THIS CONTRACT AGREEMENT, made this 10th day of February, 2017 by and between:
address at Brgy. Isabang, Lucena City, hereinafter called the Procuring Entity;
MA. LOURDES D. PALICPIC
-and-
Accountant III
(Witness)
WITNESSETH:
Government of the Republic of the Philippines
_____________________________________
WHEREAS, the PROCURING ENTITY is desirous that the Contractor execute the Works
CELESTIAL S. FLANCIA
Philippine pesos.
Chief, Construction Section
WHEREAS, the whole Works in the Project as covered by this Agreement shall be
GEORGE R. TADIOSA
completed within Two Hundred Forty (240) calendar days in accordance with the
(Witness)
The items of work covered under this contract are enumerated hereunder, viz:
A.1.1 Construction of Field Office for the Engineer L.S. 1.00 75,640.00 75,640.00
R. A. MENDIOLA CONSTRUCTION AND
B.7 Occupational Safety and Health Program mos. 8.00 1,722.74 13,781.92
B.8 Traffic Management mos. 8.00 39,720.64 317,765.12
B.9 Mobilization / Demobilization L.S. 1.00 39,525.90 39,525.90
PART C - EARTHWORKS
100 (2) Clearing and Grubbing L.S. 1.00 303,023.60 303,023.60
By:
100 (3) a Individual Removal of Trees , 150-300mm dia., (Small) Each 40.00 1,352.00 54,080.00
100 (3) b Individual Removal of Trees , 301-500mm dia., (Small) Each 20.00 3,380.01 67,600.20
_____________________________________
100 (3) c Individual Removal of Trees , 501-750mm dia., (small) Each 30.00 13,520.04 405,601.20
101 (1) Removal of Structures and Obstruction L.S. 1.00 1,046,808.80 1,046,808.80
102 (1) Unsuitable Excavation Cu. M. 7,760.00 228.91 1,776,341.60
MA. LOURDES D. PALICPIC
104 (1) b1 Embankment from Borrow (Common Soil) Cu. M. 9,876.00 2,671.22 26,380,968.72
(Witness)
105 (1) a Subgrade Preparation (Common Material) Sq. M. 22,287.00 18.71 416,989.77
PART D - SUBBASE AND BASE COURSE
200 (1) Aggregate Subbase Course Cu. M. 5,560.00 2,687.95 14,945,002.00
PART E - SURFACE COURSE
311 (1) c1 PCC Pavement (Unreinforced) 0.23m thick 14days Sq. M. 2,415.00 1,762.59 4,256,654.85
PART F - DRAINAGE STRUCTURES & SLOPE PROTECTION
500 (1) a3 Pipe Culverts, 910 mm diameter, Class II, RCPC L.M. 90.00 4,679.91 421,191.90
506 (1) Stone Masonry Cu. M. 671.00 4,547.83 3,051,593.93
GRAND TOTAL 54,065,385.99
NOW, THEREFORE, for and consideration of the foregoing premises, the parties hereto
(DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS)
Government of the Republic of the Philippines
_____________________________________
agree as follows:
CELESTIAL S. FLANCIA
1. In this Contract Agreement, words and expressions shall have the same
meanings as are respectively assigned to them in the Conditions of Contract
District Engineer
2. The following documents shall be attached, deemed to form, and be read and
construed as part of this Contract Agreement, and shall be interpreted in the
following order of priority:
(2) CONTRACTORs Bid in the Form of Bid, including its Technical and
Financial Components, as calculated by the Procuring Entity and
(Witness)
____________________________________
(7) Specifications
ROMMEL A. MENDIOLA
Owner/General Manager
(8) Drawings
all respects.
Represented by:
Accountant III
District Engineer
PROCURING ENTITY
CELESTIAL S. FLANCIA
month and year first above written.
Witnessed by:
Represented by:
CONTRACTOR
GEORGE R. TADIOSA
Owner/General Manager
ROMMEL A. MENDIOLA
Page 4 of 5
_____________________________________
GOVERNMENT OF REPUBLIC )
OF THE PHILIPPINES )
(Witness)
_______________________ )S.S
_______________________ )
ACKNOWLEDGEMENT
BEFORE ME, as the Notary Public for and within the City of ___________________,
personally appeared CELESTIAL S. FLANCIA, District Engineer, representing the
M.G. SALAZAR CONSTRUCTION CORP. AND
____________________________________
District Engineering Office), with PRC ID No. 0023560 issued on December 9, 1980 at
ROMMEL A. MENDIOLA
Owner/General Manager
the same is their true act and deed for and in behalf of the parties they represented.
By:
This instrument consists of five (5) pages, including this page, on which this
acknowledgement is written duly signed by the contracting parties and their witnesses
_____________________________________
IN WITNESS WHEREOF, I have hereunto affixed my Signature and Official Seal this