325.00 11,375.00
3 Threaded Adaptor
male 3/4 x 25mm no 40 286.00 11,440.00
Female 3/4 x 25mm no 30 260.00 7,800.00
39
ITEM DESCRIPTION UNIT QTY RATE TOTAL COST(N)
3 Swept Bend
110mm no 30 1040.00 31,200.00
50mm no 70 260.00 18,200.00
5 Pan connector
110mm no 6 3250.00 19,500.00
6 Floor drain
50mm no 7 325.00 2,275.00
110mm no 2 3250.00 6,500.00
8 Acess Plug
50mm no 20 260.00 5,200.00
110mm no 6 1820.00 10,920.00
40
SUMMARY OF COST
A PRILIMINARIES 50,000.00