Division : Kakinada
Circle : Kakinada
Provisions:-
1 Earth work excavation
2 Plain Cement Concrete
3 Vibrated Reinforced Cement Concrete M 20 Design Mix for footings
4 Vibrated Reinforced Cement Concrete M 20 Design Mix for pedestals
5 Vibrated Reinforced Cement Concrete M 20 Design Mix for columns
6 Vibrated Reinforced Cement Concrete M 20 Design Mix for roof beams, slabs
7 Filling with useful available excavated earth
8 Brick Masonry in superstructure with CM (1:8)
9 Plastering 20mm thick in two coats with base of 16mm thick
10 Reinforced cement concrete with M20 grade Design mix, platforms & Plates for shelves
2,438,429
2 Provision for VAT @5% 121,921.00
5 Provision for publication charges, unforeseen items & rounding off 29,272.76
-50,396.76
2,399,603.2
4
-2,899,603.24
Note Submitted :
Sir,
Sub:- Providing Amenities including water supply and sanitary arrangements to Bio Fertilizer
Samalkot in East Godavari District
Ref :- 1. GO Rt No. 345 dated 06-07-2012 of School Education (SE-PROG 1) Dept, Andhra Pradesh
******* *******
The Principal Secratary to Government, Education(SE-PROG.I) Dept., Government of Andhra P
Hyderabad have accorded Administrative Sanction for Construction of (355) Girls hostel Buildings
premises of Model Schools through G.O.Rt. No. 345, Dated 06-07-2012 with a unit cost of Rs. 1.288 Cr
various Places in Andhra Pradesh, including Providing Amenities including water supply and s
arrangements to Bio Fertilizer Lab at Samalkot in East Godavari District
The Funding Pattern is : 90% of the capital cost will be borne by the Central Government
balance 10 % will be provided by the State Government. While planning and designing the building an
infrastructure for the model school attached Girls hostel buildings all standard norms were adopted
altogether 32 rooms are to be constructed with following provisions:
No of Room
Description
Rooms Size
master Bedroom 1 4.88 x
dressing room 2
2.13 x
Bath rooms with WCs 2
0.92 x
Bed Room 1 4.27 x
Bed room 1 4.88 x
Dining/Livingroom 1
7.32 x
wash area 1 1.82 x
store 1
1.45 x
kitchenroom 1 3.13 x
puja 1 1.83 x
corridor 1 3.05 x
drawingroom 1
4.27 x
office room 1
3.47 x
steno room 1
3.88 x
toilets 1
1.33 x
wide sitout 1
5.30 x
The total plinth area of the builidng including walls & circulation area is arrived as 256.51 S
are 2760 Sft.
Civil works include construction of security room , Generator room, compound wall and gate, septi
drinking water facilities, electrification including fixtures. This estimate is prepared adopting the type
communicated . The total plinth area is 8500 Sft
Vide reference 2nd cited the Superintending Engineer has submitted the detailed estimate duly a
the type design.
2 P.C.C (1:5:10) prop: nominal mix for levelling course in foundations and as bed
concrete for flooring.
4 VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for Footings, Pedestals, Plinth beams and Columns up to plinth level.
6 Filling with useful available excavated earth in trenches, sides of foundations and for basement
B) Superstructure:
1 VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine crushed grade
for Columns, Roof Beams, Roof Slabs.
2 Providing HYSD bars Fe 415 for all diameters more than 6mm for VRCC & RCC work.
3 Providing Mild Steel Fe 250 for 6mm bars for VRCC & RCC work.
4 P.C.C (1:3:6) prop: nominal mix for Bed Blocks and Hold Fasts.
5 RCC (1:2:4) prop. Nominal mix using 12mm HBG machine crushed graded metal for Lintels,
thick platforms.
6 RCC M 25 grade design mix ( by weigh batching), using 20mm HBG machine crushed grade
for sun shades, 7.5cm thick at fixed end and 5.0 cm thick at free end, of any width as per ap
plan.
7 PCC M20 grade Design Mix ( by weigh batching), using 20mm HBG machine crushed grade
for steps .
8 Brick masonry in CM(1:8) prop. using 2nd class traditional bricks for Superstructure.
9 Reinforced Brick masonry 115mm thick in CM(1:4) prop. using 2nd class traditional bri
Partition walls.
10 Plastering 12 mm thick in two coats, base coat 8mm thick in CM(1:6) and top coat 4mm t
CM(1:4) for even face of walls.
11 Plastering 20 mm thick in two coats, base coat 16mm thick in CM(1:6) and top coat 4mm th
CM(1:4) for uneven face of walls.
13 Providing impervious coat over RCC roof slab, in side of septic tank to required slopes with CM
prop. 20 mm thick (average) mixed with water proofing compound.
14 Flooring with Polished Black Kadapa slabs minimum of 15 mm thick (0.457M x 0.457M) set
base coat of CM (1:8), 12mm thick over already laid C.C. bed or R.C.C. roof slabs.
15 Flooring with Ceramic non-skid tiles of 7.3 mm thick 1st. quality of any shade set over a base
CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab.
16 Providing Skirting to internal walls to 12.5 cm height with Rough Kadapa slabs of minimum
thick, size not less than (0.457 x 457M) slabs 15mm to 18mm thick.
17 Dadooing to walls with coloured glazed tiles 1st. quality of size not less than 300mm x 200mm.
18 Flooring with 15 to 18mm thick high polished granite stone slabs of blue colour.
19 Whiting to new walls and ceiling in two coats with Birla white or equavalent quality for interna
20 Painting with Plastic emulsion grade -1 paint to exterior faces of new walls with 3 coats of ap
make shade and colour.
21 Painting to wood work, flush shutters with luppam finish.
22 Painting two coats with synthetic enamel paint 1st grade to new iron work.
23 Supply and Fixing of Door with Double leaf shutter, Door Size 2.00x2.13 mtrs with Sal wood
of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board typ
commercial ply on both faces of 35mm thick including all fixtures.
24 Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Sal wood
of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board typ
commercial ply on both faces of 35mm thick including all fixtures.
25 Supply and Fixing of Door with Double leaf shutter, Door Size 1.00x2.13 mtrs with Sal Wood
of sections size 75mm x 100mm with Flush Door Shutters Solid Bond Wood black board ty
commercial ply on both faces of 35mm thick including all fixtures.
26 #REF!
27 #REF!
28 NCL or Equivalent Eco 3000 Series Windows with Galvalume Corrugated sheet with
AMENITIES:
1 The Superintending Engineer has submitted the sub-estimate for Water supply and Sa
Arrangements as per the requirements based on approved plan and the same may be allo
2 The Superintending Engineer has submitted the sub-estimate for Internal Electrification
the requirements based on approved plan and the same may be allowed.
The Standard specifications as per APSS are adopted and the work will be carried out true
relevant standard specification of APSS and as per the agreement conditions.
Quarries:
The Superintending Engineer has proposed 20 % on labour charges towards Municipal area allowen
necessaey certificate is enclosed in the lead chart, hence the same may be allowed on the responsibilty of t
APEWIDC Kakinada
VAT:
Lump sum amounts at the rate of 5% towards VAT has been added in the Abstracts of all the es
by the SE APEWIDC,Kakinada, which is as per the Revised Standard Data - Part-III (Building
the same will be allowed at 5% of ECV.
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF! :
#REF!
:
#REF! :
#REF! :
#REF! :
The Estimate is scrutinized and here-with put up for kind perusal and for according technical sanc
Rs128.81 Lakhs. The Draft 'Bill of Quantites' and BID document is also here-with put for kind peru
approval.
AE/AEE Dy. EE EE SE
anitary arrangements to Bio Fertilizer Lab at
Room Area in
Size Sqm
4.88 23.81
2.06
8.78
2.4
4.42
4.88 20.84
3.66 17.86
5.30
38.80
3.00 5.46
1.83
2.65
3.20 10.00
1.83 3.35
1.83 5.58
4.88
20.84
3.28
11.37
3.28
12.73
1.83
2.43
1.22
6.47
195.39
culation area is arrived as 256.51 Sqmt
ovisions:
undations
in foundations and as bed
oring.
lumns.
basement.
ent.
sing 20mm HBG machine crushed graded metal
e coat in CM(1:4).
sh.
de to new iron work.
Door Size 2.00x2.13 mtrs with Sal wood Frame
hutter Solid Bond Wood black board type with
g all fixtures.
mm x 1350mm ) (W1)
me (W3).
de of MS angles of 25mm X 25mm X 3mm and
mm & 900 mm x 450 mm).
estimate
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
mate
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
perusal and for according technical sanction for
ment is also here-with put for kind perusal and
CE
SPECIFICATION REPORT
Authority:
While planning and designing the building and other infrastructure for the
model schools specification as stipulated by GOI, specified norms are
adopted. A Model Plan is preprared as per the scheme norms of Girls Hostel.
The hostel is proposed to accommodate 100 students in G+1 with following
accommadation.
As per the Girls hostel norms, altogether, 34 rooms are to be constructed as
follows:
Living Rooms with sitout &drying space : 25 nos
Library cumReading room : 1 nos
The estimate is prepared dully adopting the type design prepared by the
APEWIDC and approved by the Govt. of India. The required accomdation is
propoaed in Ground floor and first floor
Civil works include construction of security room , Generator room, compound
wall and gate, septic tank, drinking water facilities, electrification including
fixtures. This estimate is prepared adopting the type design communicated .
The total plinth area is 8500 Sft
Provisions:
The Detailed Estimates are prepared with the following common provisions:
2 P.C.C (1:5:10) prop: nominal mix for levelling course in foundations and as bed
concrete for flooring.
4 VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for Footings, Pedestals, Plinth beams and Columns up to
plinth level.
5 Random Rubble Stone masonry in CM(1:8) prop, for basement.
B) Superstructure:
1 VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for Columns, Roof Beams, Roof Slabs.
2 Providing HYSD bars Fe 415 for all diameters more than 6mm for VRCC & RCC
work.
3 Providing Mild Steel Fe 250 for 6mm bars for VRCC & RCC work.
4 P.C.C (1:3:6) prop: nominal mix for Bed Blocks and Hold Fasts.
5 RCC (1:2:4) prop. Nominal mix using 12mm HBG machine crushed graded
metal for Lintels, 50mm thick platforms.
6 RCC M 25 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for sun shades, 7.5cm thick at fixed end and 5.0 cm thick
at free end, of any width as per approved plan .
7 PCC M20 grade Design Mix ( by weigh batching), using 20mm HBG machine
crushed gradedmetal for steps .
10 Plastering 12 mm thick in two coats, base coat 8mm thick in CM(1:6) and top
coat 4mm thick in CM(1:4) for even face of walls.
11 Plastering 20 mm thick in two coats, base coat 16mm thick in CM(1:6) and top
coat 4mm thick in CM(1:4) for uneven face of walls.
13 Providing impervious coat over RCC roof slab, in side of septic tank to required
slopes with CM (1:3) prop. 20 mm thick (average) mixed with water proofing
compound.
15 Flooring with Ceramic non-skid tiles of 7.3 mm thick 1st. quality of any shade
set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C.
slab.
16 Providing Skirting to internal walls to 12.5 cm height with Rough Kadapa slabs
of minimum 40 mm thick, size not less than (0.457 x 457M) slabs 15mm to
18mm thick.
17 Dadooing to walls with coloured glazed tiles 1st. quality of size not less than
300mm x 200mm.
18 Flooring with 15 to 18mm thick high polished granite stone slabs of blue colour.
19 Providing Green Chalk Board of size 3.00 x 1.2 mm including border with
palstering in CM (1:2) 12 mm thick as base coat and 3 mm thick top coat with
cement green oxide powder in (1:1) prop.
20 Whiting to new walls and ceiling in two coats with Birla white or equavalent
quality for internal walls.
21 Painting with Plastic emulsion grade -1 paint to exterior faces of new walls with
3 coats of approved make shade and colour.
22 Painting to wood work, flush shutters with luppam finish.
23 Painting two coats with synthetic enamel paint 1st grade to new iron work.
24 Supply and Fixing of Medium Teak Wood Main Door with Double leaf shutter
and grilled & Glazed side panel is proposed. Door Size is 4.00x2.13 mtrs with
Medium teak wood Frame and Medium teak wood Shutters. Fixtures are of
brass metal for elegant look and q
25 Supply and Fixing of Door with Single leaf shutter, Door Size 1.22x2.13 mtrs
with Sal Wood Frame of sections size 75mm x 100mm with Flush Door Shutter
Solid Bond Wood black board type with commercial ply on both faces of 35mm
thick.
26 Supply and Fixing of Door with Single leaf shutter, Door Size 1.00x2.13 mtrs
with Sal Wood Frame of sections size 75mm x 100mm with Flush Door Shutter
Solid Bond Wood black board type with commercial ply on both faces of 35mm
thick.
27 #REF!
28 #REF!
29 NCL or Equivalent Eco 3000 Series Windows with Galvalume Corrugated sheet
with
AMENITIES:
1) Sub-Estimate is prepared for Water supply and Sanitary Arrangements as per
the requirements based on approved plan.
The Data of all the items are adopted as per the Revised Standard Data Part-III
(Buildings) and the rates are worked out based on current SSR i.e Building SSR 2011-
2012. Cement and Steel rates are adopted as approved by the Committee of the Chief
Engineers for January, 2016
SPECIFICATIONS:
The Standard specifications as per APSS are adopted and the work will be
carried out true to the relevant standard specification of APSS and as per the agreement
conditions.
Quarries:
The nearest leads, quarries are adopted while preparing the Datas, and as per
the location of the site 20 % allowance on labour is proposed towards Municipal area
allowence
14% towards overhead charges and contractors profit put together has been
proposed in the estimates which is as per the Revised Standard Data - Part-III
(Buildings), ordered by the Government of A.P vide G.O.Ms.No.49, IRRIGATION
& CAD (PW-REFORMS) DEPARTMENT Dated: 2-3-2009, for adoption by all
Engineering /Public Works Departments and other organizations.
Lump sum amounts at the rate of 5% towards VAT has been added in the
Abstracts of all the estimates by the SE APEWIDC,Kakinada, which is as per the
Revised Standard Data - Part-III (Buildings), and the same will be provided at
5% of ECV.
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
Err:509
Err:509
CONVEYANCE CHARGES AS PER COMMON SSR 2015 - 2016
Cement/Steel/
PCC
Earth/Sand/G Rubble/Size RCC
Slabs/Shabad
Sl. Lead in ravel/Murru Stone/Cut poles/A.C &
Slabs/CC & Water Bricks
No Kms m/Lime/Surk Stone/Coarse G.I
Laterite
i aggregates Sheets/Packed
Blocks/Wood
materials
1 1.00 0.00 0.00 0.00 0.00 0.00 0.00
2 2.00 10.91 10.56 6.60 15.49 0.89 17.60
3 3.00 23.68 24.64 15.40 36.17 1.92 38.02
4 4.00 34.59 35.56 22.18 52.28 2.80 55.54
5 5.00 45.50 46.47 29.05 68.30 3.69 73.14
6 6.00 56.42 57.39 35.91 84.32 4.58 90.66
7 7.00 67.33 68.30 42.78 100.34 5.46 108.17
8 8.00 78.25 79.21 49.64 116.36 6.35 125.69
9 9.00 89.16 90.13 56.51 132.38 7.24 143.20
10 10.00 100.07 101.04 63.37 148.40 8.12 160.72
11 11.00 110.99 111.96 70.24 164.41 9.01 178.23
12 12.00 121.90 122.87 77.10 180.43 9.90 195.75
13 13.00 132.82 133.79 83.97 196.45 10.79 213.26
14 14.00 143.73 144.70 90.83 212.47 11.67 230.78
15 15.00 154.65 155.61 97.70 228.49 12.56 248.29
16 16.00 165.56 166.53 104.56 244.51 13.45 265.81
17 17.00 176.47 177.44 111.43 260.53 14.33 283.33
18 18.00 187.39 188.36 118.29 276.55 15.22 300.84
19 19.00 198.30 199.27 125.16 292.57 16.11 318.36
20 20.00 209.22 210.18 132.02 308.59 16.99 335.87
21 21.00 220.13 221.10 138.89 324.61 17.88 353.39
22 22.00 231.04 232.01 145.76 340.62 18.77 370.90
23 23.00 241.96 242.93 152.62 356.64 19.65 388.42
24 24.00 252.87 253.84 159.49 372.66 20.54 405.93
25 25.00 263.79 264.75 166.35 388.68 21.43 423.45
26 26.00 274.70 275.67 173.22 404.70 22.31 440.96
27 27.00 285.61 286.58 180.08 420.72 23.20 458.48
28 28.00 296.53 297.50 186.95 436.74 24.09 475.99
29 29.00 307.44 308.41 193.81 452.76 24.97 493.51
30 30.00 318.36 319.32 200.68 468.78 25.86 511.02
31 31.00 327.42 328.39 207.54 484.80 26.75 528.54
32 32.00 336.49 337.46 213.26 498.17 27.48 543.15
33 33.00 345.55 346.52 218.99 511.55 28.21 557.76
34 34.00 354.62 355.59 224.71 524.93 28.94 572.37
35 35.00 363.68 364.65 230.43 538.31 29.67 586.98
36 36.00 372.75 373.72 236.15 551.69 30.40 601.59
37 37.00 381.82 382.78 241.87 565.07 31.13 616.20
38 38.00 390.88 391.85 247.59 578.44 31.86 630.81
39 39.00 399.95 400.92 253.31 591.82 32.59 645.43
40 40.00 409.01 409.98 259.03 605.20 33.33 660.04
41 41.00 418.08 419.05 264.75 618.58 34.06 674.65
42 42.00 427.14 428.11 270.47 631.96 34.79 689.26
43 43.00 436.21 437.18 276.20 645.34 35.52 703.87
44 44.00 445.28 446.24 281.92 658.72 36.25 718.48
45 45.00 454.34 455.31 287.64 672.09 36.98 733.09
46 46.00 463.41 464.38 293.36 685.47 37.71 747.70
47 47.00 472.47 473.44 299.08 698.85 38.44 762.31
48 48.00 481.54 482.51 304.80 712.23 39.17 776.92
49 49.00 490.60 491.57 310.52 725.61 39.90 791.53
50 50.00 499.67 500.64 316.24 738.99 40.64 806.14
51 51.00 508.74 509.70 321.96 752.37 41.37 820.75
52 52.00 517.80 518.77 327.69 765.74 42.10 835.37
53 53.00 526.87 527.84 333.41 779.12 42.83 849.98
54 54.00 535.93 536.90 339.13 792.50 43.56 864.59
55 55.00 545.00 545.97 344.85 805.88 44.29 879.20
CONVEYANCE CHARGES AS PER COMMON SSR 2014 - 2015
Cement/Stee
PCC
Rubble/Size l/RCC
Earth/Sand/G Slabs/Shabad
Sl. Lead in Stone/Cut poles/A.C &
ravel/Murrum Slabs/CC & Water Bricks
No Kms Stone/Coarse G.I
/Lime/Surki Laterite
aggregates Sheets/Pack
Blocks/Wood
ed materials
### 1 1.00 0.00 0.00 0.00 0.00 0.00 0.00
2 2.00 11.06 11.06 6.91 16.27 6.58 17.79
3 3.00 23.97 23.97 14.98 35.25 14.26 38.54
4 4.00 35.04 35.04 21.90 51.52 20.85 56.33
5 5.00 46.10 46.10 28.81 67.79 27.43 74.12
6 6.00 57.16 57.16 35.73 84.06 34.01 91.91
7 7.00 68.22 68.22 42.65 100.33 40.59 109.70
8 8.00 79.28 79.28 49.57 116.60 47.17 127.49
9 9.00 90.34 90.34 56.49 132.87 53.75 145.28
10 10.00 101.40 101.40 63.41 149.14 60.33 163.07
11 11.00 112.46 112.46 70.33 165.41 66.91 180.86
12 12.00 123.52 123.52 77.25 181.68 73.49 198.65
13 13.00 134.58 134.58 84.17 197.95 80.07 216.44
14 14.00 145.64 145.64 91.09 214.22 86.65 234.23
15 15.00 156.70 156.70 98.01 230.49 93.23 252.02
16 16.00 167.76 167.76 104.93 246.76 99.81 269.81
17 17.00 178.82 178.82 111.85 263.03 106.39 287.60
18 18.00 189.88 189.88 118.77 279.30 112.97 305.39
19 19.00 200.94 200.94 125.69 295.57 119.55 323.18
20 20.00 212.00 212.00 132.61 311.84 126.13 340.97
21 21.00 223.06 223.06 139.53 328.11 132.71 358.76
22 22.00 234.12 234.12 146.45 344.38 139.29 376.55
23 23.00 245.18 245.18 153.37 360.65 145.87 394.34
24 24.00 256.24 256.24 160.29 376.92 152.45 412.13
25 25.00 267.30 267.30 167.21 393.19 159.03 429.92
26 26.00 278.36 278.36 174.13 409.46 165.61 447.71
27 27.00 289.42 289.42 181.05 425.73 172.19 465.50
28 28.00 300.48 300.48 187.97 442.00 178.77 483.29
29 29.00 311.54 311.54 194.89 458.27 185.35 501.08
30 30.00 322.60 322.60 201.81 474.54 191.93 518.87
31 31.00 331.82 331.82 207.57 488.10 197.42 533.70
32 32.00 341.04 341.04 213.33 501.66 202.91 548.53
33 33.00 350.26 350.26 219.09 515.22 208.40 563.36
34 34.00 359.48 359.48 224.85 528.78 213.89 578.19
35 35.00 368.70 368.70 230.61 542.34 219.38 593.02
36 36.00 377.92 377.92 236.37 555.90 224.87 607.85
37 37.00 387.14 387.14 242.13 569.46 230.36 622.68
38 38.00 396.36 396.36 247.89 583.02 235.85 637.51
39 39.00 405.58 405.58 253.65 596.58 241.34 652.34
40 40.00 414.80 414.80 259.41 610.14 246.83 667.17
41 41.00 424.02 424.02 265.17 623.70 252.32 682.00
42 42.00 433.24 433.24 270.93 637.26 257.81 696.83
43 43.00 442.46 442.46 276.69 650.82 263.30 711.66
44 44.00 451.68 451.68 282.45 664.38 268.79 726.49
45 45.00 460.90 460.90 288.21 677.94 274.28 741.32
46 46.00 470.12 470.12 293.97 691.50 279.77 756.15
47 47.00 479.34 479.34 299.73 705.06 285.26 770.98
48 48.00 488.56 488.56 305.49 718.62 290.75 785.81
49 49.00 497.78 497.78 311.25 732.18 296.24 800.64
50 50.00 507.00 507.00 317.01 745.74 301.73 815.47
51 51.00 516.22 516.22 322.77 759.30 307.22 830.30
52 52.00 525.44 525.44 328.53 772.86 312.71 845.13
53 53.00 534.66 534.66 334.29 786.42 318.20 859.96
54 54.00 543.88 543.88 340.05 799.98 323.69 874.79
55 55.00 553.10 553.10 345.81 813.54 329.18 889.62
56 56.00 562.32 562.32 351.57 827.10 334.67 904.45
57 57.00 571.54 571.54 357.33 840.66 340.16 919.28
58 58.00 580.76 580.76 363.09 854.22 345.65 934.11
59 59.00 589.98 589.98 368.85 867.78 351.14 948.94
60 60.00 599.20 599.20 374.61 881.34 356.63 963.77
61 61.00 608.42 608.42 380.37 894.90 362.12 978.60
62 62.00 617.64 617.64 386.13 908.46 367.61 993.43
63 63.00 626.86 626.86 391.89 922.02 373.10 1008.26
64 64.00 636.08 636.08 397.65 935.58 378.59 1023.09
65 65.00 645.30 645.30 403.41 949.14 384.08 1037.92
66 66.00 654.52 654.52 409.17 962.70 389.57 1052.75
67 67.00 663.74 663.74 414.93 976.26 395.06 1067.58
68 68.00 672.96 672.96 420.69 989.82 400.55 1082.41
69 69.00 682.18 682.18 426.45 1003.38 406.04 1097.24
70 70.00 691.40 691.40 432.21 1016.94 411.53 1112.07
71 71.00 700.62 700.62 437.97 1030.50 417.02 1126.90
72 72.00 709.84 709.84 443.73 1044.06 422.51 1141.73
73 73.00 719.06 719.06 449.49 1057.62 428.00 1156.56
74 74.00 728.28 728.28 455.25 1071.18 433.49 1171.39
75 75.00 737.50 737.50 461.01 1084.74 438.98 1186.22
76 76.00 746.72 746.72 466.77 1098.30 444.47 1201.05
77 77.00 755.94 755.94 472.53 1111.86 449.96 1215.88
78 78.00 765.16 765.16 478.29 1125.42 455.45 1230.71
79 79.00 774.38 774.38 484.05 1138.98 460.94 1245.54
80 80.00 783.60 783.60 489.81 1152.54 466.43 1260.37
81 81.00 792.82 792.82 495.57 1166.10 471.92 1275.20
82 82.00 802.04 802.04 501.33 1179.66 477.41 1290.03
83 83.00 811.26 811.26 507.09 1193.22 482.90 1304.86
84 84.00 820.48 820.48 512.85 1206.78 488.39 1319.69
85 85.00 829.70 829.70 518.61 1220.34 493.88 1334.52
86 86.00 838.92 838.92 524.37 1233.90 499.37 1349.35
87 87.00 848.14 848.14 530.13 1247.46 504.86 1364.18
88 88.00 857.36 857.36 535.89 1261.02 510.35 1379.01
89 89.00 866.58 866.58 541.65 1274.58 515.84 1393.84
90 90.00 875.80 875.80 547.41 1288.14 521.33 1408.67
91 91.00 885.02 885.02 553.17 1301.70 526.82 1423.50
92 92.00 894.24 894.24 558.93 1315.26 532.31 1438.33
93 93.00 903.46 903.46 564.69 1328.82 537.80 1453.16
94 94.00 912.68 912.68 570.45 1342.38 543.29 1467.99
95 95.00 921.90 921.90 576.21 1355.94 548.78 1482.82
96 96.00 931.12 931.12 581.97 1369.50 554.27 1497.65
97 97.00 940.34 940.34 587.73 1383.06 559.76 1512.48
98 98.00 949.56 949.56 593.49 1396.62 565.25 1527.31
99 99.00 958.78 958.78 599.25 1410.18 570.74 1542.14
100 100.00 968.00 968.00 605.01 1423.74 576.23 1556.97
101 101.00 977.22 977.22 610.77 1437.30 581.72 1571.80
102 102.00 986.44 986.44 616.53 1450.86 587.21 1586.63
103 103.00 995.66 995.66 622.29 1464.42 592.70 1601.46
104 104.00 1004.88 1004.88 628.05 1477.98 598.19 1616.29
105 105.00 1014.10 1014.10 633.81 1491.54 603.68 1631.12
106 106.00 1023.32 1023.32 639.57 1505.10 609.17 1645.95
107 107.00 1032.54 1032.54 645.33 1518.66 614.66 1660.78
108 108.00 1041.76 1041.76 651.09 1532.22 620.15 1675.61
109 109.00 1050.98 1050.98 656.85 1545.78 625.64 1690.44
110 110.00 1060.20 1060.20 662.61 1559.34 631.13 1705.27
111 111.00 1069.42 1069.42 668.37 1572.90 636.62 1720.10
112 112.00 1078.64 1078.64 674.13 1586.46 642.11 1734.93
113 113.00 1087.86 1087.86 679.89 1600.02 647.60 1749.76
114 114.00 1097.08 1097.08 685.65 1613.58 653.09 1764.59
115 115.00 1106.30 1106.30 691.41 1627.14 658.58 1779.42
116 116.00 1115.52 1115.52 697.17 1640.70 664.07 1794.25
117 117.00 1124.74 1124.74 702.93 1654.26 669.56 1809.08
118 118.00 1133.96 1133.96 708.69 1667.82 675.05 1823.91
119 119.00 1143.18 1143.18 714.45 1681.38 680.54 1838.74
120 120.00 1152.40 1152.40 720.21 1694.94 686.03 1853.57
121 121.00 1161.62 1161.62 725.97 1708.50 691.52 1868.40
122 122.00 1170.84 1170.84 731.73 1722.06 697.01 1883.23
123 123.00 1180.06 1180.06 737.49 1735.62 702.50 1898.06
124 124.00 1189.28 1189.28 743.25 1749.18 707.99 1912.89
125 125.00 1198.50 1198.50 749.01 1762.74 713.48 1927.72
126 126.00 1207.72 1207.72 754.77 1776.30 718.97 1942.55
127 127.00 1216.94 1216.94 760.53 1789.86 724.46 1957.38
128 128.00 1226.16 1226.16 766.29 1803.42 729.95 1972.21
129 129.00 1235.38 1235.38 772.05 1816.98 735.44 1987.04
130 130.00 1244.60 1244.60 777.81 1830.54 740.93 2001.87
131 131.00 1253.82 1253.82 783.57 1844.10 746.42 2016.70
132 132.00 1263.04 1263.04 789.33 1857.66 751.91 2031.53
133 133.00 1272.26 1272.26 795.09 1871.22 757.40 2046.36
134 134.00 1281.48 1281.48 800.85 1884.78 762.89 2061.19
135 135.00 1290.70 1290.70 806.61 1898.34 768.38 2076.02
136 136.00 1299.92 1299.92 812.37 1911.90 773.87 2090.85
137 137.00 1309.14 1309.14 818.13 1925.46 779.36 2105.68
138 138.00 1318.36 1318.36 823.89 1939.02 784.85 2120.51
139 139.00 1327.58 1327.58 829.65 1952.58 790.34 2135.34
140 140.00 1336.80 1336.80 835.41 1966.14 795.83 2150.17
141 141.00 1346.02 1346.02 841.17 1979.70 801.32 2165.00
142 142.00 1355.24 1355.24 846.93 1993.26 806.81 2179.83
143 143.00 1364.46 1364.46 852.69 2006.82 812.30 2194.66
144 144.00 1373.68 1373.68 858.45 2020.38 817.79 2209.49
145 145.00 1382.90 1382.90 864.21 2033.94 823.28 2224.32
146 146.00 1392.12 1392.12 869.97 2047.50 828.77 2239.15
147 147.00 1401.34 1401.34 875.73 2061.06 834.26 2253.98
148 148.00 1410.56 1410.56 881.49 2074.62 839.75 2268.81
149 149.00 1419.78 1419.78 887.25 2088.18 845.24 2283.64
150 150.00 1429.00 1429.00 893.01 2101.74 850.73 2298.47
151 151.00 1438.22 1438.22 898.77 2115.30 856.22 2313.30
152 152.00 1447.44 1447.44 904.53 2128.86 861.71 2328.13
153 153.00 1456.66 1456.66 910.29 2142.42 867.20 2342.96
154 154.00 1465.88 1465.88 916.05 2155.98 872.69 2357.79
155 155.00 1475.10 1475.10 921.81 2169.54 878.18 2372.62
156 156.00 1484.32 1484.32 927.57 2183.10 883.67 2387.45
157 157.00 1493.54 1493.54 933.33 2196.66 889.16 2402.28
158 158.00 1502.76 1502.76 939.09 2210.22 894.65 2417.11
159 159.00 1511.98 1511.98 944.85 2223.78 900.14 2431.94
160 160.00 1521.20 1521.20 950.61 2237.34 905.63 2446.77
161 161.00 1530.42 1530.42 956.37 2250.90 911.12 2461.60
162 162.00 1539.64 1539.64 962.13 2264.46 916.61 2476.43
163 163.00 1548.86 1548.86 967.89 2278.02 922.10 2491.26
164 164.00 1558.08 1558.08 973.65 2291.58 927.59 2506.09
165 165.00 1567.30 1567.30 979.41 2305.14 933.08 2520.92
166 166.00 1576.52 1576.52 985.17 2318.70 938.57 2535.75
167 167.00 1585.74 1585.74 990.93 2332.26 944.06 2550.58
168 168.00 1594.96 1594.96 996.69 2345.82 949.55 2565.41
169 169.00 1604.18 1604.18 1002.45 2359.38 955.04 2580.24
170 170.00 1613.40 1613.40 1008.21 2372.94 960.53 2595.07
171 171.00 1622.62 1622.62 1013.97 2386.50 966.02 2609.90
172 172.00 1631.84 1631.84 1019.73 2400.06 971.51 2624.73
173 173.00 1641.06 1641.06 1025.49 2413.62 977.00 2639.56
174 174.00 1650.28 1650.28 1031.25 2427.18 982.49 2654.39
175 175.00 1659.50 1659.50 1037.01 2440.74 987.98 2669.22
176 176.00 1668.72 1668.72 1042.77 2454.30 993.47 2684.05
177 177.00 1677.94 1677.94 1048.53 2467.86 998.96 2698.88
178 178.00 1687.16 1687.16 1054.29 2481.42 1004.45 2713.71
179 179.00 1696.38 1696.38 1060.05 2494.98 1009.94 2728.54
180 180.00 1705.60 1705.60 1065.81 2508.54 1015.43 2743.37
181 181.00 1714.82 1714.82 1071.57 2522.10 1020.92 2758.20
182 182.00 1724.04 1724.04 1077.33 2535.66 1026.41 2773.03
183 183.00 1733.26 1733.26 1083.09 2549.22 1031.90 2787.86
184 184.00 1742.48 1742.48 1088.85 2562.78 1037.39 2802.69
185 185.00 1751.70 1751.70 1094.61 2576.34 1042.88 2817.52
186 186.00 1760.92 1760.92 1100.37 2589.90 1048.37 2832.35
187 187.00 1770.14 1770.14 1106.13 2603.46 1053.86 2847.18
188 188.00 1779.36 1779.36 1111.89 2617.02 1059.35 2862.01
189 189.00 1788.58 1788.58 1117.65 2630.58 1064.84 2876.84
190 190.00 1797.80 1797.80 1123.41 2644.14 1070.33 2891.67
191 191.00 1807.02 1807.02 1129.17 2657.70 1075.82 2906.50
192 192.00 1816.24 1816.24 1134.93 2671.26 1081.31 2921.33
193 193.00 1825.46 1825.46 1140.69 2684.82 1086.80 2936.16
194 194.00 1834.68 1834.68 1146.45 2698.38 1092.29 2950.99
195 195.00 1843.90 1843.90 1152.21 2711.94 1097.78 2965.82
196 196.00 1853.12 1853.12 1157.97 2725.50 1103.27 2980.65
197 197.00 1862.34 1862.34 1163.73 2739.06 1108.76 2995.48
198 198.00 1871.56 1871.56 1169.49 2752.62 1114.25 3010.31
199 199.00 1880.78 1880.78 1175.25 2766.18 1119.74 3025.14
200 200.00 1890.00 1890.00 1181.01 2779.74 1125.23 3039.97
201 201.00 1899.22 1899.22 1186.77 2793.30 1130.72 3054.80
202 202.00 1908.44 1908.44 1192.53 2806.86 1136.21 3069.63
203 203.00 1917.66 1917.66 1198.29 2820.42 1141.70 3084.46
204 204.00 1926.88 1926.88 1204.05 2833.98 1147.19 3099.29
205 205.00 1936.10 1936.10 1209.81 2847.54 1152.68 3114.12
206 206.00 1945.32 1945.32 1215.57 2861.10 1158.17 3128.95
207 207.00 1954.54 1954.54 1221.33 2874.66 1163.66 3143.78
208 208.00 1963.76 1963.76 1227.09 2888.22 1169.15 3158.61
209 209.00 1972.98 1972.98 1232.85 2901.78 1174.64 3173.44
210 210.00 1982.20 1982.20 1238.61 2915.34 1180.13 3188.27
211 211.00 1991.42 1991.42 1244.37 2928.90 1185.62 3203.10
212 212.00 2000.64 2000.64 1250.13 2942.46 1191.11 3217.93
213 213.00 2009.86 2009.86 1255.89 2956.02 1196.60 3232.76
214 214.00 2019.08 2019.08 1261.65 2969.58 1202.09 3247.59
215 215.00 2028.30 2028.30 1267.41 2983.14 1207.58 3262.42
216 216.00 2037.52 2037.52 1273.17 2996.70 1213.07 3277.25
217 217.00 2046.74 2046.74 1278.93 3010.26 1218.56 3292.08
218 218.00 2055.96 2055.96 1284.69 3023.82 1224.05 3306.91
219 219.00 2065.18 2065.18 1290.45 3037.38 1229.54 3321.74
220 220.00 2074.40 2074.40 1296.21 3050.94 1235.03 3336.57
221 221.00 2083.62 2083.62 1301.97 3064.50 1240.52 3351.40
222 222.00 2092.84 2092.84 1307.73 3078.06 1246.01 3366.23
223 223.00 2102.06 2102.06 1313.49 3091.62 1251.50 3381.06
224 224.00 2111.28 2111.28 1319.25 3105.18 1256.99 3395.89
225 225.00 2120.50 2120.50 1325.01 3118.74 1262.48 3410.72
226 226.00 2129.72 2129.72 1330.77 3132.30 1267.97 3425.55
227 227.00 2138.94 2138.94 1336.53 3145.86 1273.46 3440.38
228 228.00 2148.16 2148.16 1342.29 3159.42 1278.95 3455.21
229 229.00 2157.38 2157.38 1348.05 3172.98 1284.44 3470.04
230 230.00 2166.60 2166.60 1353.81 3186.54 1289.93 3484.87
231 231.00 2175.82 2175.82 1359.57 3200.10 1295.42 3499.70
232 232.00 2185.04 2185.04 1365.33 3213.66 1300.91 3514.53
233 233.00 2194.26 2194.26 1371.09 3227.22 1306.40 3529.36
234 234.00 2203.48 2203.48 1376.85 3240.78 1311.89 3544.19
235 235.00 2212.70 2212.70 1382.61 3254.34 1317.38 3559.02
236 236.00 2221.92 2221.92 1388.37 3267.90 1322.87 3573.85
237 237.00 2231.14 2231.14 1394.13 3281.46 1328.36 3588.68
238 238.00 2240.36 2240.36 1399.89 3295.02 1333.85 3603.51
239 239.00 2249.58 2249.58 1405.65 3308.58 1339.34 3618.34
240 240.00 2258.80 2258.80 1411.41 3322.14 1344.83 3633.17
241 241.00 2268.02 2268.02 1417.17 3335.70 1350.32 3648.00
242 242.00 2277.24 2277.24 1422.93 3349.26 1355.81 3662.83
243 243.00 2286.46 2286.46 1428.69 3362.82 1361.30 3677.66
244 244.00 2295.68 2295.68 1434.45 3376.38 1366.79 3692.49
245 245.00 2304.90 2304.90 1440.21 3389.94 1372.28 3707.32
246 246.00 2314.12 2314.12 1445.97 3403.50 1377.77 3722.15
247 247.00 2323.34 2323.34 1451.73 3417.06 1383.26 3736.98
248 248.00 2332.56 2332.56 1457.49 3430.62 1388.75 3751.81
249 249.00 2341.78 2341.78 1463.25 3444.18 1394.24 3766.64
250 250.00 2351.00 2351.00 1469.01 3457.74 1399.73 3781.47
251 251.00 2360.22 2360.22 1474.77 3471.30 1405.22 3796.30
252 252.00 2369.44 2369.44 1480.53 3484.86 1410.71 3811.13
253 253.00 2378.66 2378.66 1486.29 3498.42 1416.20 3825.96
254 254.00 2387.88 2387.88 1492.05 3511.98 1421.69 3840.79
255 255.00 2397.10 2397.10 1497.81 3525.54 1427.18 3855.62
256 256.00 2406.32 2406.32 1503.57 3539.10 1432.67 3870.45
257 257.00 2415.54 2415.54 1509.33 3552.66 1438.16 3885.28
258 258.00 2424.76 2424.76 1515.09 3566.22 1443.65 3900.11
259 259.00 2433.98 2433.98 1520.85 3579.78 1449.14 3914.94
260 260.00 2443.20 2443.20 1526.61 3593.34 1454.63 3929.77
261 261.00 2452.42 2452.42 1532.37 3606.90 1460.12 3944.60
262 262.00 2461.64 2461.64 1538.13 3620.46 1465.61 3959.43
263 263.00 2470.86 2470.86 1543.89 3634.02 1471.10 3974.26
264 264.00 2480.08 2480.08 1549.65 3647.58 1476.59 3989.09
265 265.00 2489.30 2489.30 1555.41 3661.14 1482.08 4003.92
266 266.00 2498.52 2498.52 1561.17 3674.70 1487.57 4018.75
267 267.00 2507.74 2507.74 1566.93 3688.26 1493.06 4033.58
268 268.00 2516.96 2516.96 1572.69 3701.82 1498.55 4048.41
269 269.00 2526.18 2526.18 1578.45 3715.38 1504.04 4063.24
270 270.00 2535.40 2535.40 1584.21 3728.94 1509.53 4078.07
271 271.00 2544.62 2544.62 1589.97 3742.50 1515.02 4092.90
272 272.00 2553.84 2553.84 1595.73 3756.06 1520.51 4107.73
273 273.00 2563.06 2563.06 1601.49 3769.62 1526.00 4122.56
274 274.00 2572.28 2572.28 1607.25 3783.18 1531.49 4137.39
275 275.00 2581.50 2581.50 1613.01 3796.74 1536.98 4152.22
276 276.00 2590.72 2590.72 1618.77 3810.30 1542.47 4167.05
277 277.00 2599.94 2599.94 1624.53 3823.86 1547.96 4181.88
278 278.00 2609.16 2609.16 1630.29 3837.42 1553.45 4196.71
279 279.00 2618.38 2618.38 1636.05 3850.98 1558.94 4211.54
280 280.00 2627.60 2627.60 1641.81 3864.54 1564.43 4226.37
281 281.00 2636.82 2636.82 1647.57 3878.10 1569.92 4241.20
282 282.00 2646.04 2646.04 1653.33 3891.66 1575.41 4256.03
283 283.00 2655.26 2655.26 1659.09 3905.22 1580.90 4270.86
284 284.00 2664.48 2664.48 1664.85 3918.78 1586.39 4285.69
285 285.00 2673.70 2673.70 1670.61 3932.34 1591.88 4300.52
286 286.00 2682.92 2682.92 1676.37 3945.90 1597.37 4315.35
287 287.00 2692.14 2692.14 1682.13 3959.46 1602.86 4330.18
288 288.00 2701.36 2701.36 1687.89 3973.02 1608.35 4345.01
289 289.00 2710.58 2710.58 1693.65 3986.58 1613.84 4359.84
290 290.00 2719.80 2719.80 1699.41 4000.14 1619.33 4374.67
291 291.00 2729.02 2729.02 1705.17 4013.70 1624.82 4389.50
292 292.00 2738.24 2738.24 1710.93 4027.26 1630.31 4404.33
293 293.00 2747.46 2747.46 1716.69 4040.82 1635.80 4419.16
294 294.00 2756.68 2756.68 1722.45 4054.38 1641.29 4433.99
295 295.00 2765.90 2765.90 1728.21 4067.94 1646.78 4448.82
296 296.00 2775.12 2775.12 1733.97 4081.50 1652.27 4463.65
297 297.00 2784.34 2784.34 1739.73 4095.06 1657.76 4478.48
298 298.00 2793.56 2793.56 1745.49 4108.62 1663.25 4493.31
299 299.00 2802.78 2802.78 1751.25 4122.18 1668.74 4508.14
300 300.00 2812.00 2812.00 1757.01 4135.74 1674.23 4522.97
301 301.00 2821.22 2821.22 1762.77 4149.30 1679.72 4537.80
302 302.00 2830.44 2830.44 1768.53 4162.86 1685.21 4552.63
303 303.00 2839.66 2839.66 1774.29 4176.42 1690.70 4567.46
304 304.00 2848.88 2848.88 1780.05 4189.98 1696.19 4582.29
305 305.00 2858.10 2858.10 1785.81 4203.54 1701.68 4597.12
306 306.00 2867.32 2867.32 1791.57 4217.10 1707.17 4611.95
307 307.00 2876.54 2876.54 1797.33 4230.66 1712.66 4626.78
308 308.00 2885.76 2885.76 1803.09 4244.22 1718.15 4641.61
309 309.00 2894.98 2894.98 1808.85 4257.78 1723.64 4656.44
310 310.00 2904.20 2904.20 1814.61 4271.34 1729.13 4671.27
311 311.00 2913.42 2913.42 1820.37 4284.90 1734.62 4686.10
312 312.00 2922.64 2922.64 1826.13 4298.46 1740.11 4700.93
313 313.00 2931.86 2931.86 1831.89 4312.02 1745.60 4715.76
314 314.00 2941.08 2941.08 1837.65 4325.58 1751.09 4730.59
315 315.00 2950.30 2950.30 1843.41 4339.14 1756.58 4745.42
316 316.00 2959.52 2959.52 1849.17 4352.70 1762.07 4760.25
317 317.00 2968.74 2968.74 1854.93 4366.26 1767.56 4775.08
318 318.00 2977.96 2977.96 1860.69 4379.82 1773.05 4789.91
319 319.00 2987.18 2987.18 1866.45 4393.38 1778.54 4804.74
320 320.00 2996.40 2996.40 1872.21 4406.94 1784.03 4819.57
321 321.00 3005.62 3005.62 1877.97 4420.50 1789.52 4834.40
322 322.00 3014.84 3014.84 1883.73 4434.06 1795.01 4849.23
323 323.00 3024.06 3024.06 1889.49 4447.62 1800.50 4864.06
324 324.00 3033.28 3033.28 1895.25 4461.18 1805.99 4878.89
325 325.00 3042.50 3042.50 1901.01 4474.74 1811.48 4893.72
326 326.00 3051.72 3051.72 1906.77 4488.30 1816.97 4908.55
327 327.00 3060.94 3060.94 1912.53 4501.86 1822.46 4923.38
328 328.00 3070.16 3070.16 1918.29 4515.42 1827.95 4938.21
329 329.00 3079.38 3079.38 1924.05 4528.98 1833.44 4953.04
330 330.00 3088.60 3088.60 1929.81 4542.54 1838.93 4967.87
331 331.00 3097.82 3097.82 1935.57 4556.10 1844.42 4982.70
332 332.00 3107.04 3107.04 1941.33 4569.66 1849.91 4997.53
333 333.00 3116.26 3116.26 1947.09 4583.22 1855.40 5012.36
334 334.00 3125.48 3125.48 1952.85 4596.78 1860.89 5027.19
335 335.00 3134.70 3134.70 1958.61 4610.34 1866.38 5042.02
336 336.00 3143.92 3143.92 1964.37 4623.90 1871.87 5056.85
337 337.00 3153.14 3153.14 1970.13 4637.46 1877.36 5071.68
338 338.00 3162.36 3162.36 1975.89 4651.02 1882.85 5086.51
339 339.00 3171.58 3171.58 1981.65 4664.58 1888.34 5101.34
340 340.00 3180.80 3180.80 1987.41 4678.14 1893.83 5116.17
341 341.00 3190.02 3190.02 1993.17 4691.70 1899.32 5131.00
342 342.00 3199.24 3199.24 1998.93 4705.26 1904.81 5145.83
343 343.00 3208.46 3208.46 2004.69 4718.82 1910.30 5160.66
344 344.00 3217.68 3217.68 2010.45 4732.38 1915.79 5175.49
345 345.00 3226.90 3226.90 2016.21 4745.94 1921.28 5190.32
346 346.00 3236.12 3236.12 2021.97 4759.50 1926.77 5205.15
347 347.00 3245.34 3245.34 2027.73 4773.06 1932.26 5219.98
348 348.00 3254.56 3254.56 2033.49 4786.62 1937.75 5234.81
349 349.00 3263.78 3263.78 2039.25 4800.18 1943.24 5249.64
350 350.00 3273.00 3273.00 2045.01 4813.74 1948.73 5264.47
351 351.00 3282.22 3282.22 2050.77 4827.30 1954.22 5279.30
352 352.00 3291.44 3291.44 2056.53 4840.86 1959.71 5294.13
353 353.00 3300.66 3300.66 2062.29 4854.42 1965.20 5308.96
354 354.00 3309.88 3309.88 2068.05 4867.98 1970.69 5323.79
355 355.00 3319.10 3319.10 2073.81 4881.54 1976.18 5338.62
356 356.00 3328.32 3328.32 2079.57 4895.10 1981.67 5353.45
357 357.00 3337.54 3337.54 2085.33 4908.66 1987.16 5368.28
358 358.00 3346.76 3346.76 2091.09 4922.22 1992.65 5383.11
359 359.00 3355.98 3355.98 2096.85 4935.78 1998.14 5397.94
360 360.00 3365.20 3365.20 2102.61 4949.34 2003.63 5412.77
361 361.00 3374.42 3374.42 2108.37 4962.90 2009.12 5427.60
362 362.00 3383.64 3383.64 2114.13 4976.46 2014.61 5442.43
363 363.00 3392.86 3392.86 2119.89 4990.02 2020.10 5457.26
364 364.00 3402.08 3402.08 2125.65 5003.58 2025.59 5472.09
365 365.00 3411.30 3411.30 2131.41 5017.14 2031.08 5486.92
366 366.00 3420.52 3420.52 2137.17 5030.70 2036.57 5501.75
367 367.00 3429.74 3429.74 2142.93 5044.26 2042.06 5516.58
368 368.00 3438.96 3438.96 2148.69 5057.82 2047.55 5531.41
369 369.00 3448.18 3448.18 2154.45 5071.38 2053.04 5546.24
370 370.00 3457.40 3457.40 2160.21 5084.94 2058.53 5561.07
371 371.00 3466.62 3466.62 2165.97 5098.50 2064.02 5575.90
372 372.00 3475.84 3475.84 2171.73 5112.06 2069.51 5590.73
373 373.00 3485.06 3485.06 2177.49 5125.62 2075.00 5605.56
374 374.00 3494.28 3494.28 2183.25 5139.18 2080.49 5620.39
375 375.00 3503.50 3503.50 2189.01 5152.74 2085.98 5635.22
376 376.00 3512.72 3512.72 2194.77 5166.30 2091.47 5650.05
377 377.00 3521.94 3521.94 2200.53 5179.86 2096.96 5664.88
378 378.00 3531.16 3531.16 2206.29 5193.42 2102.45 5679.71
379 379.00 3540.38 3540.38 2212.05 5206.98 2107.94 5694.54
380 380.00 3549.60 3549.60 2217.81 5220.54 2113.43 5709.37
381 381.00 3558.82 3558.82 2223.57 5234.10 2118.92 5724.20
382 382.00 3568.04 3568.04 2229.33 5247.66 2124.41 5739.03
383 383.00 3577.26 3577.26 2235.09 5261.22 2129.90 5753.86
384 384.00 3586.48 3586.48 2240.85 5274.78 2135.39 5768.69
385 385.00 3595.70 3595.70 2246.61 5288.34 2140.88 5783.52
386 386.00 3604.92 3604.92 2252.37 5301.90 2146.37 5798.35
387 387.00 3614.14 3614.14 2258.13 5315.46 2151.86 5813.18
388 388.00 3623.36 3623.36 2263.89 5329.02 2157.35 5828.01
389 389.00 3632.58 3632.58 2269.65 5342.58 2162.84 5842.84
390 390.00 3641.80 3641.80 2275.41 5356.14 2168.33 5857.67
391 391.00 3651.02 3651.02 2281.17 5369.70 2173.82 5872.50
392 392.00 3660.24 3660.24 2286.93 5383.26 2179.31 5887.33
393 393.00 3669.46 3669.46 2292.69 5396.82 2184.80 5902.16
394 394.00 3678.68 3678.68 2298.45 5410.38 2190.29 5916.99
395 395.00 3687.90 3687.90 2304.21 5423.94 2195.78 5931.82
396 396.00 3697.12 3697.12 2309.97 5437.50 2201.27 5946.65
397 397.00 3706.34 3706.34 2315.73 5451.06 2206.76 5961.48
398 398.00 3715.56 3715.56 2321.49 5464.62 2212.25 5976.31
399 399.00 3724.78 3724.78 2327.25 5478.18 2217.74 5991.14
400 400.00 3734.00 3734.00 2333.01 5491.74 2223.23 6005.97
401 401.00 3743.22 3743.22 2338.77 5505.30 2228.72 6020.80
402 402.00 3752.44 3752.44 2344.53 5518.86 2234.21 6035.63
403 403.00 3761.66 3761.66 2350.29 5532.42 2239.70 6050.46
404 404.00 3770.88 3770.88 2356.05 5545.98 2245.19 6065.29
405 405.00 3780.10 3780.10 2361.81 5559.54 2250.68 6080.12
406 406.00 3789.32 3789.32 2367.57 5573.10 2256.17 6094.95
407 407.00 3798.54 3798.54 2373.33 5586.66 2261.66 6109.78
408 408.00 3807.76 3807.76 2379.09 5600.22 2267.15 6124.61
409 409.00 3816.98 3816.98 2384.85 5613.78 2272.64 6139.44
410 410.00 3826.20 3826.20 2390.61 5627.34 2278.13 6154.27
411 411.00 3835.42 3835.42 2396.37 5640.90 2283.62 6169.10
412 412.00 3844.64 3844.64 2402.13 5654.46 2289.11 6183.93
413 413.00 3853.86 3853.86 2407.89 5668.02 2294.60 6198.76
414 414.00 3863.08 3863.08 2413.65 5681.58 2300.09 6213.59
415 415.00 3872.30 3872.30 2419.41 5695.14 2305.58 6228.42
416 416.00 3881.52 3881.52 2425.17 5708.70 2311.07 6243.25
417 417.00 3890.74 3890.74 2430.93 5722.26 2316.56 6258.08
418 418.00 3899.96 3899.96 2436.69 5735.82 2322.05 6272.91
419 419.00 3909.18 3909.18 2442.45 5749.38 2327.54 6287.74
420 420.00 3918.40 3918.40 2448.21 5762.94 2333.03 6302.57
421 421.00 3927.62 3927.62 2453.97 5776.50 2338.52 6317.40
422 422.00 3936.84 3936.84 2459.73 5790.06 2344.01 6332.23
423 423.00 3946.06 3946.06 2465.49 5803.62 2349.50 6347.06
424 424.00 3955.28 3955.28 2471.25 5817.18 2354.99 6361.89
425 425.00 3964.50 3964.50 2477.01 5830.74 2360.48 6376.72
426 426.00 3973.72 3973.72 2482.77 5844.30 2365.97 6391.55
427 427.00 3982.94 3982.94 2488.53 5857.86 2371.46 6406.38
428 428.00 3992.16 3992.16 2494.29 5871.42 2376.95 6421.21
429 429.00 4001.38 4001.38 2500.05 5884.98 2382.44 6436.04
430 430.00 4010.60 4010.60 2505.81 5898.54 2387.93 6450.87
431 431.00 4019.82 4019.82 2511.57 5912.10 2393.42 6465.70
432 432.00 4029.04 4029.04 2517.33 5925.66 2398.91 6480.53
433 433.00 4038.26 4038.26 2523.09 5939.22 2404.40 6495.36
434 434.00 4047.48 4047.48 2528.85 5952.78 2409.89 6510.19
435 435.00 4056.70 4056.70 2534.61 5966.34 2415.38 6525.02
436 436.00 4065.92 4065.92 2540.37 5979.90 2420.87 6539.85
437 437.00 4075.14 4075.14 2546.13 5993.46 2426.36 6554.68
438 438.00 4084.36 4084.36 2551.89 6007.02 2431.85 6569.51
439 439.00 4093.58 4093.58 2557.65 6020.58 2437.34 6584.34
440 440.00 4102.80 4102.80 2563.41 6034.14 2442.83 6599.17
441 441.00 4112.02 4112.02 2569.17 6047.70 2448.32 6614.00
442 442.00 4121.24 4121.24 2574.93 6061.26 2453.81 6628.83
443 443.00 4130.46 4130.46 2580.69 6074.82 2459.30 6643.66
444 444.00 4139.68 4139.68 2586.45 6088.38 2464.79 6658.49
445 445.00 4148.90 4148.90 2592.21 6101.94 2470.28 6673.32
446 446.00 4158.12 4158.12 2597.97 6115.50 2475.77 6688.15
447 447.00 4167.34 4167.34 2603.73 6129.06 2481.26 6702.98
448 448.00 4176.56 4176.56 2609.49 6142.62 2486.75 6717.81
449 449.00 4185.78 4185.78 2615.25 6156.18 2492.24 6732.64
450 450.00 4195.00 4195.00 2621.01 6169.74 2497.73 6747.47
451 451.00 4204.22 4204.22 2626.77 6183.30 2503.22 6762.30
452 452.00 4213.44 4213.44 2632.53 6196.86 2508.71 6777.13
453 453.00 4222.66 4222.66 2638.29 6210.42 2514.20 6791.96
454 454.00 4231.88 4231.88 2644.05 6223.98 2519.69 6806.79
455 455.00 4241.10 4241.10 2649.81 6237.54 2525.18 6821.62
456 456.00 4250.32 4250.32 2655.57 6251.10 2530.67 6836.45
457 457.00 4259.54 4259.54 2661.33 6264.66 2536.16 6851.28
458 458.00 4268.76 4268.76 2667.09 6278.22 2541.65 6866.11
459 459.00 4277.98 4277.98 2672.85 6291.78 2547.14 6880.94
460 460.00 4287.20 4287.20 2678.61 6305.34 2552.63 6895.77
461 461.00 4296.42 4296.42 2684.37 6318.90 2558.12 6910.60
462 462.00 4305.64 4305.64 2690.13 6332.46 2563.61 6925.43
463 463.00 4314.86 4314.86 2695.89 6346.02 2569.10 6940.26
464 464.00 4324.08 4324.08 2701.65 6359.58 2574.59 6955.09
465 465.00 4333.30 4333.30 2707.41 6373.14 2580.08 6969.92
466 466.00 4342.52 4342.52 2713.17 6386.70 2585.57 6984.75
467 467.00 4351.74 4351.74 2718.93 6400.26 2591.06 6999.58
468 468.00 4360.96 4360.96 2724.69 6413.82 2596.55 7014.41
469 469.00 4370.18 4370.18 2730.45 6427.38 2602.04 7029.24
470 470.00 4379.40 4379.40 2736.21 6440.94 2607.53 7044.07
471 471.00 4388.62 4388.62 2741.97 6454.50 2613.02 7058.90
472 472.00 4397.84 4397.84 2747.73 6468.06 2618.51 7073.73
473 473.00 4407.06 4407.06 2753.49 6481.62 2624.00 7088.56
474 474.00 4416.28 4416.28 2759.25 6495.18 2629.49 7103.39
475 475.00 4425.50 4425.50 2765.01 6508.74 2634.98 7118.22
476 476.00 4434.72 4434.72 2770.77 6522.30 2640.47 7133.05
477 477.00 4443.94 4443.94 2776.53 6535.86 2645.96 7147.88
478 478.00 4453.16 4453.16 2782.29 6549.42 2651.45 7162.71
479 479.00 4462.38 4462.38 2788.05 6562.98 2656.94 7177.54
480 480.00 4471.60 4471.60 2793.81 6576.54 2662.43 7192.37
481 481.00 4480.82 4480.82 2799.57 6590.10 2667.92 7207.20
482 482.00 4490.04 4490.04 2805.33 6603.66 2673.41 7222.03
483 483.00 4499.26 4499.26 2811.09 6617.22 2678.90 7236.86
484 484.00 4508.48 4508.48 2816.85 6630.78 2684.39 7251.69
485 485.00 4517.70 4517.70 2822.61 6644.34 2689.88 7266.52
486 486.00 4526.92 4526.92 2828.37 6657.90 2695.37 7281.35
487 487.00 4536.14 4536.14 2834.13 6671.46 2700.86 7296.18
488 488.00 4545.36 4545.36 2839.89 6685.02 2706.35 7311.01
489 489.00 4554.58 4554.58 2845.65 6698.58 2711.84 7325.84
490 490.00 4563.80 4563.80 2851.41 6712.14 2717.33 7340.67
491 491.00 4573.02 4573.02 2857.17 6725.70 2722.82 7355.50
492 492.00 4582.24 4582.24 2862.93 6739.26 2728.31 7370.33
493 493.00 4591.46 4591.46 2868.69 6752.82 2733.80 7385.16
494 494.00 4600.68 4600.68 2874.45 6766.38 2739.29 7399.99
495 495.00 4609.90 4609.90 2880.21 6779.94 2744.78 7414.82
496 496.00 4619.12 4619.12 2885.97 6793.50 2750.27 7429.65
497 497.00 4628.34 4628.34 2891.73 6807.06 2755.76 7444.48
498 498.00 4637.56 4637.56 2897.49 6820.62 2761.25 7459.31
499 499.00 4646.78 4646.78 2903.25 6834.18 2766.74 7474.14
500 500.00 4656.00 4656.00 2909.01 6847.74 2772.23 7488.97
501 501.00 4665.22 4665.22 2914.77 6861.30 2777.72 7503.80
502 502.00 4674.44 4674.44 2920.53 6874.86 2783.21 7518.63
503 503.00 4683.66 4683.66 2926.29 6888.42 2788.70 7533.46
504 504.00 4692.88 4692.88 2932.05 6901.98 2794.19 7548.29
505 505.00 4702.10 4702.10 2937.81 6915.54 2799.68 7563.12
506 506.00 4711.32 4711.32 2943.57 6929.10 2805.17 7577.95
507 507.00 4720.54 4720.54 2949.33 6942.66 2810.66 7592.78
508 508.00 4729.76 4729.76 2955.09 6956.22 2816.15 7607.61
509 509.00 4738.98 4738.98 2960.85 6969.78 2821.64 7622.44
510 510.00 4748.20 4748.20 2966.61 6983.34 2827.13 7637.27
511 511.00 4757.42 4757.42 2972.37 6996.90 2832.62 7652.10
512 512.00 4766.64 4766.64 2978.13 7010.46 2838.11 7666.93
513 513.00 4775.86 4775.86 2983.89 7024.02 2843.60 7681.76
514 514.00 4785.08 4785.08 2989.65 7037.58 2849.09 7696.59
515 515.00 4794.30 4794.30 2995.41 7051.14 2854.58 7711.42
LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING
STRETCH
Name of the work: Providing Amenities including water supply and sanitary arrangements to Bio
Fertilizer Lab at Samalkot in East Godavari District
A) For HBG metal:
HBG metal from Rayavaram quarry
A) yeleswaram- Jaddangi0/0 1'/900 = 1.900 kms
B)Yeleswaram-addatheegala ramavaram road length:
From km 0 / 000 to 6 / 800 = 6.800 kms
C) NH 16 Road length:
From km 246 / 600 to 245 / 600 1.000
D) Yarravaram to Kirlampudi:
From km 8 / 600 to 0 / 000 8.600
E) Samalkot-Prathipadu Road length:
From km 18 / 000 to 0 / 400 17.600
F) Branch road No-II length:
From km 0 / 600 to 0 / 000 0.600
36.500 kms
Or say: 37 kms
B) For Sand: Dowlaiswaram
A) CT
From km = 1.000 kms
B) Kakinada -Rajahmundry canal road road
From km 61 600 to 14 / 200 = 47.400 kms
C)ROB Portion kms
From km 0 000 to 0 / 400 0.400
D)Branch Road No-I road kms
From km 0 000 to 0 / 400 0.400
E)Samalkot-Uppada road kms
From km 0 400 to 1 / 800 1.400
F)Samalkot-Prathipadu road kms
From km 0 000 to 0 / 400 0.400
G)Branch Road No-II road kms
From km 0 000 to 0 / 600 0.600
= 51.600 kms
Or say: 52.000 kms
C) For Bricks:
Vaddlamuru
A)Samalkot-Prathipadu road
From km 0 400 to 3 / 600 = 3.200 kms
B)Branch Road No-II
From km 0 600 to 0 / 000 = 0.600 kms
= 3.800 kms
Or say: 4.000 kms
D) For Gravel :
Gravel @ Pandavulametta
A) Cart track length = = 2.000 kms
B) Samalkot-Gokavaram Road
From km 8 000 to 2 / 600 = 5.400 kms
C)Branch Road No-II
From km 0 000 to 0 / 600 0.600 kms
= 8.000 kms
Or say: 8.000 kms
LEAD CHART
Providing Amenities including water supply and sanitary arrangements to Bio Fertilizer Lab at Samalkot in East Godavari District
RATES AS PER COMMON SSR OF 2016-17 with cement and steel rates of January, 2016
Lead in Area
KM Initial Cost
Add allowence
including
Differenc 1% on loading
Convence Stacking Loading unloading
Sl. No. Description SSR Sl.No. Source of Material in Seignio- towards & Total
Charges Charges charges charges
Total rage storage unloading
wherever
Charges charges
necesssary
@ 20 %
(1) (2) (3) (4) (5) (6) (7) (8) (9) (8) (9) (10) (11)
M-005
1 Sand for concrete works kulla 46 471.33 610.00 0.00 0.00 0.00 0.00 0.00 1081.33
M-006
2 Sand for mortar,plastering works kulla 46 471.33 677.00 0.00 0.00 0.00 0.00 0.00 1148.33
M-008
4 Gravel S-G Road 20 212.56 103.00 0.00 0.00 0.00 0.00 1.73 317.29
LEAD 42
Lead in Area
KM Initial Cost
Add allowence
including
Differenc 1% on loading
Convence Stacking Loading unloading
Sl. No. Description SSR Sl.No. Source of Material in Seignio- towards & Total
Charges Charges charges charges
Total rage storage unloading
wherever
Charges charges
necesssary
@ 20 %
water M-189 (b)
12 Local 0 0.00 77.00 0.00 77.00
13 Cement CSSR-A.05 At Site 0 0.00 6400.00 0.00 0.00 0.00 62.40 12.48 6474.88
CERTIFICATES:-
1 Certified that the above leads are true and correct to the best of my knowledge
2 Certified that the work site does falls within 12 Kms belt of municipality/ Corporation Limits and hence extra allowence is required
LEAD 43
LEAD CHART
arrangements to Bio Fertilizer Lab at Samalkot in East Godavari District
Unit per
(12)
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
Cum.
1000 Nos
1Sqm.
LEAD 44
Unit per
KL
M.T
M.T
M.T
M.T
M.T
LEAD 45
Providing Amenities including water supply and sanitary arrangements to Bio Fertilizer Lab at Samalkot in East
Godavari District
--
1650.22
--
--
--
0
Nos
32.5/1000
no
0.00
774
LABOUR CHARGES
Sl.No Description SSR Sl.No. Initial Rate Final Rate Unit
13 Labour charges for fixing flush door BMM-V.23 348.00 348.00 per Sqmt.
shutter of any thickness fixing the door
shutter to the frame and fixtures to the
door shutter
SCAFFOLDING CHARGES
BRICK MASONRY rate per (0.23M 0.115 thick
sqm THICK)
a) For Superstructure in FF over the rate 982 71.76 312.00 1 cu.m. 624.00
of foundation and basement
b) For Superstructure in SF over the rate 983 97.71 424.83 1 cu.m. 849.65
of FF superstructure
c) For Superstructure in 3rd floor over the 984 123.67 537.70 1 cu.m. 1075.39
rate 2nd floor superstructre
d) Add for every additional floor over 2nd 985 0.00 1 cu.m. 0.00
floor
Scaffolding for Plastering of
walls,ceiling or painting of roof
timber,or walls where height is more
than 3Mt.
Sl NAME OF THE STRUCTURAL Unit of Material Hire charges Labour charges Centring Charges
MEMBER Measureme for 2015-16
nt
1 2 6 3 4 5
HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height up to 3.66 M -Steel scaffolding pipes, jack Props,
wallers, Foot plates, brackets, steel Centering Plates, etc.,
Page 48 C-data
F COLUMNS per 1 cum Rs. 341.00 Rs. 1700.00 Rs. 2041.00
G BEAMS per 1 cum Rs. 2002.00 Rs. 1426.00 Rs. 3428.00
H SLABS - Up to 150 mm thick per 1 sqm Rs. 227.00 Rs. 162.00 Rs. 389.00
I SLABS - above 150 mm - Up to 300 per 1 sqm Rs. 233.00 Rs. 166.00 Rs. 399.00
mm thick
J SLABS - above 300 mm thick per 1 sqm Rs. 244.00 Rs. 174.00 Rs. 418.00
K WAFFLE - (GRID) SLABS (Rib per 1 sqm Rs. 824.00 Rs. 587.00 Rs. 1411.00
Beams with Slabs)
L PERGOLA SLABS (Only Rib Beams) per 1 sqm Rs. 578.00 Rs. 412.00 Rs. 990.00
M ARCH BEAMS - up to 1.5 M Span per 1 cum Rs. 2276.00 Rs. 1621.00 Rs. 3897.00
N ARCH BEAMS - above 1.5 M Span per 1 cum Rs. 2308.00 Rs. 1644.00 Rs. 3952.00
O DOME SLABS per 1 cum Rs. 3681.00 Rs. 2621.00 Rs. 6302.00
P HELICAL STAIRCASES per 1 sqm Rs. 280.00 Rs. 200.00 Rs. 480.00
Q Shear walls RCC walls,Water tank per 1 sqm Rs. Rs. Rs. 0.00
walls
HIRE CHARGES FOR CENTERING & SCAFFOLDING - Unsupported Height up to 7.32 M - Steel scaffolding pipes, jack Props,
wallers, Foot plates, brackets, steel Centering Plates, etc.,
DOME SLABS
P HELICAL STAIRCASES per 1 sqm Rs. 313.00 Rs. 424.00 Rs. 737.00
Sl NAME OF THE STRUCTURAL Unit of Material Hire charges Labour charges Centring Charges
MEMBER Measureme for 2009-10
nt
1 2 6 3 4 5
A FOOTINGS per 1 cum Rs. 19.00 Rs. 361.00 Rs. 380.00
B per 1 cum Rs. 23.00 Rs. 361.00 Rs. 384.00
PEDESTALS
C per 1 cum Rs. 328.00 Rs. 361.00 Rs. 689.00
PLINTH BEAMS
D LINTELS per 1 cum Rs. 279.00 Rs. 361.00 Rs. 640.00
E CHAJJAS - SUNSHADES per 1 sqm Rs. 55.00 Rs. 361.00 Rs. 416.00
F COLUMNS per 1 cum Rs. 42.00 Rs. 361.00 Rs. 403.00
G BEAMS per 1 cum Rs. 422.00 Rs. 361.00 Rs. 783.00
H SLABS - Up to 150 mm thick per 1 sqm Rs. 47.00 Rs. 361.00 Rs. 408.00
I SLABS - above 150 mm - Up to 300 mm per 1 sqm Rs. 49.00 Rs. 361.00 Rs. 410.00
J SLABS - above 300 mm thick per 1 sqm Rs. 51.00 Rs. 361.00 Rs. 412.00
K WAFFLE - (GRID) SLABS (Rib Beams wper 1 sqm Rs. 174.00 Rs. 361.00 Rs. 535.00
L PERGOLA SLABS (Only Rib Beams) per 1 sqm Rs. 122.00 Rs. 361.00 Rs. 483.00
M ARCH BEAMS - up to 1.5 M Span per 1 cum Rs. 480.00 Rs. 361.00 Rs. 841.00
N ARCH BEAMS - above 1.5 M Span per 1 cum Rs. 486.00 Rs. 361.00 Rs. 847.00
O DOME SLABS per 1 cum Rs. 905.00 Rs. 361.00 Rs. 1266.00
P HELICAL STAIRCASES per 1 sqm Rs. 69.00 Rs. 361.00 Rs. 430.00
HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casurina Bellies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates etc., for BRICK MASONRY/STONE MASONRY - 1 sqm
A 1st - Floor per 1 sqm Rs. 9.33 Rs. 61.83 Rs. 71.16
B 2nd - Floor per 1 sqm Rs. 9.33 Rs. 87.78 Rs. 97.11
Page 49 C-data
C per 1 sqm Rs. 9.33 Rs. 113.70 Rs. 123.03
3rd - Floor
D per 1 sqm Rs. 9.33 Rs. 139.70 Rs. 149.03
4th - Floor
E per 1 sqm Rs. 9.33 Rs. 165.60 Rs. 174.93
5th - Floor
Sl NAME OF THE STRUCTURAL Unit of Material Hire charges Labour charges Centring Charges
MEMBER Measureme for 2009-10
nt
1 2 6 3 4 5
HIRE CHARGES FOR ACCESS SCAFFOLDING - up to 3.66 M using Casurina Bellies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates etc., for PLASTERING TO WALLS - 1 sqm
A 1st - Floor per 1 sqm Rs. 0.99 Rs. 6.18 Rs. 7.17
B 2nd - Floor per 1 sqm Rs. 0.99 Rs. 8.78 Rs. 9.77
C 3rd - Floor per 1 sqm Rs. 0.99 Rs. 11.37 Rs. 12.36
D 4th - Floor per 1 sqm Rs. 0.99 Rs. 13.97 Rs. 14.96
E 5th - Floor per 1 sqm Rs. 0.99 Rs. 16.56 Rs. 17.55
HIRE CHARGES FOR STAGE SCAFFOLDING - up to 3.66 M using Casurina Bellies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates etc., for CEILING PLASTERING - 1 sqm
A 1st - Floor per 1 sqm Rs. 2.37 Rs. 12.55 Rs. 14.92
B 2nd - Floor per 1 sqm Rs. 2.37 Rs. 17.64 Rs. 20.01
C per 1 sqm Rs. 2.37 Rs. 22.73 Rs. 25.10
3rd - Floor
D 4th - Floor per 1 sqm Rs. 2.37 Rs. 27.82 Rs. 30.19
E 5th - Floor per 1 sqm Rs. 2.37 Rs. 32.91 Rs. 35.28
CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Steel scaffolding pipes, jack Props, St
Slabs -
Above
Slabs - Up
Chajjas - 150 Mm -
Lintels Columns Beams To 150 mm
Sun Shades Up To
Thick
300 mm
Thick
Unit per 1 cum per 1 sqm per 1 cum per 1 cum per 1 sqm per 1 sqm
1st - Floor
Material Hire for any Floor H 1266.00 250.00 190.00 1916.00 215.00 223.00
Labour Charges for 1st Floor L 424.00 424.00 424.00 424.00 424.00 424.00
Total Hire Charges (H+L) T 1690.00 674.00 614.00 2340.00 639.00 647.00
LABOUR CHARGES for Further Floors
2nd - Floor L 466.00 466.00 466.00 466.00 466.00 466.00
3rd - Floor L 509.00 509.00 509.00 509.00 509.00 509.00
4th - Floor L 551.00 551.00 551.00 551.00 551.00 551.00
5th - Floor L 594.00 594.00 594.00 594.00 594.00 594.00
CENTERING & SCAFFOLDING CHARGES- FLOOR WISE RATES for Casurina Ballies, Bamboos, Wooden Reapers, Runners, Woo
Slabs -
Above
Slabs - Up
Chajjas - 150 Mm -
Lintels Columns Beams To 150 mm
Sun Shades Up To
Thick
300 mm
Thick
Unit per 1 cum per 1 sqm per 1 cum per 1 cum per 1 sqm per 1 sqm
1st - Floor
Material Hire for any Floor H 279.00 55.00 42.00 422.00 47.00 49.00
Labour Charges for 1st Floor L 361.00 361.00 361.00 361.00 361.00 361.00
Total Hire Charges (H+L) T 640.00 416.00 403.00 783.00 408.00 410.00
LABOUR CHARGES for Further Floors
2nd - Floor L 397.00 397.00 397.00 397.00 397.00 397.00
3rd - Floor L 433.00 433.00 433.00 433.00 433.00 433.00
4th - Floor L 469.00 469.00 469.00 469.00 469.00 469.00
5th - Floor L 505.00 505.00 505.00 505.00 505.00 505.00
total
MATERIAL RATES OF MISCELLANEOUS BUILDING ITEMS
Page 50 C-data
Sl. Description of Item SSR Sl. No Unit Rate
No
1 2 3 4 5
Page 51 C-data
29 Mastic Pad 0.60 x 1.20 Mts, 12.7mm BMS.W.21 Sqmt. 568.00
thick
DATA
Providing Amenities including water supply and sanitary arrangements to Bio Fertilizer Lab at Samalkot in East
Godavari District
Qty Rate Per Amount
CEMENT MORTAR (1:2)
Material
Cost of Sand 1.05 Cum 1148.33 1 Cum 1205.75
Cost of Cement 720 Kgs 6474.88 1000 Kgs 4661.91
Man Power
Light Mazdoor 0.20 Nos 420.00 1 Day 84.00
Rate per cu.m. 5951.66
CEMENT MORTAR (1:3)
Material
Cost of Sand 1.05 Cum 1148.33 1 Cum 1205.75
Cost of Cement 480 Kgs 6474.88 1000 Kgs 3107.94
Man Power
Light Mazdoor 0.20 Nos 420.00 1 Day 84.00
Rate per cu.m. 4397.69
CEMENT MORTAR (1:4)
Material
Cost of Sand 1.05 Cum 1148.33 1 Cum 1205.75
Cost of Cement 360 Kgs 6474.88 1000 Kgs 2330.96
Man Power
Page 52 C-data
Light Mazdoor 0.20 Nos 420.00 1 Day 84.00
Rate per cu.m. 3620.70
CEMENT MORTAR (1:5)
Material
Cost of Sand 1.05 Cum 1148.33 1 Cum 1205.75
Cost of Cement 288 Kgs 6474.88 1000 Kgs 1864.77
Man Power
Light Mazdoor 0.20 Nos 420.00 1 Day 84.00
Rate per cu.m. 3154.51
CEMENT MORTAR (1:6)
Material
Cost of Sand 1.05 Cum 1148.33 1 Cum 1205.75
Cost of Cement 240 Kgs 6474.88 1000 Kgs 1553.97
Man Power
Light Mazdoor 0.20 Nos 420.00 1 Day 84.00
Rate per cu.m. 2843.72
CEMENT MORTAR (1:8)
Material
Cost of Sand 1.05 Cum 1148.33 1 Cum 1205.75
Cost of Cement 180 Kgs 6474.88 1000 Kgs 1165.48
Man Power
Light Mazdoor 0.20 Nos 420.00 1 Day 84.00
Rate per cu.m. 2455.23
Cost andConvenyance of 20mm to
6mm HBG Graded Metal / (Trap
20mm 0.6 Cum 1874.27 1 Cum 1124.56
Metal)
12mm 0.15 Cum 1615.51 1 Cum 242.33
10mm 0.15 Cum 1462.75 1 Cum 219.41
6mm 0.10 Cum 1271.99 1 Cum 127.20
Rate per 1 cu.m. Total 1713.50
Hire charges of machinery
SL. Description of machinery Units Hire fuel charges crew total
No charges charges
a) Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils
like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges
such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc.,
complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Pipe
line where the depth is more than 1.5 times width.(APSS No. 308)
Page 53 C-data
C) Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils
like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges
such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc.,
complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Septic
tank soak pit and sump.(APSS No. 308)
174.88
2 Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
material
Metal 40mm 0.9 cu.m. 1345.03 1 cu.m. 1210.52
Sand 0.45 cu.m. 1081.33 1 cu.m. 486.60
Cement 129.6 Kgs. 6474.88 1000 Kgs. 839.14
Water 1.2 KL 77.00 1 KL 92.40
Machinery
concrete mixer300/200 (diesel) 1 Hour 338.60 1 Hour 338.60
LA oncrew charges 20% 206.70 1 41.34
Labour
1st class mason 0.1 Nos. 534.00 1 Each 53.40
Light Mazdoor 1.39 Nos. 420.00 1 Each 583.80
Page 54 C-data
4 Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved
quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing,
laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work for Foundations (APSS No. 402)
material
Metal 40mm 0.9 cu.m. 1345.03 1 cu.m. 1210.52
Sand 0.45 cu.m. 1081.33 1 cu.m. 486.60
Cement 162 Kgs. 6474.88 1000 Kgs. 1048.93
Water 1.2 KL 77.00 1 KL 92.40
Machinery
concrete mixer300/200 (diesel) 1 Hour 338.60 1 Hour 338.60
LA oncrew charges 20% 206.70 1 41.34
Labour
1st class mason 0.1 cu.m. 534.00 1 cu.m. 53.40
Light Mazdoor 1.39 Nos. 420.00 1 Each 583.80
Add 13.615% over heads 3855.59 cu.m. 0.14 1 cu.m. 524.94
Rate per Cu.m. Total 4381.00
5 Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and
labour charges such as mixing, laying concrete, finishing top surface, curing concrete, etc., complete for finished item
of work for Dummy Columns. (APSS No. 402)
materal
Graded Metal 20mm to 6mm 0.9 cu.m. 1713.50 1 cu.m. 1542.15
Sand 0.45 cu.m. 1081.33 1 cu.m. 486.60
Cement 129.6 Kgs. 6474.88 1000 Kgs. 839.14
Water 1.2 KL 77.00 1 KL 92.40
Machinery
concrete mixer300/200 (diesel) 1 Hour 338.60 1 Hour 338.60
LA oncrew charges 20% 206.70 1 41.34
Labour
1st class mason 0.1 cu.m. 534.00 1 cu.m. 53.40
Light Mazdoor 1.39 Nos. 420.00 1 Each 583.80
Total 3977.43
Rate for other Floors GF FF SF TF
Basic Rate of P.C.C(1:5:10) per Cum. 3977.43 3977.43 3977.43 3977.43
Hire charges on centering material 341.00 341.00 341.00 341.00
Labour charges for centering 1700.00 1870.00 2040.00 2210.00
La on centering labour charges 20% 340.00 374.00 408.00 442.00
Lift Charges per Cum. 0.00 63.72 127.44 191.16
6358.43 6626.15 6893.87 7161.59
Add 13.615% over heads 0.14 865.70 902.15 938.60 975.05
Rate per cu.m. Total 7224.15 7528.35 7832.50 8136.65
5 Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed
Blocks and Hold Fasts (APSS No. 402)
Material
Page 55 C-data
concrete mixer300/200 (diesel) 1 Hour 338.60 1 Hour 338.60
LA oncrew charges 20% 206.70 1 41.34
Labour
1st class mason 0.1 cu.m. 534.00 1 Each 53.40
Light Mazdoor 1.39 Nos. 420.00 1 Each 583.80
Basic rate per Cum. Total 4562.76
Rate for other Floors GF FF SF TF
Basic Rate of P.C.C(1:3:6) per Cum. 4562.76 4562.76 4562.76 4562.76
Hire charges on centering material 277.00 277.00 277.00 277.00
Labour charges for centering 473.00 520.30 567.60 614.90
La on centering labour charges 20% 94.60 104.06 113.52 122.98
Lift Charges per Cum. 0.00 63.72 127.44 191.16
5407.36 5527.84 5648.32 5768.80
Add 13.615% over heads 0.14 736.21 752.62 769.02 785.42
Rate per cu.m. Total 6143.60 6280.50 6417.35 6554.25
6 Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and
labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402)
Material
Graded Metal 20mm to 6mm 0.9 cu.m. 1713.50 1 cu.m. 1542.15
Sand 0.45 cu.m. 1081.33 1 cu.m. 486.60
Cement 331.2 Kgs. 6474.88 1000 Kgs. 2144.48
Water 1.2 KL 77.00 1 KL 92.40
Machinery
concrete mixer300/200 (diesel) 1 Hour 338.60 1 Hour 338.60
LA oncrew charges 20% 206.70 1 41.34
Labour
1st class mason 0.1 cu.m. 534.00 1 cu.m. 53.40
men &women Mazdoor 1.39 Nos. 420.00 1 Each 583.80
Basic rate per Cum. Total 5282.77
Rate for other Floors GF FF SF TF
Basic Rate of P.C.C(1:2:4) per Cum. 5282.77 5282.77 5282.77 5282.77
Hire charges on centering material 277.00 277.00 277.00 277.00
Labour charges for centering 473.00 520.30 567.60 614.90
La on centering labour charges 20% 94.60 104.06 113.52 122.98
Lift Charges per Cum. 0.00 63.72 127.44 191.16
6127.37 6247.85 6368.33 6488.81
Add 13.615% over heads 0.14 834.24 850.64 867.05 883.45
Rate per cu.m. Total 6961.65 7098.50 7235.40 7372.30
9 Plain Cement Concrete M20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine
crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1
cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate,
water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing,
laying concrete, lift charges, curing etc., complete for finished item of work for steps (APSS No. 402 )
Material
Graded Metal 20mm to 6mm 0.8 cu.m. 1713.50 1 cu.m. 1370.80
Sand 0.4 cu.m. 1081.33 1 cu.m. 432.53
Cement 350 kgs 6474.88 1000 kgs 2266.21
Water 1.2 KL 77.00 1 KL 92.40
Machinery
Batchingplant 0.5 cum 1.333 Hour 556.80 1 Hour 742.21
needle vibrator 40 mm (petrol) 1.333 Hour 175.40 1 Hour 233.81
LA on crew charges 20% 624.91 1 124.98
Labour
1st class Masons 0.1 Nos. 534.00 1 Each 53.40
Page 56 C-data
Man and Mazdoor 1.39 Nos. 420.00 1 Each 583.80
Basic rate per Cum. 5900.14
Rate for other Floors GF FF SF TF
Basic Rate of P.C.C(1:1.5:3) per Cum. 5900.14 5900.14 5900.14 5900.14
Hire charges on centering material 277.00 277.00 277.00 277.00
Labour charges for centering 473.00 520.30 567.60 614.90
La on centering labour charges 20% 94.60 104.06 113.52 122.98
Lift Charges per Cum. 0.00 63.72 127.44 191.16
6744.74 6865.22 6985.70 7106.18
Add 13.615% over heads 0.14 918.30 934.70 951.10 967.51
Rate per cu.m. Total 7663.05 7799.95 7936.85 8073.70
10 Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved
quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting
stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item
of work for foundation and basement (APSS No. 601 & 615)
11 Coursed Rubble stone masonry 2nd sort, in CM (1:8) prop: (Cement: Sand) using hard blasted granite stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site
including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as
cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 612)
12 Flush Pointing to CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges
and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Page 57 C-data
5 Supply and placing of the M-25 Grade Vibrated Reinforced Design Mix Concrete corresponding to IS 456 using WEIGH
BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from
standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for footings, plinth
beams and pedestals
Material
Graded Metal 20mm to 6mm 0.8 cu.m. 1713.50 1 cu.m. 1370.80
Sand 0.4 cu.m. 1081.33 1 cu.m. 432.53
Cement 380 kgs 6474.88 1000 kgs 2460.45
Machinery
manpower
1st Class Mason 0.133 Nos. 534.00 1 Each 71.02
2nd Class Mason 0.267 Nos. 480.00 1 Each 128.16
Man Mazdoor 4.6 Nos. 420.00 1 Each 1932.00
Basic rate per Cum. Total 7588.37
a) VRCC M25 grade design mix for
footings
Basic Rate per Cum. 1 cu.m. 7588.37 1 cu.m. 7588.37
Material
Graded Metal 20mm to 6mm 0.8 cu.m. 1713.50 1 cu.m. 1370.80
Sand 0.4 cu.m. 1081.33 1 cu.m. 432.53
Cement 380 kgs 6474.88 1000 kgs 2460.45
Page 58 C-data
Water 1.2 KL 77.00 1 KL 92.40
Machinery
Batchingplant 0.5 cum 1.333 Hour 556.80 1 Hour 742.21
needle vibrator 40 mm (petrol) 1.333 Hour 175.40 1 Hour 233.81
LA on crew charges 20% 624.91 1 124.98
manpower
1st Class Mason 0.167 Nos. 534.00 1 Each 89.18
2nd Class Mason 0.167 Nos. 480.00 1 Each 80.16
Man Mazdoor 5.6 Nos. 420.00 1 Each 2352.00
Basic rate per Cum. Total 7978.53
a) For columns / RCC walls and Water
tanks
b) For Lintels
Rate as worked out above per Cum. 7978.53 7978.53 7978.53 7978.53
8 Supply and placing of the M-25 Grade Vibrated Reinforced Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with
minimum cement content as per IS code from standard suppliers approved by the department including
pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its
fabrication charges for finished item of work For beams and slabs
Material
Graded Metal 20mm to 6mm 0.8 cu.m. 1713.50 1 cu.m. 1370.80
Sand 0.4 cu.m. 1081.33 1 cu.m. 432.53
Cement 380 kgs 6474.88 1000 kgs 2460.45
Water 1.2 KL 77.00 1 KL 92.40
Machinery
Batchingplant 0.5 cum 0.308 Hour 556.80 1 Hour 171.49
needle vibrator 40 mm (petrol) 0.308 Hour 175.40 1 Hour 54.02
LA on crew charges 20% 144.39 1 28.88
manpower
1st Class Mason 0.067 Nos. 534.00 1 Each 35.78
2nd Class Mason 0.133 Nos. 480.00 1 Each 63.84
Man Mazdoor 3.077 Nos. 420.00 1 Each 1292.34
Page 59 C-data
Basic rate per Cum. Total 6002.54
a) For Roof Beams
Rate for other Floors GF FF SF TF
Rate as worked out above per Cum. 6002.54 6002.54 6002.54 6002.54
Hire charges on centering material 2002.00 2002.00 2002.00 2002.00
Labour charges for centering 1426.00 1568.60 1711.20 1853.80
La on centering labour charges 20% 285.20 313.72 342.24 370.76
Lift charges @ 10% extra on each floor 139.20 278.39 417.59
9715.74 10026.06 10336.37 10646.69
Add 13.615% over heads 0.14 1322.80 1365.05 1407.30 1449.55
Rate per cu.m. Total 11038.55 11391.15 11743.70 12096.25
Cost of VRCC for 75 mm thick slab 0.075 cu.m. 6002.54 1 cu.m. 450.19
Cost of VRCC for 110 mm thick slab 0.11 cu.m. 6002.54 1 cu.m. 660.28
Cost of VRCC for 120 mm thick slab 0.12 cu.m. 6002.54 1 cu.m. 720.30
Page 60 C-data
Rate for other Floors GF FF SF TF
Rate as worked out above per Cum. 720.30 720.30 720.30 720.30
Hire charges on centering material 227.00 227.00 227.00 227.00
Labour charges for centering 162.00 178.20 194.40 210.60
La on centering labour charges 20% 32.40 35.64 38.88 42.12
Lift charges @ 10% extra on each floor 16.70 33.41 50.11
1141.70 1177.84 1213.99 1250.13
Add 13.615% over heads 0.14 155.44 160.36 165.29 170.21
Rate per 1 Sqmts. Total 1297.15 1338.25 1379.30 1420.35
Cost of VRCC for 125 mm thick slab 0.125 cu.m. 6002.54 1 cu.m. 750.32
Cost of VRCC for 140 mm thick slab 0.14 cu.m. 6002.54 1 cu.m. 840.36
Page 61 C-data
Cost of VRCC for 115 mm thick slab 0.1 cu.m. 6002.54 1 cu.m. 600.25
Cost of VRCC for 150 mm thick slab 0.15 cu.m. 6002.54 1 cu.m. 900.38
Page 62 C-data
m) VRCC M25 for Slabs
180mm thick for 180 mm thick slab
Cost of VRCC 0.18 cu.m. 6002.54 1 cu.m. 1080.46
7 Supply and placing of the M-25 Grade Vibrated Reinforced Design Mix Concrete corresponding to IS 456 using WEIGH
BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel
and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from
standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating,
curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work
Material
Graded Metal 20mm to 6mm 0.8 cu.m. 1713.50 1 cu.m. 1370.80
Sand 0.4 cu.m. 1081.33 1 cu.m. 432.53
Cement 380 kgs 6474.88 1000 kgs 2460.45
Water 1.2 KL 77.00 1 KL 92.40
Machinery
Batchingplant 0.5 cum 1.333 Hour 556.80 1 Hour 742.21
LA on crew charges 20% 426.56 1 85.31
manpower
Page 63 C-data
1st Class Mason 0.167 Nos. 534.00 1 Each 89.18
2nd Class Mason 0.167 Nos. 480.00 1 Each 80.16
Man Mazdoor 5.6 Nos. 420.00 1 Each 2352.00
Basic rate per Cum 7705.05
a) For Lintels
Rate for other Floors GF FF SF TF
Rate as worked out above per Cum. 7705.05 7705.05 7705.05 7705.05
Cost of RCC for 62.5 mm thick 0.0625 cu.m. 5939.00 1 cu.m. 371.19
sunshade
Rate as worked out above per Cum. 371.19 371.19 371.19 371.19
Hire charges on centering material 224.00 224.00 224.00 224.00
Labour charges for centering 186.00 204.60 223.20 241.80
La on centering labour charges 20% 37.20 40.92 44.64 48.36
Lift charges @ 10% extra on each floor 8.70 17.40 26.10
Cost of RCC for 50 mm thick platform 0.05 cu.m. 5939.00 1 cu.m. 296.95
Page 64 C-data
718.35 744.75 771.15 797.55
Add 13.615% over heads 0.14 97.80 101.40 104.99 108.59
Rate per Sqmt. Total 816.00 846.15 876.15 906.15
cost of cement for Cement Mortar (1:3) 0.96 Kgs 6.47 1 Kgs 6.22
cost of sand for Cement Mortar (1:3) 0.002 cu.m. 1081.33 1 cu.m.
1st Class Mason 0.048 Nos. 534.00 1 Each 25.63
2nd Class Mason 0.112 Nos. 480.00 1 Each 53.76
Man mazdoor 0.05 Nos. 420.00 1 Each 21.00
Woman mazdoor 0.11 Nos. 420.00 1 Each 46.20
Rate per 1 Sqmt. Total 152.80
9 Brick Masonry in basement with CM (1:8) prop: using Bricks traditional size 23 x 11 x 7 with compressive of 37 Kgs /
Sqcm from approved source including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as
mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of
work. (APSS No. 501 & 504).
Page 65 C-data
Rate per Cum. Total 5231.00
18 Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and
labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc.,
complete for finished item of work. (APSS No. 501 & 504).
Page 66 C-data
Bricks traditional size 23 x 11 x 7 cms 6167.21 Nos 512.00 1000 Nos 3157.61
2nd classfor Cement Mortar (1:8)
Cement 36 Kgs 6.47 1 Kgs 232.92
Sand for Cement Mortar (1:8) 0.2 cu.m. 1081.33 1 cu.m. 216.27
Labour
1st class mason 0.24 cu.m. 534.00 1 cu.m. 128.16
2nd class mason 0.56 Nos. 480.00 1 Each 268.80
Man Mazdoor 1.89 Nos. 420.00 1 Each 793.80
Woman Mazdoor 0 Nos. 420.00 1 Each 0.00
Basic Rate per Cum. 4797.56
Rate for other Floors GF FF SF TF
Basic rate per Cum 4797.56 4797.56 4797.56 4797.56
Hire charges of stage scafflding per 81.13 81.13 81.13 81.13
cum
Labour charges for stage scaffolding 537.65 763.30 988.70 1214.78
per
Addcum
LA on Labour for scaffolding 20% 107.53 152.66 197.74 242.96
Lift charges @ 10% extra on each floor 119.08 238.15 357.23
5523.87 5913.73 6303.28 6693.66
Add 13.615% over heads 0.14 752.07 805.15 858.19 911.34
Rate per Cum. Total 6276.00 6718.90 7161.50 7605.00
10 Brick Masonry with CM (1:6) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs /
Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc.,
to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges
such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished
item of work. for basement (APSS No. 501 & 504).
11 Reinforced Brick Masonary wall of 11.5 cm in CM ( 1:4) using 2nd class brick having a crushing strength of not less
than 35 Kgs and using two mild steel bars of 6 mm dia in every third layer of brick masonary with free joints of main
brick works including cost, seigniorage and conveyance of all materials and water from approved source to work site and
all operational, incidental labour charges such as scaffolding, mixing mortar, constructing masonary, lift charges, curing
etc., complete for finished item of work as per SS 509 for first floor
Material
Bricks traditional size 23 x 11 x 7 cms 6167.21 Nos 58.90 1000 Nos 363.25
2nd class
Cement for Cement Mortar (1:4) 7.2 Kgs 6.47 Kgs 46.58
Sand for Cement Mortar (1:4) 0.02 cu.m. 1081.33 1 cu.m. 21.63
Labour
1st class mason 0.06 cu.m. 534.00 1 cu.m. 32.04
2nd class mason 0.06 Nos. 480.00 1 Each 28.80
Man Mazdoor 0.275 Nos. 420.00 1 Each 115.50
Basic Rate per One Sqmt. 607.80
Rate for other Floors GF
Hire charges of stage scafflding per 607.80
cum
Labour charges for stage scaffolding 145.87
per
25%cum
on labour charges 25% 0.00
753.67
Add 14% over heads 0.14 102.61
Page 67 C-data
Rate per One Sqmt. Total 856.28
12 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm
diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and
conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks,
chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting,
bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of
work (APSS No.126) in all floors.
Material
Cost of steel including 5% wastage and 1.05 MT 34589.76 1 MT 36319.25
overlaps
cost of binding wire 6 Kg 60.00 1 Kg 360.00
Labour
Blacksmith/Tin Smith/Rivetor 10 Nos 534.00 1 Nos 5340.00
Light mazdoor 10 Nos 420.00 1 Nos 4200.00
Rate per MT Total 46219.25
Rate for other Floors GF FF SF TF
Basic rate per MT 46219.25 46219.25 46219.25 46219.25
Lift Charges per MT @10% extra on 954.00 1908.00 2862.00
labour per floor
Material
15 Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in
CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing
mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in -
charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Material
Labour
Page 68 C-data
1st Class Mason 0.063 Nos. 534.00 1 Each 33.64
2nd Class Mason 0.147 Nos. 480.00 1 Each 70.56
Light mazdoor 0.39 Nos. 420.00 1 Each 163.80
Basic rate per 1 Sqmt. 318.18
Material
Base coat 8mm thick in C.M. (1:6)
26 Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS
901,903 & 904)
Page 69 C-data
2nd Class Mason 0.147 Nos. 480.00 1 Each 70.56
Light mazdoor 0.39 Nos. 420.00 1 Each 163.80
Basic rate per 1 Sqmt. 330.56
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 330.56 330.56 330.56 330.56
Hire charges of access scafflding pers 0.99 0.99 0.99 0.99
qm
Labour charges for access scaffolding 6.18 8.78 11.37 13.97
per sqm
Add LA on Labour for scaffolding 20% 1.24 1.76 2.27 2.79
Lift charges @ 10% extra on each floor 26.80 53.60 80.40
338.97 368.89 398.79 428.71
Add 13.615% over heads 0.14 46.15 50.22 54.30 58.37
Rate per 1 Sqmt. Total 385.15 419.15 453.10 487.10
27 Ornamental Plastering with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials
like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
sand for Cement Mortar (1:4) 0.015 cu.m. 1148.33 1 cu.m. 17.22
1st Class Mason 0.06 Nos. 534.00 1 Each 32.04
Man mazdoor 0.096 Nos. 420.00 1 Each 40.32
Rate per 1 Sqmt. Total 124.55
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 124.55 124.55 124.55 124.55
Hire charges of access scafflding pers 0.99 0.99 0.99 0.99
qm
Labour charges for access scaffolding 6.18 8.78 11.37 13.97
per
Addsqm
LA on Labour for scaffolding 20% 1.24 1.76 2.27 2.79
Lift charges @ 10% extra on each floor 7.24 14.47 21.71
132.96 143.32 153.65 164.01
Add 13.615% over heads 0.14 18.10 19.51 20.92 22.33
Rate per 1 Sqmt. Total 151.10 162.85 174.60 186.35
28 Plastering with CM(1:4) Prop: 20mm thick in single coat including cost and conveyance of all materials like cement,
sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS
901,906)
sand for Cement Mortar (1:4) 0.021 cu.m. 1148.33 1 cu.m. 24.11
1st Class Mason 0.094 Nos. 534.00 1 Each 50.20
Man mazdoor 0.16 Nos. 420.00 1 Each 67.20
Rate per 1 Sqmt. Total 190.45
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 190.45 190.45 190.45 190.45
Hire charges of access scafflding pers 0.99 0.99 0.99 0.99
qm
Labour charges for access scaffolding 6.18 8.78 11.37 13.97
per
Addsqm
LA on Labour for scaffolding 20% 1.24 1.76 2.27 2.79
Lift charges @ 10% extra on each floor 11.74 23.48 35.22
198.86 213.72 228.56 243.42
Add 13.615% over heads 0.14 27.07 29.10 31.12 33.14
Rate per 1 Sqmt. Total 225.95 242.85 259.70 276.60
29 Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average)
mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at
1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread
lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water
proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth
with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
Page 70 C-data
cost of cement for Cement Mortar (1:3) 10.08 kg 6.47 1 kg 65.22
sand for Cement Mortar (1:3) 0.021 cu.m. 1148.33 1 cu.m. 24.11
Water proof compound 0.2 Kgs 115.00 1 Kgs 23.00
1st Class Mason 0.066 Nos. 534.00 1 Each 35.24
2nd Class Mason 0.154 Nos. 480.00 1 Each 73.92
Man Mazdoor 0.37 Nos. 420.00 1 Each 155.40
Basic rate per 1 Sqmt. 376.90
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 376.90 376.90 376.90 376.90
Lift charges @ 10% extra on each floor 22.93 45.86 68.80
376.90 399.83 422.76 445.70
Add 13.615% over heads 0.14 51.31 54.44 57.56 60.68
Rate per 1 Sqmt. Say 428.25 454.30 480.35 506.40
Page 71 C-data
32 Err:504
Flooring with Rough Kadapa slabs of
minimum 40 mm thick, size not less
than (0.457 x 457M)laid over existing
CC bed or roof slab set over a base coat
of CM (1:8), 12mm thick and pointing
with CM(1:3) to full depth of flooring
slabs dully filling joints neatly ,
including cost and conveyance of all
materials like flooring stones, cement,
sand, water, etc. to site, seigniorage
charges, sales and other taxes on all
materials, all operational, incidental and
labour charges such as mixing of
cement mortar, laying, pointing, curing,
lift charges etc., complete for finished
item of work.(APSS No.703 & 701)
sand for Cement Mortar (1:8) 0.012 cu.m. 1081.33 1 cu.m. 12.98
Pointing with CM (1:3) 1 Sqmt. 152.80 1 Sqmt. 152.80
Material
Cost of Polished Black Kadapa slabs 1.1 Sqmt. 1035.96 1 Sqmt. 1139.55
minimum of 15 mm thick (0.457M x
0.457M)
sand for Cement Mortar (1:3) 0.012 cu.m. 1081.33 1 cu.m. 12.98
cement for Cement Mortar (1:3) base 5.76 Kgs 6474.88 1000 Kgs 37.30
coat
Cement for slurry 3.3 Kgs 6474.88 1000 Kgs 21.37
Labour
Page 72 C-data
1st Class Mason 0.096 Nos. 534.00 1 Each 51.26
2nd Class Mason 0.224 Nos. 480.00 1 Each 107.52
Man Mazdoor 0.31 Nos. 420.00 1 Each 130.20
Add water charges @1% on labour 1% 288.98 2.89
Basic rate per 1 Sqmt. 1503.07
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 1503.07 1503.07 1503.07 1503.07
Lift charges @ 10% extra on each floor 29.19 58.37 87.56
1503.07 1532.26 1561.44 1590.63
Add 14% over heads 0.14 204.64 208.62 212.59 216.56
Rate per 1 Sqmt. Total 1707.75 1740.90 1774.05 1807.20
in Single piece with the edges flat nd fixing of
34 nosed and and
Supplying set over
fixinga of
base coat ofBlack
Polished CM
(1:3),
Kadapa 12mm thick, and fixing in
slabs minimum of 15 mm thick
position
(0.457M xwith neat incement paste
0.457M) Single piece
including cost flat
andnosed
conveyance of alla
with the edges and set over
materials
base coat oflike
CM cement, sand, water,
(1:3), 12mm thick, and
stones
fixing etc. to site, seigniorage
in position with neat charges,
cement
sales
paste and other cost
including taxesand
onconveyance
all materials,of
all operational,
all materials likeincidental and labour
cement, sand, water,
charges such as dressing of stones
stones etc. to site, seigniorage charges, to the
required sizes, taxes
mixing
on allofmaterials,
cement
sales and other
mortar, fixing in position, curing, lift
all operational, incidental and labour
charges etc., complete
charges such as dressingforoffinished
stones toitem
the
of work For
required raisers
sizes, (APSSofNo.701
mixing cement &
707)
mortar, fixing in position, curing, lift
charges etc., complete for finished item
of work For raisers (APSS No.701 &
707)
Page 73 C-data
cost of Polished Black Kadapa slabs 1.1 Sqmt. 1035.96 1 Sqmt. 1139.55
minimum of 15 mm thick (0.457M x
0.457M)
Coarse sand for mortor(C.M. 1:8) 0.012 cum 1081.33 1 cum 12.98
Machinery
Labour
Page 74 C-data
14 Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as approved by Engineer - in - charge set
over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like
consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth
mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic
tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges
such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work.(APSS No.701 &
707) in All Floors
Material
Ceramic Tiles 1.01 Sqmt. 450.00 1 Sqmt. 454.50
Sand 0.012 cum 1081.33 1 cum 12.98
Cement 2.16 Kgs 6474.88 1000 Kgs 13.99
Grey Cement for slurry 3.3 Kgs 6474.88 1000 Kgs 21.37
White Cement for pointing 0.2 Kgs 29.00 1 Kgs 5.80
Labour
Labour
32 Whiting to new walls and ceiling in two coats with Birla White or equavalent quality to give an even shade after
thoroughly brushing the surface to remove all loose powdered materials including cost and conveyance of all materials
and water to site, sales & other taxes, all operational, incidental and labour charges such as cleaning the surface,
painting, curing etc., complete for finished item of work for internal walls. (APSS No.901 & 908) in All Floors
Page 75 C-data
33 Painting to New walls with two coats of Snowcem cement paint of superior quality of approved brand and shade over
base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the
surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for
External Walls.(APSS No. 912) in All Floors
Material
16 Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an
existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational
and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
42 Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5 Kg/cm2 pressure including Cost of
necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and
conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental
and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors
Cost of 110mm dia PVC Pipe.(page 3.00 Rmt. 70.00 1 Rmt 210.00
274)
Cost of P.V.C.Bend 391 BMW-F.57 1.00 No. 65.00 1 No 65.00
Cost PVC shoe 397 BMW-G.63 1.00 No. 56.00 1 No 56.00
Cost of Clips 440 BMW-G.106 3.00 Nos. 14.00 1 No 42.00
Plumber 1st Class 0.30 Nos. 534.00 1 Each 160.20
Plumber 2nd class 0.70 Nos. 480.00 1 Each 336.00
Man Mazdoor 1.00 No. 420.00 1 Each 420.00
Rate per 3 Rmt. 1289.20
429.73
Add 14% over heads 0.14 429.73 58.51
Rate per Rmt. Total 488.25
43 Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, Fins & staircase railing with rabbit wire
mesh & nominal reinforcement as directed by Engineer-in-charge with dubara spong finishing including cost &
conveyence of all materials to site, including seigniorage charges, sales and other taxes on all materials and all
operational, incidental charges such as labour charges, like mixing cement mortar, scaffolding charges, lift charges,
curing, for making 50 mm thick RCM Paradah walls (RCM Drop walls) including tying Rabbit (chicken) wire mesh to
the existing mild steel / HYSD Steel reinforcement applying mortar lumps, finishing, plastering to both faces, sponge
finishing etc complete for finished item of work but excluding cost of steel and its fabrication charges in All Floors
materials
Costof rabit wire mesh 1.33 Sqmt 17.00 1 Sqmt 22.61
43 Grade cement 31.91 Kgs 6474.88 1000 Kgs 206.61
Cost of coarse sand 0.06 Cum 1081.33 1 Cum 62.72
Labour
Page 76 C-data
1st Class Mason 0.80 Nos. 534.00 1 Each 427.20
Miller operator 0.10 Nos. 534.00 1 Each 53.40
Man Mazdoor 1.00 Nos. 420.00 1 Each 420.00
Hire charges of miller 0.20 Hour 89.00 1 Hour 17.80
Basic rate per 1 Sqmt. 1210.34
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 1210.34 1210.34 1210.34 1210.34
Lift charges @ 10% extra on each floor 91.84 183.68 275.52
17 Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an
even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains
including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges
etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
PRIMARY COAT
Luppam finish BMT-J.07 0.1 Kg. 158.00 1 Kg 15.80
Ready mixed primer 0.07 lit 158.00 1 Lt 11.06
Ist class painter 0.021 Nos. 612.00 1 Each 12.85
2nd class painter 0.049 Nos. 480.00 1 Each 23.52
TWO COATS OF PAINTING
Synthetic enamel paint 0.12 lit 276.00 1 lit 33.12
1st class painter 0.036 Nos. 612.00 1 Each 22.03
2nd class painter 0.084 Nos. 480.00 1 Each 40.32
158.70
Add 13.615% over heads 0.14 158.70 21.61
Rate per 1 Sqmt. for all Floors Total 180.00
45 Supply and Fixing of 50mm thick Jali including cost and conveyance of all materials to site, sales & other taxes, all
operational, incidental and labour charges etc., complete for finished item of work in All Floors.
Unit = 1 Sqmt
A ) material
cost of 6mm thick corregated AC sheets 1.05 Sqmt 222.00 1 Sqmt 233.10
8mm dia G.I.J bolts & nuts 2.2 Nos. 13.00 1 Each 28.60
G.I washersBitumen washers 2.2 Nos. 0.50 1 Each 1.10
Bitumen washers 2.2 Nos. 0.20 1 Each 0.44
B) labour
Page 77 C-data
Carpenter II class 0.043 Nos. 534.00 1 Each 22.96
Man Mazdoor 0.054 Nos. 420.00 1 Each 22.68
Sundries including 50 x 6 mm Iron 0.00
wind ties and white lead etc.,
308.88
Rate per 1 Sqmt. for all Floors 308.88
Add 14% over heads 0.14 42.05
Rate per one Sqmt 350.95
36 Supply and Fixing MS Purlins 50mm dia including Labour Charges for fixing complete including cost and conveyance
of all materials to site, sales and other taxes, all labour charges etc., complete for finished item of work
Cost of MS Pipe 50mm dia asper 5.1 Kgs. 61.00 1 Kgs. 311.10
(BMT-F.04)
Fabrication, Cutting and Fixing charges 5.1 Kgs. 21.00 1 Kgs. 107.10
(BMM-V.16)
418.20
Add 13.615% over heads 0.14 418.20 56.94
Rate per Rmt. 475.15
18 Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over
base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the
surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for Walls.
(APSS No. 912) in All Floors(internal)
50 Providing expansion joint treatment with ploy sulphide compound of approved make of finsihed size 25 x 12 mm
including making of 25mm x 12mm groove and primer coat over finished groove with finishing of edges true to straight
line and level over the finished surface of expansion joint including cost and convenyance of all materials to site, all
incidental , operational , labour charges etc., complete for finished item of work as per approved drawing ( for all floors
on top slab i.e, in the flooring and for internal vertical joints of grooves in dadooing surface).
Page 78 C-data
Add 14% over heads 0.14 353.00 48.06
toal 401.10
53 Supply and Fixing of 230mm wide PVC water bar at expansion joint over roof slab including cost , all taxes and
convenyance of all materials to site and all labour charges , cutting and fixing charges etc., complete for finsihed item of
work.
19 Painting with weather proof plastic emulson grade -1 paint to exterior faces of new walls with 3 coats of approved make
shade and colour including self prime coat including cost and conveyence of all materials like plastic emulsinn paint of
Grade-1 to site including cost of brushes scaffolding charges, lifiting charges and labour charges such as preparing the
wall applying three coats of plastik emlsion etc., complete for finished item of work (APSS No 910,911 7 1201) in all
floors
Primary coat
Lappam finish 0.100 Kg 43.75 1 kg 4.38
Ready mixed primer 0.070 ltrs 210.00 1 ltr 14.70
1st class painter 0.021 Nos 534.00 each 11.21
2 nd class painter 0.049 Nos 480.00 each 23.52
two coat of painting
Plastic emulsion paint Grade-1 0.090 ltrs 189.00 1 ltr 17.01
1 st class painter 0.036 Nos 534.00 each 19.22
2 nd class painter 0.084 Nos 480.00 each 40.32
130.36
Page 79 C-data
Add 13.615% over heads 0.14 17.75
Rate per 1 sqm total 148.00
56 Providing and laying of cinder concrete in cement cinder mix (1 :15) prop. Using 12.5 mm nominal size cinder laid in
layers and compacted as directed for filling sunken floors including cost and conveyence of all materials, water to the
work site, seinerage charges and all operational, incidental labour charges such as mixing cement & cinder etc. complete
for finished item of work.
Unit = 10 sqm
A) Chlorpyriphos/ Lindane
emulsifiable concentrate of 20%
Unit = 10 sqm
A. MATERIALS:
Chequerred terrazzo tiles of 30mm sqm 314.00 10.05 3155.70
thick (medium shade)
Cement for CM (1:6) proportion for kg. 6.47 28.80 186
base coat
Cement for slurry kg. 6.47 33.00 213.67
Cement for jointing & pointing kg. 6.47 6.00 38.85
Pigment kg. 0.00 0.00 0.00
Sand for CM (1:6) proportion cum 1081.33 0.12 129.76
Seigniorage charges of sand cum 0.00 0.12 0.00
B. MACHINERY
Nill
C. LABOUR
Mason 2nd class day 480.000 0.960 460.80
Man mazdoor day 320.000 2.240 716.80
Mazdoor (unskiled) day 250.00 3.30 825.00
Add water charges 1% 5727 1% 57.27
Page 80 C-data
Add 13.615% over heads 5784 14.00% 809.81
Grand Total per 10 sqm 6594
Page 81 C-data
22 Flooring with vitrified tiles of 1st quality of size not less than 598 x598 mm x 8 mm thickness set over base coat of
cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of
matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage
charges, etc., complete for finished item of work Ground floor
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles of 1st quality of size sqm 940.00 10.10 9494.00
Cement for CM (1:8) for base coat kg. 6.47 21.60 139.86
23 Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set
over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per
sqm and jointed with white cement paste mixed with pigment of matching shade , including cost of all materials like
tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work,
Ground floor
Unit = 10 sqm
A. MATERIALS:
Vitrified tiles polished 1st quality sqm 940.00 10.10 9494.00
Sand for cm 1:5 base coat cum 1081.33 0.12 129.76
Cement for cm 1:5 base coat kgs 6.47 34.56 223.77
Cement for slurry kgs 6.47 33.00 213.67
White cement for jointing & pointing kgs 29.00 2.00 58.00
Supply of Red Oxide Primer Paint for 0.70 Liter 142.00 1 Liter 99.40
iron works of Grade -1
Painter Cl- I 0.21 day 612.00 1 day 128.52
Painter Cl- II 0.49 day 480.00 1 day 235.20
Applicable Municipal Area Allowance 0.00
0.00
Supply of ready mixed Synthetic 1.10 Liter 276.00 1 Liter 303.60
Enamel paints in all shades Grade - I
Page 82 C-data
Applicable Overheads and Contractor's 13.615% 1338.28 182.21
profit
Value Added Tax ( Works Contract Tax) 0% 0.00
25 Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness
over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying
knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the
surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour
charges etc. complete for finished item of work for Internal walls for:-Internal Colouring - Providing Putty to Internal
walls
Total 1685.29
Rate per 1 Sqm Say 169
29 Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty or texture paint or
equivalent such as NCL/ Saicoat texture paint of average 2 to 3 mm thickness over plastered surface to prepare the
surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered
materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by
putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to
work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls -
including cost of access scaffolding for:-External Colouring - Providing Putty/ Texture to External walls
Total 4070.90
Rate per 1 Sqm Say 407
26 Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat of approved
cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to
remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls for:-
External Colouring - Plastic emulsion paint - 3 Coats
0.00
acrylic emulsion paint 0.80 Ltr 248.00 1 Ltr 198.40
Page 83 C-data
Painter Cl- I 0.21 day 534.00 1 day 112.14
Painter Cl- II 0.49 day 480.00 1 day 235.20
Light mazdoor 1.50 day 320.00 1 day 480.00
Applicable Municipal Area Allowance
Total 1798.62
Rate per 1 sqm say 180
27 Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1 as per India Gypsum) using
12.5 mm thick Gyp Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27
mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c
and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm
c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip
to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to
the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at
230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the
tapered & square edges with jointing compound, two coats of drywall topcoat complete for finished item of work as per
Idia Gypsum Ltd specification.
UNIT -1 sqm
A) Material requirement as per India
Gypsum
12.5 mm Gypboard BMT-M.03 1.03 sqm 248.00 1 sqm 254.35
Ceiling Angle BMT-M.04 0.00
25 mm x 10 mm x 0.55 mm 0.64 RM 74.00 1 RM 47.36
Connecting Clips BMT-M.17 1.84 Nos 2.00 1 Nos 3.68
Ceiling Section BMT-M.05 0.00
51.5 mm x 26 mm x 10.5 mm x 0.55 0.84 RM 85.00 RM 71.40
1
mm thick
Intermediate Channel BMT-M.06 0.00
45 mmx 15 mm x 15 mm x 0.9 mm 0.84 RM 84.00 RM 70.56
1
Page 84 C-data
Jointing Paper Tape BMT-M.23 1.46 RM 5.00 1 RM 7.30
Drywall Top Coat BMT-M.24 0.15 Lits 142.00 1 Lits 21.30
B) LABOUR CHARGES 0.00
1st Class Carpenter 0.12 day 420.00 1 day 50.40
2nd Class Carpenter 0.12 day 375.00 1 day 45.00
1st Class Painter 0.02 day 480.00 1 day 11.52
2nd Class Painter 0.02 day 375.00 1 day 9.00
Operator lathe/drilling/shearing 0.01 day 480.00 day 5.76
1
machine
Operator bending/planing machine 0.02 day 420.00 day 10.08
1
Material
Material
Cost of polished black kadapa 1.1 Sqmt. 137.90 1 Sqmt. 151.69
minimum of 15mm
thick(0.457mx0.457m)
Page 85 C-data
sand for Cement Mortar (1:3) 0.012 cu.m. 1148.33 1 cu.m. 13.78
cement for Cement Mortar (1:3) base 5.76 Kgs 6474.88 1000 Kgs 37.30
coat
Cement for slurry 3.3 Kgs 6474.88 1000 Kgs 21.37
Labour
1st Class Mason 0.096 Nos. 534.00 1 Each 51.26
2nd Class Mason 0.224 Nos. 480.00 1 Each 107.52
Man Mazdoor 0.31 Nos. 420.00 1 Each 130.20
Add water charges @1% on labour 1% 288.98 2.89
Basic rate per 1 Sqmt. 516.01
Rate for other Floors GF FF SF TF
Basic rate per 1 Sqmt. 516.01 516.01 516.01 516.01
Lift charges @ 10% extra on each floor 29.19 58.37 87.56
516.01 545.20 574.38 603.57
Add 14% over heads 0.14 70.25 74.23 78.20 82.18
Rate per 1 Sqmt. Total 586.30 619.45 652.60 685.75
Page 86 C-data
Doors and Windows
1 Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles of 48 mm x 60 mm x 2.0 mm for
outer frames, 64 mm x 60 mm x 2.0 mm for mullion sections for two or more openable shutters and 78 mm x 60 mm x 2.0 mm for outward openable shutter frame or 70 mm x 60 mm x 2.0 mm
for inward openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated &
welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant accessories for
casement window - friction stay hinges of stainless steel grade 304- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, locking system suitably concealed 1 No., per sash provided
with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and
conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work
UNIT 1 Sqm
A Material BMT-P.69 Supplying and fixing of Unplasticised Poly Vinyl 1.00 Sqm 6471.00 1 Sqm 6471.00
Chloride (UPVC) casement windows openable
shutters duly manufactured using UPVC reinforced
profiles of 48 mm x 60 mm x 2.0 mm for outer
frames, 64 mm x 60 mm x 2.0 mm for mullion
sections for two or more openable shutters and 78
mm x 60 mm x 2.0 mm for outward openable shutter
frame or 70 mm x 60 mm x 2.0 mm for inward
openable shutter frame
UNIT 1 Sqm
A Material BMT-P.21 Ventilators: Fixed louvers 4'-0" x 2'-0" (1219.2 x 1.00 Sqm 4737.00 1 Sqm 4737.00
609.6 mm) (Box section) outer frame section size of
33 x 56 mm Mullion section size of 33 x 56 mm
3 BLD-CSTN- Supply and Fixing Door made of Skin pass galvanized Iron Sheet ( conform to Base Steel as per IS 513 D Quality, Galvanized as per IS 277 with Hot Zinc Coating of 120 grams/ Sq.mtr) with
13-16 pure polyester powder coating of 60 - 65 Microns (Dry Film thickness) manufactured from 1.2 mm thick galvanized steel sheet formed to single rebate profile of size 100 mm x 58 mm fitted with
TEE anchors and supplied to knock down /welded form with Miter Joint for Bolted Assembly at site, cleaned and coated with Polyurethane powder coating of thickness 65 75 microns (Dry
Film Thickness) & Oven Baked at 200 Degree Centigrade for Wood Grain finish, Stainless Steel Ball Bearing Butt Hinges of 102 x 76 x 3mm thick fixed flush to the frame, suitable for double
leaves of door shutters frame of section 105 x 60 x 35 rebate including 6 Nos. of standard legs made from flat/ steel strips not less than 1.60 mm thick including base tie of section 50 mm x 25
mm (minimum) pre-fixed hinges of size 100 x 65 x 2 mm 6 Nos. for double shutters with one side fixed to frame for fixing shutters, 3 Nos. rubber bottom inserts in the frame necessary
arrangements for aldrop hole( 10 long 12 mm aldrop) and tower bolt welded to frame at top and bottom and fixing 50 mm long hinges to frame for wind cleat 1 No and flush door shutters of 35
mm thick solid bond wood block board type with both side commercial ply (BSC) as per drawing including including cost of Powder Coated 6 Nos. butt hinges 150 x 31.75 x 3.5 mm, 4 No
tower bolt of 250x12mm dia, 1 No. Aldrops - 300 mm long and 4 Nos. handles of 150 mm size & 2 No. 63 mm long door stopper including fixing the fixtures to door with required no. of
screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work as per APSS 1001 & 1002
Material BMT-F.32 Supply and Fixing Door Frames made of Skin pass 7.64 Rmt 787 1 Rmt 6012.68
galvanized Iron Sheet ( conform to Base Steel as per
IS 513 D Quality, Galvanized as per IS 277 with
Hot Zinc Coating of 120 grams/ Sq.mtr) with pure
polyester powder coating of 60 - 65 Microns (Dry
Film thickness) manufactured from 1.2 mm thick
galvanized steel sheet formed to single rebate profile
of size 100 mm x 58 mm fitted with TEE anchors
and supplied to knock down /welded form with
Miter Joint for Bolted Assembly at site, cleaned and
coated with Polyurethane powder coating of
thickness 65 75 microns (Dry Film Thickness) &
Oven Baked at 200 Degree Centigrade for Wood
Grain finish, Stainless Steel Ball Bearing Butt
Hinges of 102 x 76 x 3mm thick fixed flush to the
frame
BMT-N.17 Flush door shutters, solid bond wood block board 6.344 sqm 1488 1 sqm 9439.872
type with commercial ply on both faces : 35
mmthick conforming to IS:2202
BMT-G.17 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 4 No. 75 1 No. 300
250 mm Long
BMT-G.36 MS-Powder Coated Door Handles (IS:208) 150 mm 4 No. 50 1 No. 200
Long
BMT-G.53 MS-Powder Coated - Door Stoppers 2 No. 50 1 No. 100
Market Rubber bush 2 No. 10 1 No. 20
Man power BMM-V.23 Labour charges for fixing Flush door shutters of any 6.344 sqm 348 1 sqm 2207.712
thickness to the existing door frame including fixing
the fixtures to the door shutter excluding cost of
shutter
BMT-G.17 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 2 No. 75 1 No. 150
250 mm Long
BMT-G.36 MS-Powder Coated Door Handles (IS:208) 150 mm 2 No. 50 1 No. 100
Long
BMT-G.53 MS-Powder Coated - Door Stoppers 1 No. 50 1 No. 50
Market Rubber bush 1 No. 10 1 No. 10
Man power BMM-V.23 Labour charges for fixing Flush door shutters of any 2.556 sqm 348 1 sqm 889.488
thickness to the existing door frame including fixing
the fixtures to the door shutter excluding cost of
shutter
BMT-G.17 MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 2 No. 75 1 No. 150
250 mm Long
BMT-G.36 MS-Powder Coated Door Handles (IS:208) 150 mm 2 No. 50 1 No. 100
Long
BMT-G.53 MS-Powder Coated - Door Stoppers 1 No. 50 1 No. 50
BMT-G.63 Providing and fixing Cast Iron Body Bottle Type 1 No. 1035 1 No. 1035
Hydraulic Door Closer (IS: 3564) with double speed
adjustment, with necessary accessories and screws
etc. complete
I. Alround frame
85 x 35 mm section alround = (1.52+1.37)*2 = 5.78 Rm
40 X 25 X 6mm thick T section = 2 X 1.22 = 2.44 @ 3.30 Kg/m =
add extra for corner pieces and cleats
4
50mm dia G.I pipes
horizontals = 1.84m X 1 no = 1.84 m
verticals = 1.05 m X 3nos = 3.15 m
total = 4.99 m
25 X25mm Square rod
verticals (large)= 1m X 3nos = 3.00 m
S.No Quantity unit Description
1 2 3 4
verticals (small)= 0.7m X 5nos = 3.5 m
horizontals = 0.7m X 4 no =2.8m
horizontal = 1.84m X 1no = 1.84m
total = 16.13m X 4.9kg/m = 79.04Kg
50mm dia G.I pipes (B - class)
79.04 kg Total steel for verticals & horizontals
5.29 m 50mm dia G.I pipes (B - class)BMW-F.77
79.04 Kg Labour charges for fabrication
BMM-V.16
79.04 Kg Labour charges for fixing in position
14% Over heads and contractor's profit
per 1 Rmt
Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters duly m
using UPVC reinforced profiles of 48 mm x 60 mm x 2.0 mm for outer frames, 64 mm x 60 mm x 2.0 mm for mul
for two or more openable shutters and 78 mm x 60 mm x 2.0 mm for outward openable shutter frame or 70 mm x
mm for inward openable shutter frame capable of mounting single glazing system structurally reinforced with hot di
up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window s
fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering s
accessories for casement window - friction stay hinges of stainless steel grade 304- 2 Nos., per sash, handle with
casting 1 No. per sash, locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth o
the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing
including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with t
casement sizing complete for finished item of work
1 sqm Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement
windows openable shutters duly manufactured using UPVC reinforced profiles
of 48 mm x 60 mm x 2.0 mm for outer frames, 64 mm x 60 mm x 2.0 mm for
mullion sections for two or more openable shutters and 78 mm x 60 mm x 2.0
mm for outward openable shutter frame or 70 mm x 60 mm x 2.0 mm for
inward openable shutter frame BMT-P.69
sqm sqm
44.00 each
176.00
550.00 sqm 1320.00
1320.00 0.00
24.00 Kg 520.45
4.00 Kg 86.74
2682.41
2682.41
5.78 Rm
8.05 Kgs
0.40
8.45 Kgs
16.87 Kgs
Rate unit Amount
5 6 7.00
10.97 Rm
10.29 Kgs
204.00 Rm 1179.12
65.62 M 719.82
22.00 Kg 1337.82
0.00
4.00 Kg 243.24
0.00
5965.19
2945.77
Say 2946
Rate unit Amount
5 6 7.00
44.06 mt 3482.76
475.00 2512.75
21.00 Kg 1659.84
3.50 Kg 276.64
7931.99 1110.48
9042.47
rmt 4914.39
windows openable shutters duly manufactured
64 mm x 60 mm x 2.0 mm for mullion sections
penable shutter frame or 70 mm x 60 mm x 2.0
structurally reinforced with hot dip galvanized
ough fusion welding the window sash shall be
PV Gaskets/ EPDM weathering seal resistant
04- 2 Nos., per sash, handle with mazak alloy
ed with raiser wedges for smooth operation and
r sealant, easy glazing/ deglazing at site etc.,
ansportation, erection at site with templates for
6471.00 Sqm
6471
6,471 881.03
7352.0267
per sqm
Providing Amenities including water supply and sanitary arrangements to Bio
Fertilizer Lab at Samalkot in East Godavari District
CERTIFICATE
a Columns up to first
floor
S.No
Description No Measurements Quantity Rate/unit Amount
L B D
1 2 3 4 5 6 7 8 9
C1 1 0.30 0.30 3.50 0.32
0.32
0.32 11384 3614
cum per cum
6 Vibrated Reinforced Cement Concrete M20 Design Mix ( by weigh
batching ) using 20mm size (SS5) hard blasted granite machine crushed
graded metal (Coarse aggregate) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concrete including cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges on all
materials including centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross members etc., shuttering ,
machine mixing, laying concrete, vibrating,lift charges, curing etc.,
complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402 & 403) For beams and slabs
a Roof Beams
C1 2 0.30 0.30 3.00 0.54
0.54
0.54 11039 5961
cum per cum
a Roof slabs
C1 1 3.00 3.00 - 9.00
9.00
9.00 1297 11574
sqm per sqm
7 Filling with useful available excavated earth (excluding rock) in trenches,
sides of foundations and basement with initial lead in layers not
exceeding 15cm thick, consolidating each deposited layer by watering and
ramming including cost and conveyence of water to work site and all
operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
Plinth protection
Plinth wall 1 100.00 - 0.46 46.00
46.00
Add extras 4.00
Say 50.00 385.15 19258
sqm sqm
10 Reinforced cement concrete with M20 grade Design mix ( by weigh
batching ) using 20mm size (SS 5) machine crushed hard blasted granite
graded metal (coarse aggregate) from approved quarry using a
minimum quantity of 350 Kg of cement per 1 Cum of concrete including
cost and conveyance of all materials like cement, fine aggregate (sand)
,coarse aggregate, water etc. to site and cost of seigniorage charges on
all materials including centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross members etc., shuttering,
machine mixing, laying concrete, 7.5cm thick at fixed end and 5cm
thick at free end with an average thickness of 6.25cm including
labour charges for mixing, laying, curing etc., complete but excluding
Reinforced cement concrete with M20 grade Design mix ( by weigh
batching ) using 20mm size (SS 5) machine crushed hard blasted granite
graded metal (coarse aggregate) from approved quarryQuantity
using a Rate/unit
S.No
Description No Measurements Amount
minimum quantity of 350 Kg of cement per 1 Cum of concrete including
cost and conveyance of all materialsLlike cement,
B fine Daggregate (sand)
1 ,coarse aggregate,
2 water etc.3 to site 4and cost 5of seigniorage
6 7 on
charges 8 9
all materials including centering using Cashewrina Ballies and Wooden
runners & staging including all bracings, cross members etc., shuttering,
machine mixing, laying concrete, 7.5cm thick at fixed end and 5cm
thick at free end with an average thickness of 6.25cm including
labour charges for mixing, laying, curing etc., complete but excluding
cost of steel and its fabrication charges for finished item of work
Platforms of 50mm
thickness
QC lab 1 6.00 - 0.90 5.40
Fermentation room-1 1 6.00 - 0.90 5.40
Fermentation room-2 1 6.00 - 0.90 5.40
Fermentation room-3 1 6.00 - 0.90 5.40
21.60
6.40
28.00 816.00 22848
sqm sqm
Shelves of 25mm thick
QC lab 1 30.00 - 0.60 18.00
Culture preparation room 1 30.00 - 0.60 18.00
Office staff room 1 30.00 - 0.60 18.00
ADA room 1 30.00 - 0.60 18.00
72.00
72.00 872.00 62784
sqm sqm
11 Plastering 12mm thick in two coats with base coat of 8mm thick in CM
(1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish
including cost and conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, finishing, curing, etc.,
complete for Even Surfaces of Wall for finished item of work. (APSS
901,903 & 904)
16 Flooring with chequered tiles of approved barand colour and shade and
design laid over a flooring bed set over 12mm thick (1:8) prop. Base and
neat grey cement shurry of honey like consistency spread at the rate of
3.30 Kgs of cement per Sqm and jointaed with heat white cement paste
mixed with pigments of matching shade and including cost, seigniorage
charges and conveyance of all materials water etc., from approved sources
to work site and all operational, incidental labour charges such as mixing
mortar, laying lift charges, water curing etc., complete for finished item of
work but excluding cost of C.C.Bed .
S.No
Description
emery paper, Sand the surface,No clean & Measurements
wipe off loose dust,Quantity
applying Rate/unit Amount
L B D
knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand
1 with 180 and 2 320 No., emery3 paper for
4 the surface
5 preparation
6 including
7 8 9
cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc. complete for finished item of work for
Internal walls
Internal Walls
ADA room 2 10.78 3.30 71.15
Office staff 2 13.86 3.30 91.48
Ent.Lounge 1 20.42 3.30 67.39
Godown -3 2 9.16 3.30 60.46
Godown -2 2 9.16 3.30 60.46
Godown -1 2 9.66 3.30 63.76
corridor 1 58.00 3.30 191.40
Deduction D -12 1.20 2.10 -30.24
Deduction D1 -2 1.00 2.10 -4.20
Deduction D/W -1 2.40 2.10 -5.04
Formulation room 2 12.43 3.30 82.04
Fermentation room-2 2 12.21 3.30 80.59
Fermentation room-1 2 12.21 3.30 80.59
Media preparation room 3.30 60.46
2 9.16
22 Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415
grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting,
bending, to required sizes and shapes placing in position with cover
blocks of approved size and binding wire of 20SWG, forming grills
for reinforcement work as per approved designs and drawings
including cost and conveyance of bars from approved sources to site
of work, including cost and conveyance of binding wire, cover blocks,
chairs, overlaps, spacers, dowels, wastage etc., and all operational,
incidental, and labour charges such as cutting, bending, placing in
position, tying etc., and sales & other taxes,on cost of all materials
complete for finished item of work (APSS No.126) in all floors.
32 Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x
457 .2 mm BMW-I.105
5 - - - 5.00 609.20 3046
no each
33 S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod
with brackets and aluminium screws BMW-I.22
nos each
39 S& F 110 mm dia 3 M Double Socket PVC/SWR pipe - 4 Kg/sq.cm -
Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand BMW-G.16
S.No
Description No Measurements Quantity Rate/unit Amount
L B D
1 2 3 4 5 6 7 8 9
1 30.00 - -
30.00 658.40 10793
m 1.83rm
40 S& F 75 mm dia 1828.8 mm (6'-0") Single Socket PVC/SWR pipe - 4
Kg/sq.cm Prince/ Sudhakar/ Kisan/ Supreme or any ISI Bran BMW-G.17
1 30.00 - -
30.00 223.25 2233
m rm
41 S& F 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings
(Prince/Sudhakar/ Kisan/ Supreme or any ISI Brand) BMW-G.57
10 - - -
10.00 114.18 1142
no each
42 Supplying and fixing CI Nahani traps 100 mm dia Inlet- 75 mm (3")
outlet pipe - 4 Kgs 1st quality ISI marked conforming to IS:1729-1979
with C.P. Grating fixing with white cement as per site requirements with
standard practice for all floors including cost and conveyance of all
materials to site, labour charges etc., complete for finished item of work.
10 - - -
10.00 415.40 4154
no each
43 110 mm dia - Single Tee - UPVC/SWR Pipe fittings (Prince/ Sudhakar/
Kisan/
Supreme or any ISI Brand) BMW-G.69
10 - - -
10.00 142.59 1426
no each
44 Providing & Placing on Terrace (at all floor levels) polyethylene
waterstorage tank with Double layer approved brand & manufacture with
cover andsuitable locking arrangement & making necessary holes for inlet
& outlets andover flow pipes but without fittings & base support for tanks
(BMW-G.01)
2 - - -
1000.00 7.05 14100
lit per lit
Submersible Pump and Borewell
45 Drilling of bore well with Rotary rig to finished dia of 175mm justify
both sides (which may be carried out by pilot bore of suitable dia and
ramming to required dia all formations suitable for rotary drilling such as
alluvial soils sand stone formation etc including insertion of 175mm dia
blue casing pipe up to depth as directed by Engineer - in-Charge
Providing Amenities including water supply and sanitary arrangements to Bio Fertilizer Lab at Samalkot in
East Godavari District
DATAS
AREA ALLOWENCE 20%
ADD 14% OVERHEADS 14%
Sl.N
DESCRIPTION ITEM CODE COEF. UNIT RATE PER UNIT Amount (Rs.)
o
1 Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc., complete including cost and
conveyance of all materials, labour charges for fixing etc., complete for finished item of work in all floors as per ssr item no 598
Basic rate as per ssr item BMW-I.28 1.00 Nos 243.00 1.00 Nos 243.00
Area allowence on labour charges BMW-I.29 20% 12.00 1.00 0.00 2.40
245.40
add overheads @ 13.62% 33.41
Total rate per 1 Nos 278.85
2 Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality
including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.
Basic rate as per ssr item BMW-I 105 1.00 Nos 513.00 1.00 Nos 513.00
Area allowence on labour charges BMW-I.106 20% 116.00 1.00 0.00 23.20
536.20
add overheads @ 13.62% 73.00
Total rate per 1 Nos
609.20
3 Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian make heavy type including cost and
conveyance of all materials , labour charges etc. complete for finished item of work.
Basic rate as per ssr item BMW-D33 1.00 Nos 930.00 1.00 Nos 930.00
Area allowence on labour charges BMW-D36 20% 150.00 1.00 0.00 30.00
960.00
add overheads @ 13.62% 130.70
Total rate per 1 No 1090.70
5 Supplying and fixing CI Nahani traps 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked conforming to IS:1729-
1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for all floors including cost and
conveyance of all materials to site, labour charges etc., complete for finished item of work.
WS-DATA P No 117
Sl.N
DESCRIPTION ITEM CODE COEF. UNIT RATE PER UNIT Amount (Rs.)
o
A Basic rate as per ssr item Nahany trap
BMW-C41 1.00 Nos 329.00 1.00 Nos 329.00
Area allowence on labour charges BMW-C42 20% 59.00 1.00 0.00 11.80
340.80
add overheads @ 13.62% 46.40
Total rate per 1 No 387.20
Basic rate as per ssr item BMW-G01 1.00 Lit 6.00 1.00 Lit 6.00
Area allowence on labour charges BMW-G02 20% 1.00 1.00 0.00 0.20
6.20
add overheads @ 13.62% 0.84
Total rate per 1 Ltr 7.05
7 Supply and fixing of stainless steel sink with drain board of size 914.4 mm x 457.2 mm 1 mm thick of indian make on cantilever brackets
including 32 mm CP waste coupling including supply & fixing of 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of 1st quality,
chasing brick masonry wall and making good after construction i.e., restoring to original srufaces etc., complete including cost and
conveyance of all materials and labour charges for all operations etc., complete for finished item of work in all floors
Basic rate as per ssr item BMW-I119 1.00 Nos 7552.00 1.00 Nos 7552.00
Area allowence on labour charges BMW-I120 20% 506.00 1.00 0.00 101.20
7653.20
add overheads @ 13.62% 1041.98
Total rate per 1 No 8695.20
8 Supply and Fixing 10 Litres capacity Single Flush white PVC low level flushing system parryware, slimline with internal components and
short bend including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc.,
complete for finished item of work for all floors.
Basic rate as per ssr item BMW-G08 1.00 Nos 1455.00 1.00 Nos 1455.00
Area allowence on labour charges 20% 0.00 1.00 0.00 0.00
1455.00
add overheads @ 13.62% 198.10
Total rate per 1 No 1653.10
WS-DATA P No 118
Standard Data Electrical Items SSR 2014-15
Providing Amenities including water supply and sanitary arrangements to Bio Fertilizer Lab at Samalkot in
East Godavari District
Area allowence
Overheads and contractors profit on materials
Overheads and contractors profit on labour 0%
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
1 1.4.2 Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all
required accessories including masonary work and labour charges etc., complete. Make : Sudhakar/
(C) Maco Plast / Modi
El Data P No 119
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
Add contr profit @14% on Labour 0% 2480.00 0.00
C) Cost for 100 RM 5711.60
Rate per Metre = C/100 57.15
3 2.1.1 Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable
(ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch
control box including all labour charges etc., comp
Make : Million / RPG/ paragon
4 Wiring with 2 runs of1.0 Sqmm PVC insulated flexible copper cable,(phase,neutral) in the metalic/nonmetalic condu
pipe with 6A flush type two way switch control, ceiling rose and 3mm thick hylam sheet covering to MS switch
control box including all labour charges etc., complete for staircase in Residential buildings as required. Make:
Finolex L&T.
Rate as per light point in non residential
Building=327.40
5 2.1.4 Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity
including wire leads, earth connections along with all labour charges etc., complete.
Makes : Anchor / Gold Medal Olive /Million Zoom
b) Labour charges : .
elec-8.1.77 Skilled Electrician day 0.067 355.00 23.79
El Data P No 120
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
Add area allowence on labour charges @ 0% 0.00
7 2.1.5 Supply and Fixing of 16A 3pin and 6A 3pin plug socket with and 16A switch control duly recessed in
wall with MS switch deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth
connections and all labour charges etc., complete. Plug Socket.
Makes : Gold Medal / ANCHOR/ OLIVE/Million ZOOM.
El Data P No 121
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
Note : Labour Charges proposed for 10 jobs per day
8 Supply and fixing of cat-6 RJ-45information outlets including dual face plate with MS box with modular
plate cover with screws connections etc., Makes: Belden/D link/Legrand
a) Material
elec-7.1.5 cat-6 RJ 45 information oulet 1 340.00 340.00
0.00
394.00
Add contr profit @14% on material 0.00 0.00
Total for material 394.00
b) Labour charges :
elec-8.1.77 Skilled Electrician day 0.2 315.00 63.00
10 3.1.4.a Supply and run of 2 of 2.5 Sq mm PVC insulated flexible copper cable and 1 run of 1.00 Sq mm flexible
PVC insulated flexible copper cable in the existing conduit pipe for run of mains from main panel board
to TPN DB'S to swithc boards connections etc.,
a) Material
elec-1.5.3 36/0.3mm (2.5 sqmm) FR PVC copper cable 100 M 2 2389.20 4778.40
El Data P No 122
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
elec-1.5.1 14/0.3mm FR PVC copper cable 100 M 1 1001.00 1001.00
5779.40
Add contr profit @14% on material 0.00 0.00
Total material cost 5779.40
b) Labour charges :
11 3.1.5 Supply and 2 runs of 4.0 sq mm PVC insulated flexible copper cable and 1 run of 2.5 sq.mm flexible
PVC insulated copper cable for earthing in the existing conduit pipe for power point including labour
charges for 16A sockets. Make: Finolex / L&T
12 3.3.7 Supply and run of 4 of 10 Sq mm PVC insulated flexible copper cable and 1 run of 4 Sq mm PVC
insulated flexible copper cable in the existing conduit pipe for run of mains from main panel board to
TPN DB'S with pin type lugs and connections etc.,complete
elec-1.5.6 140/0.3mm (10 Sq.mm) FR PVC flexible copper 100 M 4 8223.60 32894.40
cable
1.5.4 56/0.3 (4.0 sqmm) FR PVC flexible copper cable 1 3478.20 3478.20
El Data P No 123
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
Add contr profit @14% on Labour 0% 2910.00 0.00
Sundries
C) Cost for 100 RM 39282.60
13 8.2.2 Supply, Transportation and fixing of 4' - 40 Watt box type flourescent single Tube Light fitting with Energy
saving electronic ballast, consuming 28 W suitable for 40 Watt tube on varnished teak wood round
blocks with flexible 3 core wire etc.,, complet Makes : Chowk: Trinic , tube : Philips / crompton
a) Material
elec-3.6.8 4' x 40 watts box type flourscent light fitting. each 1 850.50 850.50
elec-3.7.16 Lamp cost of 40W each 1 45.00 45.00
elec-8.1.35 Tw Round blocks each 2 6.00 12.00
Rate per each 907.50
Add contr profit @14% on material 0.00 0.00
Total for material 907.50
a) Labour charges
elec-8.1.77 Skilled Electrician day 0.10 355 35.50
elec-8.1.78 Semi Skilled Electrician day 0.10 285 28.50
Labour for 1 No 971.50
14 Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all
connections and all labour charges with 40W bulb (for new installation).
Makes : Gold Medal /Million / Vimal
b) Labour charges :
elec-8.1.77 Skilled Electrician day 0.05 355.00 17.75
15 Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings
with all standard accessories.
Makes: Crompton Decora / Bajaj Ultima /Havells Velocity / Usha Astra / Orient PSPO.
El Data P No 124
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
a) Material
a) Material
b) Labour charges.
elec-8.1.78 Semi skilled Electrician day 0.1 285.00 28.50
Sundries. 21.20
Add area allowence on labour charges @ 0% 0.00
Add contr profit @14% on Labour 0% 0.00
Labour Charges
17 Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections
with twin core wire etc., complete.
a) Material
elec-1.6.8 23/0060 Twin Core wire M 1 9.90 9.90
Unforseen item works, such as painting to down LS 1 3.00 3.00
rod, screws etc.,
12.90
Add contr profit @14% on material 0.00 0.00
Total for material 12.90
b) Labour charges.
elec-8.1.77 Skilled Electrician day 0.125 355.00 44.38
elec-8.1.85 Helper day 0.125 285.00 35.63
Add area allowence on labour charges @ 0% 0.00
18 Supply of fresh air exhaust fan of heavy duty 250V A.C.50Hz.. 300mm size (12") 900 R.P.M etc.,
complete.
Makes: CG / Bajaj / Havells/ Orient.
a) Material
elec-5.1.14 300mm (12") 900 RPM H.D. Exhaust Fan each 1 2645.00 2645.00
El Data P No 125
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
Transportation Charges on Unit Cost 1% 26.45 26.45
a) Material
elec-1.6.8 23/0060 Twin flat wire M 1 9.90 9.90
elec-8.1.54 Cement kg 25 5.60 140.00
149.90
Add contr profit @14% on material 0.00 0.00
Total for material 149.90
b) Labour charges.
elec-8.1.77 Skilled Electrician day 0.25 355.00 88.75
elec-8.1.85 Helper day 0.25 285.00 71.25
elec-8.1.79 Mason day 0.25 315.00 78.75
Add area allowence on labour charges @ 0% 0.00
20 Supply of 1x40W weather proof flourescent streetlight fitting comprising canopy of sheet Aluminium in
stove enamel finish with copper / VPIT ballast, capacitor, tube and starter etc., complete. Makes:
Phillips / GE / Wipro /Thorn
a) Material
elec-3.1.1 1x40W WP flourscent street light fitting. each 1 1459.50 1459.50
elec-3.7.16 Lamp cost of 40W each 1 45.00 45.00
1504.50
Add contr profit @14% on material 0.00 0.00
Total for material 1504.50
21 Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS
flat etc., including giving connections and labour charges etc., complete.
a) Material
elec-8.1.59 25mm dia G.I pipe light grade M 1 205.00 205.00
elec-1.6.8 23/0060 twin core flexible copper cable M 2 9.90 19.80
Pipe bending charges LS 1 25.00 25.00
M.S flat and welding charges LS 1 35.00 35.00
284.80
Add contr profit @14% on material 0.00 0.00
Total for material 284.80
b) Labour charges
El Data P No 126
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
elec-8.1.77 Skilled Electrician/carpenter day 0.2 355.00 71.00
elec-8.1.79 Mason day 0.2 315.00 63.00
elec-8.1.78 Semi skilled Electrician / Helper day 0.2 285.00 57.00
Add area allowence on labour charges @ 0% 0.00
Add contr profit @14% on Labour 0% 191.00 0.00
Rate per each 475.80
Note : Labour Charges considered for 5 fixtures /
day .
22 Supply and fixing TPN - Vertical type Distribution board with IP -43 Protection with 125A, 4 Pole 25 kA
MCCB as incomer with 4Nos 63A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing including internal
connection and labour charges for flush mounting etc.
El Data P No 127
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
Total material cost 5710.80
b) Labour charges :
elec-8.1.77 Skilled Electrician day 0.5 355.00 177.50
elec-8.1.78 Semi Skilled Electrician day 1 285.00 285.00
elec-8.1.85 Helpers day 1 285.00 285.00
Add area allowence on labour charges @ 0% 0.00
Add contr profit @14% on Labour 0% 747.50 0.00
Sundries such as TW Plugs, Screws Cement etc, LS 14.00 14.00
25 Elec4.1.25 supply of 35 sqmm 3.5 core PVC XLPE armourd SSR rateRs.246.20.
cable 1100V Grade with ISI Mark Standard / Solid
Alluminium Conductor. Make :
Universal/NICCO/Torrent/CCI
246.20
26 Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size
specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories
with hume pipe ring duly providing staggered holes
a) Material
El Data P No 128
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
Earth Work Excavation of Hard gravel Soil with cum 1.21 122.11 147.75
small boulder for trench 1st step of size 1.5 x 0.9 x
0.9 m
Excavation of Hard disteggrated rocks and boulders cum 0.9 150.00 135.00
for trench 2nd Step of size 1.2 x 0.6 x 1.2 m (Civil
SSR)
25% extra for narrow trench & pit and back filling 1 25.00 25.00
with Sand, Coke, Salt etc., and leveling
40mm dia 'B' Class G.I pipe Mtr 2.5 301.00 752.50
25 x 6 mm (1"X 1/4") G.I Flat duly drilled 12mm Each 1 75.00 75.00
holes (4 Nos) of 200 mm (8") length
Drilling of 16 Nos through holes of 12mm dia to G.I Each 16 5.00 80.00
pipe
elec-8.1.12 G.I Nuts, Bolts an Washers Set 4 12.00 48.00
18" dia hume pipe ring Each 1 100.00 100.00
elec-8.1.16 Hard Coke Kg 20 8.00 160.00
elec-8.1.17 Salt Kg 20 4.00 80.00
1603.25
Add contr profit @14% on material 0.00 0.00
Total material cost 1603.25
b) labour charges for fixing pipe ring and Each
connections
Semi skilled Electrician day 0.5 285.00 142.50
Helpers day 0.5 285.00 142.50
Add area allowence on labour charges @ 0% 0.00
Add contr profit @14% on Labour 0% 285.00 0.00
Sundries
Rate per each Say 1888.30
27 Supply and Fixing of 3 phase meter Box, 3 Nos 100 A fuse units, Neutral link, on T.W block with all
accessaries etc., complete for finished items of work.
a) Material
elec-2.6.4 100 A Fuse units each 3 484.00 1452.00
100 A neutral links each 1 118.00 118.00
elec-1.4.7 T.W blocks ( 12" x 15" ) each 1 99.00 99.00
1669.00
Add contr profit @14% on material 0.00 0.00
Total for material 1669.00
b) Labour charges
elec-8.1.77 Skilled Electrician day 1 315.00 315.00
elec-8.1.85 Helper day 4 285.00 1140.00
Add area allowence on labour charges @ 0% 0.00
Add contr profit @14% on Labour 0% 1455.00 0.00
Sundires such as Cement, Sand etc., 50.00
Rate per Each 3174.00
28 Supply and laying of 2 pair telephone wire in the
existing metallic/non metallic conduit pipe with
connections etc.,complete
Makes: million/payal/goldmedal/powerflex
El Data P No 129
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
a) Material
elec-7.1.1 2 pair telephone wire 100 M 1 1010.00 1010.00
Add contr profit @14% on material 0.00 0.00
Total for material 1010.00
b) Labour charges :
elec-8.1.77 Skilled Electrician day 0.34 315.00 107.10
elec-8.1.78 Semi Skilled Electrician day 1 285.00 285.00
elec-8.1.85 Helpers day 0.34 285.00 96.90
Add area allowence on labour charges @ 0% 0.00
a) Material
115.20
Add contr profit @14% on material 0.00 0.00
b) Labour charges :
Sundries
El Data P No 130
Index Specific Description Unit QTY Rate Rs. Amount Rs.
-code ation No.
1 2 3 4 5 6
31 Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing metallic/non metallic conduit pipe
with connections etc.,complete Makes:D Link/Finolex
El Data P No 131
Lab at Samalkot in
ohr
El Data P No 132
ohr
talic/nonmetalic conduit
ng to MS switch
s required. Make:
El Data P No 133
ohr
El Data P No 134
ohr
El Data P No 135
ohr
El Data P No 136
ohr
El Data P No 137
ohr
El Data P No 138
ohr
El Data P No 139
ohr
El Data P No 140
ohr
El Data P No 141
ohr
El Data P No 142
ohr
El Data P No 143
ohr
El Data P No 144
Name of the work : Sub Estiate for the work Providing Electrification to Model School
WIRING
57 Supply and fixing of 3 Nos 6A 3 pin wall plug socket with 3 Nos. 6A EACH #REF! #REF!
switch control on a common switch board with earth continuity
including wire leads, earth connections along with all labour charges
etc., complete.
Makes : Anchor / Gold Medal Olive /Million Zoom
5 207 PTS Wiring with three runs of 1.0 sq.mm insulated PVC flexible POINT #REF! #REF!
copper conductor cable (phase, neutral, earth) in the existing
conduit pipe with 6 Amps flush type switch, and 6 A 3/2 pin
socket on Separate switch board etc.,complete as required
Make:Million / Gold Medal
8 57 NOS Supply and fixing of cat-6 RJ-45information outlets including dual EACH #REF! #REF!
face plate with MS box with modular plate cover with screws
connections etc., Makes: Belden/D link/Legrand
RUN OF MAINS
9 628 RM Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. ONE #REF! #REF!
insulated flexible copper cable in existing pipe for earth RM
continuity including all labour charges etc., complete.
Makes : Gold Medal / Finolex / RPG/ L&T Hager / Million
10 1985 RM Supply and run of 2 of 2.5 sq.mm PVC insulated flexible ONE #REF! #REF!
copper cable and one run of 1.0 sq.mm flexible copper wire RM
for earthing in existing MS conduit pipe for circuits including
labour charges (phase neutral and earth) etc., complete as
required for switch board circuit mains.
Make:Finolex / Gold Medal /L&T/ Million / RPG.
11 420 RM Supply and run of 2 of 2.5 sq.mm PVC insulated flexible ONE #REF! #REF!
copper cable for earthing in existing MS conduit pipe for RM
circuits including labour charges (phase neutral and earth)
etc., complete as required for switch board circuit mains.
Make:Finolex / Gold Medal /L&T/ Million / RPG.
14 224 RM Supply and laying of 2 pair telephone wire in the existing ONE #REF! #REF!
metallic/non metallic conduit pipe with connections etc.,complete RM
Makes: million/payal/goldmedal/powerflex
15 538 RM Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing ONE #REF! #REF!
metallic/non metallic conduit pipe with connections etc.,complete RM
Makes:D Link/Finolex
16 50 NOS Supply of 3feet length patch cords of make D link make / Beldan / EACH 200.00 10000.00
Krone
17 11 NOS Supply and fixing of telephone jack type socket with top on MS box EACH #REF! #REF!
with modular plate cover with screws connections etc., Makes: Gold
Medal Olive / Million zoom
LIGHT FITTINGS
18 306 NOS Supply, Transportation and fixing of 4' - 40 Watt box type flourescent EACH #REF! #REF!
single Tube Light fitting with Energy saving electronic ballast
suitable for 40 Watt tube on varnished teak wood round blocks with
flexible 3 core wire etc.,, complete with all connections including cost
of 40W tube. The fitting shall be under warranty for three years.
Makes: Crompton/Bajaj/Surya/Havells.
19 85 NOS Supply and fixing of batten holder / slanting holder in lieu of ceiling EACH #REF! #REF!
rose of light point complete with all connections and all labour
charges with 40W bulb (for new installation).
Makes : Gold Medal /Million / Vimal
20 157 NOS Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 EACH #REF! #REF!
Blades and double ball bearings with all standard accessories.
Makes: Crompton Aura / Bajaj R Gold / Havells Festiva / Usha
Premium.
21 157 NOS Supply and erecting Electronic type regulator for ceiling fans 1200 EACH #REF! #REF!
mm sweep complete erected on existing board.
22 157 NOS Labour charges for Fixing of Ceiling fan and regulator including EACH #REF! #REF!
transportation and giving connections with twin core wire etc.,
complete.
23 14 NOS Supply of fresh air exhaust fan of heavy duty 250V A.C.50Hz.. EACH #REF! #REF!
300mm size (12") 900 R.P.M etc., complete.
Makes: CG / Bajaj / Havells/ Orient.
24 14 NOS Labour charges for fixing of Exhaust fan in wall with necessary EACH #REF! #REF!
connections and masonary work of making hole, finishing etc.,
complete
25 12 NOS Supply of 1x40W weather proof flourescent streetlight fitting EACH #REF! #REF!
comprising canopy of sheet Aluminium in stove enamel finish with
copper / VPIT ballast, capacitor, tube and starter etc., complete.
Makes: Phillips / GE / Wipro
26 12 NOS Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm EACH #REF! #REF!
dia GI pipe bracket and anti tilting MS flat etc., including giving
connections and labour charges etc., complete.
27 1 NOS Supply of Integral street light luminaire of 150W HPSV lamp fitting EACH #REF! #REF!
comprises of single piece die cast Aluminium body with copper
wound ballast and capacitor, Ignitor, with pot optics including 150W
HPSV lamp etc., complete.
Makes: Phillips / GE.
28 1 NOS Fixing of MV / SV/MH luminaire on wall with 1.0mt 40mm dia GI EACH #REF! #REF!
pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable
etc.,including all labour charges for mason work and giving
connections etc., complete.
DISTRIBUTION BOARDS
29 2 NOS Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH #REF! #REF!
Protection with 125A, 4 Pole 25 kA MCCB as incomer with 4Nos
63A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing including
internal connection and labour charges for flush mounting etc.,
complete.
Makes: MDS/ L&T Hager
30 8 NOS Supply and fixing of TPN 4 way distribution board board EACH #REF! #REF!
flushed in wall suitable for single pole outgoing MCB's in
sheet metal enclosure with 63 Amps -4 pole isolator incomer
and 12 nos. 16 to 32 Amps single pole, 10 KA breaking
capacity MCB outgoings including connections and labour
etc. (Lighting DB's)
Makes : MDS / L&T Hager.
31 250 RM Supply of the following PVC XLPE armoured cable 1100 V. ONE #REF! #REF!
Grade with ISI mark stranded/solid aluminimum conduct RM
complete., Make: Universal/NICCO/RPG/SURANA/POY
CAB/Paragaon Cables. 3.50Core 25 Sq.mm
32 2 Nos Supply and fixing of 24 port switches of D link make including EACH #REF! #REF!
making connections and etc., complete
33 2 Nos Supply of 17U floor mounting net work rack with power spike #REF!
including all accessries of make HCL / Vall
34 2 Nos Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH #REF! #REF!
Protection with 1 No. 63A TP MCB as incomer with 24 Nos. 10 kA
SPMCBs as outgoing including internal connection and labour
charges for flush mounting etc., complete.
Makes: MDS/ L&T Hager
CABLES
35 100 Mtrs Supply of 3.5 Core 95 Sq. mm PVC XLPE armoured cable 1100 V. 1 Mtr #REF! #REF!
Grade with ISI mark stranded / solid, aluminimum conductor
complete
Make: Universal / NICCO/ TORRENT/CCI/ FORTUNE ART
36 200 Mtrs Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm
1 Mtr #REF! on sand cushion
#REF! covering th
EARTHING
38 1 NO Supply and Fixing of 3 phase meter Box, 3 Nos 100 A fuse units, EACH 2521.00 2521.00
Neutral link, on T.W block with all accessaries etc., complete for
finished items of work.
TOTAL: #REF!
HIRE CHARGES OF MACHINERY
Hire Fuel Crew Total Per
Charges Charges Charges
a) Hire charges of Tipper 5.00 446.70 322.20 153.10 922.00 Hour
Cum capacity
b) Hire charges of Tipper 10 414.10 322.20 153.10 889.40 Hour
Tonnes capacity
c) Hire charges of Water Tanker 402.50 322.20 153.10 877.80 Hour
8000 Ltrs capacity
d) Hire charges of Truck 10 414.10 322.20 153.10 889.40 Hour
Tonnes capacity
e) Hire charges of FE loader 414.10 322.20 153.10 889.40 Hour
1.00 Cum bucket capacity @
45 Cum
2 Lead up to 2 Km:
Out put = 5.00 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 93.81
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 67.66
0.21 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 32.15
0.00 add area allowance at 0% on Rs. 32.15 Rs. 0.00
Rate for 5.00 Cum Rs. 193.62
Rate for 1.00 Cum Rs. 38.72
0.00 add overheads and contractors profit at 0% 38.72 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 38.72
3 Lead up to 3 Km:
Out put = 5.00 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 125.08
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 90.22
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 42.87
0.00 add area allowance at 0% on Rs. 42.87 Rs. 0.00
Rate for 5.00 Cum Rs. 258.17
Rate for 1.00 Cum Rs. 51.63
0.00 add overheads and contractors profit at 0% 51.63 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 51.63
4 Lead up to 4 Km:
Out put = 5.00 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 151.88
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 109.55
0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 52.05
0.00 add area allowance at 0% on Rs. 52.05 Rs. 0.00
Rate for 5.00 Cum Rs. 313.48
Rate for 1.00 Cum Rs. 62.70
0.00 add overheads and contractors profit at 0% 62.70 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 62.70
5 Lead up to 5 Km:
Out put = 5.00 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 178.68
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 128.88
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 61.24
0.00 add area allowance at 0% on Rs. 61.24 Rs. 0.00
Rate for 5.00 Cum Rs. 368.80
Rate for 1.00 Cum Rs. 73.76
0.00 add overheads and contractors profit at 0% 73.76 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 73.76
3 Lead up to 3 Km:
Out put = 5.00 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 125.08
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 90.22
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 42.87
0.00 add area allowance at 0% on Rs. 42.87 Rs. 0.00
Rate for 5.00 Cum Rs. 258.17
Rate for 1.00 Cum Rs. 51.63
0.00 add overheads and contractors profit at 0% 51.63 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 51.63
4 Lead up to 4 Km:
Out put = 5.00 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 151.88
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 109.55
0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 52.05
0.00 add area allowance at 0% on Rs. 52.05 Rs. 0.00
Rate for 5.00 Cum Rs. 313.48
Rate for 1.00 Cum Rs. 62.7
0.00 add overheads and contractors profit at 0% 62.70 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 62.70
5 Lead up to 5 Km:
Out put = 5.00 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 178.68
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 128.88
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 61.24
0.00 add area allowance at 0% on Rs. 61.24 Rs. 0.00
Rate for 5.00 Cum Rs. 368.80
Rate for 1.00 Cum Rs. 73.76
0.00 add overheads and contractors profit at 0% 73.76 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 73.76
2 Lead up to 2 Km:
Out put = 8.00 MT Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 93.81
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 67.66
0.21 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 32.15
0.00 add area allowance at 0% on Rs. 32.15 Rs. 0.00
Rate for 8.00 MT Rs. 193.62
Rate for 1.00 MT Rs. 24.2
0.00 add overheads and contractors profit at 0% 24.20 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 24.20
3 Lead up to 3 Km:
Out put = 8.00 MT Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 125.08
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 90.22
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 42.87
0.00 add area allowance at 0% on Rs. 42.87 Rs. 0.00
Rate for 8.00 MT Rs. 258.17
Rate for 1.00 MT Rs. 32.27
0.00 add overheads and contractors profit at 0% 32.27 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 32.27
4 Lead up to 4 Km:
Out put = 8.00 MT Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 151.88
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 109.55
0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 52.05
0.00 add area allowance at 0% on Rs. 52.05 Rs. 0.00
Rate for 8.00 MT Rs. 313.48
Rate for 1.00 MT Rs. 39.19
0.00 add overheads and contractors profit at 0% 39.19 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 39.19
5 Lead up to 5 Km:
Out put = 8.00 MT Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 178.68
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 128.88
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 61.24
0.00 add area allowance at 0% on Rs. 61.24 Rs. 0.00
Rate for 8.00 MT Rs. 368.80
Rate for 1.00 MT Rs. 46.1
0.00 add overheads and contractors profit at 0% 46.10 Hour Rs. 0.00
on Rs.
Total rate for 1.00 MT Rs. 46.10
2 Lead up to 2 Km:
Out put = 3.40 Cum Rate Per Amount
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 93.81
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 67.66
0.21 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 32.15
0.00 add area allowance at 0% on Rs. 32.15 Rs. 0.00
Rate for 3.40 Cum Rs. 193.62
Rate for 1.00 Cum Rs. 56.95
0.00 add overheads and contractors profit at 0% 56.95 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 56.95
3 Lead up to 3 Km:
Out put = 3.40 Cum Rate Per Amount
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 125.08
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 90.22
0.28 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 42.87
0.00 add area allowance at 0% on Rs. 42.87 Rs. 0.00
Rate for 3.40 Cum Rs. 258.17
Rate for 1.00 Cum Rs. 75.93
0.00 add overheads and contractors profit at 0% 75.93 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 75.93
4 Lead up to 4 Km:
Out put = 3.40 Cum Rate Per Amount
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 151.88
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 109.55
0.34 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 52.05
0.00 add area allowance at 0% on Rs. 52.05 Rs. 0.00
Rate for 3.40 Cum Rs. 313.48
Rate for 1.00 Cum Rs. 92.2
0.00 add overheads and contractors profit at 0% 92.20 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 92.20
5 Lead up to 5 Km:
Out put = 3.40 Cum Rate Per Amount
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs. 446.70 Hour Rs. 178.68
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs. 322.20 Hour Rs. 128.88
0.40 Hrs. crew charges of Tipper 5.00 Cum @ Rs. 153.10 Hour Rs. 61.24
0.00 add area allowance at 0% on Rs. 61.24 Rs. 0.00
Rate for 3.40 Cum Rs. 368.80
Rate for 1.00 Cum Rs. 108.47
0.00 add overheads and contractors profit at 0% 108.47 Hour Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 108.47
2 Lead up to 2 Km:
Out put = 8000 Ltrs Rate Per Amount
0.21 Hrs. hire charges of water tanker 8000 ltrs 402.50 Hour Rs. 84.53
capacity @ Rs.
0.21 Hrs. fuel charges of water tanker 8000 ltrs 322.20 Hour Rs. 67.66
capacity @ Rs.
0.21 Hrs. crew charges of water tanker 8000 ltrs 153.10 Hour Rs. 32.15
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 32.15 Rs. 0.00
Rate for 8000 Ltrs Rs. 184.34
Rate for 1000 Ltrs Rs. 23.04
0.00 add overheads and contractors profit at 0% 23.04 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 23.04
3 Lead up to 3 Km:
Out put = 8000 Ltrs Rate Per Amount
0.28 Hrs. hire charges of water tanker 8000 ltrs 402.50 Hour Rs. 112.70
capacity @ Rs.
0.28 Hrs. fuel charges of water tanker 8000 ltrs 322.20 Hour Rs. 90.22
capacity @ Rs.
0.28 Hrs. crew charges of water tanker 8000 ltrs 153.10 Hour Rs. 42.87
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 42.87 Rs. 0.00
Rate for 8000 Ltrs Rs. 245.79
Rate for 1000 Ltrs Rs. 30.72
0.00 add overheads and contractors profit at 0% 30.72 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 30.72
4 Lead up to 4 Km:
Out put = 8000 Ltrs Rate Per Amount
0.34 Hrs. hire charges of water tanker 8000 ltrs 402.50 Hour Rs. 136.85
capacity @ Rs.
0.34 Hrs. fuel charges of water tanker 8000 ltrs 322.20 Hour Rs. 109.55
capacity @ Rs.
0.34 Hrs. crew charges of water tanker 8000 ltrs 153.10 Hour Rs. 52.05
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 52.05 Rs. 0.00
Rate for 8000 Ltrs Rs. 298.45
Rate for 1000 Ltrs Rs. 37.31
0.00 add overheads and contractors profit at 0% 37.31 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 37.31
5 Lead up to 5 Km:
Out put = 8000 Ltrs Rate Per Amount
0.40 Hrs. hire charges of water tanker 8000 ltrs 402.50 Hour Rs. 161.00
capacity @ Rs.
0.40 Hrs. fuel charges of water tanker 8000 ltrs 322.20 Hour Rs. 128.88
capacity @ Rs.
0.40 Hrs. crew charges of water tanker 8000 ltrs 153.10 Hour Rs. 61.24
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 61.24 Rs. 0.00
Rate for 8000 Ltrs Rs. 351.12
Rate for 1000 Ltrs Rs. 43.89
0.00 add overheads and contractors profit at 0% 43.89 Rs. 0.00
on Rs.
Total rate for 1000 Ltrs Rs. 43.89
2 Lead up to 2 Km:
Out put = 3000 Nos Rate Per Amount
0.21 Hrs. hire charges of Truck 10 Tonnes 414.10 Hour Rs. 86.96
capacity @ Rs.
0.21 Hrs. fuel charges of Truck 10 Tonnes 322.20 Hour Rs. 67.66
capacity @ Rs.
0.21 Hrs. crew charges of Truck 10 Tonnes 153.10 Hour Rs. 32.15
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 32.15 Rs. 0.00
Rate for 3000 Nos Rs. 186.77
Rate for 1000 Nos Rs. 62.26
0.00 add overheads and contractors profit at 0% 62.26 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 62.26
3 Lead up to 3 Km:
Out put = 3000 Nos Rate Per Amount
0.28 Hrs. hire charges of Truck 10 Tonnes 414.10 Hour Rs. 115.95
capacity @ Rs.
0.28 Hrs. fuel charges of Truck 10 Tonnes 322.20 Hour Rs. 90.22
capacity @ Rs.
0.28 Hrs. crew charges of Truck 10 Tonnes 153.10 Hour Rs. 42.87
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 42.87 Rs. 0.00
Rate for 3000 Nos Rs. 249.04
Rate for 1000 Nos Rs. 83.01
0.00 add overheads and contractors profit at 0% 83.01 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 83.01
4 Lead up to 4 Km:
Out put = 3000 Nos Rate Per Amount
0.34 Hrs. hire charges of Truck 10 Tonnes 414.10 Hour Rs. 140.79
capacity @ Rs.
0.34 Hrs. fuel charges of Truck 10 Tonnes 322.20 Hour Rs. 109.55
capacity @ Rs.
0.34 Hrs. crew charges of Truck 10 Tonnes 153.10 Hour Rs. 52.05
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 52.05 Rs. 0.00
Rate for 3000 Nos Rs. 302.39
Rate for 1000 Nos Rs. 100.80
0.00 add overheads and contractors profit at 0% 100.80 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 100.80
5 Lead up to 5 Km:
Out put = 3000 Nos Rate Per Amount
0.40 Hrs. hire charges of Truck 10 Tonnes 414.10 Hour Rs. 165.64
capacity @ Rs.
0.40 Hrs. fuel charges of Truck 10 Tonnes 322.20 Hour Rs. 128.88
capacity @ Rs.
0.40 Hrs. crew charges of Truck 10 Tonnes 153.10 Hour Rs. 61.24
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 61.24 Rs. 0.00
Rate for 3000 Nos Rs. 355.76
Rate for 1000 Nos Rs. 118.59
0.00 add overheads and contractors profit at 0% 118.59 Rs. 0.00
on Rs.
Total rate for 1000 Nos Rs. 118.59
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for masonry work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.02 day Head mazdoor 400.00 day Rs. 8.00
0.50 day Mazdoor 350.00 day Rs. 175.00
Rs. 183.00
0.00 add area allowance at 0% on Rs. 183.00 Rs. 0.00
Total labour charges Rs. 183.00
Rate for 5.50 Cum Rs. 183.00
Rate for 1.00 Cum Rs. 33.27
0.00 add overheads and contractors profit at 0% 33.27 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 33.27
LOADING & UNLOADING CHARGES BY MANUAL MEANS (INCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.01 day Head mazdoor 400.00 day Rs. 4.00
0.25 day Mazdoor 350.00 day Rs. 87.50
Rs. 91.50
0.00 add area allowance at 0% on Rs. 91.50 Rs. 0.00
Total labour charges Rs. 91.50
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes 414.10 Hour Rs. 207.05
capacity @ Rs.
0.50 Hrs. fuel charges of Truck 10 Tonnes 322.20 Hour Rs. 161.10
capacity @ Rs.
0.50 Hrs. crew charges of Truck 10 Tonnes 153.10 Hour Rs. 76.55
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 76.55 Rs. 0.00
Total machinery charges Rs. 444.70
Total labour and machinery charges Rs. 536.20
Rate for 5.50 Cum Rs. 536.20
Rate for 1.00 Cum Rs. 97.49
0.00 add overheads and contractors profit at 0% 97.49 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 97.49
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Labour:
0.02 day Head mazdoor 400.00 day Rs. 8.00
0.50 day Mazdoor 350.00 day Rs. 175.00
Rs. 183.00
0.00 add area allowance at 0% on Rs. 183.00 Rs. 0.00
Total labour charges Rs. 183.00
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes 414.10 Hour Rs. 207.05
capacity @ Rs.
0.50 Hrs. fuel charges of Truck 10 Tonnes 322.20 Hour Rs. 161.10
capacity @ Rs.
0.50 Hrs. crew charges of Truck 10 Tonnes 153.10 Hour Rs. 76.55
capacity @ Rs.
0.00 add area allowance at 0% on Rs. 76.55 Rs. 0.00
Total machinery charges Rs. 444.70
Total labour and machinery charges Rs. 627.70
Rate for 5.50 Cum Rs. 627.70
Rate for 1.00 Cum Rs. 114.13
0.00 add overheads and contractors profit at 0% 114.13 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 114.13
B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put = 5.50 Cum Rate Per Amount
a) Machinery:
0.17 Hrs. hire charges of Tipper 10 Tonnes 414.10 Hour Rs. 70.40
capacity @ Rs.
0.17 Hrs. fuel charges of Tipper 10 Tonnes 322.20 Hour Rs. 54.77
capacity @ Rs.
0.17 Hrs. crew charges of Tipper 10 Tonnes 153.10 Hour Rs. 26.03
capacity @ Rs.
0.12 Hrs. hire charges of FE loader 1.00 Cum 414.10 Hour Rs. 49.69
bucket capacity @ 45 Cum @ Rs.
0.12 Hrs. fuel charges of FE loader 1.00 Cum 322.20 Hour Rs. 38.66
bucket capacity @ 45 Cum @ Rs.
0.12 Hrs. crew charges of FE loader 1.00 Cum 153.10 Hour Rs. 18.37
bucket capacity @ 45 Cum @ Rs.
0.00 add area allowance at 0% on Rs. 44.40 Rs. 0.00
Total machinery charges Rs. 257.92
Rate for 5.50 Cum Rs. 257.92
Rate for 1.00 Cum Rs. 46.89
0.00 add overheads and contractors profit at 0% 46.89 Rs. 0.00
on Rs.
Total rate for 1.00 Cum Rs. 46.89
A.P Stadard Building Data Materials,Hire chrges of machinary,Labour,
Seigniorage & Conveyanance chrges etc., 2016-17
-- 2 --
River Godavari,
Rajahmundry
104 Kms Sand for Mortar/Concreate
Executive Engineer
(R&B) Division: Rajamahendravaram
LEAD CALICULATIONS
Sand HBG Bricks Rough Stone OTG veraity, CR Stone & Bond Stone
Metal
1.00Km 27.73 26.76 44.62
2.00Km 38.82 10.65 17.78
3.00Km 51.75 25.00 38.55
4.00Km 62.84 36.09 56.42
5.00Km 46.21 47.18 74.29 43.8596491228
6.00Km 57.299 58.27 92.15
7.00Km 68.389 69.36 110.02
8.00Km 79.479 80.45 127.89
9.00Km 90.569 91.54 145.75
10.00Km 101.659 102.63 163.62
11.00Km 112.749 113.72 181.49
12.00Km 123.839 124.81 199.36
13.00Km 134.929 135.90 217.22
14.00Km 146.019 146.99 235.09
15.00Km 157.109 158.08 252.96
16.00Km 168.199 169.17 270.82
17.00Km 179.289 180.26 288.69
18.00Km 190.379 191.35 306.56
19.00Km 201.469 202.44 324.42
20.00Km 212.559 213.53 342.29
21.00Km 223.649 224.62 360.16
22.00Km 234.739 235.71 378.03
23.00Km 245.829 246.80 395.89
24.00Km 256.919 257.89 413.76
25.00Km 268.009 268.98 431.63
26.00Km 279.099 280.07 449.49
27.00Km 290.189 291.16 467.36
28.00Km 301.279 302.25 485.23
29.00Km 312.369 313.34 503.09
30.00Km 323.459 324.43 520.96
31.00Km 332.70 333.67 535.84
32.00Km 341.94 342.91 550.71
33.00Km 351.19 352.15 565.59
34.00Km 360.43 361.40 580.46
35.00Km 369.67 370.64 595.34
36.00Km 378.91 379.88 610.21
37.00Km 388.15 389.12 625.09
38.00Km 397.40 398.36 639.96
39.00Km 406.64 407.61 654.84
40.00Km 415.88 416.85 669.71
41.00Km 425.12 426.09 684.59
42.00Km 434.36 435.33 699.46
43.00Km 443.61 444.57 714.34
44.00Km 452.85 453.82 729.21
45.00Km 462.09 463.06 744.09
46.00Km 471.33 472.30 758.96
47.00Km 480.57 481.54 773.84
48.00Km 489.82 490.78 788.71
49.00Km 499.06 500.03 803.59
50.00Km 508.30 509.27 818.46
51.00Km 517.54 518.51 833.34
52.00Km 526.78 527.75 848.21
53.00Km 536.03 536.99 863.09
54.00Km 545.27 546.24 877.96
55.00Km 554.51 555.48 892.84
56.00Km 563.75 564.72 907.71
57.00Km 572.99 573.96 922.59
58.00Km 582.24 583.20 937.46
59.00Km 591.48 592.45 952.34
60.00Km 600.72 601.69 967.21
61.00Km 609.96 610.93 982.09
62.00Km 619.20 620.17 996.96
63.00Km 628.45 629.41 1011.84
64.00Km 637.69 638.66 1026.71
65.00Km 646.93 647.90 1041.59
66.00Km 656.17 657.14 1056.46
67.00Km 665.41 666.38 1071.34
68.00Km 674.66 675.62 1086.21
69.00Km 683.90 684.87 1101.09
70.00Km 693.14 694.11 1115.96
71.00Km 702.38 703.35 1130.84
72.00Km 711.62 712.59 1145.71
73.00Km 720.87 721.83 1160.59
74.00Km 730.11 731.08 1175.46
75.00Km 739.35 740.32 1190.34
76.00Km 748.59 749.56 1205.21
77.00Km 757.83 758.80 1220.09
78.00Km 767.08 768.04 1234.96
79.00Km 776.32 777.29 1249.84
80.00Km 785.56 786.53 1264.71
81.00Km 794.80 795.77 1279.59
82.00Km 804.04 805.01 1294.46
83.00Km 813.29 814.25 1309.34
84.00Km 822.53 823.50 1324.21
85.00Km 831.77 832.74 1339.09
86.00Km 841.01 841.98 1353.96
87.00Km 850.25 851.22 1368.84
88.00Km 859.50 860.46 1383.71
89.00Km 868.74 869.71 1398.59
90.00Km 877.98 878.95 1413.46
91.00Km 887.22 888.19 1428.34
92.00Km 896.46 897.43 1443.21
93.00Km 905.71 906.67 1458.09
94.00Km 914.95 915.92 1472.96
95.00Km 924.19 925.16 1487.84
96.00Km 933.43 934.40 1502.71
97.00Km 942.67 943.64 1517.59
98.00Km 951.92 952.88 1532.46
99.00Km 961.16 962.13 1547.34
100.00Km 970.40 971.37 1562.21
101.00Km 979.64 980.61 1577.09
102.00Km 988.88 989.85 1591.96
103.00Km 998.09 999.09 1606.84
104.00Km 1007.31 1008.34 1621.71
105.00Km 1016.52 1017.58 1636.59
106.00Km 1025.73 1026.82 1651.46
107.00Km 1034.94 1036.06 1666.34
108.00Km 1044.15 1045.30 1681.21
109.00Km 1053.36 1054.55 1696.09
110.00Km 1062.57 1063.79 1710.96
111.00Km 1071.78 1073.03 1725.84
112.00Km 1080.99 1082.27 1740.71
113.00Km 1090.20 1091.51 1755.59
114.00Km 1099.42 1100.76 1770.46
115.00Km 1108.63 1110.00 1785.34
116.00Km 1117.84 1119.24 1800.21
117.00Km 1127.05 1128.48 1815.09
118.00Km 1136.26 1137.72 1829.96
119.00Km 1145.47 1146.97 1844.84
120.00Km 1154.68 1156.21 1859.71
121.00Km 1163.89 1165.45 1874.59
122.00Km 1173.10 1174.69 1889.46
123.00Km 1182.31 1183.93 1904.34
124.00Km 1191.53 1193.18 1919.21
125.00Km 1200.74 1202.42 1934.09
126.00Km 1209.95 1211.66 1948.96
127.00Km 1219.16 1220.90 1963.84
128.00Km 1228.37 1230.14 1978.71
129.00Km 1237.58 1239.39 1993.59
130.00Km 1246.79 1248.63 2008.46
131.00Km 1256.00 1257.87 2023.34
132.00Km 1265.21 1267.11 2038.21
133.00Km 1274.42 1276.35 2053.09
134.00Km 1283.64 1285.60 2067.96
135.00Km 1292.85 1294.84 2082.84
136.00Km 1302.06 1304.08 2097.71
137.00Km 1311.27 1313.32 2112.59
138.00Km 1320.48 1322.56 2127.46
139.00Km 1329.69 1331.81 2142.34
140.00Km 1338.90 1341.05 2157.21
141.00Km 1348.11 1350.29 2172.09
142.00Km 1357.32 1359.53 2186.96
143.00Km 1366.53 1368.77 2201.84
144.00Km 1375.75 1378.02 2216.71
145.00Km 1384.96 1387.26 2231.59
146.00Km 1394.17 1396.50 2246.46
147.00Km 1403.38 1405.74 2261.34
148.00Km 1412.59 1414.98 2276.21
149.00Km 1421.80 1424.23 2291.09
150.00Km 1431.01 1433.47 2305.96
151.00Km 1440.22 1442.71 2320.84
152.00Km 1449.43 1451.95 2335.71
153.00Km 1458.64 1461.19 2350.59
154.00Km 1467.86 1470.44 2365.46
155.00Km 1477.07 1479.68 2380.34
156.00Km 1486.28 1488.92 2395.21
157.00Km 1495.49 1498.16 2410.09
158.00Km 1504.70 1507.40 2424.96
159.00Km 1513.91 1516.65 2439.84
160.00Km 1523.12 1525.89 2454.71
161.00Km 1532.33 1535.13 2469.59
162.00Km 1541.54 1544.37 2484.46
163.00Km 1550.75 1553.61 2499.34
164.00Km 1559.97 1562.86 2514.21
165.00Km 1569.18 1572.10 2529.09
166.00Km 1578.39 1581.34 2543.96
167.00Km 1587.60 1590.58 2558.84
168.00Km 1596.81 1599.82 2573.71
169.00Km 1606.02 1609.07 2588.59
170.00Km 1615.23 1618.31 2603.46
171.00Km 1624.44 1627.55 2618.34
172.00Km 1633.65 1636.79 2633.21
173.00Km 1642.86 1646.03 2648.09
174.00Km 1652.08 1655.28 2662.96
175.00Km 1661.29 1664.52 2677.84
176.00Km 1670.50 1673.76 2692.71
177.00Km 1679.71 1683.00 2707.59
178.00Km 1688.92 1692.24 2722.46
179.00Km 1698.13 1701.49 2737.34
180.00Km 1707.34 1710.73 2752.21
181.00Km 1716.55 1719.97 2767.09
182.00Km 1725.76 1729.21 2781.96
183.00Km 1734.97 1738.45 2796.84
184.00Km 1744.19 1747.70 2811.71
185.00Km 1753.40 1756.94 2826.59
186.00Km 1762.61 1766.18 2841.46
187.00Km 1771.82 1775.42 2856.34
188.00Km 1781.03 1784.66 2871.21
189.00Km 1790.24 1793.91 2886.09
190.00Km 1799.45 1803.15 2900.96
191.00Km 1808.66 1812.39 2915.84
192.00Km 1817.87 1821.63 2930.71
193.00Km 1827.08 1830.87 2945.59
194.00Km 1836.30 1840.12 2960.46
195.00Km 1845.51 1849.36 2975.34
196.00Km 1854.72 1858.60 2990.21
197.00Km 1863.93 1867.84 3005.09
198.00Km 1873.14 1877.08 3019.96
199.00Km 1882.35 1886.33 3034.84
200.00Km 1891.56 1895.57 3049.71
201.00Km 1900.77 1904.81 3064.59
202.00Km 1909.98 1914.05 3079.46
203.00Km 1919.19 1923.29 3094.34
204.00Km 1928.41 1932.54 3109.21
205.00Km 1937.62 1941.78 3124.09
206.00Km 1946.83 1951.02 3138.96
207.00Km 1956.04 1960.26 3153.84
208.00Km 1965.25 1969.50 3168.71
209.00Km 1974.46 1978.75 3183.59
210.00Km 1983.67 1987.99 3198.46
211.00Km 1992.88 1997.23 3213.34
212.00Km 2002.09 2006.47 3228.21
213.00Km 2011.30 2015.71 3243.09
214.00Km 2020.52 2024.96 3257.96
215.00Km 2029.73 2034.20 3272.84
216.00Km 2038.94 2043.44 3287.71
217.00Km 2048.15 2052.68 3302.59
218.00Km 2057.36 2061.92 3317.46
219.00Km 2066.57 2071.17 3332.34
220.00Km 2075.78 2080.41 3347.21
221.00Km 2084.99 2089.65 3362.09
222.00Km 2094.20 2098.89 3376.96
223.00Km 2103.41 2108.13 3391.84
224.00Km 2112.63 2117.38 3406.71
225.00Km 2121.84 2126.62 3421.59
226.00Km 2131.05 2135.86 3436.46
227.00Km 2140.26 2145.10 3451.34
228.00Km 2149.47 2154.34 3466.21
229.00Km 2158.68 2163.59 3481.09
230.00Km 2167.89 2172.83 3495.96
231.00Km 2177.10 2182.07 3510.84
232.00Km 2186.31 2191.31 3525.71
233.00Km 2195.52 2200.55 3540.59
234.00Km 2204.74 2209.80 3555.46
235.00Km 2213.95 2219.04 3570.34
236.00Km 2223.16 2228.28 3585.21
237.00Km 2232.37 2237.52 3600.09
238.00Km 2241.58 2246.76 3614.96
239.00Km 2250.79 2256.01 3629.84
240.00Km 2260.00 2265.25 3644.71
241.00Km 2269.21 2274.49 3659.59
242.00Km 2278.42 2283.73 3674.46
243.00Km 2287.63 2292.97 3689.34
244.00Km 2296.85 2302.22 3704.21
245.00Km 2306.06 2311.46 3719.09
246.00Km 2315.27 2320.70 3733.96
247.00Km 2324.48 2329.94 3748.84
248.00Km 2333.69 2339.18 3763.71
249.00Km 2342.90 2348.43 3778.59
250.00Km 2352.11 2357.67 3793.46
251.00Km 2361.32 2366.91 3808.34
252.00Km 2370.53 2376.15 3823.21
253.00Km 2379.74 2385.39 3838.09
254.00Km 2388.96 2394.64 3852.96
255.00Km 2398.17 2403.88 3867.84
256.00Km 2407.38 2413.12 3882.71
257.00Km 2416.59 2422.36 3897.59
258.00Km 2425.80 2431.60 3912.46
259.00Km 2435.01 2440.85 3927.34
260.00Km 2444.22 2450.09 3942.21
261.00Km 2453.43 2459.33 3957.09
262.00Km 2462.64 2468.57 3971.96
263.00Km 2471.85 2477.81 3986.84
264.00Km 2481.07 2487.06 4001.71
265.00Km 2490.28 2496.30 4016.59
266.00Km 2499.49 2505.54 4031.46
267.00Km 2508.70 2514.78 4046.34
268.00Km 2517.91 2524.02 4061.21
269.00Km 2527.12 2533.27 4076.09
270.00Km 2536.33 2542.51 4090.96
271.00Km 2545.54 2551.75 4105.84
272.00Km 2554.75 2560.99 4120.71
273.00Km 2563.96 2570.23 4135.59
274.00Km 2573.18 2579.48 4150.46
275.00Km 2582.39 2588.72 4165.34
276.00Km 2591.60 2597.96 4180.21
277.00Km 2600.81 2607.20 4195.09
278.00Km 2610.02 2616.44 4209.96
279.00Km 2619.23 2625.69 4224.84
280.00Km 2628.44 2634.93 4239.71
281.00Km 2637.65 2644.17 4254.59
282.00Km 2646.86 2653.41 4269.46
283.00Km 2656.07 2662.65 4284.34
284.00Km 2665.29 2671.90 4299.21
285.00Km 2674.50 2681.14 4314.09
286.00Km 2683.71 2690.38 4328.96
287.00Km 2692.92 2699.62 4343.84
288.00Km 2702.13 2708.86 4358.71
289.00Km 2711.34 2718.11 4373.59
290.00Km 2720.55 2727.35 4388.46
291.00Km 2729.76 2736.59 4403.34
292.00Km 2738.97 2745.83 4418.21
293.00Km 2748.18 2755.07 4433.09
294.00Km 2757.40 2764.32 4447.96
295.00Km 2766.61 2773.56 4462.84
296.00Km 2775.82 2782.80 4477.71
297.00Km 2785.03 2792.04 4492.59
298.00Km 2794.24 2801.28 4507.46
299.00Km 2803.45 2810.53 4522.34
300.00Km 2812.66 2819.77 4537.21
301.00Km 2821.87 2829.01 4552.09
302.00Km 2831.08 2838.25 4566.96
303.00Km 2840.29 2847.49 4581.84
304.00Km 2849.51 2856.74 4596.71
305.00Km 2858.72 2865.98 4611.59
306.00Km 2867.93 2875.22 4626.46
307.00Km 2877.14 2884.46 4641.34
308.00Km 2886.35 2893.70 4656.21
309.00Km 2895.56 2902.95 4671.09
310.00Km 2904.77 2912.19 4685.96
311.00Km 2913.98 2921.43 4700.84
312.00Km 2923.19 2930.67 4715.71
313.00Km 2932.40 2939.91 4730.59
314.00Km 2941.62 2949.16 4745.46
315.00Km 2950.83 2958.40 4760.34
316.00Km 2960.04 2967.64 4775.21
317.00Km 2969.25 2976.88 4790.09
318.00Km 2978.46 2986.12 4804.96
319.00Km 2987.67 2995.37 4819.79
320.00Km 2996.88 3004.61 4834.61
321.00Km 3006.09 3013.85 4849.44
322.00Km 3015.30 3023.09 4864.26
323.00Km 3024.51 3032.33 4879.09
324.00Km 3033.73 3041.58 4893.91
325.00Km 3042.94 3050.82 4908.74
326.00Km 3052.15 3060.06 4923.56
327.00Km 3061.36 3069.30 4938.39
328.00Km 3070.57 3078.54 4953.21
329.00Km 3079.78 3087.79 4968.04
330.00Km 3088.99 3097.03 4982.86
331.00Km 3098.20 3106.27 4997.69
332.00Km 3107.41 3115.51 5012.51
333.00Km 3116.62 3124.75 5027.34
334.00Km 3125.84 3134.00 5042.16
335.00Km 3135.05 3143.24 5056.99
336.00Km 3144.26 3152.48 5071.81
337.00Km 3153.47 3161.72 5086.64
338.00Km 3162.68 3170.96 5101.46
339.00Km 3171.89 3180.21 5116.29
340.00Km 3181.10 3189.45 5131.11
341.00Km 3190.31 3198.69 5145.94
342.00Km 3199.52 3207.93 5160.76
343.00Km 3208.73 3217.17 5175.59
344.00Km 3217.95 3226.42 5190.41
345.00Km 3227.16 3235.66 5205.24
346.00Km 3236.37 3244.90 5220.06
347.00Km 3245.58 3254.14 5234.89
348.00Km 3254.79 3263.38 5249.71
349.00Km 3264.00 3272.63 5264.54
350.00Km 3273.21 3281.87 5279.36
351.00Km 3282.42 3291.11 5294.19
352.00Km 3291.63 3300.35 5309.01
353.00Km 3300.84 3309.59 5323.84
354.00Km 3310.06 3318.84 5338.66
355.00Km 3319.27 3328.08 5353.49
356.00Km 3328.48 3337.32 5368.31
357.00Km 3337.69 3346.56 5383.14
358.00Km 3346.90 3355.80 5397.96
359.00Km 3356.11 3365.05 5412.79
360.00Km 3365.32 3374.29 5427.61
361.00Km 3374.53 3383.53 5442.44
362.00Km 3383.74 3392.77 5457.26
363.00Km 3392.95 3402.01 5472.09
364.00Km 3402.17 3411.26 5486.91
365.00Km 3411.38 3420.50 5501.74
366.00Km 3420.59 3429.74 5516.56
367.00Km 3429.80 3438.98 5531.39
368.00Km 3439.01 3448.22 5546.21
369.00Km 3448.22 3457.47 5561.04
370.00Km 3457.43 3466.71 5575.86
371.00Km 3466.64 3475.95 5590.69
372.00Km 3475.85 3485.19 5605.51
373.00Km 3485.06 3494.43 5620.34
374.00Km 3494.28 3503.68 5635.16
375.00Km 3503.49 3512.92 5649.99
376.00Km 3512.70 3522.16 5664.81
377.00Km 3521.91 3531.40 5679.64
378.00Km 3531.12 3540.64 5694.46
379.00Km 3540.33 3549.89 5709.29
380.00Km 3549.54 3559.13 5724.11
381.00Km 3558.75 3568.37 5738.94
382.00Km 3567.96 3577.61 5753.76
383.00Km 3577.17 3586.85 5768.59
384.00Km 3586.39 3596.10 5783.41
385.00Km 3595.60 3605.34 5798.24
386.00Km 3604.81 3614.58 5813.06
387.00Km 3614.02 3623.82 5827.89
388.00Km 3623.23 3633.06 5842.71
389.00Km 3632.44 3642.31 5857.54
390.00Km 3641.65 3651.55 5872.36
391.00Km 3650.86 3660.79 5887.19
392.00Km 3660.07 3670.03 5902.01
393.00Km 3669.28 3679.27 5916.84
394.00Km 3678.50 3688.52 5931.66
395.00Km 3687.71 3697.76 5946.49
396.00Km 3696.92 3707.00 5961.31
397.00Km 3706.13 3716.24 5976.14
398.00Km 3715.34 3725.48 5990.96
399.00Km 3724.55 3734.73 6005.79
400.00Km 3733.76 3743.97 6020.61
401.00Km 3742.97 3753.21 6035.44
402.00Km 3752.18 3762.45 6050.26
403.00Km 3761.39 3771.69 6065.09
404.00Km 3770.61 3780.94 6079.91
405.00Km 3779.82 3790.18 6094.74
406.00Km 3789.03 3799.42 6109.56
407.00Km 3798.24 3808.66 6124.39
408.00Km 3807.45 3817.90 6139.21
409.00Km 3816.66 3827.15 6154.04
410.00Km 3825.87 3836.39 6168.86
411.00Km 3835.08 3845.63 6183.69
412.00Km 3844.29 3854.87 6198.51
413.00Km 3853.50 3864.11 6213.34
414.00Km 3862.72 3873.36 6228.16
415.00Km 3871.93 3882.60 6242.99
416.00Km 3881.14 3891.84 6257.81
417.00Km 3890.35 3901.08 6272.64
418.00Km 3899.56 3910.32 6287.46
419.00Km 3908.77 3919.57 6302.29
420.00Km 3917.98 3928.81 6317.11
421.00Km 3927.19 3938.05 6331.94
422.00Km 3936.40 3947.29 6346.76
423.00Km 3945.61 3956.53 6361.59
424.00Km 3954.83 3965.78 6376.41
425.00Km 3964.04 3975.02 6391.24
426.00Km 3973.25 3984.26 6406.06
427.00Km 3982.46 3993.47 6420.89
428.00Km 3991.67 4002.68 6435.71
429.00Km 4000.88 4011.89 6450.54
430.00Km 4010.09 4021.10 6465.36
431.00Km 4019.30 4030.31 6480.19
432.00Km 4028.51 4039.53 6495.01
433.00Km 4037.72 4048.74 6509.84
434.00Km 4046.94 4057.95 6524.66
435.00Km 4056.15 4067.16 6539.49
436.00Km 4065.36 4076.37 6554.31
437.00Km 4074.57 4085.58 6569.14
438.00Km 4083.78 4094.79 6583.96
439.00Km 4092.99 4104.00 6598.79
440.00Km 4102.20 4113.21 6613.61
441.00Km 4111.41 4122.42 6628.44
442.00Km 4120.62 4131.64 6643.26
443.00Km 4129.83 4140.85 6658.09
444.00Km 4139.05 4150.06 6672.91
445.00Km 4148.26 4159.27 6687.74
446.00Km 4157.47 4168.48 6702.56
447.00Km 4166.68 4177.69 6717.39
448.00Km 4175.89 4186.90 6732.21
449.00Km 4185.10 4196.11 6747.04
450.00Km 4194.31 4205.32 6761.86
451.00Km 4203.52 4214.53 6776.69
452.00Km 4212.73 4223.75 6791.51
453.00Km 4221.94 4232.96 6806.34
454.00Km 4231.16 4242.17 6821.16
455.00Km 4240.37 4251.38 6835.99
456.00Km 4249.58 4260.59 6850.81
457.00Km 4258.79 4269.80 6865.64
458.00Km 4268.00 4279.01 6880.46
459.00Km 4277.21 4288.22 6895.29
460.00Km 4286.42 4297.43 6910.11
461.00Km 4295.63 4306.64 6924.94
462.00Km 4304.84 4315.86 6939.76
463.00Km 4314.05 4325.07 6954.59
464.00Km 4323.27 4334.28 6969.41
465.00Km 4332.48 4343.49 6984.24
466.00Km 4341.69 4352.70 6999.06
467.00Km 4350.90 4361.91 7013.89
468.00Km 4360.11 4371.12 7028.71
469.00Km 4369.32 4380.33 7043.54
470.00Km 4378.53 4389.54 7058.36
471.00Km 4387.74 4398.75 7073.19
472.00Km 4396.95 4407.97 7088.01
473.00Km 4406.16 4417.18 7102.84
474.00Km 4415.38 4426.39 7117.66
475.00Km 4424.59 4435.60 7132.49
476.00Km 4433.80 4444.81 7147.31
477.00Km 4443.01 4454.02 7162.14
478.00Km 4452.22 4463.23 7176.96
479.00Km 4461.43 4472.44 7191.79
480.00Km 4470.64 4481.65 7206.61
481.00Km 4479.85 4490.86 7221.44
482.00Km 4489.06 4500.08 7236.26
483.00Km 4498.27 4509.29 7251.09
484.00Km 4507.49 4518.50 7265.91
485.00Km 4516.70 4527.71 7280.74
486.00Km 4525.91 4536.92 7295.56
487.00Km 4535.12 4546.13 7310.39
488.00Km 4544.33 4555.34 7325.21
489.00Km 4553.54 4564.55 7340.04
490.00Km 4562.75 4573.76 7354.86
491.00Km 4571.96 4582.97 7369.69
492.00Km 4581.17 4592.19 7384.51
493.00Km 4590.38 4601.40 7399.34
494.00Km 4599.60 4610.61 7414.16
495.00Km 4608.81 4619.82 7428.99
496.00Km 4618.02 4629.03 7443.81
497.00Km 4627.23 4638.24 7458.64
498.00Km 4636.44 4647.45 7473.46
499.00Km 4645.65 4656.66 7488.29
500.00Km 4654.86 4665.87 7503.11
Rate
5200.00
5850.00
25000.00
24000.00
11000.00
96.00
110.00
961.00
1239.00
1654.00
3183.00
2767.00
2352.00
729.00
589.00
999.00
465.00
413.00
1048.00
314.00
75.00
29.00
70.00
23.00
26.00
610.00
460.00
677.00
23.00
39.00
59.00
155.00
318.00
12.00
103.00
735.00
#REF!
935.00
#REF!
1097.00
1365.00
1313.00
845.00
252.00
23.00
39.00
59.00
103.00
77.00
5920.00
42500.00
42500.00
41000.00
70.00 5920
67.00
69.00
75.00 50.00
30.00 22.00
50.00 40.00
165.00 165.00
7.00 7.00
5.00 5.00
4.00 4.00
1925.00 1925.00
445.00
510.00
445.00 9.61
400.00
400.00
350.00
539.30
320.00
352.50
206.70
471.10
206.70
184.60
148.80 152.2
83.20
227.80 152.2
ANUAL MEANS
62.40
62.40
74.80
74.80
52.00 44.7
52.00
6-2017. P. No. 215) 1000 Nos.
50.70
70.90
94.50
114.80
135.10
20.30
16.90
14% less
246.80 336.35
1007.31 32.68
57.30 32.68
907.71
74.29
527.75
68.39
CR Stone & Bond Stone
1.13165
Datas for watersupply and sanitary items
1 S& F 25 mm Nominal Bore GI pipe Medium Grade properties &
weight asper IS 1239 ISI mark with GI fittings including the cost of
pipe & its fittings &labour charges complete for fixing the same in
position etc., complete BMW-F.83
BMW-G.01 1 6 1lit 6
MAA@25% on labour charges 0.25 1 1lit 0.25
over head 0.13615 6 1lit 0.85
[email protected]% 7.10
1lit 7