SSR 2008 09 5 6 08
SSR 2008 09 5 6 08
The Engineer-in-Chief (State Roads), R&B Department has furnished draft proposals for
common materials ,conveyance rates of materials and hire charges of machinery & plant vide ref
2nd cited.
The Engineer-in-Chief, Public health Department has furnished Public Health Work Items and
Public Health material rates vide ref 3rd cited.
The regional Superintending Engineers of Irrigation Circles of Hyderabad, Dowlaiswaram and
Chittoor have furnished draft rates of Common materials & work items and Conveyance rates of
Materials of their region., i.e., Telangana , Andhra and Rayalaseema regions respectively.
The labour rates are obtained from the Commissioner, labour department vide the reference
th
4 cited.
Based on the proposals, the draft common SSR for the year 2008-09 was reviewed and
finalized in the annual Board of Chief Engineers meeting held on 24 -5–2008.
One hard copy & compact disc containing common S.S. Rates are communicated. No other
items other than the items communicated by this Office shall be introduced in the SSR
The Heads of Department /Regional superintending Engineers of Irrigation & CAD Dept
mentioned below are authorized to print the Common S S R. The unauthorized printing & selling of
the Common SSR is strictly prohibited.
The revised rates will come into force from 1st June of 2008.
The receipt of the proceedings may be acknowledged.
a) (i)25% extra over the rates on labour component of works is allowed in all
Municipal Corporation Limits of Andhra Pradesh except Greater Hyderabad,
Greater Visakhapatnam and Vijayawada municipal corporations( up to a belt of
12 Kms. from Municipal Corporation limits ) and other corporations as notified
by the Government from time to time.
(ii)40% extra over the rates on labour component of works for Greater
Hyderabad , Greater Visakhapatnam and Vijayawada Municipal Corporation( up
to a belt of 12 Kms. from Municipal Corporation limits ).
b) Allow 20% extra over basic rates on labour component of works in all District
Headquarters and the remaining Municipal limits ( up to a belt of 12 Kms. from
Municipal limits ).
c) For works at Tirumala Hills in Chittoor District, 40% extra over the basic rates
of labour component is allowed.
d) For works at Horsely hills in Chittoor District, 30% extra over the basic rates of
labour component is allowed.
e) For works located inside Tirumala Temple, 20% extra over the basic rate of
labour component specified for Tirumala Hills is allowed.
f) For Works located inside T.T.D Temples of Sri Padmavathi Ammavari Temple,
Tiruchanoor, Sri Govindaraja Swamy Temple at Tirupathi, Sri Kapleswara
Swamy Temple, Kapilatheerthm, Tirupathi and Sri Kalyana Venkateswara
Swamy Temple, Srinivasa Mangapuram , 20% extra over the basic rates of
labour component for Tirupathi Municipal Corporation is allowed.
B) JAIL COMPOUNDS:
15% extra is allowed over labour rates for the work in the Jail compounds. Only
equivalent number of Man Mazdoor shall be provided in the Jail premises and no
women Mazdoor are allowed inside.
C) INDUSTRIAL AREA:
a. 20% over basic rates on labour component works allowed for works situated
within 10 Kms belt of Industrial area of, Jeedimetla, Lingampally,
Ibrahimpatnam,Tandur in Ranga Reddy District, Ibrahimpatnam, Vuyyuru,
Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur
District Garividi in Vijayanagaram District, Kothur in Mahabubnagar District,
Patancheru, Ramachandrapur in Medak District, Bibinagar in Nalgonda
District, Ramagundam and Godavarikhani in Karimnagar District, Renigunta in
Chittoor District and Yerraguntla & Mangampet in Kadapa District, Manchiryal,
Mandamarri, Bellampalli in Adilabad District, Sarpaka, Kothagudem, Paloncha,
Manguguru, Singareni Collieries in Khammam District, Kamalapur,
Bhoopalpally of Warangal District, Wadepally of Nalgonda District,
Nagapally(Centenary Colony, Begumpet “X” roads),Takkelapally of
Karimnagar District, Hindupur, Tadipatri, Anantapur, Guntakal, Rayalcheruvu,
Yadiki of Anantapur District and Adoni, Dhone, Cement Nagar, Nandyal,
Kurnool, Yemmiganur & Bethamcherla of Kurnool District ,Anakapally of
Vishakhapatnam District.
a) 25% extra is allowed for the works located with in the interior Agency / Tribal
limits, i.e. for the works located with in & upto16 KMs from any all weather
route inside Agency / Tribal.
b) 40% extra is allowed for the works located with in the interior Agency / Tribal
limits, i.e. for the works located beyond 16 KMs from any all weather route
inside Agency / Tribal.
E) GHAT ROADS:
For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5
times the existing length of the road for the purpose of leads only for
conveyance of materials based on the certificate for the Ghat Road given by the
Superintending Engineer concerned.
If more than one area allowance ( such as those ) for (1) Municipalities (2)
Agency / Tribal areas (3) Industrial areas are applicable for a particular
Maximum 13% towards LI & LA will be allowed only in the case of works where
the labour component i.e. excluding cost of material such as cement and steel
works out to more than Rs. 20.00 lakhs on the basis of certificate of Executive
Engineer that the labour available is not adequate and that labour has to be
imported for executing the work, subject to approval of the Chief Engineer in
terms of G.O.Ms.No.7 Finance (Works & Projects) Dept Dt. 20-6-2005.
The following labour is allowed for conveyance of water for every ½ Kilometer
lead or part there of over the initial lead of ½ kilometer.
3
COMMON SSR 2008-09
PREAMBLE
Note:- For Water leads of over 2 KMs, specific approval of Chief Engineer
concerned is necessary.
A. TRIAL TRENCHES:
B. TRIAL PITS:
II) For pipe lines where the depth is less … 75% extra
than 1.5 times the width
Note: 1) The extra percentage is allowed over S. S. 20 B rate for corresponding soil. It
includes the charges for all lifts and initial lead but does not include
dewatering charges if any in respect of all the items under ( A) and (B)
above.
5.0 Proportion of First class and 2nd class workmen under Skilled Labour:
30% of the skilled labour provided in the data may be taken as 1st Class and the
remaining 70% as 2nd Class.
6.0
A) Cement Concrete proportion and requirement of coarse aggregate etc.,
for 1 cum (unit ) of finished work:
II) For cement concrete proportions (1:5:8), (1:6:10) etc., 0.90 cum. of
coarse aggregate shall be adopted and the quantity of mortar required
calculated proportionately in each case.
Note:- In massive walls above 3 Mts. thick 0.40 cum. of cement mortar shall be
allowed.
I) The size of stone for the volume range ( 0.015 to 0.030 Cum) shall
not be less than (0.30 X 0.30 X 0.15 to 0.30 X 0. 225 X 0.225m)
II) The size of stone for the volume range (0.011 to 0.015 Cum) shall
not be less than (0.30 X 0.225 X 0.15 to 0.225 X 0.225 X 0. 225
m)
III) The rate of labour component as per the standard data book is to
be adopted for revetment work only. However for apron work Rs.
3.00 per cum. should be deducted.
IV) For the labour for the “Rock Toe” shall be taken as 2/3rd of the
labour charges of revetment as Chief Engineer, Circular No. P3/
OT2/ T3/ 65167/78, Dt: 19.03.1980.
8.0 Deep cuts:
Deep cuts are defined as reaches of canal where excavation in all soils is for a
depth of excavation 6m and more. The following increase over normal rates is
permitted in deep cuts on a graded basis.
NOTE : 1) The extra percentage is only on basic rate. 2) The above percentage
are not applicable for “LEADS & LIFTS”. 3) The above extra percentages are to
be allowed only on items excluding the blasting component which may be taken
as 1/3 of the rate.
9.0 The conveyance of bitumen for bulk and packed may be admitted as
follows:
Excavation in all soils up to SDR & Stone matrix with machinery within a radius of
5 m i.e. cut and dump – Basic rate for SS 20B Rs : 13.00 / cum
NOTE:-I) The machinery rate for earth work excavation should be adopted for more than
1000 cum quantity as per G. O. Ms. No. 134 Dated: 25.11.2002. (Irrigation &
CAD(PW:COD) Department).
II) The machinery rates for earth work excavation for soil classification should be adopted
as per G.O. Ms. No 10 Dated: 26.07.2005 Finance (works & Projects) Dept. The
machinery rates for soil classification from Extracts of the above G.O are as
follows.(The machinery rates for earth work excavation should be adopted for 1000
Cum or more.)
6
COMMON SSR 2008-09
LABOUR RATES
7
COMMON SSR 2008-09
LABOU R ATES
RATES OF LABOUR
S.S. S S RATE
Sl. Unit
Item Description FOR
No. (per)
No. 2008-09
1 2 3 4 5
(A) Skilled Workmen
First Class
8
COMMON SSR 2008-09
LABOU R ATES
S.S. S S RATE
Sl. Unit
Item Description FOR
No. (per)
No. 2008-09
1 2 3 4 5
Operator
9
COMMON SSR 2008-09
LABOU R ATES
S.S. S S RATE
Sl. Unit
Item Description FOR
No. (per)
No. 2008-09
1 2 3 4 5
Work Inspector with Non-technical
40 19 Day 188.00
qualification SSLC/SSC/HSC
SECOND CLASS
10
COMMON SSR 2008-09
LABOU R ATES
S.S. S S RATE
Sl. Unit
Item Description FOR
No. (per)
No. 2008-09
1 2 3 4 5
11
COMMON SSR 2008-09
LABOU R ATES
S.S. S S RATE
Sl. Unit
Item Description FOR
No. (per)
No. 2008-09
1 2 3 4 5
Casual labour on loading & Un-loading
77 6(a) Day
operations
Helpers/Cleaners/Sweepers/Scavangers/
78 6(b) Day
Choukidaars/Security Guards/Office Boys
12
COMMON SSR 2008-09
COMMON MATERIAL
&
WORK ITEMS
13
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
14
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
15
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
119 g - do - 50mm size (IS383,19705) 1 cum 390.00
120 h - do - 60mm size (IS383,1970) 1 cum 360.00
121 I - do - 65mm size (IS383,1970) 1 cum 325.00
122 j - do - 75mm size (IS383,1970) 1 cum 260.00
16
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
17
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
151 s - do - 20 mm size (IS383,1970) 1 Cum 251.00
18
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
171 z7 - do - 25 mm size 1 Cum 37.50
172 z8 - do - 40 mm size 1 Cum 42.00
173 z9 - do - 50 mm size 1 Cum 37.50
19
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
The
price of
cement
will be
reviewe
d and
fixed on
monthly
basis as
per
G.O.Ms.N
Cement excluding cost of empty cement Metric
183 42 o.94
bags Tonne
T,R&B
Dept
Dt16-4-
2008
and
rates
will be
commun
icated
separate
ly.
NOTE: (1) The rate is material at site ( No conveyance charges
to be allowed) 2)As per the rates applicable to the District. 3)
Least of the (1) and (2 ) above may allowed 4) The price of
cement will be reviewed and fixed on monthly basis as per
G.O.Ms.No.94 T,R&B Dept Dt16-4-2008 and rates will be
communicated separately.
(D) MORTARS
Rates
have to
be
43 to worked
189 Items 43 to 45
45 out
based on
standard
data.
The
One Metric prices of
190 Mild steel rods 6mm dia.
Tonne steel will
be
20
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
One Metric
191 Mild steel flats
Tonne
One Metric
193 High Yield Strength Deformed Bars
Tonne
One Metric
194 Mild Steel Plates
Tonne
NOTE: (1) The rate are inclusive of sales tax. 2) As per the rates
applicable to the District. 3) Least of the (1) and (2 ) above may
allowed 4) The prices of steel will be reviewed and fixed on
monthly basis as per G.O.Ms.No.94 T,R&B Dept, Dt 16-4-2008
and rates will be communicated separately.
III RATES OF WORKS
(A) CLEARING SITE
195 1.a Clearing heavy Jungle 1 Sqm 2.20
196 b Clearing light Jungle 1 Sqm 2.00
197 c Clearing Scrub Jungle 1 Sqm 2.00
Clearing Juliflora (Prosafis) jungle
198 d including up-rooting and removing of 1 Sqm 3.30
Juliflora stumps.
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
208 ii - do - 100 to 200 cm Each 38.00
209 iii - do - above 200 cm Each 62.00
Uprooting and removing stumps of other
210 f.I kind of trees including stacking of girth Each 18.00
30 to 100 cm.
211 ii - do - 100 to 200 cm Each 26.00
212 iii - do - above 200 cm Each 35.50
213 3.a Uprooting and clearing prickly pear jungle 1 Sq.m 1.90
covered
under
Blasting and removing hard granite
224 6 1 cum earth
measured in solid
work
item
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
a) Manually ( Hand)
23
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
(vii) Allowance for compaction and
Shrinkage- 12 to 12.5%
EARTH WORK EXCAVATION AND
DEPOSITING ON BANK WITH AN
INITIAL LEAD OF 10 METRES AND AN
INITIAL LIFT OF 2 METRES IN CASE
OF HEAD LEAD ONLY.
Sand or loose soils wet sand not under
237 8.a water, silt in canals, channels and drains 1 cum 27.00
SS 20-A.
238 b - do - 20-B 1 cum 25.00
Loamy and Clayey soils like black cotton
239 9.a soils, red earth and ordinary gravel SS 1 cum 41.00
20-A.
240 b - do - 20-B 1 cum 37.50
Slushy soil and silt clearance up to 0.60
241 10.b 1 cum 41.00
metres depth SS 20-B
Clayey Soil in wet and slushy condition
242 11.b 1 cum 43.00
SS 20-B
24
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
Hard rock and boulders more than 3 cum
255 19.a.I in size requiring blasting including 1 cum 320.00
stacking
25
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
FOR ALL SOILS, SOFT
DISINTEGRATED ROCK AND STONE
MATRIX (ITEM N0s 8-b to 15 ABOVE
)
269 iii -do- from 7 th extra lift and above 1 cum 4.00
FOR HARD DISINTEGRATED ROCK
(ITEM 16 & 17 ABOVE )
275 iii -do- from 7 th extra lift and above 1 cum 8.50
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
Add to relevant SS 20-A rates for new
tank bunds, closing breaches, road
b(I) formation and embankments for extra 1 cum 5.00
watering and consolidation by pneumatic
tampers at 90% proctor's density.
50% of
earth
work
Trimming of slopes of embankments and
excavati
287 b depositing the soils on the top of the 1 cum
on of
bank.
similar
classific
ation
27
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
Rates
have to
be
289 SSI NOS 31a to 39 and SSI Nos. 60 to 87 worked
based on
standard
data
290 Note:
291 1. Add for vibrating concrete 1 cum 43.00
292 2. Add for machine mixing of concrete. 1 cum 45.00
3.Add where the power is available for
293 1 cum 27.50
operating the mixer, the rate is,
White washing and colour banding for
294 aI guard and guide stones including cost of each 5.80
materials
295 bI Screening sand and gravel 1 cum 5.70
296 b2 Screening chips and metal 1 cum 11.80
Removing and refixing Hectometer or
297 c1 each 8.60
Demarcation stones
CENTERING CHARGES
Centering charges for culvert slabs and
298 L1 other structures of 3 mts. span and 1 cum 950.00
above
Centering charges for bed blocks and
299 L2 culvert slabs and other structures of less 1 cum 760.00
than 3 mts. span.
CENTERING CHARGES FOR MINOR
AND MAJOR BRIDGE WORKS
For mass concrete piers, abutments and
300 L3 1 cum 700.00
steining well curbs, well caps etc.,
For RCC piers, abutments, wing wall,
301 L4 1 cum 850.00
steining, well curbs, well caps etc.,
NOTE:- The rates under L3 and L 4 are
302 applicable to Roads and Buildings and
Irrigation structures up to 2 metres width
303 L5 For RCC deck slabs 1 cum 1550.00
304 L6 For RCC beams 1 cum 2000.00
305 L7 For RCC hand rails 1 cum 2200.00
For CC pavements, wearing coats,
306 L8 approach, slabs, guide stone, J. M. stone 1 cum 160.00
etc.,
28
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
Laying and fixing RCC Hume pipes in
position including lifting, aligning
etc., complete with (fixing ) collars
n
for the following diametres of pipes
but excluding cost of materials ( NP2
Class )
307 n1 250 mm diameter 1 Rm 17.00
308 n2 300 mm diameter 1 Rm 23.50
29
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
Picking gravelled surface 25 mm deep
324 3 10 sqm 6.00
and levelling and sectioning
Picking the existing B.T. surface and
325 4 10 sqm 22.00
removal of chips
Picking old metalled surface to a
depth of 40 to 100 mm and spreading
metal including watering with an
initial lead of 2 Hectometers and
rolling with power rollers watering
and spreading gravel for blindage
326 5 and power roller rolling including
hire charges of power roller rolling
including hire charges of power roller
( 8 to 10 T) barricading and diversion
of traffic and wetting the new
consolidation for a fortnight ( for
compacted thickness of )
HARD METAL
327 5 (a) 40 mm thickness 10 sqm 137.00
328 (b) 50 mm thickness 10 sqm 155.00
329 (c ) 75 mm thickness 10 sqm 170.00
330 (d ) 100 mm thickness 10 sqm 185.00
331 (e) 150 mm thick excluding hire charges 10 sqm 330.00
Spreading gravel watering with an
initial lead of 2 hectometers and
power roller ( 8 to 10 T ) rolling
excluding hire charges of power
roller and barricading etc., ( for a
compact thickness of )
332 6a 50 mm thickness 10 sqm 25.00
333 b 75 mm thickness 10 sqm 34.00
334 c 100 mm thickness 10 sqm 53.00
335 d 150 mm thickness 10 sqm 60.00
Blinding the road surface 6 mm thick
with gravel or sand available at site
336 7a 10 sqm 1.80
after remaining loose stones
including watering.
337 b -do- without watering 10 sqm 1.50
Blinding the road surface 6 mm thick
338 8a with gravel or sand dug from road 10 sqm 2.90
site including watering.
339 b -do- without watering 10 sqm 2.10
Spreading gravel sand including
340 watering and roller rolling ( for
compacted thickness of )
341 9a -do- 6mm to 20 mm thick 1 cum 38.00
342 b -do- from 20 to 25 mm thick 1 cum 34.00
343 c -do- from 25 to 40 mm thick 1 cum 32.00
344 d -do- from 40 to 50 mm thick 1 cum 30.00
30
COMMON SSR 2008-09
COMMON MATERIALS AND WORK ITEMS
S.S. SS Rate
Sl.
Item Description Unit for
No
No. 2008-09
1 2 3 4 5
Picking 50 to 100 mm Old metalled
surface, spreading metal and blindage
345 10 10 sqm 28.00
watering tamping for patch repairs (
labour only )
Picking old metalled surface 50 to 100
346 11 mm deep spreading gravel watering and 10 sqm 15.00
tamping ( labour only )
Levelling ruts and tamping gravelled
347 12 10 sqm 3.00
roads
Levelling ruts and tamping metalled
348 13 10 sqm 6.00
roads
Spreading gravel or sand including
349 14 watering and rolling with hand roller 10 cum 230.00
irrespective of thickness in layer
Carrying for water for WBM consolidation
metal and blindage of 40 to 150 mm
350 15(I) thickness for every one hectometer 10 sqm 3.00
beyond initial lead of 2 hectometers
beyond initial lead of 2 hectometers
Rate towards the cost of water to be
consumed for Cement Concrete
Roads(including curing) under Greater
Hyderabad Municipal Corporation limits
(ii) only, subject to issue of certificate by the 1 sqm 10.00
concerned Executive Engineer in charge
of the work that water required for the
work is to be purchased from other
source.
Gelatin(For MORTH data,for works of
351 Per Kg 60.00
state & national high ways only)
Electric Detonators(For MORTH data,for
352 each 3.00
works of state & national high ways only)
Hot applied thermoplastic compound(For
353 MORTH data, for works of state & Per Litre 200.00
national high ways only)
Reflectionising glass beads of 2 mm
354 thick(For MORTH data, for works of state Per Kg 65.00
& national high ways only)
Road marking paint confirming to IS
355 164(For MORTH data, for works of state Per Kg 160.00
& national high ways only)
BAILING OUT WATER CHARGES FOR
CD & CM WORKS (WHEREVER
REQUIRED)
For earth work excavation for foundations
356 I 14 1 cum 80.00
below low water level
For cement concrete for foundation below
357 I 15 1cum 120.00
low water level
Labour charges for laying filters with
358 n 1 cum 45.00
coarse aggregate.
359 o Labour charges for laying filter with sand. 1 cum 25.00
31
COMMON SSR 2008-09
BUILDING ITEMS,
SANITARY& WATER
SUPPLY ITEMS
(The S.S Rates will be finalised by Committee Constituted Vide G.O.Rt.No.471 T R & B(R1) Dept
Dt 20-4-2007)
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
f. As per
Common
material
and work
For controlled blasting at restricted places items (i.e.
item no.
19a.iii & iv
of
S.No.256)
NOTE :- Rock should be measured in solids.
In case it is not possible, stacks should be
made in which case 40% for voids to be
deducted from the stack measurements.
4 Loading or unloading materials such as C.I.
Pipes, PVC Pipes, AC Pressure Pipes, DI
Pipes, SW Pipes, PVC Pipes, A.C/Specials
less than 300 mm dia up to 4 m in length
including stacking.
a. C.I. Pipes/D.I. Pipes and fittings Per Tonne 73.80
b. A.C. Pipes & Specials Per Tonne 61.60
c. Stoneware pipes & Specials Per Tonne 61.90
d. P.V.C. Pipes and fittings Per Tonne 60.80
5 Loading or unloading materials such as C.I.
Pipes, DI pipes, SW pipes, AC pressure pipes
& fittings/ specials from 300 mm to 600 mm
dia up to 4 m in length including stacking.
a. C.I. Pipes/D.I. Pipes and fittings Per Tonne 92.50
b. A.C. Pipes & Specials Per Tonne 83.80
c. Stoneware pipes & Specials Per Tonne 84.40
6 Loading or unloading materials such as C.I.
Pipes, DI pipes, PVC pipes, AC pipes less
than 300 mm dia, above 4 m in length
including stacking.
a. C.I. Pipes/D.I. Pipes and fittings Per Tonne 91.20
b. A.C. Pipes & Specials Per Tonne 83.80
c. P.V.C. Pipes and fittings Per Tonne 83.30
7 Loading or unloading materials such as C.I.
Pipes, DI pipes, AC pipes from 300 mm to
600 mm above 4 m in length including
stacking.
a. C.I. Pipes/D.I. Pipes and fittings Per Tonne 110.90
b. A.C. Pipes & Specials Per Tonne 103.80
Note:- For loading and unloading the above
materials at Railway Stations, the rates may
be adopted based on the competitive
quotations or the hammalae charges if
prevailing
35
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
8. Lowering the C.I. Pipes, D.I. Pipes and
a. fittings with S/S ends carefully into the
trenches and laying them true to alignment
and gradient including all sundries, but
excluding conveyance from source of supply
as per BIS No.3114/85.
DIAMETER OF PIPE/Fittings in mm :
36
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
80 Per Metre 20.20
100 Per Metre 20.20
125 Per Metre 20.20
150 Per Metre 21.20
180 Per Metre 21.60
200 Per Metre 23.70
225 Per Metre 25.30
250 Per Metre 26.90
300 Per Metre 34.40
350 Per Metre 61.60
380 Per Metre 63.50
400 Per Metre 68.20
450 Per Metre 75.80
500 Per Metre 79.20
530 Per Metre 88.40
560 Per Metre 95.10
600 Per Metre 103.60
650 Per Metre 106.30
680 Per Metre 114.90
700 Per Metre 132.50
750 Per Metre 149.60
800 Per Metre 183.50
900 Per Metre 221.80
1000 Per Metre 262.80
1100 Per Metre 308.30
1200 Per Metre 359.30
9. Jointing the C.I. / DI Pipes & fittings with
a. S/S ends excluding cost of jointing materials
such as lead or lead wool and hemp yarn but
including sundries such as cost of fuel for
melting lead, filling with water, with a water
lead up to 500 m and testing to required
pressure etc., complete as BIS No.3114/85.
DIAMETER OF PIPE/Fittings in mm :
80 Each Joint 53.80
100 Each Joint 57.70
125 Each Joint 83.00
150 Each Joint 86.70
180 Each Joint 100.60
200 Each Joint 113.40
37
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
225 Each Joint 127.90
250 Each Joint 141.20
300 Each Joint 165.70
350 Each Joint 181.40
380 Each Joint 207.90
400 Each Joint 236.10
450 Each Joint 262.30
500 Each Joint 278.40
530 Each Joint 302.30
560 Each Joint 326.60
600 Each Joint 374.80
650 Each Joint 400.50
680 Each Joint 407.10
700 Each Joint 417.50
750 Each Joint 455.20
800 Each Joint 487.30
900 Each Joint 566.40
1000 Each Joint 642.30
1100 Each Joint 724.40
1200 Each Joint 797.20
9. Jointing the C.I. Pipes, D.I. Pipes & fittings
b. with Rubber Gasket, excluding the cost of
the gasket but including all sundries filling
with water with a water lead up to 500 m
and testing to required pressure etc.,
complete as per BIS No.3114/85.
DIAMETER OF PIPE/Fittings in mm :
80 Each Joint 49.80
100 Each Joint 53.40
125 Each Joint 77.30
150 Each Joint 80.60
180 Each Joint 93.20
200 Each Joint 107.10
225 Each Joint 121.20
250 Each Joint 131.60
300 Each Joint 156.70
350 Each Joint 169.20
380 Each Joint 193.90
400 Each Joint 222.40
38
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
450 Each Joint 247.10
500 Each Joint 262.20
530 Each Joint 284.60
560 Each Joint 307.60
600 Each Joint 356.60
650 Each Joint 381.20
680 Each Joint 387.40
700 Each Joint 397.30
750 Each Joint 433.10
800 Each Joint 464.00
900 Each Joint 539.00
1000 Each Joint 611.30
1100 Each Joint 676.40
1200 Each Joint 740.40
10 Jointing the C.I. Pipes, fittings and valves
with flanged ends excluding cost of jointing
materials such as bolts, nuts, rubber
insertion, white lead and including filling
with water with a water lead up to 500 m
and testing to required pressure etc.,
complete as per BIS No.3114/85.
DIAMETER OF PIPE/Fittings/ valve in mm :
80 Each Joint 63.40
100 Each Joint 67.50
125 Each Joint 97.50
150 Each Joint 101.50
180 Each Joint 118.60
200 Each Joint 134.00
225 Each Joint 152.60
250 Each Joint 165.60
300 Each Joint 198.40
350 Each Joint 217.10
380 Each Joint 248.20
400 Each Joint 279.30
450 Each Joint 313.30
500 Each Joint 329.10
530 Each Joint 362.90
560 Each Joint 389.40
600 Each Joint 459.20
650 Each Joint 493.50
39
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
680 Each Joint 499.30
700 Each Joint 513.20
750 Each Joint 559.80
800 Each Joint 600.10
900 Each Joint 696.40
1000 Each Joint 836.30
1100 Each Joint 890.40
1200 Each Joint 981.60
11a Lowering the RCC plain ended pipes carefully
into the trench laying them true to alignment
and gradient, jointing RCC pipes with cement
joints including curing, the cost of jointing
materials i.e., Cement Mortar (1:1.5), hemp
yarn etc., and testing including filling with
water with a water lead upto 500 metres
excluding cost of rubber rings as per BIS
No.783/85.
per every 25 mm dia. Per Metre 10.20
11b Lowering the RCC S/S pipes carefully into
the trenches, laying them true to the
alignment and gradient, jointing with rubber
rings and testing including filling with water
with a water lead upto 500 metres excluding
cost of rubber rings as per BIS No.783/85.
per every 25 mm dia. Per Metre 6.30
12 Laying, jointing of G.I. / PVC/HDPE pipes
and specials/fittings including excavation
upto 0.5 m depth in all soils except rock
requiring blasting and re-filling trenches
after laying and jointing pipes.
a G.I. PIPES :
DIA in mm
50 Per Metre 17.00
40 Per Metre 17.00
32 Per Metre 15.80
25 Per Metre 15.80
20 Per Metre 14.10
15 Per Metre 14.10
b PVC/HDPE pipes as per BIS No.7634 part-
III/75 for PVC and BIS No.7634 part-II/75
for HDPE pipes.
DIA in mm
50 Per Metre 15.80
40 Per Metre 15.80
32 Per Metre 14.40
40
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
25 Per Metre 14.40
20 Per Metre 13.20
NOTE :- (i) The above rates are applicable
for the works in District only.
(ii) If the depth of excavation is more than
0.5 m separate rates to be worked out.
13 Lowering and laying in ready made trenches
true to alignment and gradient, jointing and
testing of stoneware pipes excluding cost of
jointing materials such as cement mortar
and hemp yarn as per BIS No. 4127/83.
DIA of Pipes in mm .
100 Per Metre 25.80
150 Per Metre 32.40
200 Per Metre 36.10
225 Per Metre 37.80
250 Per Metre 43.20
300 Per Metre 49.60
400 Per Metre 55.30
450 Per Metre 74.20
14 Lowering, laying, jointing & testing to
Hydraulic Field test pressure including cost
of water with minimum water lead of 500 M
(Labour charges only) for PVC pipes
excluding the cost of jointing materials.
DIA of Pipes in mm .
63 Per Metre 9.10
75 Per Metre 9.70
90 Per Metre 9.80
110 Per Metre 10.50
125 Per Metre 10.90
140 Per Metre 11.30
160 Per Metre 11.60
180 Per Metre 12.20
200 Per Metre 13.00
225 Per Metre 13.60
250 Per Metre 14.10
280 Per Metre 14.80
41
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
15 Lowering, laying, jointing & testing to
Hydraulic Field Test pressure including cost
of water with minimum water lead of 500
mts (labour charges only) for HDPE pipes
excluding the cost of jointing materials.
Outer Dia of pipes in MM
63 Per Metre 20.90
75 Per Metre 23.10
90 Per Metre 25.40
110 Per Metre 29.30
125 Per Metre 35.20
140 Per Metre 38.00
160 Per Metre 41.40
180 Per Metre 45.00
200 Per Metre 48.50
225 Per Metre 52.90
250 Per Metre 57.30
280 Per Metre 62.60
315 Per Metre 124.30
355 Per Metre 138.50
400 Per Metre 154.30
450 Per Metre 171.90
NOTE:- For item 9 to 16 the element of
testing charges is to be considered as 20%
of the combined rate for laying, jointing and
testing. This 20% shall be released only
after satisfactory testing of the pipe line to
the required pressure.
16 Labour charges for lowering and keeping in
position of C.I. Sluice valves, reflux valves
and scour valves.
Dia of Valve in mm.
80 Each 26.70
100 Each 35.20
125 Each 46.10
150 Each 54.50
200 Each 100.90
250 Each 136.40
300 Each 206.50
350 Each 355.40
400 Each 435.90
450 Each 570.70
42
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
17 Labour charges for fixing Air Valves
including boring the mains, threading the
bore and fixing nipple etc., complete.
Dia of Air valve in mm.
25 Each 73.10
40 Each 83.80
50 Each 88.70
65 Each 94.40
80 Each 103.70
100 Each 121.80
125 Each 188.70
150 Each 206.30
18 Labour charges for fixing Kinetic Air Valves
with isolating Sluice valves, Double Air
valves/ Air Cushion valve excluding cost of
jointing materials such as bolts, nuts and
rubber insertions etc., complete.
Dia of Air valve in mm.
25 Each 72.80
40 Each 83.50
50 Each 88.10
65 Each 94.10
80 Each 103.30
100 Each 121.30
125 Each 187.90
150 Each 205.40
19 Labour charges for fixing fire hydrants
excluding cost of jointing materials.
65 mm Each 83.00
80 mm Each 103.40
20 Uprooting C.I./ DI Pipes by melting the
lead, loosening the joints, scraping the
Observed
pipes, hoisting and keeping within a lead of Per Metre
data only
10 m but excluding earth work excavation
and refilling.
21 Uprooting of RCC pipes including breaking
the collars, loosening the joint, scraping the
observed
pipes, hoisting and keeping within a lead of Per Metre
data only
10 m but excluding earthwork excavation
and refilling.
22 Removing GI/PVC/HDPE pipes and specials/
fittings and clearing.
Dia of Pipes in mm
50 Per Metre 50% of
rate for
40 Per Metre
laying &
30 Per Metre jointing of
Per Metre correspond
25 ing pipes
43
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
20 Per Metre
15 Per Metre
23 Cutting C.I./ DI Pipes without water in
mains.Dia of pipes in mm.
Dia of Pipes in mm
80 Each cut 39.90
100 Each cut 39.90
125 Each cut 39.90
150 Each cut 39.90
180 Each cut 45.70
200 Each cut 45.70
225 Each cut 45.70
250 Each cut 65.80
300 Each cut 65.80
350 Each cut 91.50
380 Each cut 100.40
400 Each cut 104.80
450 Each cut 130.20
500 Each cut 156.40
530 Each cut 170.10
560 Each cut 183.70
600 Each cut 208.30
680 Each cut 235.10
24 Cutting A.C. Pipes without water in
mains.Dia of pipes in mm.
Dia of Pipes in mm
80 Each cut 16.20
100 Each cut 16.20
125 Each cut 16.20
150 Each cut 16.20
200 Each cut 17.00
250 Each cut 27.60
300 Each cut 27.60
350 Each cut 34.60
400 Each cut 38.40
450 Each cut 47.00
500 Each cut 52.30
600 Each cut 58.50
25 Drilling and tapping CI/ DI Main and fixing
brass screw down ferrule and plug.
10 mm to 20mm Each
83.20
Tapping
25 mm to 40mm Each
99.20
Tapping
44
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
26 Cutting road surface including stacking of
excavated materials for pipe line trench
work.
a) Cutting open B.T. road surface (as well as
asphalt concrete upto 75 mm thick) 10 Sqm 258.80
including water bound macadam
b) Cutting open C.C. road surface 1 Cum 720.00
c) Cutting open water bound macadam road
1 Cum 88.10
including soiling
27 Bailing out water.(For PH item)
a) Bailing out water from the pipe line
trenches with oil engine driven pumpsets,
HP/Hour 23.00
including hire charges, fuel charges and
wages for Driver and Helper.
b) Bailing out water from the pipe line
trenches with Electric Driven pumpset
HP/Hour 16.80
including hire charges, current charges and
wages for Driver and Helper.
NOTE:- The rate is payable on the total H.P.
hours ignoring fractions less than 0.5 HP
hour and rounding off 0.5 HP hour or more
to the next higher integer.
28 Shoring and strutting of trenches for water
and sewer main.
a) Single Staging from (0 to 2.5 Mts.) 10 Sqm of
Shoring 788.00
area
b) Double staging from (2.5 m to 4.5 Mts.) 10 Sqm of
Shoring 1065.50
area
29 Barricading, hoarding, lighting and watching
etc., for water supply and sewerage works 10 RM 44.50
for trenches.
30 Excavation of trenches for infiltration
galleries, syphon lines and connecting mains
in all soils under water including all leads,
lifts, shoring, strutting, bailing out water and
removal of shoring and strutting materials,
after completion of pipe line
a) 0 to 1 m deep under water. 10 Cum 6571.80
b) 1 to 2 m deep under water. 10 Cum 9414.00
c) 2 to 5 m deep under water. 10 Cum 14131.40
d) Beyond 5 m deep under water for every
additional 1 m depth over item 'c' 10 Cum 2699.90
45
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
31 Laying and jointing glazed stoneware pipes
including loose jointing with cement fillets
and all other incidental charges for
infiltration gallery, inclusive of bailing out
water by pumping to keep the trench
reasonably dry to facilitate the work
excluding cost of Stone Ware pipes.
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
NOTE: Scaffolding for every extra height of 1
m or part thereof but not less than 0.5 m. 10 Sqm
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
From 8 to 10 m below GL/m Per metre 19757.00
Note:-Below 10 m for every metre depth or
part thereof add Rs.250/- per m. For higher
dia, observed data is to be prepared and got
approved
44 Sinking in Hard strata other than rock but in
soils like limestone, gravel, clay under water Observed
including, pumping dewatering, hire charges Data
for mechanical equipment etc., complete.
45 Rates for OHSRs/ELSRs including fixtures
with a staging of 15 m, without Seismic
analysis.
a 500 Kilo litres Per litre 8.70
b 1000 Kilo litres Per litre 7.89
c 1500 Kilo litres Per litre 7.45
d 2000 Kilo litres Per litre 7.12
e 2500 Kilo litres Per litre 6.77
NOTE: -1)For intermediate ranges
proportional rates may be adopted.2) The
above rates are applicable for Elevated Level
Services Reservoirs / OHSRs with RAFT
FOUNDATION and a rate of Rs.4,400/- per
tonne for cement and Rs.41,500/- per tonne
for steel.
2) For stagings less than 15 m, the rate
shall be reduced by Rs.0.02 paise per litre
per every metre of difference in staging.
3) For stagings above 15 m, the rate shall be
increased by Rs.0.05 paise per litre per
every metre of additional staging.
4) Variation of above ratio due to increase /
decrease in the cost of cement
= (Rc-4400) x 0.00007
Rc = Rate of cement (Rs per Mt) at this time
of preparation of estimate.
5) Variation of above ratio due to increase /
decrease in the cost of steel = (RS-41500) x
0.00002
Rs = Rate of steel (Rs per Mt) at this time of
preparation of estimate.
6) Rate inclusive of three coats of epoxy
paint to inner surface of the reservoir
including roof dome.
7) The above rates be adopted for estimate
purposes for construction of ELSR for a
finished work including 2 coats of snowcem
painting for external surfaces, lettering, all
required fixtures, pipes, bends, valves etc.,
for pipe connections but excluding cost of
pipes,bends and valves as per departmental
designs and drawings.
8) The above rates are applicable for wind
pressure upto 350 kg / sq m
48
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
9) For tribal/Agency / Rural area, the above
rates shall be increased by 10%
10) If the ELSR is to be designed for seismic
forces also cost shall be arrived by working
out detailed quantities based on the design
& difference to be paid extra.
11) Fixtures include.
a) A balcony of 0.75 m width at floor slab
level/ middle ring beam level / top ring
beam level with RCC post with GI pipe hand
railing.
b) C.I. Manhole frame and cover : 0.60 x 0.6
m size 2 Nos.
c) RCC Mosquito proof ventilators.
d) RCC Finial - 1 No.
e) RCC precast ladders 0.45 m wide - 2 Nos.
f) RCC dog legged stair case of 1.00 m
width with hand railing - 1 No.
g) RCC hand railing 0.75 m height alround at
floor level and roof level.
h) Water level indicator of approved pattern
- 1 No.
i) Lightening arrestor with all its accessories
complete including earthing - 1 No.
46 Rates for OHSRs/ELSRs including fixtures
with a staging of 15 m without Seismic
analysis.
a Up to 10,000 Litres capacity Per litre 33.75
b 15,000 Litres capacity Per litre 23.25
c 20,000 Litres capacity Per litre 22.83
d 40,000 Litres capacity Per litre 22.16
e 60,000 Litres capacity Per litre 16.84
f 1,00,000 Litres capacity Per litre 15.56
g 2,00,000 Litres capacity Per litre 13.64
h 3,00,000 Litres capacity Per litre 12.80
i 4,00,000 Litres capacity Per litre 11.29
j 4,50,000 Litres capacity Per litre 9.80
NOTE: -1) For intermediate ranges
proportional rates may be adopted 2)The
above rates are applicable for Elevated Level
Services Reservoirs / OHSRs with RAFT
FOUNDATION and a rate of Rs.4,400/- per
tonne for cement and Rs.41,500/- per tonne
for steel.
2) For every metre of staging less than 15
m, the rate shall be reduced by Rs.0.02 paise
per litre.
3) For every metre of staging above 15 m,
the rate shall be increased by Rs.0.05 paise
per litre.
49
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
4) Variation of above rates due to increase /
decrease in the cost of cement
= (Rc-4400) x 0.00007
Rc = Rate of cement (Rs per Mt) at the time
of preparation of estimate.
5) Variation of above rate due to increase /
decrease in the cost of steel
= (RS-41500) x 0.00002
Rs = Rate of steel (Rs per Mt) at this time of
preparation of estimate.
6) Rate inclusive of three coats of epoxy
paint to inner surface of the reservoir
including roof dome.
7) The above rates be adopted for estimate
purposes for construction of ELSR for a
finished work including 2coats of snowcem
painting for external surfaces lettering,
fixing of all required fixtures, pipes, bends,
valves etc., for pipe connections, but
excluding cost of pipes,bends and valves as
per departmental designs and drawings.
8) The above rates applicable for wind
pressures upto 350 kg / sq m. If the ELSR /
OHSR is to be designed for seismic forces
also, cost shall be arrived by working out
detailed quantities based on the designs.
9) For Tribal/Agency/ Rural area, the above
rates shall be increased by 10%
10) If the ELSR is to be designed for seismic
forces also cost shall be arrived by working
out detailed quantities based on the design
& difference to be paid extra.
11) Fixtures include :
a) RCC or Aluminium ladder inside 0.45 m
wide.
b) Spiral staircase on the outside.
c) Lightening arrestor, including conductor
and earthing etc.
d) RCC ventilators with copper or stainless
steel fly proof mesh.
e) RCC finial ventilators with copper or
stainless steel fly proof mesh
f) Manholes frame and cover 0.75x0.75 m
with frame as per IS specifications (light
duty) – 2 Nos
g) Railing with 32 mm dia G.I. Pipes (A
class) in two rows around OHSR fixed in RCC
(1:2:4) posts of size 100x75x75 mm with 1.5
m intervals around periphery on top of the
OHSR for smaller capacities.
h) Water level indicator of good quality with
ebonite/ copper float approved pattern- 1
No
50
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
47 Construction of Rapid Gravity Filtration Plant
including civil, mechanical and electrical
fully automation including trial running etc.,
complete.
1) 2.0 Mld Per litre 2.17
2) 5.0 Mld Per litre 1.99
3) 10.0 Mld Per litre 1.82
4) 20.0 Mld Per litre 1.64
5) 30.00 Mld and above Per litre 1.44
NOTE :-
a) For intermediate ranges proportional
rates may be adopted
b) The above rates are applicable with
cement @ rate of Rs.4,400/-MT and steel of
41500/MT.
c) Variation of above rates due to increase /
decrease in the cost of cement
= (Rc-4400) x 0.00007
Rc = Rate of cement (Rs per MT) at the time
of preparation of estimate.
d) Variation of above rates due to increase /
decrease in the cost of steel = (RS-41500) x
0.00002
Rs = Rate of steel (Rs per MT) at the time of
preparation of estimate.
e) For rural areas an extra allowance of 10%
shall be given on basic rate.
f) In case of raft foundation, additional cost
involved due to provision of raft foundation
shall be worked out and paid extra.
g) For intermediate ranges proportional
rates may be adopted
h)The components of the Filtration Plant are
as follows.
A) Civil Works:
(all works of VRCC shall be in M30 design mix).
1)Stilling chamber .
2)Ventury flume channel with measuring
devices
3)Flash mixer chamber
4)Clariflocculator Tube settler & floculation
tanks.
5)Filter house, chemical house, Alum store,
laboratory office room chlorination plant
room, toilet etc. (All items shall be under
RCC roof only )
6)Wash water tank of suitable capacity.
B) Mechanical Equipment
1)Raw water flow measuring and recording
equipment.
51
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
SS Rate
Sl.
Description Unit for
No.
2008-2009
1 2 3 4
2)Alum dosing equipment
3)Flash mixer equipment
4)Sludge disposal fittings by gravity
5)Filtration plant euqipment instrumentation
and piping.
6)Clarifloccualation equipment (with
stainless steel blades) with rotating bridge
arrangement etc.,
7)Wash water tank fittings and pump sets
with 100% stand by.
8)Air blower with motor 100% stand by and
pipe connections.
9)Chlorination equipment and pipe
connections
10)Automated Lab testing equipment of
internationally approved make and
consumables for one year. For filtration
plants of capacity 10 MLD and more
automated online testing equipment shall be
installed
11)Spares & Tools for 2 years
C) Electrical Equipement
1)Necessary power supply wiring to motors
and switches bus bar connections as per I.E.
Rules
2)Internal wiring and illumination and
fittings and fixtures for internal and external
lighting exhaust fans, ceiling fans etc.
3) Erecting mechanical & Electrical
equipment, trial run for 90 days 23.50 hours
per day testing the treated water for
efficient standards and maintenance of
records and imparting training to staff.
4)Supply of 6 - sets of completion plans and
maintenance manual and brochures.
5)Provision towards soil investigation.
52
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
The revised cost of RCC pipes due to increase / decrease in the cost of raw materials shall
be as per the following formula.
Revised Cost =Cost as per the above table +R1+R2
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of
M.S. Rods = (S2-S1)/1000 X Ws.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of
Cement = (C2-C1)/1000 X Wc.
S1 = Rs. 41500/-
S2 = Cost of M S Rods (Rs. Per MT including all taxes and freight) at the time of
preparation of estimate.
C1 = Rs. 4400/-
C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of preparation
of estimate Ws=Weight of MS Rods required (Kg.) per metre of pipe as per IS:458/1988.
Wc= Weight of Cement required (Kg.) per metre of pipe.
53
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
Sl.No. Description
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. COLLARS
CONFORMING TO B.I.S. 458/2003 (RATE PER EACH COLLAR)
1
SUITABLE FOR R.C.C. PLAIN ENDED PIPES INCLUDING
TRANSPORTATION BUT EXCLUDING TAXES & DUTIES
Size Unit S S Rates for 2008-09.
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Each 34.00
100 mm dia Each 37.00
150 mm dia Each 38.00
200 mm dia Each 51.00
225 mm dia Each 55.00
250 mm dia Each 60.00
300 mm dia Each 79.00 111.00 111.00
350 mm dia Each 97.00 138.00 138.00
400 mm dia Each 105.00 157.00 157.00
450 mm dia Each 167.00 209.00 209.00
500 mm dia Each 192.00 248.00 248.00
600 mm dia Each 255.00 327.00 327.00
700 mm dia Each 333.00 440.00 440.00
800 mm dia Each 468.00 557.00 557.00
900 mm dia Each 561.00 650.00 650.00
1000 mm dia Each 655.00 814.00 814.00
1100 mm dia Each 802.00 1029.00 1029.00
1200 mm dia Each 975.00 1289.00 1289.00
1400 mm dia Each 1258.00 1633.00 1633.00
1600 mm dia Each 1604.00 2093.00 2093.00
1800 mm dia Each 1668.00 2697.00 2697.00
54
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
Note: All the prices are ex-works, Excise duty, CST/VAT extra as applicable
at the time of supply.
The above rates of RCC S/S Non-Pressure pipes are based on the following
raw materials cost.
Cement. Rs.4,400/- per MT (including all taxes and freight).
Steel (M.S. Rods) - Rs.41,500/- per MT. (including all taxes and freight).
The revised cost of RCC pipes due to increase / decrease in the cost of raw materials
shall be as per the following formula.
Revised Cost =Cost as per the above table +R1+R2
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the
cost of M.S. Roads =(S2-S1)/1000 X Ws.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the
cost of Cement =(C2-C1)/1000 X Wc.
S1 = Rs. 41500/-
S2 = Cost of M S Rods (Rs. Per MT including all taxes and freight) at the time of
preparation of estimate.
C1 = Rs. 4400/-
C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of
preparation of estimate
Ws=Weight of MS Rods required (Kg.) per metre of pipe as per IS:458/1988.
Wc= Weight of Cement required (Kg.) per metre of pipe.
55
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
Note: All the prices are ex-works, Excise duty, CST/VAT extra as applicable at
the time of supply.
The above rates of RCC S/S Pressure pipes are based on the following raw
materials cost.
Cement. Rs.4,400/- per MT (including all taxes and freight).
Steel (M.S. Rods) - Rs.41,500/- per MT. (including all taxes and freight).
The revised cost of RCC pipes due to increase / decrease in the cost of raw materials
shall be as per the following formula.
Revised Cost =Cost as per the above table +R1+R2
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of
M.S. Roads =(S2-S1)/1000 X Ws.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of
Cement =(C2-C1)/1000 X Wc.
S1 = Rs. 41500/-
S2 = Cost of M S Rods (Rs. Per MT including all taxes and freight) at the time of
preparation of estimate.
C1 = Rs. 4400/-
C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of
preparation of estimate
Ws=Weight of MS Rods required (Kg.) per metre of pipe as per IS:458/1988.
Wc= Weight of Cement required (Kg.) per metre of pipe.
56
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
57
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
58
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
Rate upto
5 Kms Rate for Rate upto 5 Rate for
Lead every Kms Lead every
including additional including additional
Sl.No. Description
Loading, 1 KM lead Loading, 1 KM lead
unloading or part unloading and or part
and thereof. stacking thereof.
stacking
1 2 3 4 5 6
CONVEYANCE OF R.C.C. PLAIN ENDED PIPES ON ALL WEATHER
1 ROADS INCLUDING LOADING, UNLOADING AND STACKING
(per Metre)
NP - 2 Class NP - 3 Class & NP - 4 Class
80 mm dia 1.90 0.10
100 mm dia 2.30 0.10
150 mm dia 3.30 0.20
200 mm dia 4.40 0.20
225 mm dia 5.10 0.30
250 mm dia 5.90 0.30
300 mm dia 8.80 0.40 23.00 0.50
350 mm dia 11.40 0.60 24.90 0.60
400 mm dia 13.20 0.70 29.30 0.90
450 mm dia 16.80 0.90 32.20 1.10
500 mm dia 18.30 1.10 35.20 1.10
600 mm dia 26.40 1.60 52.80 2.30
700 mm dia 33.70 2.30 58.60 2.70
800 mm dia 39.60 2.30 70.30 2.70
900 mm dia 45.40 2.30 92.30 5.10
1000 mm dia 67.40 4.80 111.40 5.10
1100 mm dia 74.00 4.80 120.10 5.50
1200 mm dia 83.50 5.10 134.80 5.50
1400 mm dia 101.10 5.10 183.20 5.80
1600 mm dia 117.20 5.10 219.80 5.80
1800 mm dia 134.80 5.10 293.00 8.10
59
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
60
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
Sl.No Description
MANUFACTURE AS PER BIS NO: 1592/2003AS AMENDED FROM TIME TO TIME
(MAZZA PROCESS) AND SUPPLY OF AC PRESSURE PIPES DULY MARKED WITH
BIS MARK, INCLUDING COST OF MATERIAL, INCIDENTAL HANDLING,
1 LOADING AND PACKING CHARGES BUT ARE EXCLUSIVE OF TRANSPORTATION,
UNLOADING, STACKING AT DEPARTMENTAL STORES, EXCISE DUTY, VAT
OCTROI AND OTHER GOVT. LEVIES.
Size Unit S.S Rates for 2008-09
Class - 10 Class - 15 Class - 20 Class - 25
80 mm dia Rate/Metre 123.00 133.00 166.00
100 mm dia Rate/Metre 161.00 204.00 252.00
125 mm dia Rate/Metre 211.00 263.00 331.00
150 mm dia Rate/Metre 299.00 372.00 465.00
200 mm dia Rate/Metre 498.00 631.00 802.00
250 mm dia Rate/Metre 629.00 810.00 1016.00
300 mm dia Rate/Metre 884.00 1143.00 1457.00
350 mm dia Rate/Metre 1079.00 1402.00 1761.00
400 mm dia Rate/Metre 1405.00 1830.00 2270.00
450 mm dia Rate/Metre 1653.00 2189.00 2743.00
500 mm dia Rate/Metre 2051.00 2682.00 3369.00
600 mm dia Rate/Metre 2912.00 3795.00 4837.00
2 Lowering, laying and Jointing of AC Pressure pipes with AC Couplings or CID
Joints complete with Rubber Rings in readymade trenches true to alignment
and gradient including filling with water lead upto 500 mts and testing to
required pressure including all sundries but excluding cost of jointing
materials and conveyance from source of supply as per BIS No. 6530/72
80 mm dia Rate/Metre 21.00 21.00 21.00
100 mm dia Rate/Metre 30.00 30.00 30.00
125 mm dia Rate/Metre 33.00 33.00 33.00
150 mm dia Rate/Metre 40.00 40.00 40.00
200 mm dia Rate/Metre 52.00 52.00 52.00
250 mm dia Rate/Metre 63.00 63.00 63.00
300 mm dia Rate/Metre 78.00 78.00 78.00
350 mm dia Rate/Metre 132.00 132.00 132.00
400 mm dia Rate/Metre 198.00 198.00 198.00
450 mm dia Rate/Metre 242.00 242.00 242.00
500 mm dia Rate/Metre 308.00 308.00 308.00
600 mm dia Rate/Metre 330.00 330.00 330.00
The above Rates of A.C pipes are based on the Cement cost of Rs.4,400/- per MT (including all taxes and
freight).
The Rates may be revised depending upon the increase/decrease in the cost of cement rate as per the
following method.
For every Rs.100/- per MT increase/decrease in the cost of cement, increase/decrease in the above rate shall
be 0.72%.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate.
Transportation of AC pressure pipes at site of work anywhere in Andhra Pradesh 10% on the basic
on motorable roads for full truck loads including transit insurance, unloading, and cost of
2 stacking at site of work etc. Complete (AC Couplings and Rubber rings are to be corresponding
supplied free of transportation charges). AC Pressure
pipes.
61
COMMON SSR 2008-09
9. S.S.RATES FOR A.C. COUPLINGS
Sl.
Description
No.
1 2
MANUFACTURE AS PER MANUFACTURERS SPECIFICATION (MAZZA
PROCESS) AND SUPPLY OF A.C. COUPLINGS EXCLUDING COST OF
RUBBER RINGS TO SUIT AC PRESSURE PIPES INCLUDING COST OF
1
MATERIAL, INCIDENTAL HANDLING, PACKING TRANSPORTATION AND
UNLOADING AT SITE TRANSIT RISK BUT EXCLUDING EXCISE DUTY, VAT
AND OTHER GOVT. LEVIES.
Size Unit S.S Rates for 2008-09.
Class - 10 Class - 15 Class - 20 Class - 25
80 mm dia Rate/Each 64.50 67.50 78.00
100 mm dia Rate/Each 84.00 87.00 105.00
125 mm dia Rate/Each 105.00 114.00 138.00
150 mm dia Rate/Each 120.00 150.00 186.00
200 mm dia Rate/Each 222.00 237.00 303.10
250 mm dia Rate/Each 258.00 324.10 414.10
300 mm dia Rate/Each 336.10 435.10 558.10
350 mm dia Rate/Each 438.10 567.10 726.10
400 mm dia Rate/Each 675.10 882.20 1137.20
450 mm dia Rate/Each 810.20 1068.20 1377.30
500 mm dia Rate/Each 966.20 1293.20 1656.30
600 mm dia Rate/Each 1163.60 1449.30 1854.30
The above Rates of A.C Couplings are based on the Cement cost of Rs.4,400/- per MT (including
all taxes and freight).
The Rates may be revised depending upon the increase/decrease in the cost of cement rate as
per the following method.
For every Rs.100/- per MT increase/decrease in the cost of cement, increase/decrease the rate
by 0.72%.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation
of estimate.
Sl.
Description
No.
1 2
SCHEDULE OF RATE FOR SUPLY OF RUBBER RINGS MANUFACTURED AS PER
BIS: 5382/1988 WITH BIS MARK EMBOSSED PER EACH SET SUITABLE FOR A.C.
1 COUPLINGS INCLUDING COST OF MATERIAL, INCIDENTAL, HANDLING,
PACKING, TRANSPORTATION AND UNLOADING AT SITE TRANSIT RISK ETC.,
BUT EXCLUDING VAT.
Size Unit S.S Rates for 2008-09.
Class - 10 Class - 15 Class - 20 Class - 25
80 mm dia Each Set 38.70 38.70 38.70
100 mm dia Each Set 47.50 47.50 47.50
125 mm dia Each Set 62.10 62.10 62.10
150 mm dia Each Set 79.30 79.30 79.30
200 mm dia Each Set 81.30 81.30 81.30
250 mm dia Each Set 94.80 94.80 94.80
300 mm dia Each Set 95.10 95.10 95.10
350 mm dia Each Set 107.10 107.10 107.10
400 mm dia Each Set 130.80 130.80 130.80
450 mm dia Each Set 154.50 154.50 154.50
500 mm dia Each Set 178.40 178.40 178.40
600 mm dia Each Set 202.20 202.20 202.20
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation Of estimate
Sl.No. Description
1 2
MANUFACTURE, SUPPLY, DELIVERY OF PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES CONFORMING TO IS
1 784/2001 Ex-factory excluding transportation, taxes & duties.
Size Unit S.S Rates for 2008-09.
Rs. Rs. Rs. Rs. Rs. Rs.
6 Kg/cm2 8 Kg/cm2 10 Kg/cm2 12 Kg/cm2 14 Kg/cm2 16 Kg/cm2
350 MM DIA Metre 2656.00 2656.00 2682.00 2707.00 2756.00 2857.00
400 MM DIA Metre 2857.00 2882.00 2908.00 2957.00 3008.00 3058.00
450 MM DIA Metre 3032.00 3058.00 3083.00 3158.00 3233.00 3308.00
500 MM DIA Metre 3284.00 3308.00 3333.00 3408.00 3483.00 3583.00
600 MM DIA Metre 3784.00 3810.00 3859.00 3985.00 4111.00 4235.00
700 MM DIA Metre 4637.00 4662.00 4737.00 4863.00 5038.00 5188.00
800 MM DIA Metre 5489.00 5538.00 5690.00 5839.00 6066.00 6290.00
900 MM DIA Metre 6365.00 6416.00 6566.00 6842.00 7117.00 7519.00
1000 MM DIA Metre 7469.00 7544.00 7769.00 8070.00 8546.00 8922.00
1100 MM DIA Metre 8495.00 8621.00 8871.00 9348.00 9775.00 10200.00
1200 MM DIA Metre 9423.00 9600.00 9925.00 10450.00 40978.00 11478.00
1300 MM DIA Metre 12724.00 13368.00 13973.00 14579.00 15630.00 16825.00
1400 MM DIA Metre 14595.00 15280.00 16156.00 17128.00 18259.00 19088.00
1500 MM DIA Metre 16586.00 17383.00 18195.00 19502.00 20745.00 21685.00
1600 MM DIA Metre 18578.00 19486.00 20410.00 22705.00 23342.00 24409.00
Cost of laying jointing, testing to Hydrostatic field test pressure including cost of rubber rings, cost of transportation
2
of water and emptying pipe line after completion of field testing etc.
350 MM DIA Metre 108.00 108.00 108.00 108.00 108.00 108.00
400 MM DIA Metre 122.00 122.00 122.00 122.00 122.00 122.00
450 MM DIA Metre 137.00 137.00 137.00 137.00 137.00 137.00
500 MM DIA Metre 144.00 144.00 144.00 144.00 144.00 144.00
600 MM DIA Metre 180.00 180.00 180.00 180.00 180.00 180.00
64
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
65
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
350 MM DIA Per Pair 8750.00 8750.00 8750.00 8750.00 8750.00 8750.00
400 MM DIA Per Pair 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00
450 MM DIA Per Pair 11,250.00 11,250.00 11,250.00 11,250.00 11,250.00 11,250.00
500 MM DIA Per Pair 12,500.00 12,500.00 12,500.00 12,500.00 12,500.00 12,500.00
600 MM DIA Per Pair 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00
700 MM DIA Per Pair 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00 17,500.00
800 MM DIA Per Pair 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00
900 MM DIA Per Pair 22,500.00 22,500.00 22,500.00 22,500.00 22,500.00 22,500.00
1000 MM DIA Per Pair 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00
1100 MM DIA Per Pair 27,500.00 27,500.00 27,500.00 27,500.00 27,500.00 27,500.00
1200 MM DIA Per Pair 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00
1300 MM DIA Per Pair 32,500.00 32,500.00 32,500.00 32,500.00 32,500.00 32,500.00
1400 MM DIA Per Pair 38,500.00 38,500.00 38,500.00 38,500.00 38,500.00 38,500.00
1500 MM DIA Per Pair 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00 45,000.00
1600 MM DIA Per Pair 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
Cost of MS Flanges including cost of Bolts, Nuts, Rubber Packing etc., complete and flange thickness confirming to
5 IS:7322-1985 and flange dimensions confirming to IS:1538-1993 excluding cost of MS Specials including cost and
conveyance to site, VAT etc., complete.
Diameter and thickness Unit Rate Diameter and thickness Unit Rate
80 mm DIA x 15 mm thick Each Flange 600.00 500 mm DIA x 20 mm thick Each Flange 5,610.00
100 mm DIA x 15 mm thick Each Flange 800.00 600 mm DIA x 20 mm thick Each Flange 7,050.00
125 mm DIA x 15 mm thick Each Flange 940.00 700 mm DIA x 25 mm thick Each Flange 9,950.00
150 mm DIA x 15 mm thick Each Flange 1,240.00 750 mm DIA x 25 mm thick Each Flange 10,990.00
200 mm DIA x 15 mm thick Each Flange 1,530.00 800 mm DIA x 25 mm thick Each Flange 12,250.00
250 mm DIA x 15 mm thick Each Flange 2,010.00 900 mm DIA x 25 mm thick Each Flange 14,030.00
300 mm DIA x 15 mm thick Each Flange 2,280.00 1000 mm DIA x 25 mm thick Each Flange 16,570.00
350 mm DIA x 18 mm thick Each Flange 3,270.00 1050 mm DIA x 25 mm thick Each Flange 17,520.00
400 mm DIA x 18 mm thick Each Flange 4,080.00 1100 mm DIA x 25 mm thick Each Flange 18,960.00
450 mm DIA x 18 mm thick Each Flange 4,720.00 1200 mm DIA x 32 mm thick Each Flange 25,180.00
66
COMMON SSR 2008-09
PUBLIC HEALTH ITEMS
Note: a) The above rate of PSC pipes are based on the HT wire cost of Rs.61,800/-MT (Basic+ CED+ST & freight).
and cement price of Rs.4400/- per MT (including all taxes and freight)
The rates may be revised depending upon the increase/decrease in the cost of HT wire and cement. as per the following method. The cost of
HT wire may be obtained from reputed firms like SAIL/TATA/ SS Ltd. etc.,
Revised Cost =Cost as per the above table +R1+R2.
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HT Wire =(H2-H1)/1000 X Wh.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of Cement =(C2-C1)/1000 X Wc.
H1 = Rs. 61800/- H2 = Cost of HT Wire (Rs. Per MT including all taxes and freight) at the time of preparation of estimate.
C1 = Rs. 4400/- C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of preparation of estimate
Wh=Weight of HT Wire required (Kg.) per metre of pipe. Wc= Weight of Cement required (Kg.) per metre of pipe.
The rates for MS flanges are considering landed price of MS Plates of Rs.45,000/- per MT. Price variation to be released on actual weight of
flange.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate
67
COMMON SSR 2008-09
Public Health Items
12. S.S. RATES FOR PRE-STRESSED (CYLINDER) CONCRETE PIPES
Sl
Description
No.
1 2
PRE-STRESSED (CYLINDER TYPE ) CONCRETE PIPES CONFORMING TO IS 784/2001 @ Ex-factory Cost of pipes, excluding
1 transportation, laying, jointing, testing, Bends, Tees, Specials, taxes & duties Etc.
400 MM DIA Meter 262.50 262.50 262.50 262.50 262.50 262.50 262.50 262.50 262.50
68
COMMON SSR 2008-09
Public Health Items
450 MM DIA Meter 304.50 304.50 304.50 304.50 304.50 304.50 304.50 304.50 304.50
500 MM DIA Meter 336.00 336.00 336.00 336.00 336.00 336.00 336.00 336.00 336.00
600 MM DIA Meter 399.00 399.00 399.00 399.00 399.00 399.00 399.00 399.00 399.00
700 MM DIA Meter 462.00 462.00 462.00 462.00 462.00 462.00 462.00 462.00 462.00
800 MM DIA Meter 525.00 525.00 525.00 525.00 525.00 525.00 525.00 525.00 525.00
900 MM DIA Meter 598.50 598.50 598.50 598.50 598.50 598.50 598.50 598.50 598.50
1000 MM DIA Meter 672.00 672.00 672.00 672.00 672.00 672.00 672.00 672.00 672.00
1100 MM DIA Meter 745.50 745.50 745.50 745.50 745.50 745.50 745.50 745.50 745.50
1200 MM DIA Meter 819.00 819.00 819.00 819.00 819.00 819.00 819.00 819.00 819.00
1300 MM DIA Meter 892.50 892.50 892.50 892.50 892.50 892.50 892.50 892.50 892.50
1400 MM DIA Meter 966.00 966.00 966.00 966.00 966.00 966.00 966.00 966.00 966.00
1500 MM DIA Meter 1060.50 1060.50 1060.50 1060.50 1060.50 1060.50 1060.50 1060.50 1060.50
1600 MM DIA Meter 1134.00 1134.00 1134.00 1134.00 1134.00 1134.00 1134.00 1134.00 1134.00
1700 MM DIA Meter 1312.50 1312.50 1312.50 1312.50 1312.50 1312.50 1312.50 1312.50 1312.50
1800 MM DIA Meter 1365.00 1365.00 1365.00 1365.00 1365.00 1365.00 1365.00 1365.00 1365.00
1900 MM DIA Meter 1480.50 1480.50 1480.50 1480.50 1480.50 1480.50 1480.50 1480.50 1480.50
2000 MM DIA Meter 1596.00 1596.00 1596.00 1596.00 1596.00 1596.00 1596.00 1596.00 1596.00
CONVEYANCE OF PRE-STRES-SED (CYLINDER TYPE) CONCRETE PIPIES AND ACCESSORIES including loading at Factory, un-
3 loading at site and stacking for the following sizes.
400 MM DIA Per KM/M 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
450 MM DIA Per KM/M 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
500 MM DIA Per KM/M 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
600 MM DIA Per KM/M 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22
700 MM DIA Per KM/M 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04
800 MM DIA Per KM/M 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04
900 MM DIA Per KM/M 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04
1000 MM DIA Per KM/M 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06
1100 MM DIA Per KM/M 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06 3.06
1200 MM DIA Per KM/M 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12
69
COMMON SSR 2008-09
Public Health Items
1300 MM DIA Per KM/M 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12
1400 MM DIA Per KM/M 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12
1500 MM DIA Per KM/M 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12
1600 MM DIA Per KM/M 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12 6.12
1700 MM DIA Per KM/M 7.44 7.44 7.44 7.44 7.44 7.44 7.44 7.44 7.44
1800 MM DIA Per KM/M 7.44 7.44 7.44 7.44 7.44 7.44 7.44 7.44 7.44
1900 MM DIA Per KM/M 7.44 7.44 7.44 7.44 7.44 7.44 7.44 7.44 7.44
2000 MM DIA Per KM/M 7.86 7.86 7.86 7.86 7.86 7.86 7.86 7.86 7.86
Note: The rates of PCCP pipes which were incorporated in the SSR are based on the following raw materials cost.
HT Wire: - Rs.61,800/- (including all taxes & freight)
HR Coil (Hot Rolled): - Rs.47,000/- (including all taxes & freight)
Cement Cost Rs. 4400/-.per MT (including all duties, taxes & freight)
The rates may be revised depending upon the increase/ decrease in the cost of raw materials (landed price) as per the
following method.
Revised Cost =Cost as per the above table +R1+R2+R3.
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HT Wire =(H2-H1)/1000 X Wh.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HR Coil =(R2-R1)/1000 X Wr.
R3= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of Cement =(C2-C1)/1000 X Wc .
H1 = Rs. 61,800/- H2 = Cost of HT Wire (Rs. Per MT including all taxes and freight) at the time of preparation of estimate.
R1 = Rs. 47,000/- R2 = Cost of HR Coil (Rs. Per MT including all taxes and freight) at the time of preparation of estimate .
C1 = Rs. 4400/- C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of preparation of estimate
Wh=Weight of HT Wire required (Kg.) per metre of pipe. Wc= Weight of Cement required (Kg.) per metre of pipe.
Wr = Weight of HR Coil required (kg) per metre of pipe.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate
70
COMMON SSR 2008-09
Public Health Items
13. S.S. RATES FOR BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES
Sl.
Description
No.
1 2
BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory excluding transportation, taxes and
1 duties etc., for Bar wrapped steel cylindrical pipes.
Size Unit Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
4 -12 14 16 18 20 22 24 26 28 30
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
250 MM DIA Meter 3039.00 3039.00 3039.00 3039.00 3039.00 3039.00 3039.00 3039.00 3068.00 3181.00
300 MM DIA Meter 3425.00 3425.00 3425.00 3425.00 3425.00 3425.00 3507.00 3640.00 3704.00 3837.00
350 MM DIA Meter 4196.00 4196.00 4196.00 4196.00 4196.00 4196.00 4300.00 4445.00 4569.00 4697.00
400 MM DIA Meter 4620.00 4620.00 4620.00 4620.00 4620.00 4832.00 5019.00 5209.00 5398.00 6049.00
450 MM DIA Meter 5043.00 5043.00 5043.00 5096.00 5333.00 5567.00 5804.00 6039.00 6280.00 6744.00
500 MM DIA Meter 5625.00 5625.00 5684.00 5949.00 6240.00 6537.00 6856.00 7114.00 7661.00 7951.00
600 MM DIA Meter 7404.00 7404.00 7508.00 7927.00 8345.00 8727.00 9165.00 9592.00 10184.00 10547.00
700 MM DIA Meter 8805.00 9017.00 9608.00 10198.00 10791.00 11382.00 12170.00 12689.00 13311.00 13986.00
800 MM DIA Meter 10009.00 10773.00 11540.00 12283.00 13035.00 14063.00 14837.00 16040.00 16812.00 17639.00
900 MM DIA Meter 12405.00 12886.00 13848.00 14785.00 15723.00 16472.00 18230.00 19362.00 20374.00 21498.00
1000 MM DIA Meter 13991.00 15175.00 16341.00 17478.00 18619.00 20370.00 21819.00 23878.00 24997.00 26498.00
1100 MM DIA Meter 20146.00 20504.00 20683.00 22653.00 24874.00 26575.00 28760.00 30909.00 33004.00 35529.00
1200 MM DIA Meter 22259.00 22904.00 23692.00 26092.00 28617.00 31159.00 33273.00 34956.00 38967.00 42531.00
Cost of laying jointing, testing to Hydrostatic field test pressure including cost of site welding and fixing of Polypropylene Diapher
2
cloth, cost of transportation of water and emptying pipe line after completion of field testing.
250 MM DIA Meter 217.00 217.00 217.00 217.00 217.00 217.00 217.00 217.00 217.00 217.00
300 MM DIA Meter 254.00 254.00 254.00 254.00 254.00 254.00 254.00 254.00 254.00 254.00
350 MM DIA Meter 302.00 302.00 302.00 302.00 302.00 302.00 302.00 302.00 302.00 302.00
400 MM DIA Meter 338.00 338.00 338.00 338.00 338.00 338.00 338.00 338.00 338.00 338.00
450 MM DIA Meter 386.00 386.00 386.00 386.00 386.00 386.00 386.00 386.00 386.00 386.00
500 MM DIA Meter 423.00 423.00 423.00 423.00 423.00 423.00 423.00 423.00 423.00 423.00
600 MM DIA Meter 519.00 519.00 519.00 519.00 519.00 519.00 519.00 519.00 519.00 519.00
700 MM DIA Meter 604.00 604.00 604.00 604.00 604.00 604.00 604.00 604.00 604.00 604.00
800 MM DIA Meter 688.00 688.00 688.00 688.00 688.00 688.00 688.00 688.00 688.00 688.00
71
COMMON SSR 2008-09
Public Health Items
900 MM DIA Meter 809.00 809.00 809.00 809.00 809.00 809.00 809.00 809.00 809.00 809.00
1000 MM DIA Meter 894.00 894.00 894.00 894.00 894.00 894.00 894.00 894.00 894.00 894.00
1100 MM DIA Meter 1050.00 1050.00 1061.00 1061.00 1082.00 1082.00 1103.00 1103.00 1103.00 1103.00
1200 MM DIA Meter 1176.00 1176.00 1218.00 1218.00 1239.00 1239.00 1281.00 1281.00 1281.00 1365.00
Conveyance of Bar Wrapped steel Cylindrical (BWSC) pipes and accessories including loading at Factory, un-
3 loading at site and stacking for the following sizes.
250 MM DIA Per KM/M 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
300 MM DIA Per KM/M 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
350 MM DIA Per KM/M 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
400 MM DIA Per KM/M 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
450 MM DIA Per KM/M 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
500 MM DIA Per KM/M 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
600 MM DIA Per KM/M 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
700 MM DIA Per KM/M 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
800 MM DIA Per KM/M 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
900 MM DIA Per KM/M 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
1000 MM DIA Per KM/M 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
1100 MM DIA Per KM/M 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70
1200 MM DIA Per KM/M 6.20 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60
Note: The above rates of BWSC pipes are based on the following raw materials' cost.
HR Plates - Rs.47,000/- per MT (Basic+CED+ST & freight)
Wire rods - Rs.44,700/- per MT (Basic+CED+ST & freight)
Cement Cost Rs. 4,400/-.per MT (including all duties, taxes & frieght)
The rates may be revised depending upon the increase/ decrease in the cost of raw materials (landed price) as per the
following method.
Revised Cost =Cost as per the above table +R1+R2+R3.
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HR Plate =(H2-H1)/1000 X Wh.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of wire rods =(W2-W1)/1000 X Ww.
R3= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of Cement =(C2-C1)/1000 X Wc .
H1 = Rs. 47000/- H2 = Cost of HR Plate (Rs. Per MT including all taxes and freight) at the time of preparation of estimate.
W1 = Rs. 44700/- W2 = Cost of Wire rods (Rs. Per MT including all taxes and freight) at the time of preparation of estimate .
C1 = Rs. 4400/- C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of preparation of estimate
Wh=Weight of HR Plate required (Kg.) per metre of pipe. Wc= Weight of Cement required (Kg.) per metre of pipe.
Ww = Weight of wire rods required (kg) per metre of pipe.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate
72
COMMON SSR 2008-09
Public Health Items
14. S.S. RATES FOR GLASS FIBRE REINFORCED PLASTIC (GRP) PIPES
Sl.No. Description
1 2
GLASSFIBRE REINFORCED PLASTIC (GRP) PIPES CONFORMING TO IS 12709 -
1994 Stiffness class 124 Kpa including transportation to any where in A.P. with
1 jointing materials i.e., Reka couplings, Rubber Gaskets etc., for jointing pipes
including cost of specials, loading, un-loading and stacking etc., complete but
excluding Central Excise duty and to be added sale tax.
Size Unit S.S. Rates for 2008-09. Rs.
3 Bar 6 Bar 9 Bar 12 Bar 15 Bar
350 MM DIA Metre 2664.00 2701.00 2785.00 2862.00 2994.00
400 MM DIA Metre 2967.00 3099.00 3212.00 3362.00 3495.00
450 MM DIA Metre 3481.00 3615.00 3812.00 4000.00 4228.00
500 MM DIA Metre 3964.00 4125.00 4361.00 4634.00 4899.00
600 MM DIA Metre 5038.00 5247.00 5566.00 6133.00 6418.00
700 MM DIA Metre 6377.00 6668.00 7085.00 7727.00 8313.00
800 MM DIA Metre 7806.00 8175.00 8826.00 9601.00 10367.00
900 MM DIA Metre 9758.00 10173.00 11052.00 11987.00 12980.00
1000 MM DIA Metre 11695.00 12233.00 13159.00 14351.00 15470.00
Cost of laying jointing, testing to Hydrostatic field test pressure including cost
2 of transportation of water and emptying pipe line after completion of field
testing.
Size Unit S.S. Rates for 2008-09. Rs.
3 Bar 6 Bar 9 Bar 12 Bar 15 Bar
350 mm dia Metre 132.00 132.00 132.00 132.00 132.00
400 mm dia Metre 198.00 198.00 198.00 198.00 198.00
450 mm dia Metre 242.00 242.00 242.00 242.00 242.00
500 mm dia Metre 308.00 308.00 308.00 308.00 308.00
600 mm dia Metre 330.00 330.00 330.00 330.00 330.00
700 mm dia Metre 374.00 374.00 374.00 374.00 374.00
800 mm dia Metre 440.00 440.00 440.00 440.00 440.00
900 mm dia Metre 484.00 484.00 484.00 484.00 484.00
1000 mm
Meter 561.00 561.00 561.00 561.00 561.00
dia
Note: The duties and taxes as applicable shall be added as per rules at the time
of preparation of estimate.
The methodology adopted for rates is as follows:
Percentage of raw materials in the finished product of the pipe
1) Hoop Glass Fibre Rovings H% (35%)
2) Chop Glass C% (40%)
3) Resin R% (25%)
The cost of variation in Raw materials are:
1) Variation in cost of Hoop Glass :h%
2) Variation in cost of Chop Glass :c%
3) Variation in cost of Resin :r%
The percentage of variation in cost of pipe allowed is
(H x h + C x c + R x r)/100
The above raw materials rates are obtained form the principal manufacturers.
The rates of raw materials are:
1) Hoop Glass Fibre Rovings - Rs.73.50/kg (Excluding CED&ST)
2) Chop Glass - Rs.102.00/kg (Excluding CED&ST)
3) Resin - Rs.95.00/kg (Excluding CED&ST)
73
COMMON SSR 2008-09
Public Health Items
15. S.S. RATES FOR H.D.P.E PIPES FOR THE YEAR 2008-09. (PE - 80 Grade)
2.5 4.0 6.0 8.0 10.0
Sl.
Description kg/ kg/ kg/ kg/ kg/
No
sqcm sqcm sqcm sqcm sqcm
1 2 3 4
Manufacture, supply, &
delivery of HDPE pipes
conforming to IS 4984 - 1995
including transportation to any
where in A.P, excluding excise
duty, sale tax and specials
etc., complete. ( Supply upto
90 mm dia in coil & above 90
mm dia straight length in 6 M.)
Rate per Meter
OD 20 mm 16.00
OD 25 mm 21.00
OD 32 mm 25.00 29.00 34.00
OD 40 mm 30.00 34.00 44.00 53.00
OD 50 mm 43.00 55.00 69.00 83.00
OD 63 mm 38.00 59.00 83.00 105.00 126.00
OD 75 mm 60.00 81.00 117.00 148.00 178.00
OD 90 mm 80.00 117.00 166.00 212.00 255.00
OD 110 mm 113.00 175.00 250.00 317.00 377.00
OD 125 mm 142.00 225.00 320.00 408.00 489.00
OD 140 mm 185.00 279.00 400.00 510.00 614.00
OD 160 mm 240.00 365.00 522.00 665.00 800.00
OD 180 mm 298.00 460.00 657.00 843.00 1011.00
OD 200 mm 366.00 563.00 814.00 1039.00 1246.00
OD 225 mm 477.00 736.00 1057.00 1350.00 1624.00
OD 250 mm 588.00 911.00 1301.00 1670.00 2005.00
OD 280 mm 739.00 1135.00 1631.00 2090.00 2512.00
OD 315 mm 928.00 1443.00 2068.00 2646.00 3178.00
OD 355 mm 1129.00 1743.00 2507.00 3206.00 3857.00
OD 400 mm 1464.00 2259.00 3258.00 4163.00 4997.00
OD 450 mm 1848.00 2869.00 4114.00 5268.00 6331.00
OD 500 mm 2277.00 3526.00 5085.00 6495.00 7806.00
Note:
Excise duty, CST / VAT extra as applicable at the time of supply.
The IPCL resin cost adopted for the above rates are
For PE - 80 grade Rs.75,970/- per MT. (Excluding CED&ST)
The variation in cost of HDPE pipes due to increase / decrease in raw material cost shall be allowed as per the
following price variation formula.
price variation formula as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.9 (for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.9 (for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Meter excluding CED & ST
P1 = Existing pipe price in Rs. Per Meter excluding CED & ST
A2 = Revised price of raw material Rs. Per MT excluding CED & ST
A1 = Existing price of raw material Rs. Per MT excluding CED & ST
M = Weight of pipe in Kgs per Meter as per weight chart.
74
COMMON SSR 2008-09
Public Health Items
16. S.S. RATES FOR H.D.P.E PIPES
(PE - 100 Grade) (New item)
Sl. 6.0 8.0 10.0
Description kg/sqcm kg/sqcm kg/sqcm
No
1 2 3 4 5
Manufacture, supply, & delivery
of HDPE pipes conforming to IS
4984 - 1995 including
transportation to any where in
A.P, excluding excise duty, sale
tax and specials etc., complete.
( Supply up to 90 mm dia in coil
& above 90 mm dia straight
length in 6 M.)
Rate per Meter
OD 32 mm 35.10
OD 40 mm 45.20 54.60
OD 50 mm 56.10 70.30 84.60
OD 63 mm 84.70 107.60 129.40
OD 75 mm 120.20 152.20 182.70
OD 90 mm 170.80 217.70 261.30
OD 110 mm 256.10 325.60 387.20
OD 125 mm 327.90 418.80 502.00
OD 140 mm 410.80 523.70 629.70
OD 160 mm 535.80 682.60 820.70
OD 180 mm 674.80 865.20 1037.10
OD 200 mm 835.50 1066.50 1278.70
OD 225 mm 1082.00 1382.60 1662.90
OD 250 mm 1332.60 1709.80 2052.40
OD 280 mm 1669.80 2139.80 2571.50
OD 315 mm 2116.70 2708.70 3253.30
OD 355 mm 2652.10 3388.50 4072.10
OD 400 mm 3502.40 4468.90 5356.60
Note:-
Excise duty, CST / VAT extra as applicable at the time of supply.
The IPCL resin cost adopted for the above rates are
For PE - 100 grade Rs.76,470/- per MT. (Excluding CED&ST)
The variation in cost of HDPE pipes due to increase / decrease in raw material cost shall be as
per the following price variation formula.
price variation formula as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.9 (for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.9 (for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Meter excluding CED & ST
P1 = Existing pipe price in Rs. Per Meter excluding CED & ST
A2 = Revised price of raw material Rs. Per MT excluding CED & ST
A1 = Existing price of raw material Rs. Per MT excluding CED & ST
M = Weight of pipe in Kgs per Meter as per weight chart.
75
COMMON SSR 2008-09
Public Health Items
17. S.S. RATES FOR PVC PIPES FOR THE YEAR 2008-09
TEST PRESSURE
Sl.
Description 2.5 4.0 6 10
No.
Kgs/cm2 Kgs/cm2 Kgs/cm2 Kgs/cm2
1 2 3 4 5 6
Manufacture, Supply and
delivery of Unplasticised PVCs
Pipes for potable water supplies
conforming to IS : 4985/2000
(third revision) with bell ends
(Socket) as per specification in
1
light Grey/Natural Ivory Grey/
Any other Color (except White)
inclusive of transportation to
the sub-divisional stores
anywhere in AP excluding
Excise duty and Sales Tax etc.
DIA IN MM Rate/Metre Rs. Rs. Rs. Rs.
20 8.50
25 13.20
32 21.10
40 20.90 32.30
50 30.90 50.20
63 33.50 47.70 73.50
75 47.80 66.50 104.90
90 44.00 67.40 95.30 148.70
110 66.00 97.30 138.10 223.30
125 84.90 126.90 174.90 291.80
140 104.10 158.10 226.30 359.60
160 138.40 208.50 293.90 474.30
180 173.60 266.00 379.80 607.40
200 221.70 323.40 461.00 738.00
225 286.00 423.70 612.00 974.40
250 347.10 495.20 760.20 1196.70
280 447.00 650.50 958.30 1515.40
315 562.70 825.70 1204.00 1911.70
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
Note: The IPCL resin cost adopted for the above rates is Rs.52,122/- per MT (Basic
rate, excluding CED)
The variation in cost of PVC pipes due to increase / decrease in raw material cost shall
be allowed subject to the following price variation formula.
The price variation formula to be adopted is as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.95 (for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.95 (for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Metre
P1 = Existing pipe price in Rs. Per Metre
A2 = Revised price of raw material Rs. Per MT
A1 = Existing price of raw material Rs. Per MT
M = Weight of pipe in Kgs per Meter as per weight chart.
76
COMMON SSR 2008-09
Public Health Items
Sl.
Description Unit S.S. Rates for 2008-09
No.
1 2 3 4 5 6
77
COMMON SSR 2008-09
Public Health Items
19. S.S. RATES FOR DUCTILE IRON PRESSURE PIPES
78
COMMON SSR 2008-09
S.S. Rate
Sl.
Description Unit for
No.
2008-09
Public Health Items
1 2 3 4 5
CENTRIFUGALLY CAST (SPUN) DUCTILE
IRON PRESSURE PIPES FOR WATER, GAS
AND SEWAGE WITH SOCKET SPIGOT
ENDS CONFORMING TO I.S.: 8329/2000
IN STANDARD WORKING LENGTHS OF 4, 5
5.5 & 6 METER FOR CLASSIFICATION K9 &
1 K7 SUITABLE FOR PUSH-ON-JOINT
(RUBBER GASKET D JOINTING) WITH
CEMENT MORTAR LINING INSIDE THE
PIPES WITH OUTSIDE ZINC COATING.
RATES ARE EX-FACTORY, EXCLUDING
TRANSPORTATION, TAXES & DUTIES.
80
COMMON SSR 2008-09
Public Health Items
20. S.S. RATES FOR DUCTILE IRON FITTINGS
S.S Rates
Sl.
Description Unit for
No.
2008-09
1 2 3 4
CENTRIFUGALLY CAST (SPUN) DUCTILE IRON FITTINGS CONFORMING
TO IS:9523/2000 HAVING DIMENTIONS AS PER TABLE. THE RATES
MENTIONED HERE UNDER ARE FOR FITTINGS, ZINC COATED
EXTERNALLY WITH INSIDE MORTAR LINING (WITH FINISHING AS
PER CLASS 13/IS 9523/2000) ( Ex-works) Excluding transportation,
taxes and duties etc.
I DI double socket branch flange Tee
Nominal dia in mm
80 x 80 Each 960.70
100 x 80 Each 1105.60
100 x 100 Each 1249.20
150 x 80 Each 1543.80
150 x 100 Each 1689.90
150 x 150 Each 2061.30
200 x 80 Each 2129.40
200 x 100 Each 2278.00
200 x 150 Each 2723.70
200 x 200 Each 3237.40
250 x 80 Each 2686.60
250 x 100 Each 2884.60
250 x 150 Each 3386.20
250 x 200 Each 3924.60
250 x 250 Each 4655.00
300 x 80 Each 3398.60
300 x 100 Each 3788.40
300x 150 Each 4679.80
300x 200 Each 4908.90
300x 250 Each 6097.60
300 x 300 Each 6530.70
350 x 80 Each 5289.60
350 x 100 Each 4863.30
350 x 150 Each 6384.00
350 x 200 Each 6382.40
350 x 250 Each 8208.00
350 x 300 Each 10032.00
350 x 350 Each 9458.30
400 x 80 Each 5640.30
400 x 100 Each 5880.60
400 x 150 Each 6704.10
400 x 200 Each 7521.90
400 x 250 Each 10032.00
400 x 300 Each 9488.80
81
COMMON SSR 2008-09
Public Health Items
400 x 350 Each 11856.00
400 x 400 Each 12198.50
450 x 80 Each 7934.40
450 x 100 Each 7154.30
450 x 150 Each 8937.60
450 x 200 Each 9849.60
450 x 250 Each 9863.00
450 x 300 Each 12220.80
450 x 350 Each 15504.00
450 x 400 Each 15595.20
450 x 450 Each 15777.60
500 x 80 Each 9955.20
500 x 100 Each 9129.40
500 x 150 Each 12004.80
500 x 200 Each 11339.10
500 x 250 Each 14640.00
500 x 300 Each 15030.40
500 x 350 Each 16787.20
500 x 400 Each 16445.10
500 x 450 Each 19520.00
500 x 500 Each 20066.80
600 x 80 Each 14737.60
600 x 100 Each 15128.00
600 x 150 Each 16104.00
600 x 200 Each 15277.00
600 x 250 Each 17665.60
600 x 300 Each 19520.00
600 x 350 Each 22448.00
600 x 400 Each 23912.00
600 x 450 Each 27816.00
600 x 500 Each 28304.00
600 x 600 Each 32208.00
700X200 Each 26224.80
700X400 Each 37632.00
II DI All socket Tees
Nominal dia in mm
80 x 80 Each 877.70
100 x 80 Each 1022.60
100 x 100 Each 1099.40
150 x 80 Each 1462.10
150 x 100 Each 1541.30
150 x 150 Each 1832.30
200 x 80 Each 2048.90
200 x 100 Each 2191.30
200 x 150 Each 2494.60
200 x 200 Each 2940.30
250 x 80 Each 2606.10
82
COMMON SSR 2008-09
Public Health Items
250 x 100 Each 2679.00
250 x 150 Each 3157.10
250 x 200 Each 3565.60
250 x 250 Each 4085.60
300 x 80 Each 4120.00
300 x 100 Each 3701.70
300 x150 Each 4779.20
300x 200 Each 4605.50
300 x250 Each 5768.00
300 x 300 Each 5750.80
350x80 Each 5289.60
350x100 Each 5380.80
350x150 Each 6201.60
350x200 Each 6840.00
350x250 Each 8208.00
350x300 Each 9120.00
350x350 Each 9302.40
400x80 Each 6657.60
400x100 Each 6566.40
400x150 Each 8208.00
400x200 Each 8390.40
400x250 Each 9576.00
400x300 Each 10944.00
400x350 Each 11582.40
400x400 Each 11856.00
450x80 Each 8025.60
450x100 Each 8208.00
450x150 Each 9576.00
450x200 Each 10488.00
450x250 Each 10944.00
450x300 Each 12768.00
450x350 Each 13680.00
450x400 Each 15048.00
450x450 Each 15321.60
500x80 Each 10248.00
500x100 Each 10443.20
500x150 Each 12200.00
500x200 Each 12688.00
500x250 Each 14640.00
500x300 Each 15616.00
500x350 Each 17080.00
500x400 Each 18056.00
500x450 Each 19520.00
500x500 Each 20008.00
600x80 Each 16201.60
600x100 Each 16396.80
83
COMMON SSR 2008-09
Public Health Items
600x150 Each 16592.00
600x200 Each 16787.20
600x250 Each 18056.00
600x300 Each 20496.00
600x350 Each 22350.40
600x400 Each 23424.00
600x450 Each 26352.00
600x500 Each 28304.00
600x600 Each 29280.00
III DI double socket concentric TAPERS
Nominal dia in mm
100 x 80 Each 576.90
150 x 80 Each 939.60
150 x 100 Each 938.40
200x80 Each 1584.00
200 x 100 Each 1448.40
200 x 150 Each 1441.00
250x80 Each 2224.80
250x100 Each 2142.40
250 x 150 Each 2036.50
250 x 200 Each 1962.20
300x100 Each 3131.20
300 x 150 Each 2791.70
300x 200 Each 2779.30
300 x 250 Each 2575.10
350 x 150 Each 4560.00
350 x 200 Each 4002.10
350 x 250 Each 3846.00
350 x 300 Each 3627.30
400x200 Each 6201.60
400 x 250 Each 5000.80
400 x 300 Each 4844.70
400 x 350 Each 4438.90
450x200 Each 7752.00
450x250 Each 7387.20
450x300 Each 6748.80
450 x 350 Each 5949.90
450 x 400 Each 5562.70
500x250 Each 9564.80
500x300 Each 9369.60
500 x 350 Each 8156.00
500 x 400 Each 7652.70
500x450 Each 8296.00
600x300 Each 14054.40
600x350 Each 14542.40
600x400 Each 13664.00
600x450 Each 13273.60
84
COMMON SSR 2008-09
Public Health Items
600 x 500 Each 10727.60
IV DI Flanged socket PN-10 PN-16
Nominal dia in mm Rate/Each
80 640.60 640.60
100 726.70 726.70
150 1131.20 1131.20
200 1619.40 1619.40
250 2128.70 2128.70
300 2740.30 2740.30
350 3778.00 3778.00
400 4556.80 4556.80
450 5323.10 5323.10
500 6896.10 6896.10
600 10248.00 10248.00
V DI Flanged Spigot PN-10 PN-16
Nominal dia in mm Rate/Unit
80 648.00 648.00
100 807.90 807.90
150 1073.60 1073.60
200 1379.20 1379.20
250 1972.10 1972.10
300 2721.10 2721.10
350 3576.10 3576.10
400 4876.70 4876.70
450 5982.70 5982.70
500 7251.20 7251.20
600 9810.40 9810.40
DI double Socket Duck foot bend
VI
(New Items)
80 Each 1148.80
100 Each 1465.60
150 Each 2455.20
200 Each 4118.40
250 Each 6509.60
300 Each 8734.40
350 Each 13132.80
400 Each 16416.00
450 Each 20976.00
500 Each 32208.00
600 Each 42944.00
DI double Flange Duck foot bend.(New
VII
Items)
80 Each 1408.00
100 Each 1689.60
150 Each 2912.80
200 Each 4752.00
250 Each 7843.20
300 Each 10852.80
85
COMMON SSR 2008-09
Public Health Items
350 Each 15550.40
400 Each 19200.00
450 Each 27200.00
500 Each 38729.60
600 Each 50540.00
VIII DI All socket Cross. (New Items)
Nominal dia in mm
80 x 80 Each 1267.20
100 x 80 Each 1465.60
100 x 100 Each 1584.00
150 x 80 Each 1853.60
150 x 100 Each 2059.20
150 x 150 Each 2692.80
200 x 80 Each 2676.80
200 x 100 Each 2883.20
200 x 150 Each 3801.60
200 x 200 Each 4118.40
250 x 80 Each 3708.00
250 x 100 Each 4037.60
250 x 150 Each 4284.80
250 x 200 Each 5273.60
250 x 250 Each 6262.40
300 x 80 Each 4779.20
300 x 100 Each 4861.60
300 x150 Each 5438.40
300x 200 Each 6468.80
300 x250 Each 6756.80
300 x 300 Each 8569.60
350x80 Each 6748.80
350x100 Each 6840.00
350x150 Each 8116.80
350x200 Each 8208.00
350x250 Each 9211.20
350x300 Each 11856.00
350x350 Each 12403.20
400x80 Each 8572.80
400x100 Each 8618.40
400x150 Each 8664.00
400x200 Each 8709.60
400x250 Each 14500.80
400x300 Each 15412.80
400x350 Each 15504.00
400x400 Each 15686.40
450x80 Each 10214.40
450x100 Each 10396.80
450x150 Each 12403.20
450x200 Each 12585.60
86
COMMON SSR 2008-09
Public Health Items
450x250 Each 17145.60
450x300 Each 17875.20
450x350 Each 19060.80
450x400 Each 19972.80
450x450 Each 20428.80
500x80 Each 13273.60
500x100 Each 13371.20
500x150 Each 16104.00
500x200 Each 16299.20
500x250 Each 21472.00
500x300 Each 21569.60
500x350 Each 21960.00
500x400 Each 23814.40
500x450 Each 26840.00
500x500 Each 26547.20
600x80 Each 21179.20
600x100 Each 21276.80
600x150 Each 21374.40
600x200 Each 21667.20
600x250 Each 28499.20
600x300 Each 28401.60
600x350 Each 28987.20
600x400 Each 31329.60
600x450 Each 38259.20
600x500 Each 39040.00
600x600 Each 39040.00
IX DI All Flange Tee. (New Items)
Nominal dia in mm
80 x 80 Each 1408.00
100 x 80 Each 1584.00
100 x 100 Each 1672.00
150 x 80 Each 2464.00
150 x 100 Each 2552.00
150 x 150 Each 2816.00
200 x 80 Each 3608.00
200 x 100 Each 3801.60
200 x 150 Each 3960.00
200 x 200 Each 4312.00
250 x 80 Each 5836.80
250 x 100 Each 5928.00
250 x 150 Each 6292.80
250 x 200 Each 6931.20
250 x 250 Each 7022.40
300 x 80 Each 7569.60
300 x 100 Each 7897.60
300 x150 Each 8755.20
300x 200 Each 8664.00
87
COMMON SSR 2008-09
Public Health Items
300 x250 Each 9393.60
300 x 300 Each 10305.60
350x80 Each 11100.00
350x100 Each 11200.00
350x150 Each 11300.00
350x200 Each 11760.00
350x250 Each 13300.00
350x300 Each 13700.00
350x350 Each 15300.00
400x80 Each 13500.00
400x100 Each 14000.00
400x150 Each 14900.00
400x200 Each 14500.00
400x250 Each 15200.00
400x300 Each 15800.00
400x350 Each 16800.00
400x400 Each 17000.00
450x80 Each 17400.00
450x100 Each 17600.00
450x150 Each 18400.00
450x200 Each 18600.00
450x250 Each 19400.00
450x300 Each 19500.00
450x350 Each 20000.00
450x400 Each 20800.00
450x450 Each 22500.00
500x80 Each 22131.20
500x100 Each 22344.00
500x150 Each 22663.20
500x200 Each 22876.00
500x250 Each 23408.00
500x300 Each 28408.80
500x350 Each 28621.60
500x400 Each 28834.40
500x450 Each 30856.00
500x500 Each 31388.00
600x80 Each 37133.60
88
COMMON SSR 2008-09
Public Health Items
600x600 Each 45220.00
700X200 Each 38192.00
700X400 Each 49280.00
700X700 Each 73920.00
750X200 Each 46076.80
750X400 Each 56918.40
750X750 Each 84515.20
800X200 Each 50512.00
800X400 Each 62832.00
800X600 Each 94864.00
800X800 Each 98067.20
900X200 Each 63448.00
900X400 Each 73920.00
900X600 Each 118272.00
900X900 Each 139216.00
1000X200 Each 88704.00
1000X400 Each 133324.80
X DI All Flange Cross. (New Items)
Nominal dia in mm
80 x 80 Each 1936.00
100 x 80 Each 2068.00
100 x 100 Each 2288.00
150 x 80 Each 3256.00
150 x 100 Each 3432.00
150 x 150 Each 3696.00
200 x 80 Each 4400.00
200 x 100 Each 4576.00
200 x 150 Each 5280.00
200 x 200 Each 5808.00
250 x 80 Each 7752.00
250 x 100 Each 7934.40
250 x 150 Each 8846.40
250 x 200 Each 9758.40
250 x 250 Each 10032.00
300 x 80 Each 10761.60
300 x 100 Each 10852.80
300 x150 Each 11308.80
300x 200 Each 11947.20
300 x250 Each 12129.60
300 x 300 Each 13041.60
350x80 Each 15600.00
350x100 Each 15800.00
350x150 Each 16000.00
350x200 Each 16600.00
350x250 Each 17100.00
350x300 Each 17200.00
350x350 Each 18900.00
89
COMMON SSR 2008-09
Public Health Items
400x80 Each 18200.00
400x100 Each 20000.00
400x150 Each 20100.00
400x200 Each 20600.00
400x250 Each 20900.00
400x300 Each 15300.00
400x350 Each 23500.00
400x400 Each 23600.00
450x80 Each 22600.00
450x100 Each 24400.00
450x150 Each 24500.00
450x200 Each 24550.40
450x250 Each 25200.00
450x300 Each 25300.00
450x350 Each 28700.00
450x400 Each 29700.00
450x450 Each 30300.00
500x80 Each 32771.20
500x100 Each 33303.20
500x150 Each 33409.60
500x200 Each 33835.20
500x250 Each 35644.00
500x300 Each 36920.80
500x350 Each 37878.40
500x400 Each 39261.60
500x450 Each 40112.80
500x500 Each 40432.00
600x80 Each 48199.20
600x100 Each 48412.00
600x150 Each 48624.80
600x200 Each 49476.00
600x250 Each 49795.20
600x300 Each 50965.60
600x350 Each 51923.20
600x400 Each 55434.40
600x450 Each 55860.00
600x500 Each 56392.00
600x600 Each 57668.80
XI DI double Flange Reducer (New Items)
Nominal dia in mm
100 x 80 Each 880.00
150 x 80 Each 1496.00
150 x 100 Each 1584.00
200x80 Each 2244.00
200 x 100 Each 1760.00
200 x 150 Each 1953.60
250x80 Each 2918.40
90
COMMON SSR 2008-09
Public Health Items
250x100 Each 3100.80
250 x 150 Each 2736.00
250 x 200 Each 2827.20
300x100 Each 3830.40
300 x 150 Each 3830.40
300x 200 Each 3639.20
300 x 250 Each 3648.00
350 x 150 Each 4195.20
350 x 200 Each 4377.60
350 x 250 Each 4468.80
350 x 300 Each 4560.00
400x200 Each 5700.00
400 x 250 Each 5800.00
400 x 300 Each 5900.00
400 x 350 Each 6000.00
450x200 Each 8000.00
450x250 Each 7700.00
450x300 Each 7800.00
450 x 350 Each 7000.00
450 x 400 Each 6748.80
500x250 Each 12129.60
500x300 Each 11704.00
500 x 350 Each 11810.40
500 x 400 Each 12023.20
500x450 Each 12342.40
600x300 Each 18194.40
600x350 Each 15747.20
600x400 Each 15960.00
600x450 Each 16172.80
600 x 500 Each 16385.60
700X600 Each 34496.00
750X600 Each 38438.40
800X700 Each 44352.00
900X800 Each 55440.00
1000X900 Each 70560.00
XII Blank Flange
700 Each 22579.20
750 Each 25166.40
800 Each 30693.60
900 Each 39984.00
1000 Each 57288.00
XIII Mechanical Joint
A. 80 mm
MJ-Double Socket bend-90 degree Each 1900.80
MJ-Double Socket bend-45 degree Each 1786.40
MJ-Double Socket bend-22.5 degree Each 1733.60
MJ-Double Socket bend-11.25 degree Each 1698.40
91
COMMON SSR 2008-09
Public Health Items
MJ-All Socket Tee-90 degree Each 2701.60
MJ-All Socket flanged branch Tee-90 degree Each 2349.60
MJ-Collar Each 1601.60
MJ-Flanged Socket-90 degree Each 1311.20
B. 100 mm Each
MJ-Double Socket bend-90 degree Each 1848.00
MJ-Double Socket bend-45 degree Each 1786.40
MJ-Double Socket bend-22.5 degree Each 1733.60
MJ-Double Socket bend-11.25 degree Each 1698.40
MJ-All Socket Tee-100X80 Each 2534.40
MJ-All Socket Tee-100X100 Each 2666.40
MJ-Double Socket flanged branch Tee-100X80 Each 2349.60
MJ-Double Socket flanged branch Tee-100X100 Each 2376.00
MJ-Double Socket Reducer-100X80 Each 2024.00
MJ-Collar Each 1821.60
MJ-Flanged socket Each 1311.20
C 150 mm
MJ-Double Socket bend-90 degree Each 3256.00
MJ-Double Socket bend-45 degree Each 2992.00
MJ-Double Socket bend-22.5 degree Each 2842.40
MJ-Double Socket bend-11.25 degree Each 2772.00
MJ-All Socket Tee-150X80 Each 3872.00
MJ-All Socket Tee-150X100 Each 3960.00
MJ-All Socket Tee-150X150 Each 4752.00
MJ-Double Socket flanged branch Tee-150X80 Each 3520.00
MJ-Double Socket flanged branch Tee-150X100 Each 3696.00
MJ-Double Socket flanged branch Tee-150X150 Each 4136.00
MJ-Double Socket Reducer-150X80 Each 2332.00
MJ-Double Socket Reducer-150x100 Each 2393.60
MJ-Collar Each 2833.60
MJ-Flanged socket Each 1988.80
D 200 mm
MJ-Double Socket bend-90 degree Each 4857.60
MJ-Double Socket bend-45 degree Each 4004.00
MJ-Double Socket bend-22.5 degree Each 3740.00
MJ-Double Socket bend-11.25 degree Each 3608.00
MJ-All Socket Tee-200X80 Each
MJ-All Socket Tee-200X100 Each 5016.00
MJ-All Socket Tee-200X150 Each 5772.80
MJ-All Socket Tee-200X200 Each 6424.00
MJ-Double Socket flanged branch Tee-200X80 Each 4153.60
MJ-Double Socket flanged branch Tee-200X100 Each 4620.00
MJ-Double Socket flanged branch Tee-200X150 Each 5148.00
MJ-Double Socket flanged branch Tee-200X200 Each 5764.00
MJ-Double Socket Reducer-200X80 Each 3036.00
MJ-Double Socket Reducer-200x100 Each 3044.80
MJ-Double Socket Reducer-200x150 Each 3388.00
MJ-Collar Each 3696.00
MJ-Flanged socket Each 2772.00
92
COMMON SSR 2008-09
Public Health Items
E 250 mm
MJ-Double Socket bend-90 degree Each 6676.00
MJ-Double Socket bend-45 degree Each 5764.00
MJ-Double Socket bend-22.5 degree Each 5262.40
MJ-Double Socket bend-11.25 degree Each 5034.40
MJ-All Socket Tee-250X80 Each 6548.00
MJ-All Socket Tee-250X100 Each 6639.20
MJ-All Socket Tee-250X150 Each 7870.40
MJ-All Socket Tee-250X200 Each 8235.20
MJ-All Socket Tee-250X250 Each 9211.20
MJ-Double Socket flanged branch Tee-250X80 Each 6174.40
MJ-Double Socket flanged branch Tee-250X100 Each 6265.60
MJ-Double Socket flanged branch Tee-250X150 Each 7223.20
MJ-Double Socket flanged branch Tee-250X200 Each 7542.40
MJ-Double Socket flanged branch Tee-250X250 Each 8363.20
MJ-Double Socket Reducer-250X80 Each 4012.80
MJ-Double Socket Reducer-250x100 Each 4195.20
MJ-Double Socket Reducer-250x150 Each 4532.80
MJ-Double Socket Reducer-250x200 Each 4624.00
MJ-Collar Each 5198.40
MJ-Flanged socket Each 3884.80
F 300 mm
MJ-Double Socket bend-90 degree Each 8919.20
MJ-Double Socket bend-45 degree Each 7733.60
MJ-Double Socket bend-22.5 degree Each 6976.80
MJ-Double Socket bend-11.25 degree Each 6639.20
MJ-All Socket Tee-300X80 Each 8208.00
MJ-All Socket Tee-300X100 Each 8299.20
MJ-All Socket Tee-300X150 Each 9667.20
MJ-All Socket Tee-300X200 Each 10032.00
MJ-All Socket Tee-300X250 Each 11491.20
MJ-All Socket Tee-300X300 Each 12312.00
MJ-Double Socket flanged branch Tee-300X80 Each 7824.80
MJ-Double Socket flanged branch Tee-300X100 Each 7916.00
MJ-Double Socket flanged branch Tee-300X150 Each 9056.00
MJ-Double Socket flanged branch Tee-300X200 Each 9375.20
MJ-Double Socket flanged branch Tee-300X250 Each 10834.40
MJ-Double Socket flanged branch Tee-300X300 Each 11472.80
MJ-Double Socket Reducer-300x100 Each 5563.20
MJ-Double Socket Reducer-300x150 Each 5836.80
MJ-Double Socket Reducer-300x200 Each 5608.80
MJ-Double Socket Reducer-300x250 Each 6019.20
MJ-Collar Each 6748.80
MJ-Flanged socket Each 5052.80
G 350 mm
MJ-Double Socket bend-90 degree Each 12970.40
MJ-Double Socket bend-45 degree Each 11820.00
93
COMMON SSR 2008-09
Public Health Items
MJ-Double Socket bend-22.5 degree Each 10720.00
MJ-Double Socket bend-11.25 degree Each 10120.00
MJ-All Socket Tee-350X80 Each 11980.00
MJ-All Socket Tee-350X100 Each 12080.00
MJ-All Socket Tee-350X150 Each 13800.00
MJ-All Socket Tee-350X200 Each 14280.00
MJ-All Socket Tee-350X250 Each 16870.40
MJ-All Socket Tee-350X300 Each 17600.00
MJ-All Socket Tee-350X350 Each 18800.00
MJ-Double Socket flanged branch Tee-350X80 Each 11570.40
MJ-Double Socket flanged branch Tee-350X100 Each 11610.40
MJ-Double Socket flanged branch Tee-350X150 Each 13100.00
MJ-Double Socket flanged branch Tee-350X200 Each 13500.00
MJ-Double Socket flanged branch Tee-350X250 Each 15900.00
MJ-Double Socket flanged branch Tee-350X300 Each 16500.00
MJ-Double Socket flanged branch Tee-350X350 Each 17400.00
MJ-Double Socket Reducer-350x150 Each 8400.00
MJ-Double Socket Reducer-350x200 Each 8470.40
MJ-Double Socket Reducer-350x250 Each 8820.00
MJ-Double Socket Reducer-350x300 Each 8950.40
MJ-Collar Each 9550.40
MJ-Flanged socket Each 7700.00
H 400 mm
MJ-Double Socket bend-90 degree Each 16700.00
MJ-Double Socket bend-45 degree Each 14520.00
MJ-Double Socket bend-22.5 degree Each 12870.40
MJ-Double Socket bend-11.25 degree Each 11620.00
MJ-All Socket Tee-400X80 Each 14080.00
MJ-All Socket Tee-400X100 Each 14180.00
MJ-All Socket Tee-400X150 Each 16080.00
MJ-All Socket Tee-400X200 Each 16580.00
MJ-All Socket Tee-400X250 Each 19900.00
MJ-All Socket Tee-400X300 Each 21100.00
MJ-All Socket Tee-400X350 Each 22200.00
MJ-All Socket Tee-400X400 Each 23200.00
MJ-Double Socket flanged branch Tee-400X80 Each 13700.00
MJ-Double Socket flanged branch Tee-400X100 Each 13800.00
MJ-Double Socket flanged branch Tee-400X150 Each 15400.00
MJ-Double Socket flanged branch Tee-400X200 Each 15800.00
MJ-Double Socket flanged branch Tee-400X250 Each 19000.00
MJ-Double Socket flanged branch Tee-400X300 Each 20000.00
MJ-Double Socket flanged branch Tee-400X350 Each 20800.00
MJ-Double Socket flanged branch Tee-400X400 Each 21800.00
MJ-Double Socket Reducer-400x200 Each 10500.00
MJ-Double Socket Reducer-400x250 Each 10600.00
MJ-Double Socket Reducer-400x300 Each 10700.00
MJ-Double Socket Reducer-400x350 Each 11300.00
94
COMMON SSR 2008-09
Public Health Items
MJ-Collar Each 10800.00
MJ-Flanged socket Each 9300.00
I 450 mm
MJ-Double Socket bend-90 degree Each 21600.00
MJ-Double Socket bend-45 degree Each 16500.00
MJ-Double Socket bend-22.5 degree Each 15500.00
MJ-Double Socket bend-11.25 degree Each 14450.40
MJ-All Socket Tee-450X80 Each 16400.00
MJ-All Socket Tee-450X100 Each 16600.00
MJ-All Socket Tee-450X150 Each 18800.00
MJ-All Socket Tee-450X200 Each 19200.00
MJ-All Socket Tee-450X250 Each 24100.00
MJ-All Socket Tee-450X300 Each 25100.00
MJ-All Socket Tee-450X350 Each 26300.00
MJ-All Socket Tee-450X400 Each 27300.00
MJ-All Socket Tee-450X450 Each 28100.00
MJ-Double Socket flanged branch Tee-450X80 Each 16100.00
MJ-Double Socket flanged branch Tee-450X100 Each 16200.00
MJ-Double Socket flanged branch Tee-450X150 Each 18100.00
MJ-Double Socket flanged branch Tee-450X200 Each 18500.00
MJ-Double Socket flanged branch Tee-450X250 Each 23000.00
MJ-Double Socket flanged branch Tee-450X300 Each 24000.00
MJ-Double Socket flanged branch Tee-450X350 Each 24900.00
MJ-Double Socket flanged branch Tee-450X400 Each 25900.00
MJ-Double Socket flanged branch Tee-450X450 Each 26940.00
MJ-Double Socket Reducer-450x200 Each 13100.00
MJ-Double Socket Reducer-450x250 Each 12800.00
MJ-Double Socket Reducer-450x300 Each 12900.00
MJ-Double Socket Reducer-450x350 Each 13400.00
MJ-Double Socket Reducer-450x400 Each 13400.00
MJ-Collar Each 12500.00
MJ-Flanged socket Each 11200.00
95
COMMON SSR 2008-09
Public Health Items
1 2 3 4 5 6
XIV DI double socket Bends PN 10/16
96
COMMON SSR 2008-09
Public Health Items
900 80820.20 - -
1000 135441.90 - -
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation
of estimate.
Transportation Charges Extra.
Price Variation Formula due to Increase / Decrease in the cost of pig iron.
P2=P1+ (R2-R1)/1000*M*0.96
Where
M = Weight of special/fitting in kg each.
P2 = Revised rate of special/fitting in Rs.
P1 = Rate of special/fitting in Rs. as per above table.
R2 = Price of Pig Iron(Rs per MT excluding CED&ST)) at the time of
preparation of estimate.
R1 = Price of Pig Iron(Rs per MT excluding CED&ST) at the time of preparation
of SSR =Rs. 27,000/-
97
COMMON SSR 2008-09
Public Health Items
S.S Rates
Sl.
Description Unit For
No.
2008-09
1 2 3 4
MANUFACTURE AS PER BIS 12820/89 WITH S.B.R.
QUALITY RUBBER CONFIRMING TO BIS: 5382/85,
SUPPLY AND DELIVERY OF RUBBER GASKETS SUITABLE
FOR C.I/ D.I. S/S PIPES ANYWHERE IN A.P. F.O.R.
DESTINATION DEPARTMENTAL STORES INCLUDING COST
1
OF MATERIAL, LOADING, INCIDENTAL HANDLING WITH
COMPANYS STANDARD PACKING, TRANSPORTATION,
UNLOADING & STACKING BUT EXCLUDING CENTRAL
EXCISE DUTY, SALES TAX, OCTROI AND OTHER GOVT.
LEVIES ETC., COMPLETE.
80mm dia Each 35.00
100mm dia Each 55.00
125mm dia Each 55.00
150mm dia Each 80.00
200mm dia Each 98.00
250mm dia Each 109.00
300mm dia Each 167.00
350mm dia Each 211.00
400mm dia Each 230.00
450mm dia Each 248.00
500mm dia Each 344.00
600mm dia Each 407.00
700mm dia Each 541.00
750mm dia Each 601.00
800mm dia Each 721.00
900mm dia Each 870.00
1000mm dia Each 952.00
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
98
COMMON SSR 2008-09
Public Health Items
Rate/ Kg
including
packing,
forwarding,
Sl. Quality or transit risk and
Description
No. sort delivery any
where in A.P.
for the year
2008-09.
Rs.
1 2 3 4
I.S. No.
MANUFACTURE, SUPPLY AND DELIVERY OF CAST 7181/1986
IRON PIPES AND FITTINGS (Spls.) CONFORMING TO 5531/1988
I.S. No. 7181/1986, 5531/1988, 3950/1979 AND 3950/1979
C.I.D. JOINTS CONFIRMING TO IS No.8794/1988 AT &
8794/1988 52.90
SITE OF WORK ANYWHERE IN A.P. INCLUDING,
LOADING, UNLOADING, TRANSPORTATION TO SITE
OF WORK STACKING AT SITE TRANSIT RISK AND
PACKAGE, EXCLUDING TAXES AND DUTIES.
Foot Note: The rate of CI pipes, CI Specials and CID Joints etc., which are to be
incorporated in the SSR are based on the following raw materials cost.
Pig Iron: Rs.27000/- per M.T.(excluding CED, Tax & Fright)
Coke : Rs.24900/- per M.T. .(excluding CED, Tax & Fright)
The rates may be revised depending upon the increase/decrease in the cost of raw
materials as per the following method. For every increase/decrease of Rs.1000/- in the
cost of raw materials or part there of proportionately.
In respect of Pig Iron: The increase/decrease in cost of CI Specials per Kg is 3.43%.
In respect of coke: The increase/decrease in cost of CI Specials per Kg is 0.67%.
The above price is at site of work , Excise duty, CST/VAT extra as applicable at the time
of supply.
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
99
COMMON SSR 2008-09
Public Health Items
101
COMMON SSR 2008-09
Public Health Items
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate. For FG 260, Grade of CI shall be certified by reputed 3rd Party
Quality Control Agency (as approved by indenting authority) at the cost of the supplier.
102
COMMON SSR 2008-09
Public Health Items
24. S.S RATES FOR C.I. D/F SOFT SEATED GATE / SLUICE VALVES
Sl.
Description
No. PN-1.0 PN-1.6
1 2 3 4
Manufacture, supply and delivery of CI D/F
Gate (Sluice) Valve (Soft Seated) as per IS:
11335/1995 with body bonnet of Cast Iron of
grade FG 260 as per IS 210-1978 wedge fully
rubber lined with EPDM and seals of NBR and
the valves should be of vaccum tight and
1 100% Leak proof with face to face dimensions
as per IS : 14846-2000. All the valves should
be with Electrostatic powder coating both
inside and outside with pocket less body
passage, excluding transportation, Central
Excise duty and sale tax etc., complete.
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate. For FG 260, Grade of CI shall be certified by reputed 3rd Party
Quality Control Agency (as approved by indenting authority) at the cost of the supplier
103
COMMON SSR 2008-09
Public Health Items
DIA IN MM
Rate / Each
80 2,265.00 2,588.00
100 3,088.00 3,530.00
125 4,245.00 4,852.00
150 4,762.00 5,442.00
200 13,124.00 14,998.00
104
COMMON SSR 2008-09
Public Health Items
NOTE All the prices are ex-factory. Excise duty and CST / Local Tax extra as
applicable at the time of supply. Packing and transportation extra at 10% on
basic cost.
The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
105
COMMON SSR 2008-09
Public Health Items
106
COMMON SSR 2008-09
Public Health Items
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
107
COMMON SSR 2008-09
Public Health Items
27. RATES FOR CAST STEEL VALVES FOR THE YEAR 2008-09
1 2 3 4 5 6
Manufacture, Supply and delivery of Cast
Carbon Steel Non rising spindle sluice valve
design standard as per IS:14846/2000 for
Water Supply Scheme with SS Spindle & SS Class-150
Class-300
Working parts the grade of Cast Steel for Body
body Bonnet, Dome, Stool Cover, Wedge, Body 1100
425PSI FOR Enclosed Spur
1 PSI Seat
Stuffing Box, Gland Thrust Plate, shall be as Seat 300 Gear Arrangement.
per IS : 1030 / 1989. (The valve shall be 750 PSI
PSI
used for High pressure schemes & pumping PN-30
PN-20
stations) excluding transportation, Central
Excise duty and sale tax etc., complete. ISI
Marked
Class 150 Class
Rate/Each 300
DIA IN MM Rs. Rs. Rs.
40 4,394 8,788
50 7,241 13,182
65 9,061 16,478
80 10,868 19,773
100 14,495 26,364
125 18,590 33,800
150 21,749 39,546
200 35,126 71,403 42,991 78,553
250 49,439 112,385 57,304 119,535
300 62,452 141,960 70,317 149,110
350 83,278 189,280 94,003 199,030
400 169,169 384,475 179,894 394,225
450 189,618 422,500 200,343 432,250
500 223,080 507,000 233,805 516,750
600 254,683 577,980 265,408 587,730
700 492,635 503,360
750 529,815 544,830
800 613,470 628,485
900 725,010 740,025
1000 929,500 944,515
1100 1,003,860 1,018,875
1200 1,133,990 1,149,005
108
COMMON SSR 2008-09
Public Health Items
Note : The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
109
COMMON SSR 2008-09
Public Health Items
110
COMMON SSR 2008-09
Public Health Items
DIA IN MM PN 10 PN 16 PN 25 PN 40
200 65,594 69,496 101,922 133,407
250 72,187 76,559 123,786 156,415
300 90,485 95,867 150,696 190,926
350 106,497 112,887 171,417 208,418
400 129,370 137,106 173,570 225,708
500 164,488 174,445 219,989 289,485
600 246,790 261,625 324,300 419,175
700 356,213 388,470 474,835 602,140
800 445,395 485,415 598,748 758,540
111
COMMON SSR 2008-09
Public Health Items
NEW ITEM
Manufacture, supply and delivery of DI
(Ductile Iron) Wafer Lug Butterfly valves
conforming to IS 13095 BIS/CM/L-
6419976 with PTEE bush upto 300mm and
PTEE with gunmetal backup above 300
5
mm dia with liquid epoxy coating. With
hand lever below 150 mm with Worm
actuator 150 mm and above excluding
transportation, CED and taxes etc,
completed
DIA IN MM . PN 10 PN 16
80 5210 5710
100 7325 7925
125 10674 11374
150 12432 13432
200 18596 20186
250 25788 27788
300 45675 48675
350 58964 63964
112
COMMON SSR 2008-09
Public Health Items
DIA IN MM PN 10 PN 16 PN 25
DN 050 6,338 6,338 10,306
DN 080 7,814 7,814 12,706
DN100 10,301 10,301 14,407
DN150 16,220 16,220 24,030
DN200 26,954 26,954 40.532
DN 250 39,132 39,132 60,203
DN300 56,420 56,420 97,650
DN350 170,823 170,823 285,755
DN 400 179,166 179,166 290,653
DN 450 With By-pass 308,243 308,243 579,405
DN 500 With By-pass 327,334 327,334 615,289
DN 600 With By-pass 421,512 421,512 792,315
113
COMMON SSR 2008-09
Public Health Items
115
COMMON SSR 2008-09
Public Health Items
116
COMMON SSR 2008-09
Public Health Items
NOTE:-All the prices are ex-godown /ex-factory. Excise duty and CST /Local
Tax Extra as applicable at the time of supply. Packaging and transportation
extra at 5% on basic cost. The duties and taxes as applicable may be added as
per rules at the time of preparation of estimate. The grade of DI &
conformation to specifications shall be certified by a third party Quality Control
Agency approved by indenting authority at the cost of supplier.
118
COMMON SSR 2008-09
Public Health Items
S.S. Rates
Sl.No. Description Unit for
2008-09.
1 2 3 4
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
119
COMMON SSR 2008-09
Public Health Items
Sl. Rate
Description Unit
No. (Rs.)
1 2 3 4
Note: The duties and taxes as applicable shall be added as per rules at the time of
preparation of estimate.
120
COMMON SSR 2008-09
Public Health Items
S.S. Rates
Sl.
Description Unit for
No.
2008-09.
1 2 3 4
121
COMMON SSR 2008-09
CONVEYANCE RATES
OF
MATERIALS
122
COMMON SSR 2008-09
CONVEYANCE RATES
SS rate
S.
LEAD PER for
No.
2008-09
1 2 3 4
1 UP TO 250 METRES cum 50.00
2 250 To 500 METRES cum 75.00
3 1 Km. cum 100.00
4 2 Km. cum 106.00
5 3 Km. cum 112.00
6 4 Km. cum 118.00
7 5 Km. cum 124.00
8 6 Km. cum 130.00
9 7 Km. cum 136.00
10 8 Km. cum 142.00
11 9 Km. cum 148.00
12 10 Km. cum 154.00
13 11 Km. cum 160.00
14 12 Km. cum 166.00
15 13 Km. cum 172.00
16 14 Km. cum 178.00
17 15 Km. cum 184.00
18 16 Km. cum 190.00
19 17 Km. cum 196.00
20 18 Km. cum 202.00
21 19 Km. cum 208.00
22 20 Km. cum 214.00
23 Beyond 20 and up to 30 Km (Rate/Km) cum 5.00
24 Beyond 30 and up to 50 Km (Rate/Km) cum 4.80
25 Beyond 50 and up to 80 Km (Rate/Km) cum 4.60
26 Beyond 80 and up to 100 Km (Rate/Km) cum 4.40
27 Beyond 100 Km (Rate / Km) cum 4.20
28 LOADING cum 10.00
29 UNLOADING cum 8.50
30 STACKING cum 5.50
123
COMMON SSR 2008-09
CONVEYANCE RATES
SS Rate
S.
LEAD UNIT for
No.
2008-09
1 2 3 4
1 UP TO 500 mts. cum 110.00
2 1 Km. cum 120.00
3 2 Km. cum 126.00
4 3 Km. cum 132.00
5 4 Km. cum 138.00
6 5 Km. cum 144.00
7 6 Km. cum 150.00
8 7 Km. cum 156.00
9 8 Km. cum 162.00
10 9 Km. cum 168.00
11 10 Km. cum 174.00
12 11 Km. cum 180.00
13 12 Km. cum 186.00
14 13 Km. cum 192.00
15 14 Km. cum 198.00
16 15 Km. cum 204.00
17 16 Km. cum 210.00
18 17 Km. cum 216.00
19 18 Km. cum 222.00
20 19 Km. cum 228.00
21 20 Km. cum 234.00
22 Beyond 20 and up to 30 Km (Rate/Km) cum 5.75
23 Beyond 30 and up to 50 Km (Rate/Km) cum 5.50
24 Beyond 50 and up to 80 Km (Rate/Km) cum 5.00
25 Beyond 80 and up to 100 Km (Rate/Km) cum 4.75
26 Beyond 100 Km (Rate / Km) cum 4.50
27 LOADING cum 12.80
28 UNLOADING cum 8.70
29 STACKING cum 8.70
124
COMMON SSR 2008-09
CONVEYANCE RATES
RATES FOR CONVEYANCE OF LIME STONE, BROKEN LATERITE AND BRICK JELLY
INCLUDING LOADING, UNLOADING &STACKING ON METALLED ROAD
SS Rate
S.
LEAD UNIT for
No.
2008-09
1 2 3 4
1 0 To 250 mts. cum 100.00
2 251 To 500 mts. cum 110.00
3 1 Km. cum 115.00
4 2 Km. cum 120.00
5 3 Km. cum 125.00
6 4 Km. cum 130.00
7 5 Km. cum 135.00
8 6 Km. cum 140.00
9 7 Km. cum 145.00
10 8 Km. cum 150.00
11 9 Km. cum 155.00
12 10 Km. cum 160.00
13 11 Km. cum 165.00
14 12 Km. cum 170.00
15 13 Km. cum 175.00
16 14 Km. cum 180.00
17 15 Km. cum 185.00
18 16 Km. cum 190.00
19 17 Km. cum 195.00
20 18 Km. cum 200.00
21 19 Km. cum 205.00
22 20 Km. cum 210.00
23 Beyond 20 and up to 30 Km (Rate/Km) cum 5.00
24 Beyond 30 and up to 50 Km (Rate/Km) cum 4.80
25 Beyond 50 and up to 80 Km (Rate/Km) cum 4.60
26 Beyond 80 and up to 100 Km (Rate/Km) cum 4.40
27 Beyond 100 Km (Rate / Km) cum 4.20
28 LOADING cum 10.00
29 UNLOADING cum 8.50
30 STACKING cum 5.50
125
COMMON SSR 2008-09
CONVEYANCE RATES
126
COMMON SSR 2008-09
CONVEYANCE RATES
127
COMMON SSR 2008-09
CONVEYANCE RATES
RATES FOR CONVEYANCE OF CI PIPES, SPECIALS & VALVES PER METRIC TONNE EXCLUDING LOADING UNLOADING & STACKING
Diameter Remarks
in MM 80 100 125 150 200 250 300 350 400 450 500 600 700 750
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
For every
KM lead
or part
there of 3.74 3.88 4.02 4.02 4.30 4.44 4.57 4.72 4.85 5.12 5.40 5.40 6.52 8.87
(Rs.)
Note : The above rates will be applicable for conveyance from Railway Station to stores or from stores to work site. In respect of DI
pipes proportionate rates based on Weight may be worked out
Adopt relevant loading, unloading and stacking as per item 4 to 7 of the P.H.S.S.R. item
128
COMMON SSR 2008-09
HIRE CHARGES
129
COMMON SSR 2008-09
HIRE CHARGES
HIRE/USAGE CHARGES FOR PLANT AND MACHINERY
Hire Charges
Sl. Description for 2008-09
Unit
No.
Machine Activity ( Rupees)
1 2 3 4 5
Spreading
1 Dozer( D 80 ) Cutting Per Hour 2760
Cleaning
Clearing
Spreading
2 Mortor Grader Per Hour 2600
GSB
WMM
Soil Ordinary
3 Hydraulic Excavator Soil Marshy Per Hour 2250
Soil unsuitable
Soil loading Per Hour 1320
4 Front end loader
Aggregate loading Per Hour
Per Hour 575
Transportation of soil, Per tonne
5 Tipper- 5.5 Cum 4.5
GSB,WMM, Hot mix etc Km
Per Km 45
Vibratory roller 8 Earth/Soil, GSB,
6 Per Hour 1550
tonne WMM
Smooth wheeled Soil compaction ,BM
7 Per Hour 540
roller 8 tonne compaction
Water tanker 6
8 Water transport Per Hour 345
Kilolitre
9 Tractor Pulling Per Hour 345
10 Tractor with rotavator Scarifying Per Hour 345
Mechanical broom
14 Surface cleaning Per Hour 290
Hydraulic
Bitumen Pressure
15 Applying bitumen tack coat Per Hour 940
Distributor
Emulsion Pressure
16 Applying emulsion tack coat Per Hour 690
Distributor
Hot mix Plant – 120 DBM/BM/SDC
17 Per Hour 23000
TPH capacity /Premix
Hot mix Plant – 100 DBM/BM/SDC
18 Per Hour 19550
TPH capacity /Premix
Hot mix Plant – 60 DBM/BM/SDC
19 Per Hour 17250
TPH capacity /Premix
Hot mix Plant – 40 to DBM/BM/SDC
20 Per Hour 15525
60 TPH capacity /Premix
Paver Finisher DBM/BM/SDC
Hydrostatic with
21 Per Hour 2530
sensor control 100 /Premix
TPH
130
COMMON SSR 2008-09
HIRE CHARGES
Paver finisher Paving of WMM, paving of
22 Per Hour 1090
Mechanical 100 DLC
Hydraulic Chip
23 Surface dressing Per Hour 2070
Spreader
24 Tandem Road roller Rolling of Asphaltic surface Per Hour 1320
25 Pneumatic Road roller Rolling of Asphaltic surface Per Hour 1035
Pot-Hole repair
26 Repair of pot-holes Per Hour 750
machine
Bitumen boiler oil
27 Bitumen Spraying Per Hour 170
fired
28 GSB Plant 50 Cum Producing GSB Per Hour 920
29 Mastic Cooker Mastic wearing coat Per Hour 52
Batching and Mixing
Plant (a) 30 Cum Concrete mixing Per Hour 2130
30 capacity
(b) 15 - 20 Cum
Concrete mixing Per Hour 1670
capacity
Transportation of concrete
31 Transit mixer Per Hour 1150
mix
Concrete pump of 45
32 Pumping of Concrete Per Hour 630
and 30 cum
Cranes
(a) 80 tonnes 950
33
(b) 35 tonnes Lifting purpose Per Hour 630
(c) 3 tonnes 280
(d)Crane with grab
Well foundation Per Hour 1725
bucket 0.75 cum
(e)Crane with grab
Well foundation Per Hour 2875
bucket 1 cum
34 Concrete bucket For pouring concrete Per Hour 12
132
COMMON SSR 2008-09
ANNEXURE
133
COMMON SSR 2008-09
ANNEXURE
134
COMMON SSR 2008-09
ANNEXURE
Note: In respect of Black Galaxy Granite, Incentive of Rs.250(Rupees two hundred and
fifty)per Cubic meter is allowed for the Blocks above 75 cms provided they are processed in
the Granite industry within State/Country
135
COMMON SSR 2008-09
ANNEXURE
SCHEDULE – II
NOTE: -
1) The above rates are liable to be revised and amended from time to time by
the State Government by Notification in the Andhra Pradesh Gazette.
2) In case of revision the revised rates as fixed by Mines and Geology
Department have to be adopted.
136
COMMON SSR 2008-09
Copy of
ABSTRACT
I & CAD Department – Scrapping of manual rate of earth work from the estimates
- Adoption of the machine rate in all cases for earth work excavation where the
quantity exceeds 1000 cum – Amendment to Para 1.05 of Annexure.I of
G.O.Ms.No.23, I & CAD (PW) Department dated: 05-3-1999 – Orders – Issued.
***
ORDER:
2. This order issues with the concurrence of Finance (Works & Projects)
Department vide their U.O.No.7335 / F8 (2)/2002-1, dated:18-11-2002.
J.HARINARAYAN
PRINCIPAL SECRETARY TO GOVERNMENT