DATE: February 14,2018

Attention: Hong, Michelle Dy

Subject: Proposal for a 3 Phase 1200 AT Service Entrance Installation


& Load Schedule.
Located at Kawit, Cavite

Sir/Ma’am:

Reference to above subject, we are pleased to submit our quotation with the total amount
of (Php 302,297.82.00) (THREE HUNDRED TWO THOUSAND TWO HUNDRED
NINETY-SEVEN AND EIGHTY-TWO CENTS) with zero VAT.

Hereby certify that upon submitting this cost proposal that had personally visited and
inspected the site. Whereas, had been mindful of having considered all existing utilities
and both neutral/man made structures warranted (i.e. demolition, landfill, canal cover,
bridge, parking pavements and the likes) are already inclusive of the cost submitted. That
I will take account of no added cost for a 3 Phase 1200 AT Service Entrance Installation &
Load Schedule on the moment that this project has been awarded to me or my company
per mutual negotiated final cost. Thus, with 50% (fifty percent) Down Payment for the
50% (fifty percent) completion of work and the full completion of work will follow upon
paying the full amount of the project itself. Listed below are the following materials to be
use and also the scope of work for this project.

 Scope of Works:

 Installation of complete service entrance in accordance with Meralco Standard


and the latest edition of Philippine Electric Code.
 Load Schedule seal and sign of our respective Professional Electrical Engineer.

MATERIALS UNIT QUANTITY


2
4 - 200mm 72 METERS
4 - 50mm2 (GND) 24 METERS
ENTRANCE CAP #4’’ 4 PCS.
RSC CONDUIT PIPE # 4” 4 PCS.
BRACKET 4 PCS.
U-BOLT # 4” 16 PCS.
EXPANSION BOLT 6 PCS.
1,200 AMPS MAIN CIRCUIT 1 SET
BREAKER W/ NEMA 3R
MISCELLANEOUS (TAPE,
VULCASEAL ETC.)
 ELECTRICAL MATERIALS ₱ 196,641.3
 LABOR, SUPERVISION & ₱ 50,656.52
TRANSPORT
 MOBILIZATION ₱ 15,000.00
 CONTRACTORS PROFIT ₱ 20,000.00
 LOAD SCHEDULE W/ SEAL AND ₱ 20,000.00
SIGN OF RESPECTIVE PEE
SUB-TOTAL ₱ 302,297.82.00
0 VAT
 TOTAL CONTRACT PRICE ₱ 302,297.82.00

Very truly yours,

MARCELINO T. TUBALLAS
General Manager
MTT Electrical Contractor & General Services