Input Sheet
Input Sheet
Name of the Scheme : ATGRAM PIPED WATER SUPPLY SCHEME Block : Nalhati - I District : Birbhum
T.W
Submersible Pump
(7 Working+4 Atgram (76) 2411 200 x10 200 x 10 200 x10 30 20.607 Over T.W 16 from TW to C.W.R
33
Standby)
C.W.R
(No including
Stand by unit Centrifugal Pump
to be decided Atgram (76) 2411 N.A 144.25 At C.W.R- 16 from C.W.R to 52
by Mech O.H.R
Planning
Wing)
OHR Kanaipur (74) 430
Stages of Pumping : Double
Note : Comprehensive estimate for mechanical and electrical components covering all items i.e. Pumps and Treatment Proposed : Iron Elimination &Disinfection by
ancillaries, Power connection, disinfection, permanent electrification unmanned operation, etc, may be sent. Chlorination.(at head works site)
Area of sub-station building, if required, has to be stated. The total estimate will constitute a part of the DPR to
be submitted.
REMARKS: Iron Elimination & Disinfection by Chlorination to be done at at H/W site.
No of College :1 (One), No of ICDS: 19(Nineteen), No of High School:2(Two),No of FPS :7 (Seven),No of SSK :4 (Four), No of MSK :1 (One), No of Health Centre :2 (two)
etc.